Texas Archival Resources Online

TABLE OF CONTENTS


Descriptive Summary

Historical Note

Scope and Content Note

Organization of Collection

Restrictions

Index Terms

Related Material

Administrative Information

Description of Series

Administration

Project Files

Reports/Studies

Public Relations

Legal Department

Publications

Photographic Materials

Audiovisual

Oral Histories

Historical Research Materials

Other Water Agencies

Addition of June 2016 (Accession 2016-035)

University of Texas San Antonio

A Guide to the San Antonio River Authority Records, 1920-2014



Descriptive Summary

Creator: San Antonio River Authority.
Title: San Antonio River Authority Records
Dates: 1920-2014
Creator Abstract: Formed in 1937 by the Texas State Legislature, the San Antonio River Authority (SARA) conserves and protects the water supply in the San Antonio River basin in Bexar, Goliad, Karnes, and Wilson counties and manages flood control.
Content Abstract: The San Antonio River Authority records consist of reports, project materials, correspondence, maps, surveys, minutes and newsletters. Also included are newspaper clippings, photographs and theses.
Identification: MS 331
Extent: 253.5 linear feet (250 boxes, 19 oversize folders, and 345 GB of electronic records)
Language: Materials are in English.
Repository: University of Texas at San Antonio Libraries Special Collections

Historical Note

The San Antonio River Authority (SARA) conserves and protects the water supply in the San Antonio River basin in Bexar, Goliad, Karnes, and Wilson counties and manages flood control. It was formed in 1937 by the Texas State Legislature, and was originally called the San Antonio River Canal and Conservancy District. It was created to develop a barge canal from the Gulf Coast to the city of San Antonio, and in 1939, its functions were expanded to flood control. The organization was renamed the San Antonio River Authority in 1953.

Over the years the functions of SARA have expanded and changed. Due to extreme flooding in San Antonio in 1946, the agency’s navigation studies were discontinued to focus on flood control efforts. This redirection was reflected in the 1954 Flood Control Act approved by Congress, which charged SARA with overseeing the San Antonio Channel Improvements Project (SACIP). The SACIP was developed to widen, straighten, and deepen the channels of the San Antonio River and its four tributaries creeks in metropolitan San Antonio; Alazan, Apache, Martinez, and San Pedro creeks.

SARA acted as the local sponsor for the SACIP, voicing local concerns and interests, providing required land and easements, relocating utilities, and building bridges and other betterments for the beautification of San Antonio. The United States Army Corps of Engineers (USACOE) constructed the flood control channels at Federal expense and the City of San Antonio (CSA) maintained all structures. The completed project aimed to provide 31 miles of channel and 55 bridges, and protect over 2,600 acres of urban area. The project was broken down into 10 units (found in Scope and Content) and was in construction over the last half of the 20th century.

In 1961, SARA added Wilson, Karnes, and Goliad counties to its jurisdiction. SARA became an active agent in the communities it served with the increase of funds in the 1960s and 1970s. SARA created several new programs including water supply projects, water quality studies, and sewage treatment projects such as the Salatrillo and Martinez Wastewater Treatment Plants. SARA’s commitment to water quality became apparent when they litigated against eight polluters of the San Antonio River Basin basin. During this time, they also began to develop infrastructure and amenities in various lakes and parks, and supported the creation of the San Antonio Missions National Historic Park by transferring several areas of land to the park. In the 1980s SARA was influential in water quality by advocating for sewage treatment improvements by the City of San Antonio, and created the San Antonio River Industrial Development Agency (SARIDA) which issued tax-free revenue bonds to qualifying enterprises developing in SARA’s jurisdiction. In the 1990’s, SARA focused heavily on the construction of the San Antonio River and San Pedro Creek tunnels.

The end of the 20th century saw the planning and development of the San Antonio River Improvements Project (SARIP). This project lasted through 2016 and included the redevelopment of a 13-mile stretch the San Antonio River. As of 2016, SARA’s focus was on ecosystem restoration, community outreach, and recreation projects, along with other flood control ventures.

All 26 dams in Bexar County are operated by SARA as well as 13 dams and reservoirs in Karnes County. Two major reservoirs in the San Antonio River watershed include Victor Braunig Lake and Calaveras Lake.

The stated goals of SARA are to: exemplify environmental leadership, stewardship and expertise; enhance community appreciation for the environmental resources of the San Antonio River and its tributaries; and deliver valued public service and advance a sustainable environment. They undertake these goals through community outreach and education, ecosystem protection, property management, and flood prevention and river recreation projects.

Some of the more prominent projects of SACIP include:

  • San Antonio River and San Pedro Creek Tunnels (Units 7, 8): As the conventional means of widening and deepening the channels proved to be too costly, disruptive, and hydraulically and geometrically complex in certain areas, another crucial part to the SACIP was the development of the San Antonio River and San Pedro Creek Tunnels (SART and SPCT) which were constructed in the late 1980s and 1990s. (Note: When looking for information about the tunnels, please search under the SACIP SAR and SPC Tunnels project section and additional tunnel information in SACIP Units 7-3-1, 8-4, 8-5.)
  • Olmos Dam Reconstruction (Unit 10): The reconstruction of the Olmos Dam began in 1979. SARA acted as a project participant and the construction coordinator for the reconstruction. The project included strengthening and anchoring the dam, modifying the gate operations, providing an emergency spillway, relocating Olmos Drive, providing a pedestrian walkway, and improving Devine Road.
  • Salado Creek Watershed Project: The Salado Creek Watershed Project was developed by SARA and the Alamo Soil and Water Conservation District (ASWCD) in 1958. Due to funding issues and extended time in surveying and public discussion, the project was not enacted by SARA and ASWCD until 1962. The responsibilities of SARA and ASWCD were to act as local sponsors and to obtain necessary land rights, relocate utilities, and operate and maintain the structures upon completion. There are 14 retention dams in the watershed.
  • San Antonio River Improvements Project (SARIP): SARIP was a project partnered by Bexar County, CSA, USACOE, SARA, and the San Antonio River Foundation, which focused on flood control, amenities, ecosystem restoration and recreational improvements to the San Antonio River. The project was broken down into sections: Downtown, Museum Reach, Mission Reach, and Eagleland. SARA served as project manager for all sections and as local sponsor for the USACOE for the Mission Reach portion. An oversight committee was appointed in 1998 to ensure public participation and representation, and to guide planning and implementation of the project. The project was completed in 2016 and restored 13 miles of the San Antonio River north and south of downtown.

Sources: San Antonio River Authority: About US, http://www.sara-tx.org/site/about.html and Handbook of Texas Online, San Antonio River Authority, http://www.tshaonline.org/handbook/online/articles/SS/mws2.html

Return to the Table of Contents


Scope and Content Note

The San Antonio River Authority records consist of reports, project materials, correspondence, maps, surveys, minutes, photographs, audiovisual materials, and historical research materials. Also included are newspaper clippings and publications including SARA newsletters, magazines, and brochures.

Return to the Table of Contents


Organization of Collection

This collection has had many additions which have been processed differently over time. The two arrangements are not entirely integrated. The records are organized into the following series:
Administration
Project Files
Reports and Studies
Public Relations
Legal Department
Publications
Photograph Materials
Audiovisual Materials
Oral Histories
Historical Research Materials
Other Water Agencies

Return to the Table of Contents


Restrictions

Access Restrictions

This collection is housed at UTSA's Hemisfair Campus and must be accessed via the Institute of Texan Cultures Special Collections reading room. To request access, please use the Collections Request Form.

Usage Restrictions

The researcher assumes full responsibility for observing all copyright, property, and libel laws as they apply.

Return to the Table of Contents


Index Terms

Organizations
San Antonio River Authority.
San Antonio River Authority--Board of Directors.
San Antonio City Water Board.
Texas Water Rights Commission.
Subjects
Aquifers--Texas--San Antonio Region.
Environmental policity--Texas.
Flood control--Texas--San Antonio River.
Geology--Texas--San Antonio Region.
Groundwater flow--Texas--San Antonio Region.
Groundwater--Texas.
Rivers--Texas--San Antonio.
Water resources development--Texas--San Antonio River Valley.
Water supply--Texas--San Antonio.
Locations
Bexar County (Tex.)
Goliad County (Tex.)
Karnes County (Tex.)
San Antonio (Tex.)
San Antonio River (Tex.)
San Antonio River Valley (Tex.)
San Antonio River Watershed (Tex.)
Wilson County (Tex.)
Genres/Formats
Correspondence.
Clippings.
Maps.
Reports.
Surveys.
Minutes.
Pamphlets.
Newsletters.
Memorandums.
Theses.
Local Subjects
San Antonio History
Urban Development and Growth

Return to the Table of Contents


Related Materials

UTSA Libraries Special Collections maintains photographs, in several of our collections, related to the San Antonio River. Provided below are links to digitized content by topic.

Photographs of the San Antonio River

Photographs of San Antonio River construction

Photographs of San Antonio River flooding

Return to the Table of Contents


Administrative Information

Preferred Citation

[Identification of item], San Antonio River Authority Records, MS 331, University of Texas at San Antonio Libraries Special Collections.

Acquisition Information

Received from San Antonio River Authority in 7 accessions from 2010 to 2016.

Processing Information

Original accession 2010-016 processed by Melissa Gohlke, Graduate Assistant, October 2010-January 2012

Accessions 2011-032, 2011-038, 2011-043, 2011-064, 2012-009, and 2014-037 processed by Abra Schnur and Gina Watts, June-August 2016.

Accession 2016-035 (22 boxes) is unprocessed and can be found at the end of the finding aid. The electronic records have not been processed and are not included.

Return to the Table of Contents


Detailed Description of the Collection

Administration

The Administration series contains correspondence, minutes, employment documents, real estate documents, bonds, and reports specific to the general and financial operations of SARA. Also included are materials related to the organizational structure of the San Antonio River Authority.
Administration materials are arranged chronologically within subseries.
Box
23 Correspondence
Victoria Chamber of Commerce,1938
Box
19 Assorted (includes related documents), 1938
Box
22 Assorted,1938
View contents
Box
19 Capt. B.C. Clarke, Army Corps of Engineers,1938-1939
Luncheon for Major Gen. Julian L. Schley,1938-1939
Assorted,1938-1939
Col. F.S. Besson, Army Corps of Engineers,1938-1942
Box
22 G.J. Lucchese,1939
Box
19 Capt. F.F. Chadwick, Corps of Engineers,1939
Box
22 Assorted,1939-1940
Box
23 Waterways Journal correspondence,1938-1942
John Weber,1939-1943
Box
19 One hundred and fourth anniversary celebration of the signing of the Texas Declaration of Independence,1940
Box
22 Reagan Houston,1940-1943
Box
19 Assorted,1941
Lt. Col. L.H. Hewitt, Army Corps of Engineers,1941-1942
Box
38 Henry B. Gonzalez,1959-1968
Box
13 Karnes County,1966
View contents
Box
15 Awards and recognition,1966-1969
Box
7 Assorted,1966-1969
Box
39 Abraham Kazen,1967-1969
Congressman O.C. Fisher,1967-1970
Box
12 City of San Antonio,1968-1969
Box
39 Ralph Yarborough,1968-1970
Senator John Tower,1969-1982
Box
13 Bexar County,1969-1979
Box
38 Henry B. Gonzalez,1969-1979
Box
39 Abraham Kazen,1970-1982
Henry B. Gonzalez,1971-1978
Box
17 Includes related documents,1971-1986
Box
10 Assorted,1971-1986
Texas Water Pollution Control Compact,1972
Box
12 City of San Antonio,1973
Box
39 Senator Lloyd Bentsen,1974-1992
Box
12 City of San Antonio,1975-1979
Box
18 Public information,1975-1979
Box
1 Assorted,1976-1982
Box
29 Bill for sewer services,1978
Box
39 Governor William Clements,1979-1982
Box
18 Public information,1980-1988
Box
38 Henry B. Gonzalez,1980-1988
Box
39 Henry B. Gonzalez,1980-1989
Tom Loeffler,1981-1984
Box
11 Assorted,1984
Box
39 Phil Gramm,1985-2000
Box
12 City of San Antonio,1986
Box
39 Albert Bustamante,1987-1992
Box
18 Public information,1989-1991
Box
39 Assorted political,1989-1995
Box
15 Awards and recognition,1989-2000
Box
39 Cyndi Taylor Krier,1990-1991
Henry B. Gonzalez,1990-1999
Box
18 Public information,1992-1999
Box
17 Assorted,1995-1997
Box
39 Kay Bailey Hutchison,1995-2000
Box
47 Congressman Ruben Hinojosa with photograph, 1999
Box
81 Congressional representatives,2002
Box
48 Assorted,2003-2009
Box
59 Assorted,2003-2010
Box
81 Christmas cards with illustrations of famous San Antonio landmarks, undated
Box
91 Board of Directors Correspondence including news clippings and agreements,1982-1989
Board of Directors Correspondence including minutes, agreements, and legal documents,1984-1986
Box
99 SARA Board of Directors,1990-2000
Box
91 Board of Directors Misc. Correspondence including reports and legal documents,1992-1994
Box
103 Fiscal Year 2005 Planning,2004-2005
Fiscal Year 2006 Planning, SACIP, SARIP,2005-2006
Fiscal Year 2007 Planning,2006-2007
Box
28 Minutes
November 1970-January 1971
Box
17 Olmos Dam studies meeting,August 1977
View contents
Box
5 Board of DirectorsJune 20, 1979
Box
17 Meetings and Workshops
Small watershed workshop,1966
Small watershed workshop,1967
Urban Hydrology Research Council meeting,1968
View contents
Box
59 Assorted Programs, 1996-2005
Box
81 Board meeting presentation notes and sign-in sheets,2003-2005
Box
83 Communication Committee packets,January-February 2006
Fiscal Committee packets,January-August 2006
Executive Committee packets,January-August 2006
Box
81 Board and Committee meeting notices,January-December 2006
Board Agenda packets,April-May 2006
Board Agenda packets,June 2006
Board Agenda packets,August 2006
Operations committee packet,January-August 2006
Box
64 Reports
Maps, charts of water surface storage,1913, 1933 and undated
Box
19 Medina and Leon Rivers Storage,1913 and undated
Box
20 General factors-territory and population,1930-1943
Flood Control,1932-1949
Box
22 City Water Department rules and regulations,1934-1937
Box
19 Economic facts and exhibits,1936-1939 and undated
Effluent and water resources reports,1936-1941 and undated
Box
20 San Antonio Public Service Company,1936-1939
Box
15 "Flood Damages in Texas,"1937
Box
20 San Antonio River Canal,1937-1938
San Antonio River Pollution,1937-1938
Kendall County brief,1938
Soil Erosion,1938 and undated
Box
19 Rate analysis and exhibits,1938 and undated
Box
20 Seguin brief,1938 and undated
Various exhibits,1938-1939 and undated
Measurement of Water in San Antonio River,1938-1940
Soil conservation in Wilson County,1939
Railroad brief (of protest),1939
Box
19 Water storage supply,1939
Stream pollution investigation including correspondence, mailing list,1939 and 1946
Box
20 Potential of hydro-electric power,1940
Box
19 Water supply and water storage reserve,1940-1941
Box
20 General factors-wealth,1940-1943
Box
81 "Report on the Flood of September-October 1946 on the San Antonio River and its Tributaries, Texas,"1946
Box
20 Flood control,1950-1954
Box
30 Summary of procedure,1951
Box
15 "A Statement of the Objectives and Policies of the San Antonio River Authority,"1960
Box
29 To the Commissioner's Court of Bexar County,1960
Box
30 Statement of objectives and policies,1960
Box
29 Standard Practice Bulletin,1961
Box
81 "San Antonio's Surface Water Problem,"1962
Box
30 Bylaws,1963
Box
29 Waste treatment volume 1,1964
Waste treatment volume 2,1964
Box
81 "Public Water Organizations in Bexar County and Surrounding South Texas Area,"1964
Box
1 Salary cost for services,1964-1965
Box
28 Statement of policy,1965
Box
30 Converse waste treatment service,1965
Box
29 Standard Practice Bulletin,1967
Box
30 Standard Practice Bulletin,1967
Box
13 Wilson County Development Plan,1967-1974 and undated
Box
80 "A Brief on the Acequias of San Antonio,"1968
Box
29 Regional sewage system study,1969
Box
19 Water analysis reports,1970-1979
Box
29 Planning methodology,1972
Box
19 Article inThe Appraisal Journal,1974
Box
13 Sewage regulations,1975
Box
15 Article 8280-119 and the by-laws of SARA,1976
Box
64 Project flow charts,1979-1982
Box
29 SARA bylaws,1981
Box
15 Photos for feasiblity study for old United States Arsenal in San Antonio,1981-1982
Feasiblity study for old United States Arsenal in San Antonio,1982
Cost tracking data,1982
Box
80 Archaeological investigations at Fort Sam Houston Cemetary,1982
Box
48 Fifty year history report,1987
Box
15 By-laws,1988
Box
80 Resolutions of the River Corridor Workshop,1989
Box
47 Prints for annual reports,1990 and undated
Box
80 Report of the River Corridor Workshop,1991
Box
17 Factsheets,1995 and undated
Article on Kuala Lumpur,1996
Box
48 Sixty year history report, 1997
Box
81 "Board Policies, Manager's Policies, and Manager's Instructions,"2000
Box
49 Annual report,2002
Box
81 Federal applications,2002
Box
17 Annual reports,2001-2004
Box
44 Annual report cover page and notes,2002
Box
81 Federal applications,2003-2005
Box
37 San Antonio River Basin highlights,2010
Box
19 Assorted reports, undated
Box
15 History of SARA directors, undated
Financial ledger, undated
Blank letterhead, undated
Box
17 Hydraulic profile comparison, undated
Box
19 Effluent treated at sewage plant, undated
Box
20 Trading area, undated
Hydrographic charts, undated
Box
64 Diagrammatic sketches of the Guadalupe Colorado Rivers, undated
Box
23 List of San Antonio companies, undated
Box
29 Organizational chart, undated
Box
46 Annual report negatives, undated
Box
86 Report of SARA to the Commissioners' Court,1960
Box
116 Proposal to SARA for a River Channel Improvement Feasibility Study,1978
Box
205 Annual Reports for 1986,1987,1991,1992,1993,1994,1995,2002,1986-2002
History of SARA Report,1987
Box
116 Recommendations of the River Corridor Workshop,1989
Box
103 Preliminary Technical Evaluation of Ecleto Creek Reservoir Site,2001
Box
98 Management Audit Report,2002
Financial Reports
Box
34 Audit reports,1951-1960
Audit reports,1961-1963
Audit reports,1964-1968
Audit reports,1968-1970
Box
38 Annual budget,1969
Box
34 Audit reports,1969-1971
Box
38 Annual budget,1970
Box
32 Operating statement,1970-1971
Box
38 Annual budget,1971
Box
32 Operating statement,1971-1972
Box
38 Annual budget,1972
Box
37 Annual financial reports,1972-1979
Box
38 Annual budget,1973
Box
32 Operating statement 4th quarter, fiscal year 1974,1973-1974
Box
38 Annual budget,1974
Box
32 Operating statement 4th quarter, fiscal year 1975,1974-1975
Box
37 Annual budget,1975
Annual budget,1976
Box
32 Operating statement 1st quarter, fiscal year 1977,1976-1977
Box
37 Annual budget,1977
Box
38 Annual budget,1978
Box
37 Annual budget,1979
Box
33 Operating statement,1979-1981
Box
37 Annual budget,1980
Annual financial report,1980
Annual budget,1981
Box
38 Annual financial report,1981
Box
37 Annual budget,1982
Box
33 Audited financial statements,1982-1983
Box
38 Annual financial reports,1982-1984
Box
36 Annual budget,1983
Box
32 Operating statement 4th quarter fiscal year 1984,1983-1984
Box
36 Annual budget,1984
Box
33 Cumulative operating statement through 4th quarter fiscal year 1985,1984-1985
Audited financial statements,1984-1986
Martinez/Salatrillo Sewage System audited financial statements,1984-1987
Box
36 Annual budget,1985
Box
38 Annual financial report,1985
Box
32 Cumulative operating statement through 4th quarter fiscal year 1986,1985-1986
Box
36 Annual budget,1986
Box
32 Cumulative operating statement through 4th quarter fiscal year 1987,1986-1987
Box
33 Federal Financial Assistance Programs,1986-1987
Audited financial statements,1986-1987
Box
36 Annual budget,1987
Box
33 Cumulative operating statement 4th quarter fiscal year 1988,1987-1988
Box
32 Second quarter report,1988
Box
33 Audited financial statements,1988
Box
36 Annual budget,1988
Box
38 Annual report,1988
Box
33 Cumulative operating statement 4th quarter fiscal year 1989,1988-1989
First quarter report,1989
Audited financial statements,1989
Box
36 Anuual budget,1989
Box
37 Annual report,1989
Box
33 Fourth quarter report,1989-1990
Audited financial statements, Federal Assistance Programs,1990
Box
37 Annual budget,1990
Annual financial report,1990
Box
33 Fourth quarter report,1990-1991
Box
34 Audited financial statements,1991
Box
37 Annual budget,1991
Box
39 Annual financial report,1991
Box
33 Fourth quarter report,1991-1992
Box
34 Federal Financial Assistant Programs,1991-1992
Martinez/Salatrillo Sewage System audited financial statements,1991-1993
Audited financial statements,1991-1993
Box
37 Annual budget,1992
Box
39 Annual financial report,1992
Box
35 Fourth quarter report,1992-1993
Box
34 Internal Conrol Structure and Compliance schedule of expenditures,1993-1994
Box
35 Fourth quarter report,1993-1994
Box
39 Annual financial report,1993
Box
40 Annual budget,1993
Annual budget,1994
Box
35 Fourth quarter report,1994-1995
First and second quarter reports,1994-1995
Third and fourth quarter reports,1994-1995
Box
34 Financial statements,1994-1996
Martinez/Salatrillo Sewage System audited financial statements,1993-1998
Box
36 Annual report,1994
Annual report,1995
Box
39 Annual budget,1995
Box
35 Fourth quarter report,1995-1996
Box
36 First and second quarter,1995-1996
Third and fourth quarter,1995-1996
Box
35 Investment porfolio,1996
Box
26 Annual report,1996
Box
39 Annual budget,1996
Box
34 Schedule of expenditures for Senate Bill 818 projects,1996-1997
Box
36 Fourth quarter report,1996-1997
Box
35 Investment porfolio,1996-1998
Box
34 Management audit,1997
Box
36 Comprehensive annual report,1997
Box
39 Annual budget,1997
Box
34 Financial statements,1997-1998
Box
35 Fourth quarter report,1997-1998
Investment activity,1998
Box
36 Comprehensive annual report,1998
Box
39 Annual budget,1998
Box
35 Cumulative operating statement,1998-1999
Box
36 Comprehensive annual report,1999
Box
39 Annual budget,1999
Box
35 Cumulative operating statement,1999-2000
Box
32 Investment activity for the 2nd quarter,2000
Box
35 Cumulative operating statement 2nd quarter,2000
Box
36 Comprehensive annual report,2000
Box
40 Annual budget,2000
Box
35 Investment activity,2000-2001
Box
36 Annual report,2001
Box
40 Annual budget,2001
Box
34 Management audit,2002
Box
38 Comprehensive annual financial report,2002
Box
40 Annual budget,2002
Box
35 Cumulative operating statement,2002-2003
Box
38 Comprehensive annual financial report,2003
Box
40 Annual budget,2003
Box
35 Cumulative operating statement,2003-2004
Investment activity,2004
Box
37 Comprehensive annual financial report,2004
Box
40 Annual budget,2004
Box
35 Cumulative operating statement,2004-2005
Box
83 Annual budget,2004-2005
Box
37 Comprehensive annual financial report,2005
Box
43 Fourth quarter report,2005
Box
81 Annual budget,2005-2006
Box
40 Annual budget,2006-2007
Box
83 Annual budget,2007-2008
Box
37 Program budgets,2009
Box
81 Program budgets,2009
Annual budget detail,2009-2010
Executive summaries and five year service and financial plan fiscal years 2010-2014,2009-2010
Program budgets,2010
Executive summaries and five year service and financial plan fiscal years 2010-2015,2010-2011
Annual budget detail,2010-2011
Box
37 Project maps for financial reporting,2010-2011
Box
86 Review and Status of SARA activities,1970
Box
205 Federal Reserve Bank Acknowledgements,1992-1997
Box
98 Sylvia Romo CPA, 2001-2005 Tax Statements,2001-2005
Box
204 Annual Budget Report,2004-2005
Box
98 Cumulative Operating Statement,2005
Cumulative Operating Statement,2005-2006
Box
205 Comprehensive Annual Financial Report,2006
Comprehensive Annual Financial Report,2007
Comprehensive Annual Financial Report,2008
Letter of Conduct on Audit,2008
Box
204 Annual Budget Report,2008-2009
Bonds
Box
205 Martinez-Salatrillo Creeks Sewage System Revenue Bonds Series 1969,1969-1992
Martinez-Salatrillo Creeks Sewage System Revenue Bonds Series 1972,1972-1998
Improvement Bond, New Series 1973,1973-1998
City of Kenedy Contract Revenue Bond, Series 1974,1974-2002
Improvement Bond, New Series 1975,1975-1998
Improvement Bond, New Series 1977,1977-1998
Box
97 SARIDA Revenue Bonds, Series 1980, (Dreco Inc. Project),1980
SARIDA Revenue Bonds, Series 1980, (The Roegelein Company Project),1980
SARIDA Revenue Bonds, Series 1980, (Amerdyne Central, Inc. Project),1980
SARIDA Revenue Bonds, Series 1980, (Fiber Glass Systems, Inc. Project),1980
Box
98 SARIDA (Atherton Properties, Inc. Project) Revenue Bonds Series 1980,1980
Box
96 SARIDA Revenue Bonds, Series 1981, (Lack Properties Inc. Project),1981
SARIDA Revenue Bonds, Series 1981, (S and B Properties Project),1981
SARIDA Revenue Bonds, Series 1981, (South West Research Institute Project),1981
SARIDA Revenue Bonds, Series 1981, (Alamo Cement Company Project),1981
SARIDA Revenue Bonds, Series 1981, (Willis Cox Associates Project),1981
Box
97 SARIDA Revenue Bonds, Series 1981, (Lone Star Brewing Co., Inc.),1981
SARIDA Revenue Bonds, Series 1981, (Clarke Graphic),1981
Box
98 SARIDA (Refrigeration Engineering, Corp Project.) Revenue Bonds Series 1981,1981
Box
100 SARIDA Revenue Bond, Series 1981, (Crown Zellerbach Corporation Project),1981
Box
101 SARIDA Revenue Bond, Series 1981, (Capitol Cold Storage, LTD. Project),1981
SARIDA Revenue Bond, Series 1981, (Ambus Properties, Inc. Project),1981
SARIDA Revenue Bond, Series 1981, (Champion International Corporation),1981
SARIDA Revenue Bond, Series 1981, (Alcon laboratories, Inc. Project),1981
SARIDA Revenue Bond, Series 1981, (Clarke Checks, Inc. Project),1981
SARIDA Revenue Bond, Series 1981, (Wilson, Wilson and Rowland Project),1981
Box
93 SARIDA Revenue Bond Series 1982 (7 documents),1982
Box
94 SARIDA Revenue Bonds, Series 1982, (Purvis Bearing, Inc. Project),1982
SARIDA Revenue Bonds, Series 1982, (Motor Parts Depot, Inc. Project Genuine Parts Company, Obligor),1982
Box
95 SARA Pollution and Control Revenue Bonds (Capitol Aggregates, Inc. Project), Series 1982,1982
SARIDA Revenue Bond Series 1982, (George Braun Parking Company Project).,1982
SARIDA Revenue Bond Series 1982 (Capitol Aggregates, Inc.Project).,1982
SARIDA Revenue Bonds, Series 1982 (Texan-Cattleman’s Square, LTD Project). Volume I of II.,1982
SARIDA Revenue Bond, Series 1982 (Southwest Airlines, Company Project). Volume I of II.,1982
Box
96 SARIDA Revenue Bonds, Series 1982, (Penland Distributors, Inc. Project),1982
SARIDA Revenue Bonds, Series 1982, (Sysco Food Srvcs, Inc. Project), Volume I of II,1982
Box
102 SARIDA Revenue Bond Series 1982 (Labatt Institutional Supply Company Project),1982
SARIDA Revenue Bond Series 1982 (Motor Parks Depot, Inc. Project),1982
Box
98 SARIDA Revenue Bond Series 1984 (Milhous Leasing Company Project),1984
Box
102 SARIDA Revenue Bond Series 1984, (Lancer Corporation Project).,1984
SARIDA Revenue Bond Series 1984, (Champion International Corporation Project),1984
SARIDA Revenue Bond Series 1984 (Crown Zellenbach Corporation Project),1984
Box
100 SARIDA Revenue Bonds, Series 1985, (Southwest Research Institute Project.,1985
SARIDA Revenue Bonds, Series 1985, (Hill Leasing, Inc. Project),1985
Box
98 SARA Channel Improvement Revenue Bonds, Series 1987,1987
Box
92 SARA Channel Improvement Revenue Bonds Series 1987,1987-1999
Box
100 SARIDA Revenue Bonds, Series 1988, (Southwest Research Institute Project),1988
Box
92 SAR Industrial Development Authority Revenue Bonds (Colin Medical Instruments Project),1989
Box
95 SAR Channel Improvement Refunding Bond Series, 1989,1989
Box
92 SARA Channel Improvement Refunding Bond series 1989,1989-1998
Box
85 Bexar County Bond Contract Amendment,1990
Box
98 SARIDA Revenue Refunding Bonds Series, 1990 (Southwest Research Institute Projects) and SARIDA Revenue Bonds Series 1990 A (Southwest Research Institute Volume II).,1990
Box
100 SARIDA Revenue Refunding Bonds, Series 1990 (Southwest Research Institute Projects) and SARIDA Revenue Bonds, Series 1990 A, (Southwest Research Institute Vol. I),1990
Box
94 SARA Channel Improvement Revenue Bond, Series 1991,1991
Box
100 SARIDA Revenue Refunding Bonds, Series 1991, (Sysco Food Services San Antonio Project),1991
Box
94 SARA Channel Improvement Refunding Revenue Bonds, Series 1992,1992
Box
92 SARA Channel Improvement and Refunding Revenue Bonds 1992,1992-2003
Box
94 SARA Martinez-Salatrillo Creeks Sewage Systems Refunding Revenue Funds, Series, 1993,1993
SARA Channel Improvement Taxable refunding revenue Bond Series, 1993 A, SARA Refunding revenue Bonds, Series 1993 B,1993
Box
92 SARA Martinez-Salatrillo Creek Sewage Water System Refunding Bonds Series 1993,1993-2003
SARA Channel Improvement Refunding Revenue Bond Series 1993 B,1993-2003
Box
94 SARA Channel Improvement Revenue Bonds Series, 1994,1994
Box
92 SARA Channel Improvement Refunding Revenue Bond Series 1994,1994-2004
Box
94 SARA Channel Improvement Junior Revenue Bonds, Series 1995,1995
Box
92 SARA Channel Improvement Junior Lien Revenue Bonds Series 1995,1995-1996
Box
94 SARA Channel Improvement Channel Improvement Refunding Revenue Bonds, Series 1996,1996
Box
205 Texas Commerce Bank/Chase Securities Investment Correspondence,1996
Channel Improvement and Refunding Revenue Bonds, Series 1996,1996
Box
92 SARA Channel Improvement Refunding Revenue Bonds Series 1996.,1996-2004
Box
94 SARA Martinez-Salatrillo Sewage Systems Revenue Bonds Series, 1998,1998
Box
98 SARA Channel Improvement Revenue Bonds Series 1998.,1998
Box
92 SARA Martinez-Salatrillo Creeks Sewage System Revenue Bonds, Series 1998.,1998-2004-2008
SARA Channel Improvement Refunding Revenue Bonds Series 1998,1998-2004-2008
SARA Channel Improvement Bonds Series 2000,2000-2004
SARA Channel Improvement Revenue Bonds Series 2000,2000-2005
SARA Channel Improvement Revenue Bonds, Series 2002,2002-2004
SARA Channel Improvement Revenue Bonds Series 2002,2002-2007
Box
95 SAR Martinez-Salatrillo Creeks Sewage Improvement Bonds, Series 2003,2003
Box
98 SARA Channel Improvement Revenue Refunding Bond Series 2003 A and Taxable Series 2003 B.,2003
Box
92 SARA Channel Improvement Revenue Refunding Bonds, Series 2003A,2003-2004
SARA Martinez-Salatrillo Creeks Sewage System Revenue Refunding and Improvement Bond, Series, 2003,2003-2008
SARA Channel Improvement Revenue Refunding Bonds, Series 2003A.,2003-2008
SARA Martinez-Salatrillo Creeks Sewage System Revenue Refunding and Improvement Bond,2003-2008
Box
94 SARA Channel Improvement Refunding Revenue Bond, Series 2004,2004
Box
92 SARA Public Facility Corp. Bond Series, 2005, Volume I,2005
SARA Public Facility Corp. Bond Series, 2005, Volume II,2005
SARA Channel Improvement Revenue Refunding Bonds Series 2007,2007
Real Estate Files
Box
223 SACIP Unit 3, ESMT and Deed, ID#s 282-316, 2098, 2167-2173, 2187, 2693-2699,1954-2009
Box
221 SACIP Unit 8 - Perry Deed ID# 2462,1968-1984
Zion Evangelical Agreement ID# 3128,1986-2003
Box
103 Brackenridge Park Deeds,1987-2005
Box
221 Salatrillo, ESMT ID#s 1611, 1620-1628,1989-2003
Lower Salatrillo, ESMT ID#s 1581-1596, 1617,1993
FEMA - Mauldin Deed ID# 2357,2001
WWTP - Crank Deed ID# 1743,2006
Rutherford Lease ID# 3165,2007
Rodriguez Butcher Supply Lease ID# 2824,2007-2008
Box
222 Espada Road ESMT ID# 3143,2008
Box
221 Alamo Model Boaters Lease ID# 3166,2009
SAR Nature Park - Castillo Deed ID# 2964,2009
Branch/Goliad ESMT ID# 2959,2009
Box
220 River Crossing Easements, Bexar, Karnes, Wilson, ID#s 3013-3045,2009-2012
Box
221 Calaveras Lake, ESMT ID#s 3073-3076,2010
Edward's Aquifer Lease ID# 3164,2010
Box
217 Salatrillo Reuse Facility, ESMT ID#s 3125-3138,2011
Box
222 Wilson, Huffman-Deed ID# 3145,2011
Box
219 Salatrillo Reuse Facility, ESMT ID#s 3113-3124,2011-2012
Box
222 Graytown WWCS ESMT ID#s 3139-3142, 3146,2011-2012
River Crossing Easements, Bexar, Goliad, Karnes, Wilson, ID#s 3077-3094,2012-2014
Wildlake Dam ESMT ID# 3144,2013
Box
218 Karnes County, ESMT ID# 3095-3112, 3187-3191, 3193-3196,2014
Wilson County, ESMT ID# 3192,2014
Box
23 Employment Documents
Fair Labor Standards,1938
Box
16 1961-1965
1970-1989
Box
43 Employee Health Benefit Meeting videocassette, 1997
Box
81 Assorted employee documents,2006
Box
15 Employee profiles, undated
Box
85 SARA Article 8280-119,1961
Box
142 SARA Candidate/Officeholder Paperwork,1988-1999
Box
D21 SARA computer hardware organization chart,1999
Box
19 Artifacts and Ephemera
Responses for hearing, exhibit tags,1939
Box
47 1971, 1992 and undated
Box
48 1980, 1998-2002 and undated
Box
46 1995-2000
Box
56 Museum Reach grand opening t-shirts, 2009
Box
55 Regional Water Alliance foam water droplet, undated
Box
56 Reusable tote, undated
Box
57 Brass nameplates, undated
Box
103 River. Life. Love it. T-shirts and medal,2011, undated

Return to the Table of Contents




Project Files

The Project Files series is the largest series in the SARA collection. The materials are organized by specific projects in alphabetical order. Materials are comprised of reports, photographs, maps, plans, surveys, correspondence, and related documents. The processing of this series took place over multiple years and includes many accessions and the arrangements have not been entirely integrated. When a project could not be easily placed with a SACIP unit, it was kept separate. For reference, the SACIP Unit assignments are as follows:
San Antonio River (SAR): Units 1, 8, 9, 10
San Pedro Creek (SPC): Units 2, 7
Martinez Creek: Units 3, 4, 6
Alazan Creek: Unit 4
Apache Creek: Unit 5
Box
3 Applewhite Reservoir
Box
1 Preliminary engineering report,1974
Questions and Answers report, memorandum,1976
Resolution,1981
Box
43 Applewhite KENS 5 Videocassettes,1991
Box
63 Braunig Lake
Well instalation,1979
Box
60 Improvements specifications and contract documents,1984
Box
62 Pcinic units and fish cleaning facilities contract documents,1986
Concession renovation,1986
Pier, parking, roads, and bank stabilization contract documents, 1987
Improvements specifications and contract documents,1988
Box
77 Boat docks and ramps improvement documents and specifications,2007
Fishing pier documents and specifications,2008
Courtesy dock documents and specifications,2008
Box
62 Photographs, undated
Box
19 Brazos River Project
Maps,1933
Correspondence,1935
Correspondence and reports,1935 and undated
Newsclippings,1936-1938
Correpondence,1938
Flood Control survey,1938
View contents
House Bill 489,1938
Excerpts from address by Governor of Nebraska,1939
Lawsuit,1940
View contents
Photographs of flood, undated
View contents
History, undated
Publicity Bureau documents, undated
Brazos Bill, undated
Overview and proposed plan, undated
Templates, undated
Box
59 Calaveras Lake
Box
63 Paving project,1979
Concession building and paving, 1979
Box
65 Improvements, 1983
Box
59 Contract documents,1984
Box
62 Road improvements contract documents,1985
Box
65 Road improvements contract documents and specifications,1997
Box
77 Boat docks and ramps improvement documents and specifications,2006
Parking lot improvement documents and specifications,2007
Box
1 Cibolo Project
Land deed,1947
Legal documents,1962-1966
Correspondence and early reports,1962-1964
Invitation for bids, 1964
Correspondence,1964-1971
Correspondence,1965
Reports,1965 and undated
Reports and correspondence,1965
Plan of borings and aerial view,1965 and undated
Plan of development,1967
Map,1969
Resolution for water rights,1971
Feasibility report,1971
Feasibility statement report,1971 and undated
Reports, environmental statement,1972
Texas Water Rights Commission registration forms for voing on hearing,1972
Correspondence and environmental statement,1972
Correspondence,1972-1973
Reports,1973
"Field Trip,"1973
Correspondence,1973-1974
Federal reports,1973-1974
Report from the Secretary of the Interior,1974
Report,1974
Correspondence,1974-1975
Information map,1975
Correspondence,1975-1976
Reports,1977-1981
Status reports,1981-1984
Reports, undated
Box
30 Question and answer, undated
Box
41 Prehistoric site distribution, undated
Possible historic structures, undated
Box
2 Cuero Project
Correspondence,1962-1963
Permits,1964
Study,1964
Field draft report,1964
Report,1964
Timetable,1964
Resolution,1965
Correspondence,1964-1966
Correspondence,1964-1969
Plans of Development,1965
Appendix to Plans of Development,1965
Correspondence,1971
Newsclippings,1984
Box
41 Prehistoric site distribution maps, undated
Possible historic structures, undated
Box
2 Goliad County
Goliad Reservoir correspondence,1961-1965
Goliad Reservoir legal documents, application for presentation,1962-1964
Goliad Reservoir reports and maps, 1970
Box
3 Goliad Reservoir correspondence,1974
Box
2 Goliad Reservoir correspondence,1984
Box
48 Goliad canoe trails correspondence, brochures, invitations, newsarticles, 2003-2009
Box
28 Goliad canoe trails assorted materials,2006
Box
76 Flood debris clean-up contract documents and specifications,2008
Box
77 Flood debris clean-up contract documents and specifications,2008
Box
43 Houston River Channel
Videocassette,1987-1988
Videocassette, undated
Box
3 Karnes City-Kenedy Water Supply
Correspondence, legal documents,1955-1962
Land rights report,1963-1967
Water supply preliminary report,1965
Project correspondence,1965-1967
Legal documents and correspondence,1967-1971
Comprehensive plan,1971
Preliminary engineering report,1976
Box
77 Flood debris clean-up contract documents and specifications,2010
Box
3 Comprehensive plan for water and sewer, undated
Falls City Dam and Reservoir site map, undated
Box
43 Nineteenth Street Dam
Videocassette of initial blasting views from east end of the proposed dam, May 1990
Videocassette,July 1995
Videocassette, undated
Box
48 Nueva Street Marina Dam
Box
64 Project manuals volumes 1 and 2,1983
Box
48 Photographs,1986 and undated
Box
60 Gate five stop log system contract documents, 1996
Box
30 Olmos Dam
Geotechnical investigation, 1977
Soil and foundation investigation,1978
Correspondence,1978
Box
32 Geological investigation,1978
Geological investigation appendix D,1978
Box
63 Olmos Drive relocationa and Devine Road detour,1978
Modifications Phase I and II contract documents and specifications, 1978
Modifications Phase I contract documents and specifications, 1978-1979
Box
64 Modifications Phase I and II drawings,1978-1979
Box
48 Photographs, 1979
Box
60 Gate operators contract documents,1989
Box
66 Instrumentations Controls project,1999
Box
45 Photographs, undated
Box
7 Salado Creek Project
Box
47 Review of Salado Creek Projects at HemisFair Plaza,1969
Box
7 Salado Creek Watershed Project photographs, reports, correspondence, agendas,1970-1978
Box
17 Salado Creek Project status report,1980
Box
46 Site photographs, 1982
Box
62 Site No. 7 contract documents,1985
Box
44 Salado site slides, 1987
Box
48 Project photographs, 1987
Box
60 Plans, specifications, bidding documents,1989
Box
65 Floodwater retarding dam contract documents,1990
Floodwater retarding structure documents,1990
Box
43 Videocassette storm event,April 1991
Videocassettes,1991
Box
48 Contact sheets, 1991
Box
60 Site no. 10, phase III contract,1995
Box
18 Salado Creek Watershed,1996 and undated
Box
46 Slides and negatives,1998
Site photographs,1998
Box
65 Site No. 15 R. Phase I contract documents, specifications, plans,1999
Box
66 Retarding dam contract documents and specifications,2003
Site No. 15R contract documents and specifications,2003
Box
44 Slides, undated
Box
46 Site photographs, undated
Box
24 San Antonio Bridges
Loop 13 Bridge
Specifications,1956
Shop drawings,1956-1957
Contractors estimates and payroll data,1956-1958
Test and inspection reports,1957-1958
Contracts, letting lists, specs,1957-1958
Correspondence,1956-1958
View contents
Box
25 Proposal for construction,1961
Contracts, correspondence and related, documents,1961
Mission Road Bridge
Invoices,1957-1962
Contracts, letting lists, specs,1960-1961
Mission cemetary fencing,1961
Inspection reports,1961-1962
Box
45 Photographs of bridge plaques, undated
Box
24 Ninth Street Bridge
Drawings, schematics, maps,1950-1953 and undated
Correspondence, contracts, and related documents,1951-1959
Specifications,1955
Contractor estimates,1955
Test and inspection reports,1955-1956
Correspondence and related documents,1955-1959
Contracts, letting lists, specs,1955-1960
Contracts and related documents,1960-1965
Theo Avenue Bridge
Box
25 Specifications,1957
Contractor estimates,1958-1959
Box
24 Correspondence,1958
Payroll account statements,1958
Test and inspection reports,1958
Contracts, letting lists, specs,1958-1959 and undated
White Avenue Bridge
Specifications,1956
Shop drawings,1956-1957
Correspondence,1956-1958
Contracts, letting lists, specs,1957-1958
View contents
Contractor estimates,1957-1958
Test and inspection reports,1957-1960
Payroll account statements,1957-1960
Box
64 Assorted Bridge Projects
Travis and Martin Street bridges contract documents and specifications,1982
Johnson Street pedestrian bridge contract documents and specifications,1982
Box
19 San Antonio Flood Control Tunnels
Statement of Compensation,1977
Box
43 Videocassette-Real estate parcels before acquistion or clearing for construction,1986
Box
19 Appraisal reports and related correspondence,1986-1987
Photographs of old houses, related newspaper articles,1987
Box
59 San Pedro Creek Diversion Tunnel demolition and site clearance contract,1987
Demolition and site clearance contract,1987
Box
61 Sale of tunnels spoils materials contract documents,1987
Box
48 Photographs and negatives, 1987-1988 and undated
Box
45 Photographs of tunnel construction,1989
Box
19 Correspondence and related documents,1989-1992
Box
48 Photographs, 1991-1992
Box
47 Construction photographs, 1992-1998
Proofs,1992-1998
Negatives,1992-1998
Slides, 1992 and undated
Box
43 Videocassette filmed from the Tower of the Americas-San Antonio Skyline and Tunnel route,July 1993
Box
59 Contract documents and specifications for Flood Gate instrumentation and and controls,1993
Construction agreement,1993
Specifications Volume I,1993
Specifications Volume II,1993
Specifications Volume III,1993
Box
61 Specifications Volume I-III,1995
Box
64 Drawings,1995
Box
77 Flood control contracts,1995-1996
Box
47 Prints of photographs,1996-1998
Photographs,1996-1998 and undated
Box
66 Tunnel outlet site soils and liner evaluation,1997
River Tunnel manual instrumentation/control project documents and specifications, 1997
Box
77 Local sponsor improvement documents and specifications, 1997
Box
79 Channel modifications engineering analysis report,1997
Box
80 Flood Control Channel modifications preliminary engineering analysis report,1997
Box
47 Photographs, undated
Box
42 Map, undated
Box
11 San Antonio Model Cities Program
Box
14 Quit Claim,1917
Box
11 Project meeting notes and agendas,1969
Apache Creek correspondence and related materials,1969
Box
9 Apache Creek correspondence and related materials,1969-1971
Apache Creek mailing lists, meeting notes,1970
Apache Creek correspondence and related materials,1971
Apache Creek correspondence and related materials,1971-1975
Box
14 HUD handbook, 1968
Box
9 Reports, correspondence, and related documents,1968
Reports, correspondence, and related documents,1968-1969
Box
14 "Major Events and Program Progress" narrative,1969
Resolution,1969
Box
9 Reports, correspondence, and related documents,1969-1971
Box
14 Apache Creek correspondence and related documents,1969-1971
Box
9 Reports, correspondence, and related documents,1970
Box
14 Quarterly Report,April-June 1970
Quarterly Report,July-September 1970
Correspondence and reports,1970
Guidelines for resident employment,1970
Box
9 Reports, correspondence, and related documents,1970-1971
Reports, correspondence, and related documents,1970-1972
Box
14 Quarterly Report,1971-1972
Apache Creek correspondence and related documents,1972-1975
Box
9 Reports, correspondence, and related documents,1972-1975
Box
13 Project Evaluation Report,1972
Box
14 Mid-planning statement, undated
"9 Components" report, undated
"A Comprehensive Demonstration Program," undated
Box
41 SARA Office Building and Hardscape Riverside
Box
45 Office construction photographs,1974
Box
42 H drawbar operator plans, 1977
Box
63 Re-roofing project,1982
Shop drawings,1986
Box
42 Plasteco skylight shop drawings,1986
Shelving unit guide form installation shop drawings, 1986
Office plans,1986
First floor plans,1986
Masonry shop drawings,1986
Shop drawings, specifications, correspondence, 1986
VSL shop drawings, product catalogs, 1986
Plans,1986-1987
Tezel and Carter shop drawings,1986-1987
Blueprints,1986-1987
Correspondence, shop drawings, plans,1986-1987
Correspondence, shop drawings, blueprints,1986-1987
Box
41 Mat testing and shop drawings, 1986-1987
Box
42 Architect's field orders,1986-1987
Correspondence, shop drawings,1986-1988
Blueprints, artist's rendering,1986-1988
Cost proposals,1986-1988
Basement, second floor plans, 1987
Window plans, 1987
Box
45 Addition photographs,1987
Box
42 Office partition plans,1987-1988
Box
41 Mat testing and shop drawings, 1987-1988
Box
42 Correspondence,1988
Box
41 WSCL consulting engineers reports, 1988
Contract documents and specifications, 1988
Inspector's project diary,1988
Correspondence and reports, 1988
Reports,1988
Project photographs and negatives,1988
Bid proposals,1988
Affidavits of payment,1988
H.B. Zachry Company bid proposal, 1988
Monthly estimates/change orders,1988
Inspection reports, 1988
Shop drawings, 1988
Field changes, 1988
Office equipment, 1988
Box
62 Contract documents and specifications, 1988
Box
41 Project accounting summary, 1989
Box
45 Office construction photographs,1989
Box
42 Phase II floor plan,1992
Box
46 Construction photographs,1994
Box
48 Contact sheet,1994
Box
76 Main office and environmental center facilities renovations project manual,July 2006
Box
42 Product data and information, undated
Box
41 Specifications for masonry cement, undated
Box
20 San Antonio River Canal
Correspondence
Correspondence, reports, and related documents,1928, 1937-1938
Box
21 1937-1939
Box
23 Tonnage,1938-1939
Box
21 1938-1940
Box
22 1938-1940
John W. Marlow,1938-1941
1938-1941
1938-1942
Legislative,1938-1942
Tonnage Traffic Survey,1938-1942
Box
21 M.L. Roark,1938-1943
Box
22 1938-1943
Box
21 Including related documents,1938-1944
Tom Connally,1939
With reports, and related documents,1939-1940
Box
22 River and Harbor Bill and related correspondence,1939-1943
Box
21 1939-1944
Box
22 With newsclippings,1940
Box
23 With inclusions,1940-1943
Box
22 1940-1944
Box
21 1941-1945
Box
23 1943-1948
Box
21 Reports
Box
22 Tonnage numbers in the San Antonio Light,1926
Box
21 Trinity River report,1937
Box
23 Reports on the Trinity River,1937
Box
22 Tonnage reports,1937-1938
Box
23 Tonnage reports,1937-1938
Box
22 Tonnage reports,1937-1938 and undated
Box
21 Hearing before the U.S. Army Engineers,1938
Texas Planning Board report, new release,1938
Box
30 Preliminary report,1938
Additional Information report,1938
Box
22 Reports and related documents,1938-1945
Tonnage report to Youngberg Associates,1940
Reports and related documents,1940-1945
Box
23 Tonnage reports,1941 and undated
Tonnage surveys,1941 and undated
Box
21 Army Engineers traffic and tonnage reports,1941-1942 and undated
Comptroller report,1942
Box
23 Tonnage survey,1942
Box
30 Preliminary report,1943
Box
23 Supplemental brief of applicant,1945
Box
80 Work underway, problems, and objectives, 1965
Box
21 Partial report, undated
Report, undated
Assorted reports,1938-1940 and undated
Maps and Blueprints
Blueprints,1923-1925
Box
19 Maps and exhibits,1931-1938 and undated
Box
20 Maps,1936-1937 and undated
Box
23 Railroad territory charts, article,1937 and undated
Box
64 Maps of Mission irrigated farms, undated
Box
22 Dam plans, undated
Box
42 Birdseye view maps, magazine illustrations, undated
Box
48 San Antonio River Improvements Project
Box
30 Survey of river just south of Fifth Street to Ninth Street,1950
Box
78 Flooding status report,1970
Box
37 River corridor interim report,1973
Box
79 South Alamo to Eighth Street modification and improvement feasibility study,1978
South Alamo to Nueva Street programming phase report,1979
Box
63 Retaining walls contracts,1981
Municipal auditorium retaining wall and access ramp,1983
Box
64 South Alamo to Arsenal Street betterments,1983
Box
62 Arsenal Street to Durango Boulevard betterments contract documents and specifications,1985
Box
44 Construction photographs,1985 and undated
View contents
Box
62 Tunnel and shaft specifications,1987
Bridge repair project contract documents and specifications Volumes I-II,1987
Box
81 River channel improvements brochure,1988
Box
48 San Antonio River Improvement fact sheet and brochure, 1988-2008
Box
47 Letter and photograph,1989
Box
78 San Pedro channel improvements, 1990
Mission Trails planning study,1993
Guenther to Espada Dam,1993
Box
79 Nueva Street to Highway 281 preliminary conceptual plan,1993
Nueva Street to Highway 281 conceptual plan,1993
Box
78 Stream management and channel design workshops report,1998
Public meeting report,1998
Box
77 Houston to Lexington preliminary design report,1999
Box
66 Houston Street to Lexington Avenue documents and specifications,2000
Box
49 Project feasibility study,2002
Box
44 Riverwalk expansion slides,2002
Box
78 Museum and Mission Reaches general re-evalutation study volumes 1 and 2,2002
Box
81 River Improvements win award of excellence,2002
Box
49 Presentation to Henry Cuellar,August 2004
Presentation to Henry Cuellar,September 2004
Box
59 Presentation to John Longoria,2004
Presentation to Sergio Rodriguez,2004
Box
49 Background report: Mission Reach and Museum Reach,September 2005
Box
59 Presentation to Councilman Roland Gutierrez,2005
Presentation to John Paul Woodley,2005
Box
49 Presentation to Sheryl L. Sculley,February 2006
SA to DC XVIII, September 2006
Box
76 Museum Reach construction documents volumes 1 and 2,October 2006
Box
77 Mission Reach ecosystem restoration and recreation Phase I,2008
Mission Reach ecosystem restoration and transguide fiber optic cable,2008
Box
46 River Improvement photographs, undated
Box
48 Mission Reach project, undated
Box
44 Construction on the Riverwalk slides, undated
Box
17 San Antonio Riverwalk lengths, undated
Box
47 Photographs, undated
Box
14 San Antonio Urban Renewal
Ordinance,1969
Cooperation Agreement,1969
Correspondence and related documents,1969
"A Decade of Progress" report,1969
Newsclippings,1969
Correspondence and related documents,1968-1969
"Scope of Services for Professional Contract,"1970
"Project 70/Project 71" publications,1970-1971
Resolutions,1971
Projects Overview, undated
Box
24 San Juan Channel Dam
San Juan Channel Dam contracts, proposal, correspondence,1958-1960
Box
35 Invoices,1958-1961
Box
25 Corrrespondence,1958-1962
Test and inspection reports,1960
Contractor estimates,1960-1961
Box
31 Preliminary design report,1987
Box
79 Diversion facilities preliminary design report,1987
Box
47 Photograph, undated
Box
25 Sewer Projects
Bergs Mill Sewer Relocation
Pipe section and design plans,1957
Siphon specifications,1957
Contracts,1957
Invoices,1957-1960
Contractor estimates,1957-1960
Contract bond department records,1957-1960
Misssion Road Sewer Project
Pressure pipe plans,1957
Specifications,1957
Correspondence and related documents,1957-1958
Invoices,1957-1958
Contracts, letting lists,1957-1959
Contractor estimates,1958
Box
30 Salatrillo/Martinez Creek Sewer Project
Report,1967
Box
63 Collection system rehabilitation general and technical specifications,1981
Box
64 Collection system rehabilitation construction plans,1981
Box
45 Site before construction photographs,1982
Box
63 Plant expansion and upgrading general and technical specifications Vol. I-II,1982
Box
45 Site construction photographs,1983
Site construction photographs,1984
Box
61 Sanitary sewer outfall line specifications and contract documents,1985
Collection system operation and maintenance manual,1985
Box
62 Martinez II specifications and contract documents, 1985
Box
46 Photographs, slides, 1985 and undated
Box
62 Salatrillo parallel outfall line contract documents and specifications,1986
Box
48 Photographs, 1987
Plant photographs, 1987 and undated
Box
60 Relief line contract documents,1988
Box
61 Relief line contract,1988
Box
64 Mid-Martinez and Ventura relief line,1990
Martinez I interceptor contract documents and specifications,1990
Salatrillo expansion and disinfection contract documents and specifications,1991
Box
48 Contact sheets, 1991-1994
Box
65 Salatrillo sludge facilities contract documents,1992
Box
59 Lower Salatrillo Parallel Relief Line documents and specifications,1993
Box
61 Martinez II report,1995
Disinfection system contract documents,1996
Box
65 Martinez emergency engine I generator unit contract documents,1996
Upper Martinez electrical facilities contract documents and specifications,1996
Salatrillo expansion contract documents and specifications,1997
Salatrillo unltraviolet light disinfection system,1997
Salatrillo mechanical screen bid proposals and specifications,1997
Salatrillo turbine equipment bid proposals and specifications,1997
Salatrillo emergency engine generator unit bid proposals and specifications,1997
Salatrillo clarifier equipment bid proposals and specifications,1997
Martinez III transfer switch bid proposals and specifications,1998
Martinez engine/generator bid proposals and specifications,1998
Martinez II contract documents and specifications,1999
Box
60 Electrical construction contract documents and specifications,1999
Box
65 Upper Martinez electrical equipment bid proposals and specifications,2000
Box
67 Martinez II expansion documents and specifications,2000
Salatrillo rotoscreen and wall screen press bid proposals and specifications,2001
Box
65 Upper Martinez mechanical screen, screw wash press bid proposals and specifications,2001
Box
44 Slides of project expansion, 2002
Box
67 Salatrillo parallel outlet Phase II documents and specifications,2002
Salatrillo 54" enclosed screw pump documents and specifications,2003
Salatrillo/Martinez solid management improvments documents and specifications,2003
Box
78 Matinez II access road and waterline improvements volume 1 contract documents and specifications,2009
Martinez II administration building contract documents and specifications volumes 1 and 2,2009
Box
25 White Avenue Sewer Relocation
Correspondence,1957-1959
Project accounts,1957-1960
Box
65 Sewer Projects Assorted
Glen Grove sanitary sewer rehabilitation contract documents and specifications,2000
Box
66 Glen subdivision sewer line rehabilitation contract documents and specifications,2004
Box
64 Sewer relocation at F.M.1976 specifications and plans,1982
Box
77 Miller Ridge sewer line replacement,2008
Box
76 Miller Ridge sanitary sewer line replacement,2006
Box
3 South Texas
Rockport-Fulton-Lamar development plan,1965
LaVernia correspondence and ordinance,1965-1969
Box
1 Palmetto Bend Reclamation project, 1967
Palmetto Bend Reclamation project report,1968
Houston Lighting and Power Company South Texas project in Matagorda County,1974
Box
7 Texas Archeological Salvage Project,1971-1975
Box
5 Clopton Crossing Reservoir,1977
Box
1 San Miguel project,1977
Box
60 Nichols Creek Channel repair, Escondido Creek Wateshed project in Karnes County,1994
Box
3 Stockdale map and correspondence plan, undated
Box
5 Texas Basins Project
"Evaluation of Impacts of a 'No-Management' Plan on the San Antonio-Guadalupe River Basin,"1975
Correspondence and reports,1976
Correspondence and reports,1977 and undated
San Antonio-Guadalupe study and correspondence,1978-1979
Box
2 Special Report for the Texas Basins Project,1983
Box
30 Water availability study for the Guadalupe and San Antonio Rivers Vol. 1,1986
Water availability study for the Guadalupe and San Antonio Rivers Vol. 2,1986
Box
5 Information booklet on alternative plans, undated
Box
12 Texas Coastal Management Program
Proposal,1974
Hearing draft,1976
Hearing draft executive summary and appendices,1976
Texas Coastal and Marine Council public hearing transcripts,1976
Report by the Texas Natural Resources Council,1978
Box
25 Woodlawn Lake
Contracts, specs, correspondence,1957-1961
Drainage project engineer plans,1959
Drainage project news article,1959
Drainage project specs,1960
Newsclippings,1960-1961
Contracts and correspondence,1961
Box
3 Woodlawn Lake Dam, undated
Bexar County Projects Assorted
Box
25 Reports and Related Documents
Barrett low water crossing,1954-1962
Box
3 "San Antonio's Underground Water Reservoir" talk given to San Antonio Real Estate Board,1956
Box
24 Pyron Road low water crossing,1956-1961
View contents
Payments made,1956-1962
Box
3 Medina River report,1960
Water and sewer facility grant,1969
Correspondence and resolutions,1970-1972
Box
14 Community Development Block Grant Program (CDBG),1983
Box
60 Brackenridge Park emergency channel repairs technical specifications,1987
Box
81 Hydraulic Model Study bridge sections photographs and data,1988
Hydraulic Model Study bridge sections negatives, rolls 1-5,1988
Box
61 Technical specifications for utilities construction,1989-1995
Placid Park/Foster Road force main rehabilitation project documents and specifications,1995
Phase I Ventura Parallel outfall,1996
Box
66 Upper Ventura Parallel Phase II,2002
Box
59 Star Soccer Complex,2002-2003
Box
66 Foster Road lift station rehabilitation bid proposals and specifications,2003
COSA GIS conduit for fiber optic data cable documents and specifications,2003
Flood debris removal along Cibolo Creek documents and specifications,2003
Wastewater collection utility system contract,2003
Box
67 Universal City Outfall replacement Phase I-II documents and specifications,2003
Box
66 Glenmont rehabilitation project documents and specifications,2004
Flood control removal along the Medina River documents and specifications,2004
Box
49 Bexar Met presentation to Mr. Jose Gallegos,December 2004
Box
76 Glen subdivision Phase II manhole rehabilitation and sewer line replacement documents,2004
Universal City Outfall replacement Phase II documents and specifications,2004
181 Outfall line contract documents and specifications,2005
Martinez Outfall rehabilitation through Woodlake Gold Course,2005
Flood debris clean-up along Cibolo Creek, 2006
Box
77 Woodlake Golf Course resue water documents and specifications,2007
Elmira Stree parking lot documents and specifications,2008
Crofton and Constance Park documents and specifications,2009
Box
42 Maps and Charts
Box
48 San Antonio maps, 1924 and undated
Box
42 San Antonio River Channel proposed improvements map,circa 1950
Box
17 San Antonio sectional aeronautical chart,1967
Map of the SARA region,1983
Drawer
64 Watercolor/drawing birdseye view of San Antonio,1988
Box
58 Project map book,2009-2010
Box
42 SARA regional maps, undated
Box
48 Calaveras and Braunig Lakes maps, River Basins map, 2007-2008 and undated
Map of early San Antonio Acequia system, undated
Drawer
64 Maps of Museum Reach and Mission Reach, undated
Box
44 Photographs and Slides
Box
47 Different projects; some with Henry B. Gonzalez,1956-1963 and undated
Box
4 Treeplanting,1974
View contents
Box
44 Slides of dams,1974-1991 and undated
Assorted slides of projects,1981-1985 and undated
Johnson Street pedestrian bridge,1983
View contents
Box
47 Assorted projects,1987
Box
44 Assorted,1988 and undated
View contents
Box
46 Assorted,1988 and undated
Box
44 Berdair project,2002
Leon Creek testing slides,2002
Sewage facilities, undated
Assorted copies of photographs, undated
Dams, undated
View contents
Dam slides, undated
Assorted, undated
Box
61 Ashby Area Construction Project
Contract documents and specifications Volume III, book 1,
Contract documents and specifications Volume III, book 2,1996
Box
60 Five Points Area Construction Project
Contract documents and specifications, Volume VI, Book 1,1994
Contract documents and specifications, Volume VI, Book 2,1994
Geotechnical and environmental investigations,1994
Box
63 Piedras (Six Mile) Creek Project
Specifications and contract documents,1978
Ashley and Mission Road relocation,1978
Engineering service contract,1978
Box
64 Irrigation system and maintenance road,1981
Creek Projects Assorted
Box
80 Dam safety studies for Calaveras and Martinez Creeks,1987
Box
64 San Pedro Creek Channel improvement archival and historical research,1989-1990
Asylum Creek and No Name Creek channel rectification project parts 1-2,1992
San Pedro Creek Channel Myrtle Street Phase,1992
Box
80 San Pedro Creek Tunnel Channel improvement project operation and maintenance manual,1996
Box
67 Martinez Creek Wateshed floodwater retarding structure documents and specifications,2004
Box
76 Martinez Creek Wateshed floodwater retarding structure documents and specifications,2006-2007
Braunig/Calaveras Lakes
Box
198 Slides,1967-1985
Box
164 Calaveras Lake Recreational Facility Construction; General Correspondence,1970-1980
Box
163 Calaveras/Braunig Lake Parks Road Improvement Contract Documents and Specifications,1985
Box
187 Road Improvements Contract Documents and Specifications,1985
Box
186 Picnic Units and Fish Cleaning facilities; Contract and Specs,1986
Box
164 Braunig/Calaveras Lake Parks- Improvements and Betterments - Roads, Picnic Units, and Fish Cleaning Tables; General Correspondence,1986
Box
103 Groundbreaking photos,1986
Box
187 Pier, Parks, Parking, Roads and Bank Stabilization Contract Documents and Specifications,1987
Box
213 Improvement Photos and Negatives,1987, undated
Box
138 Calaveras and Braunig Lake Park Road Improvements Contract and Specs,1997-1998
Box
186 Braunig Lake Road Improvements Photos,1997-1998, undated
Calaveras Lake Boat Docks and Ramps Improvement; Contract and Specs,2006
Calaveras Lake Parking Lot Improvement; Contract and Specs,2007
Braunig Lake Boat Docks and Ramps Improvement; Contract and Specs,2007
Braunig Lake Park Fishing Pier; Contract and Specs,2008
Braunig Lake Courtesy Dock; Contract and Specs,2008
Cibolo Creek
Box
206 Buyout House; Slides,2002
Flour Mill Bend
Box
85 Correspondence and Pioneer Flour Mill Bend Proposal,1951
Mitchell Lake
Box
191 General Correspondence and Maps,1965-1976
San Antonio Channel Improvements Project (SACIP)
Planning and Development
Box
84 Brief of Supplemental Economic Studies,1950
Box
87 Maps,1950
Box
84 Channel Improvement Profiles and Maps,1950-1952
Box
85 Recommending the SACIP House Document # 344, 83rd Congress 2nd Session,1954
Box
141 Bond Election; General Correspondence,1955-1956
Bond Election; Harvey L. Hardy; General Correspondence,1955-1956
General Operations
Box
84 Amendatory Contracts between Bexar Co./SARA,1950-1972
Box
85 Contracts and Agreements,1953-1965
Amendatory Contracts between Bexar Co./SARA,1955-1960
Box
87 Financials, General Correspondence and Contract between SARA and Bexar County including picture,1955-1997
Box
85 United States Army COE and SARA contracts and correspondence,1956-1972
Unit Construction correspondence,1956-1972
Box
87 1958 SARA Improvement Bond Official Statement,1958
1960 Commissioners Court Report on Flood Control,1960
Box
85 Statement of SARA...before the Subcommittee on Public Works, exhibits,1962
Unit Construction plans,1962-1967
Box
171 Operations and Maintenance; General Correspondence,1963-1990
Box
89 Blueprints,1964-1966
Box
200 Units 9 and 10 Slides,1965-1979, undated
Box
144 Betterments - Local Interest Projects; General Correspondence,1965-1986
Box
128 Proposal and Specifications for various channel protection features,1966
Box
172 Waste Water Management 201 Series Bond Improvement; Maps,1966-1987, undated
Box
84 1967 Amendatory Contract,1967
Box
197 Units 8 and 10 Slides,1967-1986, undated
Box
207 Unit 4, Unit 8, SART and SPCT Slides,1967-1999
Box
86 Summary of SARA Commitments and Cost Estimates,1968
Management Report to the Board of Directors, SARA, concerning the SACIP,1968
Box
90 Management report to Board of Directors of SARA concerning SACIP,1968
Box
85 SACIP Status Report,1970
Box
86 Final Environmental Statement,1971
Box
198 SACIP Slides,1971-1986, undated
Box
89 Specifications Reports for Martinez Creek,1972
Box
117 New Town on the San Antonio River :An Opportunity for a Quality Urban Environment,1972
San Antonio New Town - Preliminary Application,1972
Box
141 General Correspondence,1974
Box
86 An Intergovernmental Effort to Reduce Flooding in the San Antonio Metropolitan Area,1975
Box
158 Status Report on SACIP,1975
Box
84 1976 Amendatory Contract and Status Reports,1975-1989
Box
87 General Correspondence including letters from Henry B. Gonzalez,1976-1988
Box
84 1990 Amendatory Contract, 1976 Amendatory Contract, and Status Reports,1976-1990
Box
173 Operations and Maintenance; General Correspondence,1977-1983
Box
86 Sediment and Benthic Collection and Analysis of Unit 7 of SPC and Unit 8-3-2 of SAR of the SACIP,1979
Environmental Resource Evaluation of Unit 7 of SPC and 8-3 Units of SAR of the SACIP,1979
Box
84 1979 Amendatory Contract, Maps, and Status Reports,1979-1993
Box
86 An Intergovernmental Effort to Reduce Flooding in the San Antonio Metropolitan Area,1980
Box
88 Unit Construction correspondence,1980-1984
Box
87 SACIP Unit Construction,1981-1983
Box
169 San Antonio Channel Improvement and Bridge Repair; General Correspondence,1981-1986
Box
173 I SACIP Operations and Maintenance; Maps/ Plans 1977,1982
Box
174 Correspondence, Inspections, and Progress Reports,1983-1987
Box
88 Unit Construction Fixed Asset/ Local Cost,1983-1990
Box
87 SACIP Unit Construction including map,1984-1991
SACIP Local Interest Cost Estimate,1985-1987
Box
139 SACIP Gate 4 Replacement Project; General Correspondence,1985-1987
Box
174 Correspondence and Progress Reports,1985-1989
Box
87 SACIP Local Interest Cost Estimate,1986-1987
Box
182 Channel Improvement and Bridge Repair, Phases I-IV; General Correspondence 86-87,1986-1987
Box
201 Projects, various,1986-1988
Box
136 Progress Photos SACIP and Bridge Repair,1987
Progress Photos SACIP and Bridge Repair,1987
Box
139 Contract and Specifications for SACIP Bridge Repair Project (phases I - VI) Vol. 1,1987
Contract and Specifications for SACIP Bridge Repair Project (phases I - VI) Vol. 2,1987
Phase II - Channel Restoration from Houston St. to Commerce St. Hydraulic Study of SAR,1987
SACIP and Bridge Repair; General Correspondence,1987
Box
155 Channel Improvement and Bridge Repair Maps and Blueprints,1987
Box
169 San Antonio Channel Improvement and Bridge Repair; General Correspondence,1987
Box
174 San Antonio Channel Improvements and Bridge Repair Blueprints,1987
Box
182 Channel Improvement and Bridge Repair, Phases I-IV; General Correspondence,1987
Box
174 Fiber Optic cable Route Plans,1987, undated
Box
187 Miscellaneous Documents,1987, undated
Box
133 Channel Improvements and Bridge Repair; Progress Photos,1987-1988
Channel Improvements and Bridge Repair; Budget Documents,1987-1988
Box
134 Channel Improvements and Bridge Repair; Progress Photos,1987-1988
Channel Improvements and Bridge Repair; Budget and Schedules,1987-1988
Box
139 SACIP and Bridge Repair; General Correspondence,1987-1989
Box
138 Local Interest Cost Estimate,1987-1991
Box
171 San Antonio Rivers and Streams Maintenance and Operations Agreement Plans; General Correspondence, Photos,1987-1997
Box
135 Betterments Completion Ceremony inc. photos of Henry Cisneros,1988
Box
169 San Antonio Channel Improvement and Bridge Repair; General Correspondence,1988
Box
172 201 Project Photos - RR-106A and B,1988, 1991, undated
City of San Antonio 201 Project; General Correspondence,1988-1994
Box
171 Operations and Maintenance; General Correspondence,1988-1995
Box
135 Progress Photos,1989-1990
Box
175 San Antonio Channel Improvement and Bridge Repair General Correspondence,1989-1994
Box
174 Correspondence, Project Scheduling, and Financials,1989-1997
Box
88 Unit Construction Fixed Asset/ Local Cost,1990-1991
Box
84 1990 Amendatory Contract and 1997 Amendment,1990-1997
Box
135 Progress Photos,1991-1996
Box
87 SACIP Unit Construction,1992-1996
Box
191 SAR; Photos,1992-1996
Box
88 Unit Construction Fixed Asset/ Local Cost,1992-1997
Box
173 Ashley Road SAR Maintenance Facility; General Correspondence,1992-1997
Box
171 Operations and Maintenance; General Correspondence (1994),1994-2005
Box
108 Inadequate Federal Reimbursement to SARA: Request for Legislative Solution,1995
Box
84 Amendatory Contract Negotiations,1996
Box
206 Various; Slides,1996, undated
Box
108 Request for Reimbursement,1997
Box
184 Preliminary Descriptive Summary for Instrumentation and Controls at SART, Olmos, and SPCT,1997
Box
88 Unit Construction correspondence,1997-1998
Box
85 Amendatory Contracts between Bexar Co./SARA,1997-1999
Box
206 Downtown; Slides,1998, undated
Box
138 FEMA Flood Plan Revisions,1998-1999
Box
87 1999 Amendatory Contract,1999
Box
108 Sanitary Sewer Relocations, Preliminary Report,undated
Box
121 Summary of SACIP,undated
Box
171 Operations and Maintenance, Maps and Plans,undated
Box
172 Operations and Maintenance; Maps and Blueprints,undated
Box
191 SAR, South Alamo Bridge to Missions; Photos,undated
Box
195 Progress Photos, sets 1-8,undated
Box
199 Notebook of Slides; Various,undated
Unit 1 San Antonio River (SAR)
Box
90 Unit 1 SAR- Ashley Road Confluence with SPC,1956-1998
Box
88 Unit 1 SAR-Ashley Rd Confluence With Specifications and correspondence,1960-1996
Box
90 Unit 1 SAR Espada Dam Failure Report,1968
Box
138 SAR Ashley Rd Bridge Report,1971
Box
127 Ashley Road Bridge Columns at SAR; Photos,1972
Box
88 Unit 1 SAR-Ashley Rd to Confluence with SPC; correspondence, maps,1976-1999
Unit 1 SAR-Specifications for East Hafer Street (South Flores to SAR) Lorraine/Thelka Streets Restoration Project,1986
Box
90 Lorraine/Thelka Street Restoration Project (South Flores to SAR); Correspondence, plans, photographs,1991-1992
Box
88 Unit 1 SAR-Ashley Rd Confluence With Specifications Maps,1993
Unit 2 San Pedro Creek (SPC)
Box
90 Unit 2 SPC Confluence with SAR to Confluence with Alazan Creek; Maps and Blueprints,1952-1960
Box
89 Unit 2 SPC- Confluence With SAR to Confluence With Alazan Creek; correspondence, plans, and maps,1956-1992
Box
90 Unit 2 SPC Confluence with SAR to Confluence with Alazan Creek; correspondence,1963-1992
Unit 3 Martinez Creek
Box
89 Unit 3-3-Martinez Creek-Fresno to Sherwood Dr.; Correspondence, Blueprints and Maps,1955-1991
Unit 3 Martinez Creek; Maps and blueprints,1956-1994
Unit 3-1- Martinez Creek IH 10 to Fresno Sam Sanchez Complaint documents,1958-1993
Unit 3-2- Martinez Creek Culebra to IH 10; Correspondence and Flood Damage Pictures,1968-1971
Box
90 Unit 3-2 Martinez Creek- Culebra to IH 10; Correspondence and Maps,1969-1998
Box
89 Unit 3-1-Martinez Creek IH 10 to Fresno; correspondence and agreements,1977-1980
Unit 4 Alazan Creek
Box
89 Unit 4 Alazan Creek, Confluence to Woodlawn Lake; Blueprints,1961-1991
Box
140 Contract with San Antonio Housing Authority for gas line relocation,1964
Poplar St. Bridge and gas line correspondence,1964
Correspondence on water well at Laurel St.,1964
Box
89 Unit 4 Alazan Creek, Confluence to Woodlawn Lake; agreements,1964-1980
Unit 4 Alazan Creek, Confluence to Woodlawn Lake;correspondence, 1965 flood photos, and negatives,1965-1996
Unit 4-2 Alazan Creek blueprints,1965-1966
Unit 4 Alazan; correspondence and blueprints relating to Glenmoore and Kentucky project,1996-1999
Unit 4 Martinez Creek
Box
89 Unit 4-4 Martinez Creek Confluence to Culebra; correspondence and agreements,1956-1991
Box
90 Martinez Creek Unit 4-4; Correspondence, photographs, agreements, and maps,1966-1990
Unit4-4 Martinez Creek Confluence to Culebra; Blueprints and Maps,1968-1970
Box
89 Unit 4-4 Martinez Creek Confluence to Culebra; correspondence and maps,1972-1999
Box
206 Martinez Creek; Slides,1978
Box
89 Unit 4-1 Martinez Creek Confluence; correspondence and blueprints,1987-1998
Unit 4-1 Martinez Creek Confluence Blueprints,1988-1992
Box
90 Martinez Creek Unit 4-4; Correspondence, photographs, and maps,1990
Unit 5 Apache Creek
Box
90 Unit 5-2 Apache Creek – Trinity St. to 19th St.; General Correspondence, contracts, maps,1917-1999
Unit 5-1 Apache Creek Confluence to Trinity Street; Blueprints,1959-1994
Unit 5-1 Apache Creek – Confluence to Trinity Street; Correspondence and agreements,1959-1994
Box
89 Units 5-1 Apache Creek Confluence to Trinity Street; correspondence and agreements,1962-1995
Box
140 Demolition of incinerator at Tampico correspondence,1963-1965
Box
89 Unit 5 Apache Creek blueprints,1966-1979
Box
91 Unit 5-2 Apache Creek – Trinity St. to 19th St.; General Correspondence and agreements,1967-1978
Box
201 Unit 5-1, 5-2, 5-3; Apache Creek; Slides,1969-1977
Box
90 Unit 5-2 Apache Creek – Trinity St. to 19th St.; Maps and news clippings,1970-1979
Box
91 Unit 5 Apache Creek ; auditors' report for Model Cities Program,1971
Box
90 Unit 5-2 Apache Creek - Trinity St. to 19th St.; Specifications and proposals,1971-1975
Box
91 Unit 5-3 Apache Creek – 19th St. to General McMullen; Maps and blueprints,1971-1990
Unit 5-2 Apache Creek Specifications,1973
Unit 5-3 Apache Creek – 19th St. to General McMullen; Maps and blueprints,1973-1975
Unit 5-3 Apache Creek – 19th St. to General McMullen; Specifications,1974
Unit 5-3 Apache Creek – 19th St. to General McMullen; General Correspondence and blueprints,1974-1975
Unit 5-3 Apache Creek – 19th St. to General McMullen; General Correspondence and agreements,1974-1977
Unit 5-3 Apache Creek – 19th St. to General McMullen; General Correspondence and plans,1977-1999
Box
196 Apache Creek; Slides,1989
Unit 6 Martinez
Box
91 Unit 6-1 East Fork, Martinez Creek, Confluence to Hildebrand; General Correspondence and map,1968-1977
Unit 6-1 East Fork, Martinez Creek, Confluence to Hildebrand; Maps,1974, undated
Box
104 Unit 6-1 SACIP East Fork, Martinez Creek Confluence Hildebrand; Correspondence, Blueprints,1976-1991
Box
196 Martinez Creek; Slides,1977-1978
Box
104 Unit 6-1 SACIP East Fork, Martinez Creek Confluence Hildebrand; Correspondence, Maps,1977-1979
Unit 6-2 North Fork, Martinez Creek, Confluence to Wildwood; Maps, Correspondence, Photos, inc. letter from Henry B. Gonzalez,1978-1994, undated
Unit 6-2 North Fork, Specifications on Martinez Creek Small Culvert Structures, Set #16,1985-1987
Unit 6-2 North Fork, Specifications on Martinez Creek Small Culvert Structures, Set #19,1985-1987
Unit 6-2 North Fork, Specifications for North Fork of Martinez Creek Drainage Project,1988
Unit 7 San Pedro Creek (SPC)
Box
105 General Correspondence including Engineering Contracts,1956-1981
Unit 7-1 SPC Confluence with Alazan Creek to Durango; Maps and blueprints,1957-1984
Unit 7-1 SPC Confluence with Alazan Creek to Durango; General Correspondence, Plans, and Blueprints,1959-1994
Box
144 San Pedro Creek Erosion Control; General Correspondence,1964-1966
Box
105 Unit 7-2, SPC- Durango to South Myrtle Street; General Correspondence and Maps,1967-1985
Box
144 Unit 7-3-1, Betterments - Travis Street/ Martin Street Bridge,1975-1983
Box
109 Unit 7-3-2 SPC Travis Street to Myrtle Street; Correspondence,1976-1987
Box
144 CSA Fredericksburg Road Improvements, Woodlief to Sandoval; General Correspondence,1977
Box
106 Unit 7-3-1 SPC Durango to Travis Street Correspondence and Plans,1977-1982
Box
105 Structural Review, General Alignment Analysis, and Estimated Construction Cost of COE Preliminary Design and Layout Based on General Design Memo,1978
San Pedro Creek Task Force Correspondence and agendas,1978-1981
Box
88 Estimate of Construction Costs SPC (concept phase),1979
Box
107 Estimate of Construction Costs for San Pedro Creek (Concept Phase),1979
Box
106 Unit 7-3-1 SPC Durango to Travis Street; Maps,1980-1990
Box
105 Report #FHWA-TEX-EIS-79-02-F Administrative Action Final Environmental Impact Statement,1981
Contract for Relocation Rearrangement or Alteration of Railroad Facilities San Antonio Belt and Terminal RR and COSA SPC @ Mkt Yard,1981
Unit 7-3 SPC – Durango to Travis Street; Maps,1981
Box
107 Design Memorandum for #5 part 3, Construction Unit 7-3,1981
Box
112 Unit 7-3-2 Vista Verde South Historical and Architectural Assessment,1981
Box
106 Unit 7-3-1 SPC Durango to Travis Street; Correspondence,1981-1995
Unit 7-3-1 SPC Durango to Travis Street; Photos,1982
Box
109 Unit 7-3-1 SPC Tunnel Project; Maps,1982
Box
144 Unit 7-3-1, Betterments - Travis Street/ Martin Street Bridge,1982
Box
145 Unit 7-3-1 Specifications and Contract,1982
Box
105 Unit 7-3 SPC – Durango to Travis Street; General Correspondence,1982-1987
Box
111 Unit 7-3-2 SPC Channel; General Correspondence including a letter from Senator Phil Gramm and San Pedro Park slides,1982-1990
Box
106 Unit 7-3-1 SPC Durango to Travis Street; General Correspondence, including a letter from Henry B. Gonzalez,1983
Box
107 Specifications for San Pedro Creek, Unit 7-3-1,1983
Box
108 Unit 7-3-1; Specifications for San Pedro Creek,1983
Box
144 Unit 7-3-1, Betterments - Travis Street/ Martin Street Bridge,1983
Box
145 Unit 7-3-1 Preliminary Report,1983
Box
106 Unit 7-3-1 SPC Tunnel Project, General Correspondence and maps,1984-1997
Box
108 Unit 7-3-1 Specifications for SPCT, Phase 1 Construction (Advanced Final,1985
Box
105 Bridge Structural Repair at Leon Creek, SW Military, Houston St, and SPC,1986
Box
107 Unit 7-3-1 SPC Tunnel Project, Maps,1986
Box
108 Unit 7-3-1 Specifications for SPCT, Phase 1 Construction,1986
Unit 7-3-1 Specifications for SPCT, Phase 1 Construction Amendment,1986
Box
111 San Pedro Creek Channel Maps and blueprints,1986
Box
144 Unit 7-3-1, Betterments-Durango Blvd/Quincy,1986-1988
Box
146 CSA Fredericksburg Road Improvements, Woodlief to Sandoval; Maps and Plans,1986, 1992, undated
Box
109 Unit 7-3-1 SPC Tunnel Project; General Correspondence,1987-1997
Unit 7-3-2 SPC Travis Street to Myrtle Street; Request for Qualifications--Place Collaborative Inc. with regard to SPC construction,1988
Unit 7-3-2 SPC Travis Street to Myrtle Street; Correspondence and Maps, inc. the process of acquiring the 5 Points property,1988-1989
Box
107 Unit 7-3-1 SPC Tunnel Project, General Correspondence,1988-1991
Box
144 CSA Fredericksburg Road Improvements, Woodlief to Sandoval; General Correspondence,1988-1992
Box
112 Unit 7-3-2 The Wohlfarth Building and 5 Points Cafe - Architectural Assessment,1989
Box
145 CSA Fredericksburg Road Improvements, Woodlief to Sandoval; Architectural Report; includes Pictures,1989
Box
114 Unit 7-3-2 SPC 5 Points Area Construction Photos; pre-existing, N. Flores, Fred. Rd, N. Laredo,1989, undated
Box
146 CSA Ashby Area Street and Drainage Improvements; Maps and Plans,1989, 1996, undated
Box
138 Unit 7-3-2 Archival and Historical Research for the SPC Channel Improvement Project,1989-1990
Box
114 Unit 7-3-2 SPC 5 Points Area Construction Photos; pre-existing, Intersection with IH 10, box culverts, Pete's building,1989-1990, undated
Unit 7-3-2 SPC 5 Points Area Construction Photos; pre-existing, N Flores, SPC channel,1989-1990, undated
Box
109 Unit 7-3-1 SPC Tunnel Project Modifications,1989-1991
Box
112 Unit 7-3-2 Photos; Railroad, N. Flores, Myrtle,1989-1991
Box
109 Unit 7-3-2 SPC Travis Street to Myrtle Street; Correspondence and Maps,1990
Box
114 Unit 7-3-2 Hydrology map negatives from USGS of SPC channel,1990
Box
110 7-3-2 SPC Channel; General Correspondence,1990-1991
Box
111 Unit 7-3-2 COE Reimbursement under Section 215; Correspondence inc. letters from Henry B. Gonzalez and Phil Gramm,1990-1998
Box
110 SPC Archival and Historical Report,1991
Box
114 Unit 7-3-2 SPC 5 Points Area Construction Photos; pre-existing, IH10 upper level and drainage construction, SPC channel, Poplar to Fred. Rd,1991, undated
Box
113 Unit 7-3-2 SPC Myrtle Street Phase General Correspondence,1991-1992
Unit 7-3-2 SPC Myrtle Street Phase; General Correspondence; Maps; Blueprints,1991-1995
Box
111 Unit 7-3-2 SPC 5 Points Area Construction correspondence,1991-1998
Box
146 CSA Ashby Area Street and Drainage Improvements; General Correspondence,1991-1998
Box
108 Unit 7-3-1 SPC Structures Contract Requests,1992
Box
110 7-3-1 SPC Tunnel Project; General Correspondence,1992
Box
113 Unit 7-3-2 SPC Myrtle Street Phase Contract and Specifications,1992
Box
116 Unit 7-3-2 SPC Myrtle Street Phase; Photos,1992
Box
145 Fredericksburg Road Improvements, Woodlief to Sandoval; Environmental Assessment,1992
Box
116 Unit 7-3-2 SPC Myrtle Street Phase; Photos,1992, undated
Unit 7-3-2 SPC Myrtle Street Phase; Photos,1992, undated
Box
110 7-3-2 SPC Channel; General Correspondence,1992-1993
Box
111 Unit 7-3-2 5 Points Area Completion Ceremony correspondence and planning,1992-1997
Box
146 CSA Fredericksburg Road Improvements, Woodlief to Sandoval; General Correspondence,1992-1999
Box
108 Unit 7-3-1 Potential Cause and Effects of Water Degradation within SPCT,1993
Unit 7-3-2 SPC Channel Hydraulic Report; Volume 1,1993
Unit 7-3-2 SPC Channel Hydraulic Report; Volume 2,1993
Unit 7-3-2 SPC Hydrology Report,1993
Box
112 Unit 7-3-2 Pavement Design Report, Cypress to Myrtle,1993
Unit 7-3-2 Sanitary Sewer Report, Cypress to Myrtle,1993
Box
145 Cypress to Myrtle Hydrology Report,1993
Box
110 7-3-2 SPC Channel; General Correspondence,1993-1994
7-3-1 SPC Tunnel Project; General Correspondence,1993-1995
Box
114 Unit 7-3-2 SPC 5 Points Area Construction display and aerial photos,1993-1995, undated
Box
112 Unit 7-3-2 5 Points Contract Documents and Specifications, Vol. 6, Book 1,1994
Unit 7-3-2 5 Points Contract Documents and Specifications, Vol. 6, Book 2,1994
Unit 7-3-2 Closure Document, Underground Storage Tank Removal,1994
Unit 7-3-2 SARA Closure Document, Underground Storage Tank Removal,1994
Unit 7-3-2 5 Points Geotechnical and Environmental Investigations Appendix,1994
Unit 7-3-2 Real Estate Appraisal Report,1994
Box
113 Unit 7-3-2 SPC Channel Ashby Area Construction Project RFP,1994
Box
145 5 Points Area Construction Geotechnical Report,1994
5 Points Area Construction Contract and Specs Vol VI Book 1,1994
5 Points Area Construction Contract and Specs Vol VI Book 2,1994
Box
111 Unit 7-3-2 SPC 5 Points Area construction correspondence,1994-1995
Box
113 Unit 7-3-2 SPC Channel North Flores Extension; General Correspondence,1994-1996
Box
112 Unit 7-3-2 Ashby Area Preliminary Construction Report,1995
Unit 7-3-2 Geotechnical Study of SPC Channel, Poplar to Myrtle,1995
Unit 7-3-2 SPC 5 Points Area Construction 8x10 photos,1995
Box
116 5 Points Area Construction Project; Photos,1995
Box
145 5 Points Area Construction Draft Environmental Considerations,1995
5 Points Area Construction Final Design Report,1995
Box
112 Unit 7-3-2 SPC 5 Points Area Construction 8x10 photos,1995-1996
Box
116 5 Points Area Construction Project; Photos,1995-1996
Box
113 5 Points Area Construction Project Photo Negatives,1995-1996, undated
Box
111 Unit 7-3-2 5 Points Area Construction Project; Cost Estimates and Planning,1995-1997
Box
113 5 Points Area Construction Project 8x10 Photo Negatives,1995-1997
Box
183 Ashby Area Agreements between SAWS and SARA,1995-1997
Box
194 5 Points; Photos,1995-1997
Box
111 Unit 7-3-2 SPC 5 Points Area; General Correspondence; including a letter from Senator Phil Gramm 1997,1995-1998
Box
110 7-3-1 SPC Tunnel Project; General Correspondence,1996
Box
112 Unit 7-3-2 Contract Documents and Specifications, Ashby Area, Vol. 3, Book 1,1996
Unit 7-3-2 Contract Documents and Specifications, Ashby Area, Vol. 3, Book 2,1996
Unit 7-3-2 SPC Channel, Murfburger Assessment Report,1996
Box
138 Ashby Construction Project Award Letter,1996
Box
145 CSA Ashby Area Construction Contract and Specs Vol III Book 1,1996
CSA Ashby Area Construction Contract and Specs Vol III Book 2,1996
Box
112 Unit 7-3-2 SPC 5 Points Area Construction 8x10 photos,1996-1997
Box
116 5 Points Area Construction Project; Photos,1996-1997
Box
196 San Pedro Creek; Slides,1996-1997
Box
204 Ashby Area 8x10 photos,1996-1998
Box
215 CSA Ashby Area St and Drainage Improvements Progress; Photos, Negatives,1996-1998
Box
113 5 Points Area Construction Project Completion Photos,1997
Box
145 Ashby Area Environmental Report,1997
Box
110 7-3-1 SPC Tunnel Project; General Correspondence,1997-1999
Box
194 Ashby; Photos,1998
Box
108 Unit 7-3-1 SPC Tunnel Project; Photos including Senator Phil Graham,undated
Box
114 Unit 7-3-2 SPC 5 Points Area Construction; assorted negatives,undated
Box
144 San Pedro Creek Construction Photos,undated
Box
206 Trashrack problem; Slides,undated
Unit 8 San Antonio River (SAR)
Box
120 Unit 8-5 Eighth Street to Hildebrand Ave; General Correspondence,1961-1983
Box
148 Johnson St. Bridge - Proposal and Specs for Local Interest Project,1962
Johnson St. Bridge - Amendments to Proposal and Specs for Local Interest Project,1962-1968
Box
146 Lone Star Blvd Bridge at Sewer Siphon; General Correspondence, Maps,1964-1971
Box
117 Unit 8 SAR; General Correspondence,1964-1973
Unit 8-2; 8-2-1; 8-3-1; 8-4; 8-5; General Correspondence,1964-1980
Box
118 Unit 8-3-2 Johnson Street to Nueva; General Correspondence,1964-1980
Box
117 Unit 8-3 SARA Channel Relocation Study,1965
Box
197 Pioneer Mill and SART Slides,1965-1980, undated
Box
89 Unit 8 SAR blueprints,1966
Box
148 Alamo St. Bridge - Proposal and Specs for Local Interest Project,1966
Box
117 Unit 8-2-1 SAR Lone Star to Alamo; General Correspondence; Maps,1966-1990
Unit 8-3 Letter to Col. Jack W. Fickessen, regarding SAR and King William Property,1967
View contents
Box
146 Alamo to Johnson Street Drainage Modifications; General Correspondence,1967-1970
Box
147 Johnson Street Bridge Replacement Correspondence,1967-1970
Correspondence, including Specia complaint,1967-1970
Johnson Street Bridge Replacement Correspondence,1967-1984
Box
117 Unit 8-2-1 Lone Star to Alamo; Maps,1967-1987
Renaissance...San Antonio River A San Antonio River Study,1968
Box
121 Unit 8-4 SAR from Nueva to McCullough; Photographs,1968
View contents
Unit 8-4 SAR from Nueva to McCullough; photographs of design model,1968
Box
148 Proposals and Specifications for Floodway Beautification Project, Alamo to Constance Crofton, Alamo to Johnson,1968
Box
125 Reports relating to the Espada Dam failure and repairs,1968-1969
Box
147 Floodway Beautification Project, Alamo/Constance/Crofton; General Correspondence,1968-1978
Floodway Beautification Project, Alamo/Constance/Crofton; General Correspondence,1968-1978
Box
201 Unit 8-3-2 Preconstruction and Construction; Slides,1968-1985
Box
118 Unit 8-4 Nueva to Eighth Street; General Correspondence,1969-1982
Box
147 Drainage Modification Blueprints,1969, undated
Box
210 Johnson St. Pedestrian Bridge/Maintenance Ramp; Photos,1970-1983
Box
197 Unit 8-3-2 Slides,1971-1979
Box
147 SACIP Unit 8-3-2 Johnson Street Bridge Maps and Blueprints,1971-1983, undated
Box
117 Unit 8-2 SAR Lone Star to Nueva Street; General Correspondence; Photos,1971-1998
San Antonio River Corridor Study - Reports and Plans,1972-1973
Box
116 Unit 8-3-2 SAR, Johnson Street to Nueva; Reports,1972-1981
Box
147 SACIP Unit 8-3-2 Johnson Street Bridge Correspondence,1972-1984
Box
170 SACIP Unit 8-3-2 Nueva Street Dam/Bridge/Marina; Blueprints,1972-1984
Box
119 Unit 8-3-2 SAR, Johnson Street to Nueva; General Correspondence,1973-1981
Box
116 Analysis I: Historic and Archeological Preservation Flood Control Project, Johnson to Nueva,1974
Box
200 Units 8-3-2, 8-4, and 8-5 Slides,1976-1985
Box
116 SAR Flood Control Project Implementation Plan from Alamo to Hildebrand,1978
Box
119 Design Team Houston Street to U.S. HWY 281; General Correspondence,1978-1990
Box
118 Unit 8-3-1 Alamo to Johnson Street; General Correspondence,1978-1997
Box
113 SAR Design Team - Phase I and II; S. Alamo to Nueva, Nueva to Hwy 281; Correspondence,1979-1983
Box
169 Inventory Rating and Water Adequacy Rating Reports,1979-1987
Box
133 Unit 8-5 Brackenridge Park; Progress Photos and Reports,1979-1988
Box
115 Design Team Guenther Street to Espada Dam; Maps and blueprints,1979-1990
Box
86 Draft Supplement - Environmental Impact Statement,1980
Box
167 8-3-2 Nueva Street Dam/Bridge/Marina; Proposal for Professional Services,1980
Box
118 Unit 8-3-2 Johnson Street to Nueva; General Correspondence; including a letter from Henry B. Gonzalez,1980-1981
Box
148 Unit 8-3-2 Nueva Street Dam/Marina/Bridge Leaf Gate Failure; Reports, Correspondence,1980-1988
Box
152 Nueva Street Dam/Marina/Bridge; General Correspondence,1980-1988
Box
115 Guenther Street to Espada Dam; General Correspondence concerning Phases I and III South, A. Alamo to Nueva and Guenther to Espada,1980-1990
Box
170 Unit 8-3-2 S Alamo to Arsenal St. Betterments; General Correspondence,1980-1995
Box
149 Unit 8-3-2 Nueva Street Dam/Marina/Bridge; General Correspondence,1980-1998
Box
116 Corrections Programming Phase Report,c. 1980
Box
86 Final Supplement-1 to Final Environmental Impact Statement,1981
Specifications for SAR Unit 8-3-2 and Channel Paving for Unit 8-3-1,1981
Amendment No. 0004 to the Bidding Schedule, Specs, and Drawings for SAR Unit 8-3-2 and Channel Paving Unit 8-3-1,1981
Box
117 Unit 8-3-2 SAR, Johnson Street to Nueva; General Correspondence,1981
Box
118 Unit 8-3-2 Johnson Street to Nueva; General Correspondence,1981
Box
OM4 Unit 8-3-1, 8-3-2 SAR, Johnson Street to Nueva;,1981
Box
148 Johnson St. Bridge - Soil and Foundation Investigation Report,1981
Box
152 Nueva Street Dam/Marina/Bridge; Contracts and Agreements,1981
Box
133 Unit 8-3-2 Retaining Wall; Photos Before Construction,1981, undated
Unit 8-3-2 Retaining Wall; Construction Photos,1981, undated
Box
154 Unit 8-3-2 Retaining Wall Report, Contract, Correspondence, and Photos,1981-1982
Box
118 Unit 8-3-2 Johnson Street to Nueva; General Correspondence,1981-1983
Box
152 Nueva Street Dam/Marina/Bridge; Blueprints,1981-1985
Box
170 Unit 8-3-2 Nueva Street Dam/Bridge/Marina Gate 4 Replacement Correspondence,1981-1985
Box
148 Unit 8-3-1 Johnson St. Bridge Contract Documents and Specifications,1982
Unit 8-3-2 Preliminary Report on the Nueva Street Dam and Marina,1982
Box
167 8-3-2 Nueva Street Dam/Bridge/Marina; Preliminary Report,1982
Box
196 Betterments; Slides,1982, undated
Box
147 SACIP Unit 8-3-2 Johnson Street Bridge Blueprints,1982-1983
Box
119 Unit 8-4 SAR, Nueva Street to Eighth Street; Correspondence, Maps, and Reports, including a letter from Henry B. Gonzalez,1982-1984
Box
154 Unit 8-4 Municipal Auditorium Retaining Wall; General Correspondence and Plans,1982-1984
Box
152 Nueva Street Dam/Marina/Bridge; Correspondence and Contract,1982-1985
Box
148 Unit 8-3-2 Johnson St. Bridge; General Correspondence,1983
Box
156 Unit 8-4 Project Manual for Municipal Auditorium Retaining Wall,1983
Box
167 8-3-2 Nueva Street Dam/Bridge/Marina; Project Manual Volumes 1 and 2,1983
Box
170 Unit 8-3-2 Nueva Street Dam/Bridge/Marina Gate 4 Replacement Reports,1983
Unit 8-3-2 Nueva Street Dam/Bridge/Marina Gate 4 Replacement Project Manual and Photos,1983
Box
171 8-3-2 South Alamo St. to Arsenal St. Betterments Contract Documents and Specifications,1983
Box
185 SACIP Unit 8-4 Soil and Foundation Study,1983
Box
207 Photos taken from Pioneer Mill, N and S SAR,1983
Box
209 Auditorium Ramp / 100 E. of Richmond Bridge Progress Photos,1983
Box
210 Martin and Travis St. Bridges; Photos,1983
Box
170 Unit 8-3-2 S Alamo to Arsenal St. Betterments; Blueprints,1983, undated
Box
85 1020 Navarro Street,1983-1984
Box
130 Unit 8-4 Municipal Auditorium; Photos,1983-1984
Box
147 SACIP Unit 8-3-2 Johnson Street Bridge Cost Estimates and Budgeting,1983-1992
Box
118 Unit 8-3-2 Johnson Street to Nueva; General Correspondence,1983-1997
Box
108 Design Memorandum #6 parts 5 and 6 for Construction Units 8-4 and 8-5,1984
Box
154 Unit 8-4 Municipal Auditorium Retaining Wall; General Correspondence and Blueprints,1984
Box
212 Unit 8-3-2, Nueva St. Dam, Gate 5, Marina and Bridge, Progress Photos,1984
Box
155 Municipal Auditorium Retaining Wall and Ramp; General Correspondence,1984-1985
Box
119 Unit 8-4 SAR, Nueva Street to Eighth Street; General Correspondence and Maps,1984-1986
Box
130 Unit 8-3-2 Nueva Street Dam/ Marina/ Bridge; Progress Photos, Negatives, Plans,1984-1987
Box
131 Unit 8-3-2 Nueva Street Dam/ Marina/ Bridge; Progress Photos and Plans,1984-1987
Box
132 Unit 8-3-2 Nueva Street Dam/ Marina/ Bridge; Progress Photos,1984-1987
Box
114 SAR Design Team - Phase I, II, III; Units 8-3-2,8-4,8-5; S. Alamo to Nueva, Nueva to Hwy 281, 281 to Hildebrand General Correspondence,1984-1988
Box
214 Unit 8-3-2, Nueva St. Dam, Gate 5, Marina and Bridge, Progress Photos,1984-1996
Box
120 Unit 8-5 Eighth Street to Hildebrand Ave; General Correspondence, Maps,1984-1997
Unit 8-4 Nueva Street to Eighth Street; Maps,1985
Box
171 Arsenal St. to Durango Blvd Betterments; General Correspondence,1985
Box
203 Houston to Commerce; Slides, Photos,1985
Box
147 SACIP Unit 8-3-2 Johnson Street Bridge Project Closeout,1985-1986
Box
155 Municipal Auditorium Retaining Wall and Ramp; General Correspondence,1985-1986
Box
130 Unit 8-3-2 Betterments; Progress Photos,1985-1986, undated
Box
183 Unit 8-3-2, Arsenal St to Durango Blvd; General Correspondence, Legal Documents, Plans, Contract,1985-1994
Box
116 Dept of Public Works COSA Proposal and Specifications Parkview - Mission Rd. West to Dead-end,1986
Box
121 Drainage Study for Incarnate Word Convent Motherhouse,1986
Box
153 Unit 8-3-2 Nueva Street Dam/Marina/Bridge; General Correspondence,1986-1988
Box
168 Houston Street Bridge; General Correspondence: 1986-1991,1986-1991
Box
117 Unit 8.1 Glenn Street to Lone Star; General Correspondence,1986-1999
Box
133 Unit 8-4 Pecan St Wall Repair; Photos,1987
Box
167 8-3-2 Nueva Street Dam/Bridge/Marina; Agreement between URS and SARA,1987
Box
196 SAR Design Team, Houston to Augusta, Walkthrough; Photos,1987
SAR Design Team, Augusta to Lexington, Walkthrough; Photos,1987
SAR Design Team,Lexington to 9th, Walkthrough; Photos,1987
Box
210 Pecan St. River Wall Repair; Slides,1987
Box
119 Unit 8-3-2 SAR, Johnson Street to Nueva; Maps and Blueprints,1987-1988
Box
155 Local Interest Projects; Pecan Street Repairs; General Correspondence,1987-1988
Box
133 Unit 8-4 Pecan St Wall Repair; Inspectors' Diaries and Material Sample,1987-1988, undated
Box
119 Unit 8-4 SAR, Nueva Street to Eighth Street; General Correspondence and Maps,1987-1999
Box
135 Unit 8-3-2 Nueva St. Dam/Marina/Bridge Progress Photos and Flood Gate Photos,1987, 1994
Box
120 Unit 8-5, SAR Design Team Phase III N; Brackenridge Park Rehabilitation,1988
Box
196 SAR Design Team, Camden to Pearl Brewery, Walkthrough; Photos,1988
SAR Design Team, 9th to Jones, Walkthrough; Photos,1988
Box
169 Unit 8-5 Brackenridge Park Emergency Channel Repairs; General Correspondence,1988-1990
Box
121 Unit 8-4 SAR Design Team Phase II Programming Report,1989
Box
113 SAR Design Team - Phase III South; S. Alamo to Espada Dam; Correspondence,1989-1990
Box
121 Unit 8-4 SAR Design Team Phase II; Nueva to Hwy 281; Meeting Minutes,1989-1990
Box
191 Unit 8-3-2 Nueva St. Dam, Marina, Bridge; Photos,1989-1991
Box
120 Unit 8-5, SAR Design Team Phase III N; 281 to Hildebrand Ave; General Correspondence,1989-1994
Box
114 SAR Design Team - Phase III South, Guenther to Espada Dam; General Correspondence,1990-1992
Box
119 Design Team Houston Street to U.S. HWY 281; General Correspondence,1990-1995
Box
115 Guenther Street to Espada Dam; General Correspondence concerning river recreational development,1992-1997
Box
166 8-3-2 Nueva Street Dam/Bridge/Marina; General Correspondence,1992-1997
Box
115 Design Team Draft of Conceptual Plan for Guenther to Espada Dam,1993
Design Team Final Version of Conceptual Plan for Guenther to Espada Dam,1993
Design Team Supplement to Conceptual Plan for Guenther to Espada Dam,1993
Box
116 Guenther Mill Saga correspondence,1993
Hydraulics for Programming Phase Report, First Draft,1993
Design Team South Hydraulic for Model Cost Estimate,1993
Box
121 Unit 8-5 Supplement to Conceptual Plans for 8-5, Hydraulic Study of SAR,1993
Box
196 Unit 8-3-2 Nueva St. Dam, Marina, Bridge, Marina Fabridam Leaks; Photos,1993
Box
141 Unit 8-5-1 Phase IV P2 Volumes I,II,III,1994
Box
120 Unit 8-5, SAR Design Team Phase III N; 281 to Hildebrand Ave; General Correspondence,1994-1999
Box
121 Unit 8-5-2 Economic Analysis for SAR and Tributaries,1995
Box
167 8-3-2 Nueva Street Dam/Bridge/Marina; Gate Repair, Phase I, Inspection Report,1995
Box
115 Design team, Mission Trails Correspondence, Planning, and Public Meetings,1995-1997
Box
206 Various; Slides,1995-1997
Box
121 Unit 8-5-2 Ecological Assessment of the Upper SAR,1996
Unit 8-5-2 Initial Re-assessment of SAR and Tributaries, Appendix B and C,1996
Box
119 Design Team Houston Street to U.S. HWY 281; General Correspondence,1996-1997
Box
120 Unit 8-4 SAR; General Correspondence; Adams Mark Hotel,1996-1997
Box
194 SAR Gates; Photos,1996-1997
Box
119 Design Team Houston Street to U.S. HWY 281; Maps and Blueprints,1997, undated
Box
202 Hildebrand to Lexington/Josephine to Lexington Flood Photos,1998
Lexington to S Alamo Flood Photos,1998
Box
115 Guenther Street to Espada Dam; General Correspondence and Maps concerning Phase III South, Guenther to Espada,1998-2004
Box
165 Houston St to Lexington Avenue Reports, Assessments, Bids, and Contract,1999-2003
Box
115 Unit 8-SAR Johnson Street – Brackenridge Park; Maps and Blueprints,undated
Box
132 Unit 8-3-2 South Alamo to Arsenal Street, Betterments; Progress Photos,undated
Unit 8-3-2 South Alamo to Arsenal Street; Progress Photos,undated
Box
167 8-3-2 Nueva Street Dam/Bridge/Marina; RFQ Freese and Nichols, Inc.,undated
Box
168 Unit 8-3-2 Nueva Street Marina/Bridge/Dam; Pictures,undated
Box
190 Design Team SAR South Slides,undated
Box
192 Unit 8-4, 8-5, Design Team; Slides,undated
Box
196 Betterments Constructions; Photos,undated
Box
206 Various; Slides,undated
Box
OM1 San Antonio River profiles,undated
San Antonio River profiles; Nueva to Mitchell,undated
San Antonio River profiles; Plaza Hotel to 4th St,undated
San Antonio River profiles; Below South Alamo,undated
San Antonio River profiles; Josephine north through Brackenridge Park,undated
San Antonio River profiles; Nueva Street Bridge to Josephine Street Bridge,undated
San Antonio River profiles; S. Main to 4th St,undated
Box
103 8-3-2 Photos,undated
Unit 9 San Antonio River (SAR)
Box
123 Unit 9-Bergs Mill Extension; General Correspondence and Maps,1954-1999
Unit 9 Bergs Mill Extension; General Correspondence; includes Photos,1965-1978
Box
121 Feasibility Study for the Bergs Mill Area,1966
Report on Floodway Extension Below Bergs Mill,1967
Box
123 Unit 9-Bergs Mill Extension; Maps and Blueprints,1968-1975
Box
121 Specifications for Unit 9,1970
Box
196 Espada and Six Mile; Slides,1970-1982
Box
121 Specifications for Pilot Channel Extension,1972
Box
123 Unit 9-1 Six Mile Creek; General Correspondence and Plans,1975-1978
Box
185 9-1 Piedras/Six Mile Creek - Ashley Rd Relocation and Mission Rd Extension; General Correspondence, Maps,1977-1984
Box
164 Piedras/Six Mile Creek - Ashley Road Relocation and Mission Road Extension,1978
Box
171 Unit 9-1 Piedras (Six Mile ) Creek - Ashley Rd. to Espada Rd. Bridge; General Correspondence,1978-1980
Box
123 Unit 9-1 Six Mile Creek Inspection Diary,1979
Box
138 Piedras/Six Mile Ck Espada Aqueduct Flood Protection,1979
Box
135 Unit 9-1 Piedras/Six Mile Ck Progress Photos,1979-1981, undated
Box
123 Unit 9-1 Six Mile Creek; Correspondence, Maps, and Blueprints,1979-1999
Box
171 Unit 9-1 Piedras (Six Mile) Creek - Fencing for Diversion Channel Contract Documents and Specifications,1981
Unit 9-1 Piedras (Six Mile) Creek - Irrigation System and Maintenance Road Contract Documents and Specifications,1981-1982
Box
135 Unit 9-1 Piedras/Six Mile Ck Irrigation System and Maintenance Road Progress Photos,1982
Box
171 Unit 9-1 Piedras (Six Mile) Creek; General Correspondence,1982-1984
Ashley Road Maintenance Building: General Correspondence,1990-1991
Box
172 Berg's Mill; Allen Property Flooding Correspondence,1992
Box
121 SAWS Replacement and Improvements Report,1998
Unit 10 Olmos Dam
Box
126 Olmos Dam Progress Photos,1925-1927
View contents
Box
123 General Correspondence and Plans,1975-1977
Box
125 Archeological Survey and Project Report,1975-1977
Box
85 Olmos Dam Modification Project (maps included),1976
Box
123 General Correspondence,1977
Box
125 Geotechnical Reports for Olmos Dam Improvements,1977-1987
Olmos Dam Foundation Reports,1978
Box
140 Olmos Drive Relocation Contract Documents Volume I of V,1978
Box
125 Devine Rd. Reports,1978-1979
Box
140 Olmos Dam Modifications and Olmos Drive Relocation; Correspondence and Contract,1978-1980
Box
124 General Correspondence and Photos,1978-1983
Box
125 Progress Photos,1979
Box
126 Olmos Dam Progress Photos,1979-1990
Box
138 Unit 10 General Correspondence,1979-1996
Box
125 Progress Photos,1980
Financial Status Report and Soil Analysis,1980-1981
Contract Documents and Specs for the Replacement of Olmos Dam Operators,1989
Box
126 Olmos Dam Gate Operations Inspection Reports and Photos,1989-1991
Slides,1990
Box
139 Certificate of Final Completion and Final Waiver of Lien for Olmos Dam Gate Operators,1991
Box
140 Olmos Dam Anchor Replacement; Correspondence,1994
Box
207 Olmos Dam panoramic photos; 5 rolls of negatives,undated
Box
D21 Plans for Improving San Antonio River immediately below Olmos Dam,undated
Box
OM1 Olmos Detention Reservoir blueprint,undated
Box
205 Olmos Dam Slides,undated
Box
206 Various; Slides,undated
River Corridor Project
Box
88 River Corridor Project, Flood Control Taskforce,1974-1978
River Corridor Project Committee; correspondence, minutes, maps,1976-1984
The River Corridor: From the '73 Plan to Action - A Report of the River Corridor Committee,1977
correspondence, minutes, board members,1986-1987
Salado Creek Watershed Project
Box
179 Site 5; General Correspondence and Contracts,1937-1975
Box
183 Project Review and Maps,1953-1969, undated
Box
181 General Correspondence,1957-1998
General Correspondence, Maps, Plans,1961-1981
Box
183 Approval Correspondence, including letters from Henry B. Gonzalez and John Tower,1962
Box
178 Site 2; Lewis Valley Rd, Camp Bullis; Maps, Plans,1962-1963
Box
180 Project Review and Public Hearing Minutes,1962-1969
Box
157 Sites 1 and 2; General Correspondence,1962-1973
Site 1; General Correspondence, Blueprints,1962-1989
Box
183 Newspaper Clippings and Contracts,1963-1968, undated
Box
178 General Correspondence,1963-1970
Box
183 General Correspondence, multiple sites,1963-1970
Box
157 Site 2; General Correspondence,1963-1973
Site 1; General Correspondence,1963-1975
Box
178 Site 4; Plans, Maps, Photos, and Correspondence,1963-1979
Box
157 Site 1; General Correspondence, Blueprints,1963-1996
Box
181 Watershed Protection and Maintenance Agreement,1964
Box
180 Site 15R; General Correspondence and Agreements,1964-1971
Box
174 Site 15A; General Correspondence,1964-1975
Box
159 Site 9; Blueprints,1964-1988
Box
181 General Correspondence,1964-1994
Box
159 Site 9; General Correspondence,1964-1995
Box
178 Site 3; General Correspondence,1965-1994
Box
174 Site 13A; General Correspondence,1967-1975
Box
185 Site 8; General Correspondence,1967-1995
Box
181 Supplemental Work Plan for Watershed Protection and Flood Prevention,1968
Box
180 Site 6; Land Rights Correspondence,1968-1973
Box
178 General Correspondence,1968-1976
Box
179 Site 5; Maps and Local Publications,1968-1986
Box
181 Site 13B; General Correspondence,1968-1988
Box
184 Site 11; Project Documents and Plans,1968-1993
Box
178 Site 2; Proposal and Specs for Relocation of Lewis Valley Rd, Camp Bullis, Photo,1969
Project Review - Transcript of Proceedings,1969
Box
138 Plans and Reports,1969-1973
Box
174 Site 13B; Plans, Photos,1969-1980, undated
Box
178 Site 6; Plans,1969, undated
Box
158 Site 13A; General Correspondence,1970
Box
182 Federal Construction; General Correspondence,1970-1982
Box
158 Site 12; General Correspondence,1970-1993
Box
183 General Correspondence and Progress Reports,1971-1973
Box
197 Sites 6-8 Slides,1972-1986, undated
Box
178 Site 4; General Correspondence,1971-1997
Box
180 Site 15R; General Correspondence,1972-1993
Box
197 Sites 2-5 Slides,1973-1978
Box
199 Salado Sites; Slides,1973-1979
Box
207 Various slides,1973, 1982, undated
Box
156 Environmental Assessment,1974
Box
174 Site 13A; Blueprints, Article,1974-1978
Box
157 Site 1; Photos, Slides,1974-1979, undated
Box
180 Site 6; General Correspondence,1974-1983
Site 15R; General Correspondence, Contract, and Map,1974-1984
Box
179 Site 5; General Correspondence,1974-1990
Box
180 Site 5; General Correspondence,1975-1979
Box
178 Site 2; Camp Bullis Water Well No. 8; General Correspondence,1976
Box
185 Site 9; General Correspondence,1976-1985
Box
159 Site 10; General Correspondence,1976-1989
Box
174 Site 13A; General Correspondence,1976-1996
Box
185 Site 7 - Walker Ranch Archaeological Landmarks; General Correspondence, Photos, Maps,1976-2003
Box
180 Site 5; General Correspondence and Agreements,1977-1995
Box
181 Site 15R; General Correspondence; including letter from Senator Kay Bailey Hutchison,1981-1999
Box
158 Site 13A; General Correspondence,1983-1985
Box
157 Salado Creek Recreational Analysis and Flood Prevention Project,1983, undated
General Correspondence,1984-1986
Box
158 Environmental Impact Report on Camp Bullis Landing Strip,1985
Box
180 Site 5; General Correspondence,1985-1987
Box
159 Site 10; Plans,1985-1988
Box
186 Site 6; Panther Springs Golf Correspondence,1985-1997
Box
158 Site 12; Photos, Maps,1986-1987
Site 12; General Correspondence,1986-1994
Box
180 Site 5; Maps, Photos and Plans,1986, undated
Box
191 Sites 5, 6, 7, 8 Slides,1986, 1987, undated
Box
158 Site 12 Emergency Spillway Reclamation Study,1987
Box
180 Site 12; General Correspondence,1987-1988
Box
157 General Correspondence,1987-1996
Box
103 Mission Ridge photos,1989
Box
84 Salado Creek Watershed and Flood Prevention Project,1989
Box
156 Bids Documents and Specifications for Floodwater Retarding Structure Phase I, Site 10,1989
Box
176 Site 10; Soil Conservation Service Emergency Action Plan,1989
Box
158 Site 12; General Correspondence,1989-1992
Box
103 Photographs,1990
Slides,1990
Box
156 Bid Documents and Specifications for Floodwater Retarding Structure Phase II, Site 10,1990
Box
157 Site 10; General Correspondence,1990-1991
Box
184 Site 10; Photos and Negatives,1990-1995, undated
Site 10, Phase II; General Correspondence,1990-1997
Site 10, Phases I and II; Blueprints and Progress Photos,1991, undated
Box
176 Site 11; Emerald Forrest PUD Unit 1 Construction Plans,1992
Site 11; Emerald Forrest PUD Unit 1 Drainage Report,1992
Box
158 Site 12; General Correspondence,1992-1996
Box
178 Site 4; Drainage Calculations for Greystone County Estates PUD Unit 2,1994
Box
185 Site 7 - Wurzbach Parkway; General Correspondence,1994
Box
183 Salado Sites Joint Use Agreements,1994-1995
Box
207 Site 10 Slides,1995
Box
158 Salado Site 10, Phase III; General Correspondence,1995-1996
Box
184 Site 10, Phase III; Bids and Correspondence,1995-1996
Box
179 Site 5; General Correspondence,1996-1997
Box
161 Site 15R; General Correspondence,1996-1999
Site 15R; General Correspondence,1997
Site 15R Borrow Pits Investigation, Maps,1997
Box
175 Site 15R; Documentation, Maps, Plans,1997-1998
Site 15R; Hydrology and Environmental Assessment 1998,1998
Box
181 Site 15R; Floodwater Retarding Structure - Environmental Assessment,1998
Box
161 Site 15R; General Correspondence,1998-2000
Box
203 Salado Site 15 R; Photos,1999
Box
175 Site 15R, Phase I; Contract Documents and Specs,1999
Box
161 Site 15R, Phase II; General Correspondence,1999-2004
Box
180 Site 15R, Phase II; Contract and Specifications,2003
Box
103 Photographs,undated
Box
181 Maps, Plans,undated
Maps, Plans,undated
San Antonio River and San Pedro Creek Tunnels (SART & SPCT)
Box
155 SART Outlet Construction; General Correspondence and Blueprints,1984-1988
Box
OM4 Units 7-3-1, 8-4, and 8-5; Plans,1986
Box
108 SPCT and SART; General Correspondence,1986-1987
Box
122 Units 7-3-1 and 8-5; General Correspondence and Maps,1986-1987
Units 7-3-1 and 8-5; General Correspondence, Photos, and Maps; including pictures of Henry Cisneros,1986-1987
Box
144 SART and SPCT; General Correspondence,1986-1996
Box
108 Bid form for Tunnel Spoils Disposal,1987
Box
121 Design Summary Phase II Tunnels and Shafts,1987
Design Summary Phase II Tunnels and Shafts, Appendix A - Geology,1987
Design Summary Phase II Tunnels and Shafts, Appendix B - Soils,1987
Phase II Tunnels and Shafts Specifications,1987
Tunnels and Shafts Specifications, Units 7-3-1, 8-4, 8-5,1987
Box
122 Units 7-3-1 and 8-5; Correspondence and Maps,1987
Units 7-3-1 and 8-5; General Correspondence and Maps,1987-1988
Box
196 SPCT; Slides,1987-1989
Box
108 SPCT and SART; General Correspondence,1987-1991
Progress Report for SART and SPCT,Sept. 1988
Progress Report for SART and SPCT,Nov. 1988
Progress Report for SART and SPCT,Dec. 1988
Box
160 SPCT Inlet/Outlet Structures Specifications, Addendum,1988
SPCT Inlet/Outlet Structures Design Analysis, Addendum,1988
Box
155 SART Outlet Construction; General Correspondence,1988-1989
SART Outlet Construction; General Correspondence and Slides,1988-1989
Box
179 SART Aeration/Recirculation Project; General Correspondence,1988-1992
Box
139 SART; General Correspondence,1988-1995
Box
144 SPCT; General Correspondence,1988-1997
Box
196 SART; Slides,1988, undated
Box
160 SPCT Inlet/Outlet Specifications, Preliminary,1989
SPCT Inlet/Outlet Design Analysis, Final,1989
SPCT Inlet/Outlet Structures, Annotated Comments,1989
Box
153 SART and SPCT; General Correspondence,1989-1990
Box
154 Outlet Construction Correspondence,1989-1990
Box
153 SART Outlet Construction; General Correspondence,1989-1992
Box
175 SART Aeration/ Recirculation Project; General Correspondence, Maps,1989-1993
Box
122 Units 7-3-1 and 8-5; General Correspondence, Maps, and Blueprints,1989-1996
Box
182 SART Sedimentation Studies,1990
Box
210 SPCT Progress; Photos,1990
Box
123 Unit 8-5; Correspondence and Plans,1991-1994
Box
148 SART; General Correspondence,1992
Box
153 SART SAWS Water Reuse; General Correspondence,1992
Box
179 SART Engineering Report,1992
Box
153 SART Local Sponsor Projects; General Correspondence,1992-1993
Box
154 Blueprints,1992-1994
Box
175 SART Local Sponsor Improvements; General Correspondence,1992-1994
Box
154 Outlet Construction Correspondence,1992-1995
Box
191 SPCT Slides,1992, undated
Box
121 Foundation Report for SAR Tunnel and Shafts,1993
Box
154 SART Specs Vol I,1993
SART Specs Vol II,1993
SART Specs Vol III,1993
Box
179 SART Inlet Structures Volume III,1993
Box
160 SART Unit 8-5-1 Phase IV Part I; General Correspondence,1993-1994
Box
169 Contract and Specs for Flood Gate Instrumentation,1993-1994
Box
179 SART Local Sponsor Improvements Correspondence,1993-1994
Box
177 SART Local Sponsor Improvements; General Correspondence,1993-1995
Box
173 SART Local Sponsor Inlet; General Correspondence,1993-1998
Box
154 RFP for Trashback Design,1994
Box
169 SART Local Sponsor Improvements; General Correspondence,1994
Box
177 Yard Piping Design Report,1994
SART Foundation Report,1994
Box
182 SART Geotechnical Investigation of Water Booster System,1994
SART Final Geotechnical Report,1994
Water Quality Analysis Report,1994
SART Inlet Site Report and Saws Lift Station Plans 5/1996,1994
SART Local Sponsor Improvements; General Correspondence,1994-1995
SART - Saws Lift Station Project; General Correspondence,1994-1995
Box
211 San Antonio River Tunnel Inlet (SART/SARI), Progress Photos,1994-1996
Box
179 SART Expenses and Correspondence,1994-1997
Box
186 SAWS Lift Station; General Correspondence,1994-1997
Box
121 Real Estate Certification SAR Tunnel Outlet at Lone Star blvd,1995
Box
160 SART Unit 8-5-1 Phase IV Part I; Reuse Water Booster Station Contract Documents and Specifications,1995
Box
162 SART Outlet Construction; Blueprints,1995
Box
173 SART Local Sponsor Inlet; Plans, Maps,1995
Box
181 SART Inlet Construction General Correspondence,1995
Box
137 SPCT and SART Local Sponsor Improvements; General Correspondence,1995-1996
Box
166 SART Outlet Contaminated Soils; General Correspondence,1995-1996
Box
182 SART - Saws Lift Station Project; General Correspondence,1995-1996
Box
166 SART Outlet Contaminated Soils; General Correspondence,1995-1997
Box
173 SART Local Sponsor Inlet; General Correspondence,1995-1997
Box
153 SART Outlet Construction; General Correspondence,1995-1998
Box
206 Tunnel Boring Machine; Slides,1995-1998, undated
Box
144 SPCT; General Correspondence,1996
Box
162 SART Outlet Construction; Blueprints,1996
Box
167 SPCT Phase IV, Improvements to Inlet/Outlet Facilities,1996
Box
186 SAWS Lift Station; General Correspondence,1996
Box
203 SPCT Inlet and Outlet Improvements Construction; Photos,1996
Box
166 SART Outlet Contaminated Soils; General Correspondence,1996-1997
Box
182 SART Local Sponsor Improvements; General Correspondence,1996-1997
Box
203 SPC Tunnel Inlet and Outlet Improvements; Photos,1996-1997
Box
87 SART Engineering Analysis Report and Correspondence,1997
Box
139 SART Outlet Modification; General Correspondence,1997
Box
169 Contract and Specs for Manual Instrumentation/Controls,1997
Box
210 SPCT Outlet Recirculation; Photos,1997
Box
179 SART Correspondence and Contract Amendments,1997-1998
Box
184 SART Local Sponsor Improvements Correspondence,1997-1999
Box
144 SPCT; General Correspondence,1997-2000
Box
206 SART Outlet; Slides,1997, undated
Box
139 SART Outlet Structure Project; General Correspondence,1998
Box
163 SART Outlet Closure Plan,1998
Box
173 SART Local Sponsor Inlet; General Correspondence,1998
Box
182 SART Local Sponsor Improvements; General Correspondence,1998
Box
202 Inlet/Outlet Flooding Photos,1998
Box
148 SART; Contract Documents and Specifications,1999
SART; Contract Documents,1999
Box
169 Contract and Specs for Flood Gate Instrumentation,1999
Box
191 SAR and SPC Tunnel Slides,undated
Box
196 Corps of Engineers Design; Slides,undated
Various; Photos,undated
Box
205 Presentation Slides,undated
Box
206 SART Presentation; Slides,undated
Various; Slides,undated
Box
207 SARA Employees in Tunnel photos and negatives,undated
San Antonio River Improvements Project (SARIP)
Box
206 River Loop; Slides,1995-1996
Box
153 River Loop Water Quality/Analyses,1995-1999
Box
148 San Antonio River Loop Water Quality/Analysis,1996
Box
196 Riverwalk; Photos,1996
Box
86 Stream Management and Channel Design Workshops and Report,1998
Public Meetings Report,1998
Box
153 River Walk Connection/Link; General Correspondence,1998
Box
85 Correspondence,1998-1999
Box
154 Riverwalk Connection/Link Correspondence and Slides,1998-1999
Box
148 River Walk Connection/Link; General Correspondence,1998-2000
Box
186 Hildebrand/Lexington and Guenther/Espada Mission; Design Correspondence,1999
Box
86 Stream Management-Concepts and Methods in Stream Protection and Restoration,1999-2000
Box
137 Mission Reach - General Correspondence,1999-2004
Box
140 Eagleland Planning Document and Correspondence,1999-2004
Box
139 Mission Reach; General Correspondence,1999-2008
Box
199 Downtown, River Draining; Slides,1999
Box
86 Planning Document Vol. 1,2000
Box
137 Mission Reach - Symphony Lane Neighborhood Flood Relief Proposal,2000
Box
OM5 Mission Reach Design Review Guidelines, Schematics,2001-2010
Box
163 Limited Phase I Environmental Site Assessment Volumes I and II,2002
Box
137 Eagleland - Amendments to Eagleland Restoration Project,2002-2003
Box
136 SARIP Museum Reach Progress Photos,2002-2008
Box
137 Eagleland - Floodplain Environmental Restoration Report,2003
Box
139 Eagleland - Environmental Restoration Plans,2003
Box
165 Eagleland Lot Fill Correspondence and Photos,2004
Box
137 SARIP General Correspondence,2004-2007
Box
103 Mission Reach Ecosystem Restoration Correspondence,2005
Box
136 Physical Model Study of SAR Lock System,2005
Box
137 SARIP RFQ - Lorna Jordan Studio/Bender Wells Clark Design; Correspondence,2005
Box
136 Intensive Pedestrian Survey along the Banks of the SAR, Archaeological Survey,2006
Box
137 Museum Reach - Final Compensatory Mitigation Plan,2006
Museum Reach - Construction Documents Vol. 1 Civil Landscape Irrigation,2006
Museum Reach - Construction and Maintenance Agreement,2007
Mission Reach - Southton Road Area; General Correspondence,2007-2008
Museum Reach - Zachry Construction Timeline,2007-2009
Museum Reach - SARA Certificate of Substantial Completion,2007-2009
Museum Reach - Progress Photos,2008
Mission Reach - Relocation of TXDOT/Transguide Fiber Optic Cable; General Correspondence,2008
Mission Reach - Contract and Specifications for Mission Reach Ecosystem Restoration And Recreation Enhancement,2009
Box
196 Downtown Reach; Slides,undated
Box
205 SAR Loop and Extension Slides,undated
San Antonio Barge and Canal Projects
Box
84 Public Hearing,1962-1963
Project documents, correspondence, and news clippings (including letter from Henry B. Gonzalez),1963-1972
Correspondence, Maps, Newsclipping, and Navigation Study,1967-1970
San Antonio Bridges
Box
129 Buena Vista and Commerce St Bridges over Alazan Ck; Proposal and Specs,1960
Guadalupe St Bridge over Alazan Ck; Plans and Correspondence,1960
El Paso St Bridge over Alazan Ck; Specifications,1962
Tampico St. Bridge over Alazan Ck; Specifications,1962
San Jacinto St Bridge over Alazan Creek; Proposal and Specifications,1963
Box
138 Cavallos St. Bridge at SPC Proposal and Specs,1963
Brazos St. Bridge at Apache Ck. Specifications,1963
Box
145 Cevallos St. Bridge over SPC Proposal and Specifications,1963
Box
128 Demolition for Houston St. Bridge across Alazan Creek; Correspondence and Agreements,1963-1964
Box
140 Poplar Street Bridge over Alazan Ck; Contract, Proposal and Specs,1963-1966
Box
138 Ruiz St. Bridge over Alazan Ck. Proposal and Specs,1964
Zarzamora St. Bridge over Alazan Ck. Proposal and Specifications,1964
Box
140 Zarzamora St. Bridge over Alazan Creek; Correspondence and Plans,1964-1989
Ruiz St. Bridge over Alazan Ck Correspondence and Plans,1964-1989
Box
128 Ruiz St. Bridge at Martinez Creek; Proposal and Specifications,1965
Box
138 Waverly Street Bridge at Alazan Creek Proposal and Specs,1965
Box
140 Waverly Street Bridge at Alazan Creek; Correspondence and Contracts,1965-1999
Box
128 Ruiz St. Bridge at Martinez Creek; Contract/Agreement,1966
Poplar Street Bridge at Martinez Ck; Contract, Proposal and Specifications,1966
Box
147 Alamo Street Bridge over SAR; Blueprints,1966-1969
Alamo Street Bridge over SAR; Correspondence and Contract,1966-1969
Alamo Street Bridge over SAR; Correspondence and Planning,1966-1975
Box
128 Fredericksburg Road Bridge over Martinez Creek; Contract, Proposal and Specifications,1966, undated
Box
145 King William St. Bridge at SAR Proposal and Specs,1967
Box
128 Sabinas Street Bridge on Martinez Ck; Agreement and Contract,1968
Culebra Avenue Bridge at Martinez Ck; Agreements, Proposal and Specifications,1968-1969
Box
147 King William Bridge over SAR; Correspondence and Proposal,1968-1992
King William Bridge over SAR; Blueprints,1968, undated
Box
128 Cincinnati Bridge over Martinez Ck; Correspondence, Proposal and Specification,1969-1970
Woodlawn Ave Bridge over Martinez Ck; Agreements and Plans,1969-1970
San Antonio Flood Control Projects
19th St. Bridge/Dam at Apache Creek,
Box
143 Contract Documents and Specifications,1970-1973, undated
Box
141 Proposal and Specifications,1972
General Correspondence,1972-1990
Box
143 Gates; Photos,1973, undated
General Correspondence and Plans,1989-1998
Box
141 Gate Replacement Contract Documents and specifications,1993
Box
210 Gate Replacement; Photos,1994-1995
Box
129 Progress Photos,1993-1995, undated
Box
144 Gate Replacement; General Correspondence,1993-1997
Box
129 Completion Ceremony Invitation and Program,1995
Box
205 Slides,1995
Box
129 Gate Replacement; Photos,1997
Box
OM4 Bridge X-ray negatives/film and prints,undated
Box
191 slides,undated
San Juan/Asylum/No Name Rectification
Box
138 San Juan Ditch Pump Station Proposal,1960
Box
125 San Juan Dam Proposal and Specifications,1965
Box
200 Slides,1965-1977, undated
Box
138 Contract and Bond Agreement for Espada, San Juan Ditch Relocation,1970
Box
126 Correspondence and Plans,1977-1980
General Correspondence and Meetings,1978-1988
Box
139 San Juan Dam; General Correspondence,1985-1990
Box
126 General Correspondence, Plans, and Status Reports,1987-1988
Box
127 General Correspondence,1987-1992
Box
125 San Juan Dam; Photographs,1988
Box
126 General Correspondence,1988
General Correspondence and Plans,1988
Box
191 San Juan Dam; Photos,1988
Box
139 San Juan Dam; General Correspondence,1988-1989
Box
125 Environmental Studies of Asylum Creek and No Name Creek,1988-1991
Box
138 Archaeological Investigation of the San Juan Dam,1989
Box
126 General Correspondence,1989-1997
Box
127 General Correspondence,1990-1991
Box
207 San Juan Acequia,1991
Box
127 Photos,1991, undated
Box
207 San Juan Ditch at No Name, SAR at Symphony Lane; Slides,1991, undated
Box
125 Contract Documents and Specifications, Volume 1,1992
Contract Documents and Specifications, Volume 2,1992
Box
127 General Correspondence,1992
Box
128 Progress Photos,1992-1993
Box
127 Photos,1992-1994
Box
206 Asylum Creek and San Juan Pumphouse Presentation; Slides,1992-1996
Box
127 General Correspondence,1992-1997
General Correspondence,1993
Box
191 Slides,1993
Box
128 Progress Photos,1993-1994
Box
138 Archaeological Surveys,1993-1994
Box
202 Survey Photos,undated
Box
207 Slide Presentation,undated
Box
84 Bexar Co. Flood Control General Correspondence and maps,1920-1998
Box
182 Elevations of High Water Marks Left by Floods,1946-1998
Box
128 Contracts between Bexar County and SARA/River Canal and Conservancy District,1951, 1955, 1960
Box
84 General Correspondence and contracts,1955-1992
Box
138 Proposal and Specifications for Construction of Slope Protection at Various Bridges,1958-1965
Box
142 Demolition of incinerator and slope protection at Apache Ck contracts and proposal,1958-1966
Box
128 Box Culverts at Olmos and San Francisco; Proposal for Construction,1959
Box
138 Roosevelt Park Drainage Proposal and Specs,1961
Box
140 Perez/Trinity Sewer Relocation at Alazan Ck Correspondence and Plans,1961-1965
Box
128 Alazan Creek Retaining Wall; Correspondence,1962
Box Culverts across Alazan Ck. Channel at W. Martin St; Proposal and Specifications,1963
Box
145 San Pedro Creek Sheet Piling- Alamo to Camp Street Proposal,1963
Box
140 Alazan Ck. Sewer Relocation correspondence and specs,1963-1965
Box
142 Fill Under Railroad at Apache Ck. Correspondence and Plans,1963-1967
Box
140 Apache Creek Storm Drain, Phases A and B,1963-1969
Box
147 SAR Erosion Control and Protection; General Correspondence,1963-1970
Box
140 Erosion Control at Camp St and SPC; Correspondence and Plans,1964-1965
Box
142 Apache Ck Storm Drain Phase B Proposal and Specs,1965
Box
145 Various Slope Protection and Erosion Control projects,1965
Lone Star Bridge and Sewer on SAR,1965
Box
140 Alazan and Apache Creek Slope Protection Contracts,1965-1966
Brazos Street Bridge Slope Protection correspondence,1965-1966
Box
201 Flooding, various; Slides,1965-1986
Box
142 Slope Protection on Alazan Ck Proposal and Specs,1966-1967
Box
145 Cutoff Modifications at SAR Proposal and Specs,1967
Box
157 Flood Plain Management Assorted Pamphlets, Maps, and Reports,1968-1976
Box
172 Flood Plain Management Plans; Floresville and Assorted Correspondence,1970, undated
Box
168 Medina River Special Flood Hazard Report,1972
Box
172 Flood Plain Management Plans; Olmos Creek Correspondence,1973-1978
Box
155 Flood Plain Management; Assorted Maps and Blueprints,1974-1979
Box
196 Cibolo and Salado Creeks Flooding; Slides,1976, undated
Box
168 Flood Plain-Subdivision Plat Review; General Correspondence, Maps, Plans,1978-1981
Box
172 Flood Plain Management Plans; Information Requests and Correspondence,1980-1981
Box
155 Flood Plain Management; Assorted Correspondence and Plans,1980-1993
Box
182 Flood Plain Subdivision Plat Reviews,1982-1983
Box
155 Flood Plain Management; Blueprints,1982-1987, undated
Flood Plain Management; Correspondence and Work Orders,1982-1988
Box
170 SAR Early Flood Warning System Plans and Correspondence,1985-1990
Box
196 SAR Flood, Olmos Basin to Southtown,1986
Flood of 1986, various locations; Photos,1986
Box
176 Dam Safety Studies for Calaveras and martinez Creek - Report,1987
Box
168 Flood Damage Prevention Court Order/Revisions,1987
Box
172 Flood Plain Management Plans; General Correspondence and Plans,1988-1992
Box
143 Elmendorf Lake Improvements Correspondence and Plans,1988-1994
Box
176 Potential for Extreme Precipitation in South Central Texas - Report,1989
Box
143 Elmendorf Lake Improvements Contracts and Proposals,1989-1990
Box
182 Water Outfall Structures; Photos,1989-1990, undated
High Water flood Event, ashley Road; Photos, Maps,1993
Box
166 Flood Gate Instrumentation/Controls Project- Phase I; General Correspondence,1993-1997
Box
86 Capital Project Application,1996
Bexar Co./SARA Flood Control Contracts: A Status Report,1996
Box
89 Capital Project Application,1996
Box
87 Correspondence and Engineering Analysis Report,1996-1997
Shortlist Requests-for-Proposal,1996-1997
Box
172 SAWS Materials Testing Correspondence,1996-1997
Flood Plain Management Plans; Public Hearing Correspondence and Plans,1996-1997
Box
85 Spencer Lane,1997
Box
86 SAR Flood Control Channel Modifications Preliminary Engineering Analysis Report,1997
Supplement to SAR Flood Control Channel Modifications Preliminary Engineering Analysis Report,1997
Supplement to SAR Flood Control Channel Modifications Preliminary Engineering Analysis Report,1997
Box
87 SAR Flood Control Spencer Lane Report and Presentation,1997
Public Meeting Correspondence,1997-1998
Box
191 South SAR, Flood of 1998; Photos,1998
Box
87 Engineering Analysis Report Correspondence,1998-1999
Box
138 Salado Creek Floodwater Retarding Structure Correspondence,2004
SARA Office Building and Hardscape Riverside
Box
137 Facilities Main Office Expansion Project,2005-2006
Box
D21 Assorted SARA building renovation plans and sketches,undated
Box
OM1 San Antonio River Authority building renovation,undated
Box
OM2 SARA building preliminary renovation plans,undated
SARA building renovation plans,undated
Box
OM3 SARA building renovation plans - copy,undated
Sewer Projects
Salatrillo/Martinez Wastewater Treatment Plant (WWTP)
Box
190 General Correspondence, inc. Converse Sanitary Systems,1959-1980
Box
191 Martinez II Resolutions and Ordinances,1962-1998
Box
190 Martinez Outfall Line Report and Correspondence,1963-1980
Box
191 Northview Mobile Home Villa Project Documents and Photos,1964-1978
Box
189 Salatrillo Expansion; General Correspondence,1964-1987
Salatrillo Expansion; General Correspondence,1965-1991
Box
190 Contracts and Correspondence,1968-1986
Box
200 Slides,1970-1981
Box
190 Contracts and Ordinances,1970-1999
Contracts and Correspondence,1972-1987
Contracts and Correspondence,1972-1987
Box
176 Salatrillo Watershed Sanitary Sewer System Infiltration/Inflow Evaluation,1974
Box
190 Plans and Contract Amendments,1974-1979
Martinez Plant Expansion Land Acquisition Documents,1977-1984
Box
176 Salatrillo/Martinez Step II; Project Documents, General Correspondence,1978-1981
Box
184 Step III Correspondence and Plans,1980-1981
Box
160 Salatrillo/Martinez Plant Expansion and Upgrading Specifications, Part I, Vol. I, Set 2,1981
Salatrillo/Martinez WWTP Rehabilitation Specifications, Part II, Vol. I, Set 2,1981
Box
163 Step III Salatrillo/Martinez Rehabilitation Contract Documents and Specifications,1981
Salatrillo/Martinez Plant Expansion and Upgrading EPA Project addendums,1981
Box
184 Expansion and Upgrading Correspondence,1981-1982
Box
176 Salatrillo/Martinez Step III; General Correspondence,1981-1984
Box
185 Salatrillo/Martinez WWTP Expansion and Upgrading, Step III; General Correspondence,1981-1985
Box
189 Salatrillo Project Documents,1981-1992
Box
162 Correspondence and Plans relating to Expansion, Collection Systems, Outfall Line, and Relief Line,1981-1996
Box
160 Salatrillo/Martinez WWTP Expansion and Upgrading Specifications, Part I, Vol. IA, set 3,1982
Box
163 Salatrillo/Martinez Plant Expansion and Upgrading General and Technical Specifications Part I Volume I B,1982
Box
176 Salatrillo/Martinez WWTP Expansion and Upgrading; General and Technical Specifications Part I Volume IA and IB,1982
Box
177 Salatrillo/Martinez WWTP Collection System Rehabilitation Correspondence and Cost Estimates,1982
Box
178 Sanitary Sewer Line Relocation at FM 1976; Specs and Plans,1982
Box
184 Expansion Contract and Specs, Part I Vol 1B,1982
Box
159 Salatrillo/Martinez WWTP Expansion Correspondence,1982-1984
Box
216 Expansion and Upgrading, Progress Photos,1982-1999
Box
164 Salatrillo/Martinez Expansion, Step III; General Correspondence,1983
Box
177 Salatrillo/Martinez WWTP Collection System Rehabilitation Correspondence and Cost Estimates,1983
Box
198 Salatrillo/Martinez Expansion Photos,1983-1986
Box
103 Photographs,1983-1987
Box
189 Salatrillo Expansion and Land Acquisition; General Correspondence,1983-1997
Box
209 Expansion and Upgrading Manual and Progress Photos,1983, undated
Box
164 Salatrillo/Martinez Expansion, Step III; General Correspondence,1984
Box
191 Martinez II Correspondence and Agreements,1984
Box
161 Salatrillo/Martinez WWTP Expansion and Upgrading; General Correspondence,1984-1985
Box
158 Martinez II Phase 1; General Correspondence,1984-1987
Box
191 Martinez II Correspondence and Agreements,1984-1989
Box
135 Martinez II/Salatrillo Photos,1985
Box
156 Martinez II WWTP Final Design Report,1985
Martinez II WWTP Design Calculations,1985
Martinez II WWTP, Phase I; Progress Photos,1985
Martinez II WWTP Contract Documents and Specifications,1985
Box
158 Martinez II Phase 1; General Correspondence,1985
Box
159 Martinez II Phase 1 Construction; Plans and Blueprints,1985
Box
161 Martinez II Phase I General Correspondence,1985
Box
176 Martinez II Phase I; Submittal Package, Installation Operation, and Maintenance Manual,1985
Box
135 Martinez II/Salatrillo Phase I Operations and Maintenance Photos,1985-1986
Box
178 Salatrillo WWTP Parallel Outfall Line; General Correspondence,1985-1986
Box
186 Martinez II Sanitary Sewer Outfall Line; Proposal,1985
Box
160 Mid-Salatrillo Relief Line Preliminary Report,1986
Salatrillo Parallel Outfall Line Contract Documents and Specifications,1986
Box
163 Martinez II Phase I Construction; Progress Photos,1986
Box
164 Martinez II Phase I Construction; Progress Photos,1986
Box
176 Martinez II Phase I; Plans,1986
Box
191 Martinez I; Photos,1986
Box
202 Salatrillo Parallel Outfall Line Photos,1986
Box
159 Martinez II Phase I Construction Reports and Correspondence,1986-1987
Box
161 Martinez II Phase I; General Correspondence,1986-1988
Box
190 Martinez Creek Agreements and Correspondence,1986-1997
Box
186 Martinez I Relief Line; General Correspondence,1987-1988
Box
190 Correspondence and Agreements,1987-1998
Box
160 Mid-Salatrillo Relief Line Contract Documents and Specifications,1988
Mid-Salatrillo Sewer Relief Line Geotechnical Study,1988
Box
163 Martinez I Relief Line Contract Documents and Specifications,1988
Box
186 Martinez I Relief Line; General Correspondence,1988-1989
Box
163 Martinez I Relief Line Subsurface Exploration and Subgrade Analysis,1989
Box
190 Ventura Outfall Correspondence,1989-1991
Box
191 Martinez II Contracts and Ordinances,1989-1997
Box
189 Salatrillo Expansion; General Correspondence,1989-2004
Box
158 Upper Martinez WWTP Dechlorinization Report and Project Specifications,1990
Box
163 Mid Martinez/Ventura Sewer Relief Line Contract Documents and Specifications,1990
Martinez I Sanitary Sewer Interceptor Line Geotechnical Study,1990
Martinez I Interceptor Contract Documents and Specifications,1990
Box
158 Upper Martinez WWPT; General Correspondence,1990-1991
Box
163 Mid Martinez/Ventura Sanitary Sewer Relief Line Geotechnical Study,1991
Box
161 Salatrillo Plant Expansion and Disinfection Project,1991-1992
Box
163 Mid Martinez/Ventura Outfall; General Correspondence,1991-1992
Box
161 Salatrillo/Martinez Sludge Facilities; General Correspondence,1991-1994
Box
189 Salatrillo Sludge Facilities Treatment; Photos,1991-1998
Box
187 Salatrillo and Upper Martinez WWTP Sludge Facilities to Reduce pathogens, Vol. 1 , Contract Documents and Specifications,1992
Martinez I and Martinez II REclaimed Water Reuse Study,1992
Salatrillo Reclaimed Water Reuse Study,1992
Box
189 Salatrillo Sludge Facilities; General Correspondence,1992
Box
177 Salatrillo/Martinez WWTP Parallel Relief Line Correspondence,1992-1994
Box
190 Placid Park/Foster Rd Rehabilitation Correspondence and Report,1992-1999
Box
167 Martinez I - Glen Shadow Relief Line; Geotechnical Study,1993
Box
177 Martinez/Salatrillo EPA General Permit Requirements and Maps,1993
Salatrillo/Martinez WWTP Relief Line Contract and Safety Reports,1993-1994
Salatrillo/Martinez WWTP Parallel Relief Line Correspondence and Contracts,1993-1995
Box
189 Salatrillo/Martinez; General Correspondence,1994-1998
Box
166 Salatrillo/Martinez - Placid Park Force Main Rehabilitation Project; General Correspondence,1995
Box
167 Salatrillo/Martinez - Placid Park/Foster Road Force Main Rehabilitation Project Contract Documents and Specifications,1995
Salatrillo/Martinez - Ventura I Parallel Outfall Line, RFP,1995
Salatrillo/Martinez - Ventura I Parallel Outfall Line; Geotechnical Study,1995
Box
166 Salatrillo/Martinez - Foster Road Force Main Rehabilitation; General Correspondence,1995-1996
Martinez I - Phase I Upper Ventura Parallel Outfall Project,1995-1997
Box
161 Martinez IV WWTP; General Correspondence,1995-2001
Box
156 Upper Martinez WWTP/UV Disinfection System Final Design Report,1996
Box
167 Salatrillo/Martinez - Upper Ventura Parallel Outfall, Phase I Contract Documents and Specifications,1996
Box
166 Martinez I - Glen Shadow Relief Sewer; General Correspondence,1997
Box
167 Salatrillo/Martinez - Upper Ventura Parallel Outfall, Phase I, Final Waiver,1997
Box
173 Martinez I Clarifier Structural Repairs; General Correspondence,1997
Box
179 Salatrillo/Martinez WWTP Expansion Contracts and Specs,1997
Box
183 Proposals and Specs for Secondary Clarifier Equipment,1997
Box
185 Salatrillo WWTP Average Daily Flow Final Engineering Report,1997
Salatrillo WWTP Ultraviolet Light Disinfection System Contract Documents and Specifications,1997
Box
158 Upper Martinez WWTP/UV Disinfection System Project; General Correspondence,1997-1998
Box
181 Salatrillo I Expansion General Correspondence,1997-1998
Box
213 Salatrillo Expansion Photos,1997-1998
Box
156 Martinez III WWTP 480 Volt Switch Proposal Documents and Specifications,1998
Box
189 Salatrillo Capacity Analysis,1998
Box
138 Martinez III Wastewater Treatment Plant; General Correspondence,1998-1999
Box
156 Salatrillo WWTP Expansion Progress Photos,1998-1999
Box
189 Salatrillo/Martinez; General Correspondence,1998-2002
Box
156 Martinez III WWTP Collection System, Phase I Contract Documents and Specifications,1999
Box
190 Correspondence and Plans regarding Universal City,1999-2000
Box
187 Martinez II WWTP Expansion and Conversion to UV Contract Documents and Specifications,2000
Box
190 Correspondence and Agreements,2000
Box
156 Salatrillo WWTP Bid Proposals and Specifications for Rotoscreen and Screw Wash Press,2001
Box
189 Salatrillo Rotoscreen and Screw Wash Press Contract Documents and Specifications,2001
Box
190 Correspondence and Plans,2001
Box
156 Martinez II WWTP Expansion, Mobile Office Bid Proposals and Specifications,2002
Box
160 Upper Ventura Parallel Outfall Line; Phase II Contract Documents and Specifications,2002
Lower Salatrillo Parallel Outfall Line, Phase II Geotechnical Study,2002
Box
165 Salatrillo Parallel Outfall Phase II; Signed Contract and Specs,2002
Box
189 Salatrillo/Martinez; General Correspondence,2002-2005
Box
172 Salatrillo/Mart I/Mart II Solids Management Improvements Contract,2003
Box
173 Martinez II; General Correspondence,2003
Box
190 Outfall Correspondence,2003
Box
187 Martinez - Woodlake Outfall Rehabilitation Contract Documents and Specifications,2005
Salatrillo - Miller Ridge Sanitary Sewer Line Replacement Contract Documents and Specifications,2006
Salatrillo - Miller Ridge Sanitary Sewer Line Replacement Phase II Contract Documents and Specifications,2008
Box
138 Martinez II Wastewater Treatment Plant Contract and Report,2008-2009
Box
173 Martinez II WWTP Expansion Contract Documents and Specifications (Cancelled),2009
Box
189 Site Photos,undated
Box
191 Slides,undated
Box
196 Various; Photos,undated
Wastewater Systems Management
Box
189 Eagle Scout Service Project: Report on Water Pollution in Cibolo Creek,1969
View contents
Industrial Waste; General Correspondence,1971-1985
Box
188 Presentation Material; General Correspondence,1975-2008
Box
189 Suggested Model Sewer Use Ordinance, Texas Department of Water Resources,1982
Industrial Waste Order, Cibolo Creek Municipal Authority,1983
Industrial Waste; General Correspondence,1985-1994
Industrial Waste Ordinances and Regulations,1989,1990, undated
Waste Grant: General Correspondence,1996
Land Registration; General Correspondence,1996
Right-of-Entry Agreement, SARA and CPS Energy,2008
Box
129 Sanitary Sewer Main along Alazan Creek; Proposal and Specifications,1960
Box
138 Alazan Creek- Poplar Street Sewer Relocations Invitation for Bids,1963
Alazan Creek-Sanitary Sewer Adjustment at Salinas/San Jacinto; Proposal and Specs,1963
Sanitary Sewer at Hidalgo St and Apache Ck Specs,1963
Box
128 SARA Specs for Sanitary Sewer Adjustments along SPC and Martinez Ck.,1966
Box
172 Wastewater Treatment Plant Improvements Correspondence,1978-1984
Box
164 Martinez I Outfall Relief Line; General Correspondence,1989-1991
Martinez I Outfall Relief Line; General Correspondence,1989-1993
Martinez I Interceptor; General Correspondence,1990-1991
Box
163 Salatrillo Plant Expansion and Disinfection Contract Documents and Specifications,1991
Box
158 Churchill Estates Sewage Collection System Documentation,1995
Box
155 Martinez II/Salatrillo WWTP Expansion; General Correspondence,2000-2001
Box
156 Glen Grove Sanitary Sewer Rehabilitation Contract Documents and Specifications,2000
Box
165 Randolph AFB WW Collection System; Correspondence and contract,2002-2006
Box
136 Camelot CIP Contracts and Specifications,2003
Box
187 Universal City Outfall Replacement Phase I and II Contract Documents and Specifications,2003
Box
164 Universal City Outfall Replacement Phase II; Contract Documents and Specifications,2004
Box
165 Glen Subdivision Phase II Sewer Line Replacement; Contract and Bids,2004-2005
Box
186 Glenmont Rehabilitation; Contract and Specs,2004
Box
138 Geotechnical Study; Universal City Outfall Replacement Phase II,2004
Box
164 Randolph AFB WW Collection System; General Correspondence,2005
Box
187 HWY181 South Outfall Line Contract Documents and Specifications,2005
Box
138 RFP for Design/Construction of Sewer Projects, Potable Water, and Parks Services Projects,2008
Woodlawn Lake
Box
196 Dam; Negatives,undated
Bexar County Projects Assorted
Box
138 Apache Creek- Slope Protection contract for Tampico/San Jacinto,1963
San Pedro Creek-Sheet Piling-Alamo to Camp Street,1963
Box
142 Various Channel Protection Projects,1966-1975
Box
139 Landscape Architect fense designs,1981
Box
182 Leon Creek; General Correspondence, Photos, Plans,1985-1990
Box
137 Contract and Specifications for Elmira Street Parking Lot,2008
Contract and Specifications for Crofton And Constance Park,2009
Box
139 Woodlake Golf Course (on Martinez Ck.) Reuse Water Project Contract Renewal,2009-2010
Goliad County Projects Assorted
Box
141 Berclair Centralized Water System - Goliad Co.Water Supply Corp.,2003
Box
137 Contract and Specifications for Flood Debris Clean-up along SAR,2008
Contract and Specifications for Flood Debris Clean-up along SAR,2009
Karnes County Project Assorted
Box
188 Various Projects; General Correspondence,1979-2008
Box
158 Notice of Termination - Nicols Creek Channel Repair Project,1997
Wilson County Projects Assorted
Box
172 Dietz Field Bridge Correspondence and Photos,1970-1988
Box
182 Lodi Branch Drainage Project (City of Floresville) Contract Documents,1976
Box
141 FEMA Hazard Mitigation Grant Documents,2002
Box
137 Contract and Specifications for Flood Debris Clean-up along Cibolo Creek,2006
Contract and Specifications for Flood Debris Clean-up along SAR,2006
Contract for Creekwood Well Replacement,2009

Return to the Table of Contents




Reports/Studies

The Reports/Studies series is organized by federal, state, regional, and local reports. Additionally, some reports deal with water supply diversion and water conservation.
Box
20 Federal
Box
23 "Interterritorial Freight Rate Problem of the United States,"1937
State of New York Public Works annual report,1937
"Railroad Freight Classification No.12,"1938
War Production Board - Facilities Unit Procedure,1942
Interterritorial Freight Rates summary report,1943
"Interstate Commerce Commission Freight Rate Service Costs,"1943
Box
20 National Rivers and Harbors Congress,1943-1944
Box
30 U.S. Senate Subommittee of Public Works SARA Request for Appropriations,1963
U. S. Army Corps of Engineers Navigation Study of the San Antonio River,1963
Box
1 Feasibility and development reports,1966
Federal acts for feasibility development studies,1966-1970
Committee on Interior and Insular Affairs,1968-1971
"The Reclamation Development Act of 1974,"1974
Box
5 Department of the Interior report "Failure of Teton Dam,"1976
Department of the Interior "General Design Memorandum,"1979
Box
3 Department of the Interior fish and wildlife mitigation policy,1980
Box
80 "Computing Water Surface Profiles with HEC-2 on a Personal Computer," U.S. Army Corps of Engineers,1988
HEC-2 Water Surface Profiles Users Manual,1990
Box
117 San Antonio North Expressway Study - US Dept. of Transportation,1971
Box
1 State of Texas
Box
8 Comprehensive State Water Plan
Correspondence, notes, reports,1959-1965
Notes from conference,1962
Box
9 Official documents,1964-1967
Box
8 Correspondence, notes, reports,1965-1966
Correspondence, notes, reports,1965-1966 and undated
Notes, maps,1966-1967
Correspondence, 1966-1967
Correspondence, maps, notes, reports,1966-1971
Box
81 Texas River Basins summary,2008
Box
8 Official statement of SARA, undated
Map, undated
Box
23 Enviromental Studies
Clays of South and Southwest Texas,1929
Box
4 Texas Society of Professional Engineers small empoundment effect study,1970-1974
Box
1 Texas Water Quality Board order, 1971
"High Radioactivity in Drinking and Ground Water in South Texas,"1973
Box
3 South Texas Studies of fish and wildlife resources in the Nueces-Corpus Christi Bay Area,1980
Box
23 Texas Industrial and Commercial Research Council report, undated
Shipping and Production
Shippers Digest of Galveston,1934
Cotton Production reports,1938
Corpus Christi Merchandise Class rates, 1941-1943
Box
4 Texas Water Commission
Texas Water Commission Guadalupe River Basin certified filings,1964
Texas Water Commission task force,1963
Box
30 Trans-Texas Water Program
Report,1994
Box
31 Interim report volume 2,May 1994
Interim report,November 1994
Water issue survey report,September 1996
Interim report volume 5,1996
Box
32 Phase II report letter of intent analysis,October 1996
Public participation/stakeholder involvement plan,February 1997
Box
31 Public participation/stakeholder involvement plan,February 1997
Integrated Resource Planning Committee final criteria report,March 1998
Public participation/stakeholder involvement program final report,March 1998
Comments,March 1998
Population, Water Demand, and Water Supply Projections,March 1998
Summary report of water supply alternatives,March 1998
Updated evaluation of potential reservoirs in the Guadalupe River Basin,March 1998
Edwards Aquifer Recharge Analyses,March 1998
Box
4 Water Development and Planning
"The Irrigation Potential of Kinney, Uvalde, Median, Bexar, Hays and Comal Counties, Texas,"1959
Box
2 Alternate plan for water delivery to San Antonio,1963
Box
8 Texas Water Development Corpus Christi hearing,1966
"Water for Texas: A Plan for the Future,"1966
Proposed Constitutional Amendment No. 11 and the Texas Water Development fund,1966
"Water for Texas: Planning for the Future,"1983
Box
5 Water Supply Diversion Reports
Maps and charts,1956-1963
Box
4 1963-1964
Guadalupe,1963-1964
Guadalupe,1963-1966
1963-1966
1982-1984
Box
1 State Reports Assorted
Box
4 U.S. Study Commission - Texas,1959
Box
1 Statewide Water Recreation Study Committee reports, hearings, 1958-1964
Box
4 Texas State Board of Engineers Colorado River Basin reports,1960-1962
Box
7 Texas Water Quality Board notice of public hearing,1970
Box
13 Regional Councils in Texas status report and directory,1975
Box
12 State Mitigation reports,1976-1977
Box
15 Texas Department of Water Resources statement and report,1978-1985
Box
12 Texas Water Resources directories,1981
Texas Water Conference proceedings,1982
Box
1 "Watershed Progress Report,"1984
Box
18 State Auditor report,1986
Box
17 Historic South Texas floods, use of state water,1989 and undated
Box
32 Regional assessment of water quality pursuant to the Txas Clean River Act,December 1992
Box
49 Committee of Six: Regional Flood Control, Drainage and Storm Water Management Program,January-February 2003
Committee of Six: Regional Flood Control, Drainage and Storm Water Management Program,April 2003
Committee of Six: Regional Flood Control, Drainage and Storm Water Management Program,September 2003
Committee of Six: Regional Flood Control, Drainage and Storm Water Management Program,October 2003
Committee of Six: Regional Flood Control, Drainage and Storm Water Management Program,March 2004
Annual Water Conference reports, 2005-2008
Box
1 Processing procedure flowchart, undated
Box
13 Bexar County
Alamo Area Council of Governments (AACOG)
Reports and related documents,1965-1967
Organizational documents,1966-1970
Reports and organizational documents,1967-1969
Correspondence and related documents,1968-1969
Program,1969
Government Applicaton Review,1964-1972
Health Service Delivery Systems,1970
Reports and related documents,1970-1978
Government Applicaton Review,1971-1977
Federal Assistance applications,1979
Correspondence,1980-1983
Government Application Review,1980-1985
Membership directory,1986
Newsletter,1987
Box
59 Letter and cd,2005-2006
Box
30 Conceptual Plans
Conceptual plan for the San Antonio River from Nueva Street to Highway 281,1993
Box
29 Conceptual plan for Guenther Street to Espada Dam,1998
Flood Plain Information
Bexar County flood control,1960
Apache Creek,1970
Rosillo Creek,1970
Olmos Creek,1972
Cibolo Creek,Universal City,Schertz,1973
Huebner Creek,Leon Valley,1973
410 to Bexar County line,1975
Box
80 Bexar County Flood Analysis volumes 1 and 2, 1999
Box
9 San Antonio and Bexar County Urban Transportation Study (SABCUTS),
San Antonio Housing Authority,1968-1985
Box
12 Report,1969
Maps, reports, correspondence,1970-1974
Maps, reports, correspondence,1975-1978
Box
29 San Antonio Channel and Salado Creek Watershed
Brochure,1964
Box
28 Reports,1964-1965
Box
29 Project review,1969
Box
30 Channel Improvement status report,1970
Box
78 Salado Creek Watershed environmental assessment,1974
Salado Creek Watershed flood prevention report,1975
Box
29 Status report,1975
Box
78 Salado Creek Watershed status report,1980
Box
30 Revenue Bonds report,1980
Box
17 Reports,1988
Box
28 Status report,1989
Box
15 Status report,1989
Box
4 San Antonio River Basin
"Potential Municipal and Industrial Water Requirements for the San Antonio River Basin,"1960
Box
28 Interchange of water between Guadalupe and San Antonio River Basins,1963
Box
79 Water availability study volumes 1 and 2,1986
Box
28 Regional assessment of water quality,1992
Box
29 Regional assessment of water quality,1996
Box
17 Summary report for the San Antonio River Basin,2003
Box
49 Basin Summary report,2003
Basin Highliights reports,2003-2009
Box
28 Highlights reports,2004-2007
Box
15 San Antonio River Basin Highlights report,2007
Box
49 Basin summary report,2008
Box
23 Reports Assorted
Box
42 Water Resources of the Edwards Limestone in the San Antonio Area,1936
Box
4 "Estimated Water Use 1960-2000,"1956
Box
29 Martinez Creek Watershed work plan,1958
Box
4 "San Antonio's Surface Water Problem,"1962
"The Role of the Edwars Reservoir in the San Antonio Water Story,"1963
Box
30 Surface water for San Antonio,1963
Water Quality Improvement,1968
Box
7 Bexar Metro Water District 27th annual report,1970
Box
9 City of San Antonio Drainage Task Force report,1972
Box
32 San Antonio River Corridor interim report,1973
San Antonio River Corridor plan for development and managment,1973
Box
79 San Antonio River Corridor plan for development and managment,1973
Box
42 Alamo Soil and Water Conservation District Annual Report,1974
Box
7 "Progress Report on Geology of the Edwards Aquifer and San Antonio Area . . .,"1976
Box
30 Magnitude of Nonpoint Sourve of Urban and Rural Runoff -San Antonio River Study,1977
Box
5 Water conservation,1977-1979 and undated
Box
17 San Antonio flood control, 1978-1982
Box
5 City of San Antonio Water Resources Task Forces reports and correspondence,1978-1984
Box
17 Olmos Dam modifications, outline for history,1979 and undated
Box
3 Hearing for water code section permit,1981
Box
9 City of San Antonio Drainage Task Force correspondence and reports,1981-1982
Box
81 "Archaeological Investigations at 41, Bx 1, Bexar County, Texas,"1988
Box
32 San Antonio Riverwalk and Flood Control nomination as a National Historic Civil Engineering Landmark,November 1995
Box
80 "Use of Rapid Bioassessment Protocols to Evaluate Aquatic Ecosystems of Streams in the San Antonio Watershed,"1996
Box
49 Countywide Watershed Master Plan final report,February 2001
Countywide Watershed Master Plan action plan,September 2001
Box
50 109th Congressional Session FY 2006 appropriations request,March 2005
109th Congressional Session FY 2006 appropriations request legislative issues,April 2005
SA to DC XXVII,June 2005
Box
49 Committee of Seven: Bexar Regional Watershed Management,February 2007
Box
50 SA to DC XXIX,March 2007
110th Congress 1st session, fy 2008 appropriations request,April 2007
Meeting in Washington,April 2007
Box
49 Committee of Seven: Bexar Regional Watershed Management,December 2007
Box
59 Appropriations efforts,2007
Box
17 Field Trip Guide-introduction to the Edwards Aquifer, undated
Box
23 San Antonio Freight Bureau merchandise class rates, undated
Box
86 A Survey of Archaeological, Architectural, and Historical Sites on the SAR from Olmos Dam to S. Alamo St. and on SPC from San Pedro Park to Guadalupe St.,1979
Box
85 Flood Analysis Report Volumes I and II,1999
Box
145 An Archaeological Assessment of San Pedro Park,2000

Return to the Table of Contents




Public Relations

The Public Relations series contains press releases, speeches, presentations, community education and outreach materials, newsclippings, and materials related to special events and ceremonies. Also included in the series are photographs of SARA staff functions and community events.
Box
20 Press Releases
News releases and articles with photographs,1938
Box
30 Information book,1938
Box
16 1966-1969
1970-1979
1981-1985
Box
42 Artwork for press release,1987-1990
Box
16 1995-1997
Box
59 2002-2004
Box
28 January 2006
February-March 2006
March-April 2006
Box
18 Speeches and Presentations
Box
81 Trinity University "A Presentation of the Purposes, Plans and Progress of the San Antonio RiverAuthority,"1959
Box
18 Speeches by SARA Board members,1960-1969
Presentations,1966-1968
Speeches,1970-1973
View contents
Presentations,1970-1977
Speeches,1980-1989
Presentations,1980-1989
Box
59 Fred Pfeiffer presentation "Edwards Water in the San Antonio River,"1982
Box
18 Presentation to the River Authority Study Committee,1986
Box
48 Corps of Engineers presentation,1988
Box
18 Presentations to schools,1990-1995
Box
42 Presentation to the Agriculture and Environment Forum, 1994
Box
18 Speeches by Fred Pfeiffer, Winston Lorenz,1993
Presentation to Alamo Title Company,1999
Box
81 Bexar Regional Watershed Management program presentation materials and cd,2004-2005
Flood debris assessment and cleanup program,2005
Box
18 Speeches, undated
Box
16 Events and Ceremonies
Correspondence, certificates, notes,1963
Alazan Creek groundbreaking,1964
Box
17 Poplar Street Bridge ceremony photographs,1964
Box
48 Alazan Creek Groundbreaking ceremony,1964
Box
16 SARA Conservation Corps dedication ceremony,1965
View contents
Correspondence and related documents regarding events,1965-1966
Hondo Creek ceremony photographs, programs, certificates,1966
View contents
Hondo Creek ceremony notes and correspondence,1966
Box
38 Harry Jersig Bridge cerremony,1966
Box
48 Tree saving, bridge dedication photographs,1966
Box
18 Salatrillo Creek ceremony,1966-1967
Box
16 Espada Park event correspondence,1966-1968
Box
17 Slide presentation notes, correspondence,1966-1972
Box
15 Tours and tour arrangements,1966-1980
Box
16 Correspondence regarding events,1966-1968
Box
17 Dedication ceremony in Kenedy, Texas,1967
Knowlton Bridge dedication photographs,1967
Knowlton Bridge dedication correspondence, notes, brochure,1967
Helicopter tour of San Antonio,1967
Visit from President's Water Pollution Control Advisory Board packet,1967
Visit from President's Water Pollution Control Advisory Board notes, correspondence, and related documents,1967-1968
Box
18 Martinez Creek Watershed ceremony,1966-1970
Box
17 Lt. General Cassidy visit,1968
Box
16 Braunig Park ceremony correspondence, notes, and related documents,1968
Braunig Park ceremony photographs,1968
Box
30 Braunig Lake Park dedication ceremony program,1968
Box
38 David Brune, Watershed Man of the Year,1968
Box
17 King William beautification ceremonies,1968-1984
Box
16 Salado Creek project photographs, press release, engraved plate,1970
View contents
Box
17 Salado Creek Watershed ceremony photographs,1970
Salado Creek Watershed ceremony correspondence, notes, and related documents,1970
Box
47 Salado Creek project ceremony photographs, 1970
Box
16 JFK memorial tree in Espada Park,1970
Espada Aqueduct ceremony article,1979
Box
48 Olmos Dam contract signing photographs,1979
View contents
Olmos Dam modifications groundbreaking ceremony,1979
Piedras Creek groundbreaking ceremony,1979
Box
16 Correspondence regarding events,1979-1985
Correspondence regarding events,1979-1987
Box
47 Olmos Dam Completion Ceremony program,1980
Box
48 Olmos Dam modifications completion ceremony,1980
Box
17 Salado ceremonies correspondence, notes, maps, and related documents,1981-1982
Box
48 King William ceremonies,1981-1984
Notes/itineraries for ceremonies,1981-1988
Box
16 Salado Creek project completion ceremony,1982
Box
47 Salatrillo/Martinez contract signing ceremony,1982
Box
16 Piedras Creek Diversion Channel ceremony photographs,1984
Piedras Creek Diversion Channel correspondence, guest list, cards,1984
Piedras Creek project correspondence and related documents,1984
View contents
Piedras Creek project photographs,1984
Espada Park ceremony photographs,1984
Espade Aqueduct ceremony correspondence,1984
Mailing lists and labels,1984
Box
17 "A Special Place" a film about San Antonio,1987
Box
48 Nueva Street Dam completion ceremony,1987
San Pedro Creek flood control tunnels groundbreaking ceremony,1987
Salado Creek Watershed completion ceremony,1987
San Antonio River beautification completion ceremony,1988
Box
16 Dedication of Ecleto Creek Watershed Project,1993
Box
48 San Antonio River Tunnel Inlet Structure and Recirculation Facilities groundbreaking ceremony,1993
19th Street Dam completion ceremony,1995
Salado Site completion ceremony,1996
San Antonio Riverwalk and Flood Control System as a historical civil engineering landmark dedication ceremony,1996
San Antonio flood control tunnels tour,1997
San Antonio flood control tunnels completion ceremony,1997
Five Points project completion ceremony,1997
Walker Ranch Historical Landmark Park dedication,1999
Box
59 Event invitations and brochures,2002-2006
Box
16 Basura Bash cd-rom and correspondence,2003-2004
Box
81 Certificates of appreciation,2003-2005
Box
16 Eagleland groundbreaking,2004
Box
48 Mission Reach Phase I groundbreaking fan,2008
"Get Outdoors, It's Yours!" community event flier,2008-2009
Box
59 Letter read by Mrs. Weaver at the reception for exiting chair Tom Weaver,2009
Box
37 San Antonio Conservation Society Historic Preservation Awards invitation,2010
Box
16 Poem entitled "A Fond Farewell to SARA: Mixed Emotions" by Inez Delker Smith, undated
Box
59 Education Materials
Box
48 Photographs, 1990-1991
Box
59 Workshop correspondence,2003-2005
Stinson Middle School project and field trip,2004
Kids Summer Fun Fair,2004
"Moving Waters,"2004-2005
Box
103 River. Life. Love it. - "Best Management Practices for Protecting Riverwalk Water Quality," and posters,2010
Box
4 Newsclippings
Box
15 Awards/Recognition
V.M. Berry award, 1969
Soil and Water Conservation awards,1969
Tribute to Robert H. Ramsey Jr.,2000
Box
81 Assorted,2000-2010
Box
15 National recognition,2001-2003
Box
17 Environmental Concerns
Pollution control,1967
Box
6 Waste treatment,1969-1971
Waste treatment,1970
Box
7 Pollution prevention,1970
Box
6 Waste treatment,1970-1971
Soil Conservation,1970-1978
Waste treatment,1972-1974
Pollution protection,1971-1977
Pollution protection,1984
Box
27 Water conservation,1986-1989 and undated
Box
5 Flood Control
Box
24 "Flood Control Plan Shelved by Congress,"1940
Box
5 1972-1978
1972-1977
Box
140 Flooding and SARA Project Highlights, inc. news of 1946 flooding,1946-1997
Box
6 Parks and Recreation
1970-1978
Box
18 Lodi Ferry on the San Antonio River in the late 1800s,2005
Box
5 SARA Elections
1969-1975
1976
1977
1980-1986
Box
4 Water Diversion
San Antonio water battle,1963
Water supply diversion publicity,1962-1965
Water supply diversion publicity,1963
Water supply diversion publicity,1964
1978-1979
Box
1 "Canyon water said insufficient for sale to S.A.,"1980
Box
3 "San Antonoio considering reservoir to aid dwindling groundwater supply,"1984
Box
5 Water Supply and Storage
Box
27 Water supply,1964
Box
5 1970-1977
Box
8 "250 Miles of Clear, Cool Water Under S.A.,"1970
Box
6 1974-1977
1979-1981
Box
5 1986
Box
15 "Canal Means Boom for S.A.," undated
Box
27 Newsclippings Assorted
Box
59 2005
Box
27 July-August 2006
San Antonio Business Journal, April 2006
Box
28 August 2006
September 2006
October 2006
November 2006
December 2006
Box
187 SARA related articles,1993-1998
Box
141 San Antonio Current and San Antonio Express News Articles,2003, 2005
Box
26 Media Monitoring
Box
27 Edwards Recharge Zone article,December 2006
River Walk, Parks, river improvement, San Antonio Water System,January-March 2007
Various newsclippings,January-October 2007
River Walk, San Antonio Water System, Edwards Aquifer,March-April 2007
River Walk, Mission Park, San Antonio Water System,April-May 2007
Various newsclippings,April-September 2007
Box
26 River Walk, Edwards Aquifer, Flooding,May 2007
Enviromental flows, floodings, River Walk,May-June 2007
Bexar watershed management, environmental health, flooding,June 2007
Box
27 Environmental health, flooding, Edwards Aquifer Authority,June-July 2007
Box
26 Water legislation, water quality,June-July 2007
Edwards Aquifer, environmental health, flooding,July 2007
Box
27 Environmental health, flooding, Edwards Aquifer Authority,July-August 2007
Environmental health, flooding, Edwards Aquifer Authority,August 2007
Box
26 Enviromental quality, tree cover, water legislation,August-September 2007
Various newsclippings, September 2007
Edward Aquifer Authority, environmental flows, River Walk, interbasin transfer,September 2007
Parks, water agencies, flooding,September-October 2007
River Walk, water legislation, environmental issues, September-October 2007
Box
27 River Walk, tree cover, water legislation, water quality,October 2007
Box
26 Environmental issues,October-November 2007
River Walk, tree cover, water quality,November 2007
Water agencies, improvments,November 2007
River Walk, water agencies, Edwards Aquifer, November 2007
Various articles,October-December 2007
Environmental issues, River Walk,November-December 2007
Box
27 Environmental quality, tree cover, tree ordinance, EPA,November-December 2007
Box
26 River Walk, improvements,December 2007-January 2008
Conservation, December 2007-January 2008
Various water agencies, January 2008

Return to the Table of Contents




Legal Department

The Legal series contains materials generated by the SARA legal department, including ordinances, resolutions and agreements.
Original folder titles retained.
Box
68 Ordinances
1950-1956
1957
1958
1959
1960
1961
1962
1963
Box
81 No. 0-2741963
Box
68 1964
1965
Box
69 1966
1967
1968
1969
1970
1971
1972
1973
1974
1975
1976
Box
70 1977
1978
1979
1980
1981
1982
1983
1984
1985
1986
1987
1988
1989
1990
Box
71 1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
Box
72 2004
2005
2006
2007
Resolutions
1950-1956
1957
1958
1959
1960
1961
1962
1963
1964
1965
1966
Box
73 1967
1968
1969
1970
1971
1972
1973
1974
1975
1976
1977
1978
1979
1980
Box
74 1981
1982
1983
1984
1985
1986
1987
1988
1989
1990
1991
1992
1993
1994
1995
1996
1997
Box
75 1998
1999
2000
2001
2002
2003
2004
2005
2006
Box
15 General
Ordinances,1956-1957
View contents
Box
10 Ordinance for Texas Water Pollution Control Compact,1971 and undated
Box
15 Resolutions-Tributes,1967-1989
View contents
Box
13 Resolutions and Agreements with Goliad County,1969-1978
Box
16 Resolution honoring William Milkin Jr., 1970
Box
10 Memorandum agreements for Texas Water Pollution Control Compact,1971-1972
Resolution for the State of Texas Water Pollution Control Compact,1971-1972
Box
5 Water conservation,1974-1979 and undated
Box
15 Timeline, undated
Resolutions-Tributes,1989-2000

Return to the Table of Contents




Publications

The Publications series contains SARA brochures, newsletters, and materials about San Antonio and regional water issues. Additionally, the series contains theses and papers written about the San Antonio River as well as other water sources and issues.
Box
19 SARA
San Antonio River History,1954-2004
Box
15 Newsletters, 1966-1969
Box
30 Brochures,1966 and undated
Box
80 "Floods on Salado Creek San Antonio, Texas,"1969
Box
19 San Antonio,1970
Box
15 Brochures,1974-1979 and undated
Box
19 San Antonio River Authority 1937-1987,1987
River Ramblin's,1991-1998
Box
28 Brochures,2000 and undated
Box
46 Assorted brochures,2000-2005
Box
17 Newsletter,2002
Box
48 SARA newsletter,2002-2008
Box
49 River Reach,2003
River Reach,2004
River Reach,2005
Box
48 "Community River Clean-up: The San Antonio Basura Bash Model,"2005
Box
81 Brochures and workbook,2005-2009 and undated
Box
49 River Reach,2006
Box
15 River Reach,2006-2007
Box
49 River Reach,2007
Box
15 Brochures,2007 and undated
Box
28 Posters,2007 and undated
Box
49 River Reach,2008
River Reach,2009
Box
48 River Reach,2009-2010
Box
59 Brochures,2009 and undated
Box
81 "Getting Great Together," newsletter for SARA employees,2010
Box
17 Flood control on the San Antonio River, undated
Box
19 Project Cityscape "A Special Place," undated
Box
48 Brochures, undated
Brochure in Spanish, undated
Box
81 "Of Vital Importance to You: Flood Control on the San Antonio River," undated
Box
103 San Antonio River Reach newsletter,2010-2011
Box
22 San Antonio
San Antonio classified telephone directory, circa 1936
Box
15 HemisFair packet,1968
Box
14 Voz Del Barrio,1968-1971
Box
10 "Downtown Action,"1986
Box
15 "San Pedro Springs, A Scrapbook" by Albert F. "Rick" Grimm III,2001
Box
49 Rio Festival,Texas Cavaliers River Parade official program,2005
Box
81 Builder/Architect,2009
Box
49 Rio,official magazine of the Riverwalk,2010
Box
103 Where Guestbook San Antonio,2010-2011
San Antonio Business Journal, April 1-7, 2011,2011
Box
17 Texas
South Texan including an article about SARA,1967
Box
18 Texas Society of Professional Engineers brochure,1982
Box
28 Karnes County Sesquicentennial magazine, 2004
Box
49 Texas Parks and Wildlife Magazine,2009
"Texas Flood" PBS video brochure, undated
Box
48 "Transforming Texas Waterfront," undated
Box
141 Texas Register,1985
Box
15 Theses/Papers
"San Antonio River Canal and Conservancy District" public hearing transcript,1951
Statement of W.B. Tuttle, Chairman of San Antonio River Authority,1954
Box
18 Masters thesis "The Effects of a Heataed Effluent on the Species Diversity of Benthic Macroinvertebrates in Calaveras Lake, a Central Texas Reservoir" by Tom C. Barra,1976
"The Story of the San Antonio River" by Mary Ann Noonan-Guerra,1978
Box
48 "The Story of the San Antonio River" by Mary Ann Noonan-Guerra,1978
Box
18 "The Romance of San Antonio's Water Supply and Distribution" by Bert J. McLean,1983
Box
15 Untitled paper about SARA's history (author unknown),1987
Box
18 Masters thesis "An Examination of the Biotic Inegrity of the Upper San Antonio River based on Fish Community Attributes" by Mike Gonzales,1988
Box
15 "History of Water in the San Antonio River Valley" by William Feathergail Wilson, undated
Olmos Dam, undated
Various water projects, undated
Box
15, 42 "History of the San Antonio River and its Developments," undated
Box
15 SARA history outline, undated
"History of Ownership, San Antonio River," undated
Box
16 SARA history,1988
Box
15 San Antonio and rural flood control,1996 and undated
"Flood Control in the city of San Antonio, Texas,"1997
Honors Thesis "Aesthetics in Engineering" by Travis P. Dunn,2003
Box
19 Assorted Publications
Snow gates and valves catalog,1938
Box
17 Land and Water Contracting,1967
Soil Conservation,1967
Box
1 "A Guide to Using Interest Factors in Economic Analysis of Water Projects,"1970
Box
19 A Lifetime at the Bar, signed copy by Harvey L. Hardy,1999
Box
23 Sulphur booklet, undated
Box
32 Xeriscape brochure, undated
Box
148 Highway: Urban Construction (article about Alamo St. Bridge,1969
Box
103 Rio - official magazine of the Riverwalk, ft, River. Life. Love it. ads,2009-2011
State Tech ft. article on SARA,2011

Return to the Table of Contents




Photographic Materials

The Photographic Materials series is comprised of the following subseries: Board Members, Annual Reports, Events, Awards, and Assorted.
The photographs and negatives in this series have been minimally processed.
Box
16 Board Members
Oath of office ceremony,1965
View contents
Box
47 1962-1995 and undated
Box
16 Leslie Neil,1969
View contents
Oath of office, undated
Box
47 Winston Lorenz and Fred Klingeman swearing in ceremony,1970
Box
46 1972
Box
47 Swearing in of new directors,1977
Box
46 Board meeting,1979
1983-1995
At events,1983-1995 and undated
Box
47 1993-1994 and undated
Negatives,1995 and undated
Box
45-46 Fred Pfeiffer's retirement party,1999
Box
46 At the Tower of the Americas, undated
Box
47 Swearing in ceremony, undated
Jim Davidson, Mr. Chang, E.E. Wohlschlege, Hugh B. Ruckman, Jr., undated
Frank Drought, undated
E.A. Flieller, Curtis C. Gunn, undated
Dorian French, undated
Martin C. Giesecke, undated
Mr. McAllister, undated
Leslie Neal, undated
Jody Pavlik, undated
Alan Polunsky, Edward Schneider, undated
Mr. Powledge, undated
Lawrence Risoner, Victor Braunig, Colone Tuttle, undated
Mr. Turner, David Evan, Irma Mireles, undated
Blair Warren, undated
Wellis Womack, undated
Box
206 Orientation Presentation; Slides,1986-1988
Box
103 Assorted board member photographs,undated
Box
47 Annual Reports
1986
Box
48 1986
Box
47 1987
Drawer
64 1989-1992
Box
48 1990-1992
Box
47 1990-1994
Box
48 Mock-up with contact sheets,1991
Box
47 Events
Community service,1971
Commissioner's luncheon at the Calaveras maintenance shop,1974
Christmas party, 1982
General Heiberg's command inspection,1982
Box
44 SARA events,1983-1990
Box
45 Bingo party,1984
Box
44 Snowstorm in San Antonio,1985
View contents
Box
47 SARA day at La Bahia Downs,1986
Box
44 Christmas party and picnic,1986 and undataed
SARA picnic,1986-1990
Box
46 SARA functions,1986-1992
Box
45 SARA functions,1987 and undated
Box
46 SARA functions,1992-1996
Box
44 Picnic,1994
Flood of October 1998 slides,1998
Luncheon slides,1999
Brush clearing, undated
View contents
Box
46 Corps of Engineers banquet, undated
Box
47 National Water Resources convention, undated
Box
206 Alamo Presentation; Slides,1986
Flood Control Presentation; Slides,1986-1999
Gorton's Boat Trip; Slides,1999
Box
207 Gorton's Boat Trip; Slides,1999
Box
206 Flood of 2002 Presentation; Slides,undated
Box
44 Awards
Awards banquet,1987
Ceremonies,1993-1999
Box
46 Faithful service awards,1997
Box
45 James Thompson 40 years of service party, undated
Service awards, undated
Box
44 Assorted
San Antonio river slides,1966, 1986-1987
Box
46 Watershed conservation,1967
Box
48 Flooding, 1967
Box
44 Pollution slides,1978-1987 and undated
Wells,1983 and undated
Box
47 Riverwalk and other site,1985-1986
Box
44 SARA headquarters and the Riverwalk,1985 and 1994
View contents
Boy with 51 pound tilapia,1986
View contents
Box
48 Park and Recreation,1986-1991 and undated
SARA employees,1986 and undated
Box
44 Laboratory slides,1986 and undated
Plants and wildlife along the river,1987-1991 and undated
Animal life along the river,1991 and undated
Box
47 Confluence of the San Antonio and Guadalupe Rivers in Refugio County aerial,1998
Box
44 Calaveras nature trail,2002
Riverwalk and other images,2002
Leon Creek landscapes,2002
Box
16 Pollution at Rosillo Creek, undated
View contents
Box
17 Riverwalk slides, undated
Box
44 River improvements presentation slides, undated
Insects, undated
Flooding, undated
Pollution, undated
View contents
Drawer
64 Unidentified men, undated
Box
48 General Garies and unindentified persons, undated
Fishing, undated
Box
44 Assorted slides, 1970-1989 and undated
Box
44-46 Assorted negatives, 1982-1988 and undated
Box
44 Assorted photographs,1985 and undated
View contents
Box
47 Assorted contact sheets, 1989-1992
Box
199 Dam Maintenance at Calaveras, Hondo, Escondido, Martinez, and Nichols Creek; Slides,1926-1978
Box
192 Aerials, Graphics, Sewers, Salado project Map, Betterments, Tunnels, SAR,1930-1985
Box
126 Construction Photos,1965-1983
Box
200 Assorted Slides - Goliad, Espada, Braunig, others,1966-1975, undated
Box
198 Pollution Slides,1967-1976
Box
207 SARA people; slides,1970-1999
Box
206 Staff events, Constructio, various,1972-1981, undated
Box
199 Canyon Lake Diversion; Medina Lake and River; Slides,1973
Box
207 Calaveras Lake Slides,1973, 1975
Box
192 Graphics and SARA Main Office construction dedication; Slides,1974-1986
Box
196 King William, SARA, and Alamo; Slides,1978, undated
Box
204 Assorted slides,1979-1983
Box
206 Nichols Creek, various,1982
Box
103 SIPP photographs,1986, undated
Box
208 Miscellaneous photos, including SAR and SPC Tunnels, Fred Pfeiffer's retirement, etc,1988-1997, undated
Box
84 Bond Issue Photos (slides),1989
Box
OM4 Four Men and a Tractor,1989
Box
210 Areas of San Antonio After Flooding; Photos,1990
Box
191 Gate 4 Warranty Slides,1990
King William Design Slides,1990, undated
Box
103 Construction photos,1990-1991
Box
196 Canyon Lake Hydroelectric Plant; Slides,1991
Oceanside Water Pollution Control Plant; Photos,1994
Various; Slides,1995-1997, undated
Box
192 SARA Engineering Analysis North Channel Problem Area Photos Slides,1996
Box
207 SAR at downtown; slides,1996
Box
196 Construction; Slides,1996, undated
River Slime; Slides,1997
Hotel Fire South of Lexington; Slides,1998
Box
202 San Antonio Flood Damage Photos,1998
Box
196 Lago Vista; Slides,1999
Box
206 Aerial views, various; Slides,undated
Aquifer news clippings; Slides,undated
Box
196 Construction, various; Photos,undated
Box
206 Construction, various; Slides,undated
Creeks, Rivers, City and Landscapes, various; Slides,undated
Dams, various; Slides,undated
Medina River and creeks, various,undated
Parks, various,undated
Box
196 Projects, various; Photos,undated
Box
191 S. A. Prestess Slides,undated
Box
196 SAR, Various; Slides, Photos,undated
Box
207 Sewer treatment plants, fishermen, Karnes Co. uranium mine, flood damage,undated
Box
191 South SAR, Flood of 1998; Photos,undated
Box
207 South SAR Slides,undated

Return to the Table of Contents




Audiovisual

The Audiovisual series contains videocassettes and dvds of SARA projects, events and presentations, and topics such as floods, the San Antonio River, and Texas water issues and programs.
Box
54 Projects
Salado Creek
Salado 7 videocassette,1987
Salado 12 videocassette,1988
Salado 5 discharge pipe, water falling into sinkhole at Salado 8 videocassette,1991
Shale at Salado 10videocassette ,1992
Salado 8 flood recharge videocassette, 1992
San Antonio Flood Control Tunnels
Hard Route videocassette,1988
Retreival shaft and upstream top heading after collapse videocassette,1990
Tunnel final inspection excluding outlet shaft videocassette,1990
Inlet videocassette,1991
Down shaft videocassette,1991
Flood charge and recharge site videocassette,1991
Divison Box gate videocassette,1992
Final tunnel inlet downstream videocassette,1992
Gate 5 operation cycle videocassette,1993
Box
55 Two dvds,1998
Box
54 Robbins tunnel boring machines videocassette, undated
Groundbreaking videocassette, undated
Assorted Projects
TBM Moving videocassette,1988
Applewhite videocassette,1988
Pollard Site 1-A at Mineral Wells, Texas videocassette,1989
First Quality Cylinders videocassette, 1992
Lavaca Street, Water Street, and St. Mary's Street videocassette,1992
Nineteenth Street Dam gates videocassette,1993
Box
55 San Antonio River Houston to Commerce videocassette,1999
Box
54 Five Points building demolition videocassette, undated
Big wall falling videocassette, undated
Box
55 Miraflores master plan dvd, undated
Box
224 SACIP Unit 7-3-2 Five Points Construction; 6 cassettes,1987-1992, undated
Box
193 SPCT Haul Routes by CSA; VHS,1988
SPCT; VHS,1989
Box
224 Beginning and Completion of Salado Creek construction; cassette,1989-1996
Box
193 SART and SPCT Project; VHS,1990
Salado Site 10 at start of construction; VHS,1990
SART; VHS,1992
SART Final Inspection #7700: tunnel Liner Ring #3359 downstream to #1433 rts Museum to Water Street; VHS,1992
Design Team SAR South, Lunsford Files; VHS,1992
Trashracks at SPCT Inlet; VHS,1992
SART Shafts Foundation Report; VHS,1993
SART Final Inspection Outlet to Water Street Inlet; VHS,1993
SART Inlet Existing Site Conditions; VHS,1993
SART and Shafts, Foundation Report; VHS,1993
ADCO Electric and SARA Contract# 394, Pre-Construction Site conditions; VHS,1994
Box
224 SACIP Unit 8-5 Correspondence; floppy disc,1994-1999
Box
193 SPC Channel, Tijerina Property; VHS,1995
North SAR Channel Inventory Problems; VHS,1996
Tunnel at S. St. Mary's; VHS,1996
Salado Site 10 Dedication; VHS,1996
SART Outlet, 1998 Flood; VHS,1998
SART Inlet Shaft Splitter Wall Problems; VHS,1998
San Antonio River Draining; VHS,1999
Box
224 SARIP Progress Photos; CDs,2007-2008
Construction Photos; CD,2008
Box
193 Tunnel Boring Machine Above Ground Testing; VHS,undated
19th St. Dam at Apache Creek; VHS,undated
Salatrillo WWTP Expansion; VHS,undated
Pavement Maintenance; VHS,undated
Box
224 Wastewater System Biosolids Contract; floppy disc,undated
Marion WWTP Letters and Worksheets; floppy disc,undated
Salado Creek; 3 floppy discs,undated
Box
43 Events and Presentations
Fred Pfeiffer water issues briefing videocassette,1996
Lonesome Dove festival videocassette,2003
Box
5 Canoe ramp dedication dvd,2007
Box
43 Gate 4 and Houston to Commerce betterments completion ceremony videocassette, undated
Box
55 Dewees Remschel House, Goliad Flotilla dvd, undated
Box
193 FEMA Conference; VHS,1989
KLRN Agenda, "Great Floods & Large Lessons," with Steve Ramsey, John German, Hayward Sanders; VHS,1998
CSA City Council "Goose with a Golden Egg" Presentation; VHS,undated
Box
43 Floods
Big flood of 1998 videocassette,1998
Tour of flood damage on the San Antonio River videocassette,1998
Videocassette,October 1999
Flood of July 2002 videocassette,2002
BRWM flood safety video,2005
"The Water Never Got This High Before: A History of Floods on the Colorado River," videocassette, undated
San Antonio River
"A Special Place" videocassette,1975
River Corridor workshop videocassette,1989
Puchek Catfish Farm videocassette,1992
Alamo Ranch videocassette,1995
"River Pains" a KENS Tv series videocassette,1995
Box
193 Flood of 1991; VHS,1991
KLRN, SAR; VHS,1997
SAR Flood Event; VHS,1998
SAR Flood Event; VHS,1998
Video; SAR Flood Event; VHS,1998
SAR North Flood Damage; VHS,1998
San Antonio to Karnes; VHS,undated
Karnes to Bay; VHS,undated
Paseo Del Rio Association, "A Special Place" by Gale Spencer; VHS,undated
Box
43 Texas
"Edwards Aquifer: A Texas Treasure" videocassette,1989
"Major Rivers: Texas Water Education Program" videocassette,1989
"Texas: the State of Water, Finding a Balance" dvd,2005
"Texas: The State of Flowing Water" dvd,2009
Box
55 "Texas: The State of Flowing Water" dvd, undated
Box
43 Assorted Topics
"GIS: The Total Geographic Information System" videocassette,1992
Box
54 Rudy II dictating cassettes,1995
Commissioners Court, four audio cassettes,June 1999
Commissioners Court audio cassette,June 2000
Box
43 SARA time-coded footage videocassette,2001
"Walk Away the Pounds" videocassette,2001
Water safety videocassette,2002
Box
55 CTG '06 dvd,2006
Box
43 SARA clips on dvd, discs 1 and 2, 2009
"We Are All Connected" videocassette, undated
"Walnut Creek: A Green Way of Opportunities" videocassette, undated
Witte Museum videocassette, undated
Untitled videocassette, undated
Box
54 Untitled videocassette, undated
Box
193 KLRN/KMOL "Clear Water-Murky Issues"; VHS,1997
Box
224 SARA Channel Improvement Revenue Refunding Bonds Transcript of Proceedings; CDs,2007
Arbitrage Rebate Reports; CD,2007

Return to the Table of Contents




Oral Histories

The Oral Histories series contains transcripts and audio cassettes of oral histories conducted with SARA Directors, board members, and employees.
Box
51-52 Astran, Alonzo, 2008
Audio and transcript
Bain, Cecil, April 23, 2008
Audio and transcript
Beene, Eugene "Pinto,"March 24, 2008
Audio and transcript
Box
53 Black, Marilyn [audio tape only], 2010
Audio and transcript
Box
50-51, 53 Blair, James, July 18, 2007
Audio and transcript
Box
51-52 Bransford, Dale, July 29, 2008
Audio and transcript
Box
50-51, 53 Brown, Ralph, June 18, 2007
Audio and transcript
Box
51-52 Cockrell, Lila, May 22, 2008
Audio and transcript
Box
51, 53 Conner, Kevin C., May21, 2008
Audio and transcript
Box
53 Fletcher, Kenny, [audio tape only],2010
Audio and transcript
Box
51-52 Gonzales, Michael, April 22, 2008
Audio and transcript
Graham, Stephen, July 22-23, 2008
Audio and transcript
Box
50-51, 53 Hardy, Harvey L., July 19, 2007
Audio and transcript
Box
51-52 Hunt, Truett, April 24, 2008
Audio and transcript
Box
50-51, 53 Lunz, Jim, July 20, 2007
Audio and transcript
Pfeiffer, Fred
Part I, June 18, 2007
Audio and transcript
Part II, June 19, 2007
Audio and transcript
Pfeiffer, Fred, J.W. Thompson, and Blair Warren, July 19, 2007
Audio and transcript
Box
51-52 Powell, Boone, July 23, 2008
Audio and transcript
Raabe, Steve, July 22, 2008
Audio and transcript
Ramsey, Steven, March 25, 2008
Audio and transcript
Ross, David, April 23,2008
Audio and transcript
Box
50-51, 53 Rothe, Gregory E., July 20, 2007
Audio and transcript
Box
51-52 Schweers, David, March 25, 2008
Audio and transcript
Schwenn, Randy, April 24, 2008
Audio and transcript
Scott, Suzanne, July 30, ~908
Audio and transcript
Box
51, 53 Sorenson, Mark, July 23, 2008
Audio and transcript
Box
51-52 Sutherland and H.B. "Trip" Ruckman III, May 21, 2008
Audio and transcript
Box
50-51, 53 Wallace, David, July 18, 2007
Audio and transcript
Box
50-51 Warren, Blair, June 19th, 2007
Audio and transcript
Handwritten history,1987-1999
Box
51-52 Weaver, Thomas, 2008

Return to the Table of Contents




Historical Research Materials

The Historical Research Materials series contains newsclippings, photographs, maps, and studies, many of which deal with floods during the early part of the twentieth century. Also included are photographs of people and activities on the San Antonio River in the early 1900s. The materials in this series predate the formation of SARA.
Box
16 Reports
Box
63 Geological surveys/tactical maps,1918-1933
Box
16 Design of a conduit,1911
The 1921 flood,1921
Proposed flood prevention in the wake of the 1921 flood,1921
Flood control and the cost of widening channels,1921 and undated
Flood prevention report by the Chamber of Commerce,1921
Notes and calculations,1921
Engineers subcommittee on proposed flood prevention work book with maps,1921
Box
20 Flood Control,1921-1924
Box
16 Flood control,1922
Flood Prevention,1928
Appendix and notes related to historical documents,1995 and undated
Newsclippings
Box
48 1913 and 1921 floods; Guenther Mill being dynamited,1913-1926
Box
16 1921
News article about the flood,1921
Drawer
64 Newsarticle about the flood,1921
Box
20 Flood Control,1922-1923
Box
17 Photographs
Activities on the San Antonio River including baptisms,1884-1902 and undated
Box
44 Irrigation tower on the San Antonio River,circa 1900
View contents
Box
48 Boys playing in the River,circa 1900
View contents
1913 and 1921 floods, Guenther Mill being dynamited,1913-1926
View contents
Drawer
64 Unidentified lake, activity on the Colorado River,1920s and undated
Box
48 The 1935 flood,1935
View contents
The 1946 flood,1946
View contents
Box
44 Canal, undated
View contents
Box
16 News articles
The flood, 1921
Drawer
64 The flood,1921
Box
20 Flood control subject file,1922-1923
Box
D21 Great Bend Cut-Off plans (photocopy),1929
Box
103 Information Concerning San Antonio River Canal and Conservancy District,1938

Return to the Table of Contents




Other Water Agencies

The Other Water Agencies series contains materials from water agencies throughout Texas.
Box
7 Alamo Soil and Water Conservation District
Correspondence,1972
Correspondence, reports, and related documents,1973-1974
Reports,1973-1976
Correspondence and reports,1974-1975
Reports, correspondence,1976-1979
Correspondence, reports, and related documents,1978-1979
Reports, correspondence,1981-1985
Brazos River Authority
Brochures,1960-1961
Correspondence,1960-1968
Correspondence,1970-1978
Progress reports,1973 and undated
Newsclippings,1968 and undated
Box
22 Colorado River Authority
Maps, graphs, schematics, 1930 and undated
Diagrams and photographs of Hamilton Dam,1933-1937 and undated
Correspondence, reports, and related documents,1934-1935
Progress reports, 1934-1937
Reports and correspondence,1934-1941
Newsclippings,1935-1936 and undated
Reports, 1935-1936
Hydrographs of the Colorado River,1935-1937
Photographs, articles, correspondence,1935-1938 and undated
Newsclippings,1937-1942
Project memorandums, undated
Guadalupe-Blanco River Authority
Newsclippings,1938-1939
Correspondence and related documents, 1938-1942
Box
1 Water supply contract,1976
Box
3 Coleto Creek power station report,1977
Box
15 Annual report,1968
Box
79 Wester Canyon Treated Water Supply project state of qualifications for real estate services,2000
Dunlap Canal Emergency Spillway project preliminary design report,2000
Box
183 Nolte Dam Bypass correspondence and agreements,1998
Box
12 Inter-Agency Resource Council
Correspondence and related documents,1971-1978
Box
1 Mitigation Committee reports,1977
Box
22 Intracoastal Canal Association of Louisiana and Texas
Correspondence,1938-1944
Correspondence and related documents,1940-1944
Box
23 Annual convention proceedings,1947
Box
7 Edwards Underground Water District,
Reports,1963-1969
Reports,1970-1974
Correspondence and related documents,1960-1968
Correspondence,1970-1971
Correspondence,1972-1975
Correspondence,1976-1979
Box
D21 Reference Maps,1994
San Antonio River Industrial Development Agency (SARIDA)
Box
142 SARIDA Bonds Issued,1978-1980
Bond correspondence - American Hospital Supply,1979
SARIDA Creation Documents,1979-1985
Box
140 SARIDA General Correspondence,1979-1987
Box
142 Bond agreement - The Ficks Reed Company,1980
Bond agreement - Days Inns of America,1980-1981
Bond agreement - Alamo Ice Co. Inc.,1981
Bond agreement - Alcon Labs,1981
Bond agreement - ESCO LTD,1981-1982
Bond agreement - L&H Packaging Co.,1982
Meeting Announcements and Bond Correspondence,1983-1987
Box
141 SARIDA Minutes,1983-1998
Box
142 Bond agreement - Grant-Lydick Beverage Co.,1984
Bond agreement - Frio Street Assoc., LTD,1984
Bond agreement - Kinetic Concepts,1986
Bond agreement - AFRAMCO Corporation,1988-1989
Box
8 Texas Water Development Board
Reports/Correspondence
1961-1969 and undated
1966-1968 and undated
"The Texas Water Plan,"1968
Reports 88 and 89,1968
Analysis of Water Resource Planning,1971
Rules and regulations,1971
Reports,1970-1972
Correspondence, studies, reports,1972-1973
Map of Aquifers,1973
Correspondence and related materials,1970-1976
"An Assessment of Surface Water Supplies of Arkansas,"1976
Correspondence and related materials,1980
Publications
Publications catalog,1969
"Water For Texas,"1971
"Water For Texas,"1971-1974
Newsletter,1987
Box
10 Texas Water Rights Commission
Correspondence and Related Documents
1945-1955
1963-1969
1969
1970-1972
1973-1978
District registration forms,1976-1977
1982-1986
Reports
1966-1968
1970-1972
Box
11 Rules and regulations,1969-1974
Reports on the Guadalupe River Basin,1963
Reports and maps of the San Antonio River Basin,1956-1962
Reports on the San Antonio River Basin,1968-1975
Permits and hearings
Stick maps for permits in the Guadalupe River Basin,1956
Applications and permits for Guadalupe River Basin,1964
Hearing for permit,1966
Applications for permits,1969
Applications for permits,1969-1977
Certified filings in San Antonio,1911-1916
Certified filings,1964-1974
Hearing for permit,1977
Adjudication for San Antonio River claims,1976-1978
Adjudication for Medina River claims,1977-1981
Adjudication for Cibolo Creek claims,1971-1981
Box
10 Minutes
1971
1972
Box
11 1973
Texas Water Conservation Association
Box
99 Correspondence,1997-2002
Box
12 Texas Water Agencies Assorted
Box
23 Texas Watersheds Association first annual conference proceedings,1938
Box
24 Texas Watersheds Association conference proceedings, mailing list,1938-1939
Box
23 Texas Watersheds Association correspondence and related documents,1939-1940
Box
21 Trinity Improvement Association newsletters, reports,1938-1940
Box
10 Texas Water Quality Board regulations,1969-1975
Box
3 Texas Water Quality Board effluent reports,1970
Box
10 Texas Water Quality Board reports, maps, correspondence,1970-1971
Box
11 Texas Water Resources Institute correspondence and related documents,1972-1979
Texas Public Utilities Commission reports,1975-1976
Box
12 Texas Water Resources Institute reports,1977
Box
11 Texas Water Resources Institute correspondence and related documents,1980-1984

Return to the Table of Contents




Addition of June 2016 (Accession 2016-035)

Real Estate Files, SACIP Unit 1
Box
244 State of Texas
Easement State of Texas
(Thelka/Lorraine Street Reconstruction) Joint Use Agreement City of San Antonio
Warranty Deed Tunnell, Anna Maria Peña et con
Warranty Deed Union Reserve Company City of San Antonio
Warranty Deed Waitz, George W. et ux
Warranty Deed Warmack, Hoke et ux
Warranty Deed Walter, Frank A. et ux
Condemnation Watterson, Vivian et al
Warranty Deed Wehe, Max et ux
Condemnation White, Clayton D.
Warranty Deed Wilcut, Bert
Warranty Deed Burton, Rae Russell et ux
Release Roberts, Wallace D. et al
Release Barrett, Thurman Sr. and Walker, R. H.
Quitclaim Deed State of Texas
Ordinance City of San Antonio
General File Ordinance
Miscellaneous
Special Warranty Deed City of San Antonio
(Mission Trails Package III) Special Warranty Deed
Spoil Disposal Licenses/Permits/Releases Miscellaneous
Spoil Disposal Licenses/Permits/Releases 2 Miscellaneous
Box
233 Askey, L. J. et ux Warranty Deed
Barrett, Thurman Jr. et al Warranty Deed
Barrett, Thurman and Kallison, Morris Warranty Deed
Walker, Ralph et al Warranty Deed
Bate, Cayloma General Warranty Deed
Becker, Ralph C. (Estate of Becker, Jessie M.) Warranty Deed
Becker, Ralph C. et ux Warranty Deed
Bexar County Warranty Deed
Blalock, Warner W. et ux Warranty Deed
Brack, Ernest M. et ux Warranty Deed
Agri-Chem of Texas, Inc. Warranty Deed
Aguirre, Emanuel et ux Warranty Deed
Aguilar, Juanita B. et con Warranty Deed
Lucey, Robert E. (Archbishop of San Antonio) Warranty Deed
Brady, Lady Patricia Warranty Deed
Brown, Nora Bridges et al Warranty Deed
City of San Antonio (Bustillo St. Storm Sewer) Joint Use Agreement
Clark, Ola Franklin Warranty Deed
Clark, Ola Franklin Warranty Deed
Corona, Louis P. et ux Warranty Deed
Crocker, E. P. et ux and Crocker, LeRoy E. et ux Warranty Deed
Diaz, Jose et ux Release
Dinkla, K. G. et ux Warranty Deed
Dinkla, K. G. et ux Warranty Deed
Dorton, J. T. et ux Release
Drake, Ellsworth A. Warranty Deed
Galle, Tillie et al Warranty Deed
Graham, Elizabeth O. Warranty Deed
Graham, Elizabeth O. Warranty Deed
Greenilee, Lelia O. Pyron et con Warranty Deed
Grinstead, C. W. et al Condemnation
Guerrero, Mariano et ux Warranty Deed
Harlandale Housing Corporation Warranty Deed
Harroun, Glen et ux/et al Warranty Deed
Haverlah, Charles A. et ux Warranty Deed
Hingst, H. F. et ux Warranty Deed
Island Park Farms Warranty Deed
Island Park Farms Warranty Deed
Jones, Cleo S. et con Warranty Deed
Real Estate Files
Box
232 RE-DAM-Calaveras 1-Robertson-Esmt
RE-DAM-Calaveras 1-Schubert-Esmt
RE-DAM-Calaveras 1-Selzer-Esmt
RE-DAM-Calaveras 1-Clements-Esmt
RE-DAM-Calaveras 1-Robertson-Esmt
RE-DAM-Calaveras 1-Harrison-Esmt
RE-DAM-Calaveras 4-Civiletto-Esmt
RE-DAM-Calaveras 4-Schoenfeld-Esmt
RE-DAM-Salado 5-Deed
RE-DAM-Martinez Site 5-Deed
RE-SRIP P3 Mission Reach-NPS-Permit
RE-SRIP Land Exchange Mission Reach-COSA-Deed
RE-SRIP Spoil Site Mission Reach-Janzen-Deed
RE-Espada Road-Loop 410-Presto Tierra-Deed
RE-SRIP P2 Mission Reach-Gonzales-Deed
RE-SCIP9A-Deed
RE-WWCS-Graytown-Montesan-Deed
Box
229 Calaveras Dam Site 1 Condemnation Longoria, Evelyn S. et al
Calaveras Dam Site 10 Deed Lopez, Louis and Lopez, Bacilia H.
Calaveras Site 6 Easement Kerns, Charlie William et ux, et al
Calaveras Dam Site 1 Easement Campbell, William G. and Campbell, Lola P.
Calaveras Dam Site 5 Easement Eckols, Edward M. and Eckols, Esther Ruth
Calaveras Dam Site 3 Easement Huber, George
Calaveras Dam Site 7 Easement Jonietz, Frank
Calaveras Dam Site 1 Easement Selzer, August and Selzer, Annie
Calaveras Dam Site 8 Easement Terrill, J. T. and Mabel
Calaveras Dam Site 1 Not applicable General File
Escondido Site 12 Condemnation Wright, William Hugh, et al (Heirs of Wright, Fred L.)
Escondido Site 12 Condemnation Goode, Mae et al
Escondido Site 12 Condemnation Kotara, Sam et al
Escondido Site 12 Deed Wright, L. A.
Escondido Site 12 Easement Fenner, Elise et al
Escondido Site 12 Easement Jonas, Nolan A. and Jonas, Mary Louise
Escondido Site 12 Easement Moody, Annie Ruth
Escondido Site 12 Easement Urrutia, Miguel et ux
Escondido Site 12 Easement Waskow, Mabel Moody
Escondido Site 13 Easement Blasingim, Estelle
Escondido Site 13 Easement Chamberlain, Fidelio et ux
Escondido Site 13 Easement Eichelberger, Nellie
Escondido Site 13 Easement Hubbard, Thomas Daniel et ux
Escondido Site 13 Easement McAda, C. D. et ux
Escondido Site 13 Easement Pace, Willie D. et ux
Escondido Site 13 Easement Southwestern Bell Telephone Company (Pace, W. D. (Heirs of Pace, Ida Estate)
Escondido Site 13 Easement Stewart, Mana Pearl et con
Escondido Site 13 Release McCarn, J. C. et ux
Box
236 RE-SCIP9A-AGMT Urban Renewal Agency of the City of San Antonio
RE-SCIP9A-COND Strieber, Mary D. et al (Estate of Strieber, Karl)
RE-SCIP9A-DEED Najera, Ernest M. et ux
RE-SCIP9A-DEED Sanchez, Valdo Jr. et al
RE-SCIP9A-DEED De La Garza, Osvaldo et ux
RE-SCIP9A-DEED Carter, David P.
RE-SCIP9A-DEED Herrera, Jesusa B.
RE-SCIP9A-DEED Bledsoe, Adele A. et al
RE-SCIP9A-DEED San Antonio Conservation Society Foundation
RE-SCIP9A-DEED Martinez, Margarita
RE-SCIP9A-DEED Guerra, J. Emil et ux
RE-SCIP9A-DEED Guerra, Eulalia
RE-SCIP9A-DEED City of San Antonio
RE-SCIP9A-DEED Espada Ditch Company
RE-SCIP9A-DEED Lamm, J.H. et ux
RE-SCIP9A-DEED Mission Park
Box
250 RE-SCIP3B-DEED Andrade, Hermina V.
RE-SCIP3B-COND Antan, H.L.
RE-SCIP3B-DEED App, A.J.
RE-SCIP3B-DEED Aztec Building Corp.
RE-SCIP3B-DEED Aztec Building Corp.
RE-SCIP3B-DEED Barnes, Clifford
RE-SCIP3B-DEED Beckham, Onny Opal
RE-SCIP3B-COND Biasiolli, Joe J. Sr. et al
RE-SCIP3B-DEED Bibb, Nellrose
RE-SCIP3B-DEED Brigham, H.C.
RE-SCIP3B-DEED Brown, William E.
RE-SCIP3B-COND Calvo, Patricio and Socorro
RE-SCIP3B-DEED Campos, Daniel J.
RE-SCIP3B-DEED Castillo, Max P. and Alicia
RE-SCIP3B-DEED Corkery, Ruth and William
RE-SCIP3B-COND Cortez, Sabas et al
RE-SCIP3B-DEED Culberson, R.L.
RE-SCIP3B-DEED De Hoyos, Emilio et ux
RE-SCIP3B-DEED De Hoyos, Emilio et ux
RE-SCIP3B-DEED De Hoyos, Emilio et ux
RE-SCIP3B-DEED De La Rosa, Mary
RE-SCIP3B-DEED Del Bosque, Manuela
RE-SCIP3B-DEED Dromgoole, William and Trinie
RE-SCIP3B-DEED DuBois, John and Nicolina
RE-SCIP3B-DEED Dubose, S.I.
RE-SCIP3B-COND Esserick, Sam
RE-SCIP3B-DEED Fernandez, Oscar et ux
RE-SCIP3B-DEED Freeborn, Sherman
RE-SCIP3B-DEED Fuentes, Gilbert et ux
RE-SCIP3B-DEED Fuentes, Gilbert F.
RE-SCIP3B-DEED Gonzales, Mauricio
RE-SCIP3B-DEED Graeber, Sylvia
RE-SCIP3B-DEED Gutierrez, Ariel et al
RE-SCIP3B-DEED Gutierrez, Jorge et ux
RE-SCIP3B-DEED Harrison, Mary et al
RE-SCIP3B-DEED Harrison, Mary et al
RE-SCIP3B-DEED Morris, Gussie L. et al (Estate of Hays, Alice)
RE-SCIP3B-COND Hernandez, Marcos et al
RE-SCIP3B-DEED Waldeck, P. L. et al
RE-SCIP3B-ESMT Hunnicutt, Robert
RE-SCIP3B-DEED Hunt, Evelyne L.
RE-SCIP3B-DEED Hurtado, Edward A. Jr. et al
RE-SCIP3B-DEED Moore, Margaret Fay (Estate of Johnson, Lizzie)
RE-SCIP3B-DEED Kelly, L.B. et al
RE-SCIP3B-DEED Frazer, E. J. et al
RE-SCIP3B-COND Krueger, Theresa
RE-SCIP3B-DEED Leibovitz, Herman et ux
RE-SCIP3B-DEED Leifeste, Arthur J.
RE-SCIP3B-DEED Llamas, Eulalia
RE-SCIP3B-DEED Loo, Gilbert N. et ux
RE-SCIP3B-DEED Lipoff, Lillie et al
RE-SCIP3B-JUA Muniz, Reynaldo R.
RE-SCIP3B-DEED Martinez, Margarit E. et con
RE-SCIP3B-DEED Martinez, Margarit E., et vir
RE-SCIP3B-DEED Machado, Adolfo et al
RE-SCIP3B-DEED Mata, Sirildo et ux
RE-SCIP3B-COND McGuffin, Lewis K.
RE-SCIP3B-DEED Mellor, Cordelia
RE-SCIP3B-DEED Blumenthal, Doris Louise Mindes
RE-SCIP3B-DEED Mission Cemetery Co.
RE-SCIP3B-DEED Mitchell, Frank et ux
RE-SCIP3B-DEED Molter, Ethel
RE-SCIP3B-DEED Moore, William J. et ux
RE-SCIP3B-COND Moreno, Alex
RE-SCIP3B-DEED Moreno, Hector M.
Box
247 RE-SCIP7-3-2-DEED San Antonio River Authority
RE-SCIP7-3-2-DEED Fest, Aubrey et al
RE-SCIP7-3-2-DEED Alamo Hardwoods, Inc.
RE-SCIP7-3-2-DEED Villarreal, Antonio
RE-SCIP7-3-2-DEED Bethea, Sally Mildred Cain
RE-SCIP7-3-2-DEED Le Bleu, Cynthia et al
RE-SCIP7-3-2-DEED Hendrix, Emmett Grady Jr.
RE-SCIP7-3-2-DEED Villalon, Mary Aida et al (Estate of Galvan, Josefa)
RE-SCIP7-3-2-DEED City of San Antonio
RE-SCIP7-3-2-DEED City of San Antonio
RE-SCIP7-3-2-DEED Hicks, Larry et al (Hicks Floor Coverings)
RE-SCIP7-3-2-DEED Slater, Jack A. Sr.
RE-SCIP7-3-2-DEED Stafford, John Z. et al
RE-SCIP7-3-2-DEED Green, Juanita J. and Malone, Thomas E.
RE-SCIP7-3-2-DEED Caballero, Maria G.
RE-SCIP7-3-2-DEED Koplan, Maynard D. and Rita R. (Metal Masters)
RE-SCIP7-3-2-ESMT Briseño, Jimmie C. Jr.
RE-SCIP7-3-2-DEED Rosenberg, Stanley D. et al
RE-SCIP7-3-2-DEED Dolan, Sharon Irene and Mueller, Bernice Ann et ux
RE-SCIP7-3-2-DEED Tijerina, Henry et ux
RE-SCIP7-3-2-DEED Garcia, Wilfred C. and Beatrice M.
RE-SCIP7-3-2-DEED San Antonio River Authority
RE-SCIP7-3-2-DEED San Antonio River Authority
RE-SCIP7-3-2-DEED San Antonio River Authority
RE-SCIP7-3-2-DEED San Antonio River Authority
RE-SCIP7-3-2-DEED San Antonio River Authority
RE-SCIP7-3-2-DEED San Antonio River Authority
RE-SCIP7-3-2-DEED San Antonio River Authority
RE-SCIP7-3-2-DEED San Antonio River Authority
RE-SCIP7-3-2-DEED San Antonio River Authority
RE-SCIP7-3-2-DEED San Antonio River Authority
RE-SCIP7-3-2-DEED San Antonio River Authority
RE-SCIP7-3-2-DEED San Antonio River Authority
RE-SCIP7-3-2-DEED San Antonio River Authority
RE-SCIP7-3-2-DEED San Antonio River Authority
RE-SCIP7-3-2-DEED San Antonio River Authority
RE-SCIP7-3-2-DEED San Antonio River Authority
RE-SCIP7-3-2-DEED San Antonio River Authority
RE-SCIP7-3-2-DEED San Antonio River Authority
RE-SCIP7-3-2-DEED San Antonio River Authority
RE-SCIP7-3-2-DEED San Antonio River Authority
RE-SCIP7-3-2-DEED Ramirez, Candida (Estate of Ramirez, Pedro Sr.)
Box
238 RE-SCIP4B-DEED Pintor, Alfonso et ux
RE-SCIP4B-DEED Quiroz, Mike et ux
RE-SCIP4B-DEED Rangel, Louis et ux
RE-SCIP4B-DEED Rodriguez, Armando Jr.
RE-SCIP4B-DEED Rodriguez, Louis Jr.
RE-SCIP4B-DEED Rodriguez, Soledad
RE-SCIP4B-DEED Appelt, Ida E. Roehr et al
RE-SCIP4B-DEED Root, Lucille Martinez et al
RE-SCIP4B-DEED Salinas, Jose R. et ux
RE-SCIP4B-DEED San Antonio River Authority
RE-SCIP4B-DEED San Roman, Bernardo et ux
RE-SCIP4B-DEED Sanchez, Consuelo A.
RE-SCIP4B-DEED Santoscoy, Genoveva A.
RE-SCIP4B-DEED Schroeder, Edwin
RE-SCIP4B-DEED Sosa, Pedro et ux
RE-SCIP4B-DEED Tarin, Manuel T. et ux
RE-SCIP4B-DEED Valenzuela, Cayetano et ux
RE-SCIP4B-DEED Morin, Theresa
RE-SCIP4B-JUA
RE-SCIP4B-ORD City of San Antonio
Box
235 RE-DAM-SALADO 13A-AGMT Capitol Aggregated, Inc.
RE-DAM-SALADO 13A-CERT Certification Relating to Land, Water and Construction Permits (Salado Site 13A and 13B)
RE-DAM-SALADO 13A-ESMT Ackermann, Bernice J. et al
RE-DAM-SALADO 13A-ESMT County of Bexar
RE-DAM-SALADO 13A-ESMT Steubing, Herbert and Elgin
RE-DAM-SALADO 13A-ESMT Steubing, Herbert
RE-DAM-SALADO 13A-REL Ackermann, Lillie E.
RE-DAM-SALADO 13A-STUDY Council of Texas Archeologists
RE-DAM-SALADO 13B-ESMT Fischer, B. G.
RE-DAM-SALADO 13B-JUA City of San Antonio
RE-DAM-SALADO 13B-JUA Six Star Properties Partnership
Box
246 RE-DAM-SALADO 12-AGMT Redland Stone Products Company
RE-DAM-SALADO 12-CERT Certification Relating to Land Rights - Salado Site 12
RE-DAM-SALADO 12-COND House-Braswell Company and San Antonio Pre-Stressed Company
RE-DAM-SALADO 12-ESMT Ackermann, Edwin F. et ux
RE-DAM-SALADO 12-ESMT Uecker, Lorine and Goodspeed, Doris Uecker
RE-DAM-SALADO 12-JUA KB Home, Lone Star, L.P.
RE-DAM-SALADO 12-REL Uecker, Lorine and Goodspeed, Doris Uecker
Box
243 RE-PIPE-ESMT Sigmor Pipeline Company
RE-PIPE-ESMT Southside Independent School District
RE-PIPE-ESMT Southwest Independent School District
RE-PIPE-ESMT Three Oaks Water Supply Corp.
RE-PIPE-ESMT Tomlinson Oil Company, Inc.
RE-PIPE-ESMT United Texas Transmission Company
RE-PIPE-ESMT Valero Transmission Company
RE-PIPE-ESMT Valero Transmission Company
RE-PIPE-ESMT Koch Pipeline Company, L.P.
RE-PIPE-ESMT GulfTerra Texas Pipeline, L.P.
RE-PIPE-ESMT San Antonio Water System
RE-PIPE-GENF General File - Title to the Bed and Banks of the SAR
RE-PIPE-JUA Williams Communications, Inc.
RE-PIPE-LIC Missouri Pacific Railroad Company
RE-PIPE-PMT City of San Antonio
RE-PIPE-ROWC Koch Refining Company, L.P.
Box
228 RE-PIPE-ESMT AT & T Communications, Inc.
RE-PIPE-ESMT Bay Rock Operating Company
RE-PIPE-ESMT Border to Border Exploration, L.L.C.
RE-PIPE-ESMT Central Power and Light Company
RE-PIPE-ESMT City Public Service Board of San Antonio
RE-PIPE-ESMT City Public Service Board of San Antonio
RE-PIPE-ESMT City Public Service Board of San Antonio
RE-PIPE-ESMT Coastal Liquids Partners, L.P.
RE-PIPE-ESMT Delhi Gas Pipeline Corporation
RE-PIPE-ESMT El Oso Area Water Supply Corp.
RE-PIPE-ESMT Interstate Gathering Corporation
RE-PIPE-ESMT Koch Refining Company, L.P.
RE-PIPE-ESMT Lone Star Gas Company
RE-PIPE-ESMT Nueces River Authority
RE-PIPE-ESMT Royal Oil & Gas Corporation
RE-PIPE-ESMT San Antonio Water System
RE-PIPE-ESMT San Antonio Water System
RE-PIPE-ESMT San Antonio Water System
RE-PIPE-ESMT San Antonio Water System
RE-PIPE-ESMT San Antonio Water System
RE-PIPE-ESMT San Antonio Water System
RE-PIPE-ESMT San Antonio Water System
Box
241 RE-SCIP4B-COND Gomez, Andres
RE-SCIP4B-COND Simmons, Sarah et al
RE-SCIP4B-DEED Mendoza, Leonardo H.
RE-SCIP4B-DEED Lozano, Dolores
RE-SCIP4B-DEED Vogel, Frances Thompson et vir
RE-SCIP4B-DEED Alvarado, Juan F. et ux
RE-SCIP4B-DEED Alvarez, Jesus V. et ux
RE-SCIP4B-DEED American Realty Corp.
RE-SCIP4B-DEED American Realty Corp.
RE-SCIP4B-DEED Barenblat, I
RE-SCIP4B-DEED Barenblat, Marvin et ux
RE-SCIP4B-DEED Bland, John Robert
RE-SCIP4B-DEED Cadena, Amado et ux
RE-SCIP4B-DEED Castillo, Antonio et ux
RE-SCIP4B-DEED Castro, H.M.
RE-SCIP4B-DEED Chavez, Delfino et ux
RE-SCIP4B-DEED Cisneroz, Louisa
RE-SCIP4B-DEED Contreras, Herbert et ux
RE-SCIP4B-DEED Cox, Ruth et con
RE-SCIP4B-DEED Fuentes, Lupe Wardell
RE-SCIP4B-DEED Garcia, Natalia R.
RE-SCIP4B-DEED Gonzales, N.R. et ux
RE-SCIP4B-DEED Gonzales, Rafael et ux
RE-SCIP4B-DEED Huron, Cayetano M. Jr.
RE-SCIP4B-DEED Jasso, Consuelo et vir
RE-SCIP4B-DEED Karam, Edward et ux
RE-SCIP4B-DEED Kemper, Sylvia
RE-SCIP4B-DEED Lifshutz, Sam B.
RE-SCIP4B-DEED Lifshutz, Sam B.
RE-SCIP4B-DEED Lifshutz, B. Lee (trustee)
RE-SCIP4B-DEED Lopez, Margarito F. et ux
RE-SCIP4B-DEED Marroquin, Carlos G.
RE-SCIP4B-DEED Miranda, Juan
RE-SCIP4B-DEED Mora, Frank J. et ux
RE-SCIP4B-DEED Morin, Theresa et al
RE-SCIP4B-DEED Navarro, Hilario et ux
RE-SCIP4B-DEED Northway, William H.
RE-SCIP4B-DEED Northway, William H.
RE-SCIP4B-DEED Ojeda, Jesus et al
RE-SCIP4B-DEED Ojeda, Jesus et al
RE-SCIP4B-DEED Hernandez, Josephine A.
RE-SCIP4B-DEED Hernandez, Josephine A.
RE-SCIP4B-DEED Olguin, Trinidad
RE-SCIP4B-DEED Partida, Larry et ux
RE-SCIP4B-DEED Perez, Ernestine S. (Guardian of Perez, Andres Arthur a minor)
RE-SCIP4B-DEED Perez, Sabino et ux
RE-SCIP4B-DEED Perry, J.F. et al
Box
237 RE-SCIP2-DEED Epstein, Jerome et al
RE-SCIP2-COND Felan, Andres M. et al
RE-SCIP2-DEED Figaro, John A.
RE-SCIP2-DEED Fisher, E. Paul et ux
RE-SCIP2-DEED Flannery, William W. (Trustee)
RE-SCIP2-DEED Flores, Ignacio R. et ux
RE-SCIP2-DEED Flores, J. N. et ux
RE-SCIP2-DEED Flores, J. M. et ux
RE-SCIP2-DEED Flores, Juan, et ux
RE-SCIP2-DEED Forrest, John P.
RE-SCIP2-DEED Fraga, Felix O. et ux
RE-SCIP2-DEED Frank, J. W. et ux
RE-SCIP2-COND Frias, Richard et al
RE-SCIP2-DEED Galanos, Michael N.
RE-SCIP2-DEED Garcia, Enrique et ux
RE-SCIP2-DEED Garcia, Alex L. et ux
RE-SCIP2-DEED Garcia, Juan C.
RE-SCIP2-DEED Garcia, Pauline et al
RE-SCIP2-DEED Gomez, Joe et ux
RE-SCIP2-DEED Gomez, Luciano A. et ux
RE-SCIP2-DEED Granato, Basilio et ux
RE-SCIP2-DEED Harwell, R. F., et ux
RE-SCIP2-JUA I-Link, Inc.
RE-SCIP2-DEED Jackson, Joe J. et ux
RE-SCIP2-COND Jimenez, Gregorio et al
RE-SCIP2-DEED Johnson, Elmer J.
RE-SCIP2-DEED Jowers, Marguerite H.
RE-SCIP2-DEED Kallison, Morris
RE-SCIP2-DEED Leal, Sam A., et ux
RE-SCIP2-DEED Lifshutz, Sam B.
RE-SCIP2-DEED Littlefield, Birt Emma et al
RE-SCIP2-DEED Lopez, Ralph, et ux
RE-SCIP2-COND Lynn, Walter et al
RE-SCIP2-DEED Macias, Joe E.
RE-SCIP2-COND Mackey, Virginia B. et vir
RE-SCIP2-DEED Martinez, Josefa V.
RE-SCIP2-DEED Martinez, Amado J. et ux/et al
RE-SCIP2-DEED Mathis, W.C., et al
RE-SCIP2-DEED McRae, J.P.
Box
242 Miller, Knox Jr. Deed
Miller, Knox Jr. Deed
Certification Related to Land & Water Rights
Bridges, John P. et al Condemnation
Alexander, L. D. et ux Easement
ARP Investors, Ltd Release
Saunders, D. F. et ux Easement
Simon, Walter B. Easement
Rogers, Wallace Jr. et al Easement
Thomas, Alex R. Jr. et al Easement
Thomas, Alex R. Jr. et al Easement
Certification Relating to Land Rights
City of San Antonio Deed
Thomas, Alex R. et al Deed
Reitmeyer Investment Company Easement
Box
231 City of San Antonio (YMCA) Deed
City of San Antonio (YMCA) Deed
Classen, Linda et al (Estate of Classen, Walter W.) Deed
Farina, Joe P. Deed
Farina, Joe P. Deed
Super, Jan P., Inc. Deed
City of San Antonio Easement
City of San Antonio Easement
City of San Antonio Easement
City of San Antonio (Stone Oak Phase II, Unit 2) Easement
City Public Service Board of San Antonio Easement
Hartman, Gordon V. (Gordon V. Hartman Enterprises, Inc.) Easement
VFA Associates, LTD Easement
Northeast Independent School District Easement
Watershed Engineering Contract Files
Box
240 Martinez II administraion Building 2 volumes May-09
Martinez II administraion Building Change orders 2010-2011
Graytown Road Wasterwater Collection System Phase III Aug-11
Salatrillo Belt Filter Press Replacement Project Jul-12
Martinez II WWTP SCADA Design-Build Project Jan-13
Alamo Community College District First Responders Wastewater Treatment Plant Jun-12
Lake Medina Dam Safety Modifcations
Floodwater Retarding Structue Site No. 8 Calaveras Creek Watershed Oct-11
Box
234 2010 Flood Debris Clean-up along SAR in Karnes County Jan-10
San Antonio River Access at County Road 125 (Graytown Park) May-13
SARA Euclid Building Concrete Apron Jun-13
Environmental Monitoring Apr-12
SARB Regional Modeling Standards-Hdrology and Hyraulics Modeling Aug-14
Low Impact Development Analysis of Vertical Project Jun-12
Bexar County Flood Warning and Flood Alert System Mar-12
Glen Mont Drive Sanitary Sewer Adjustments from Old Walzem Road to Crestway Road
Utilities SCADA Wrap-up Design-Build Project 8/21/2014
Helton San Antonio River Nature Park Project (Trails) Aug-13
Peter Reed Field 1/20/2014
Box
245 Description: Watershed Engineering Contract Files
Martinez II WWTP Expansion Diversion Structure and Screw Pump Replacements Oct-09
Martinez II WWTP Access Road and Waterline Improvements Project Jun-09
Salatrillo Reuse Pipeline Project Sep-12
Salatrillo Reuse Pump Station Project Sep-12
Woodlake Golf Course Reuse Water Project Sep-07
Calaveras Creek Watershed Floodwater Retarding Structure Site No. 6 Rehabilitation Jun-10
Martinez II WWTP Phase II 1.5 MGD Expansion to 3.5 MGD Aug-10
Upper Martinez WWTP SCADA Design Project Oct-10
Box
230 SARIP Park Segement trails 12 & 12B
SARIP Park Segment Phase 2 Preliminary Drawings and Specs
SARIP Park Segment Phase 2 Stormwater Management Plan
SARIP Park Segement Phase 2-Phase 1 -Avenue B Plans & Specs
Mission Reach Package 3 Award Set-Base Project
Mission Reach Package 3 Award Set-Betterments
Mission Reach GIS File Geodatabase
SARIP Urban Segment-Graphics and Wayfinding Program
SARIP-submittal-pedestrian Bridge repainting-riverwalk expansion
SARIP Mission Reach Phase 1-Revised Recod Drawing
SARIP Mission Reach Phase4-95% Review
SARIP Mission Reach Phase 2A-1005 Review
SARIP Mission Reach Phase 2B,2C,3-100% reivew
SARIP Mission Reach-95% Supplemental Design Review
SARIP Concept Design-Design Guidelines
Amendment 5 for Mission Reach Outfall Review
Amendment 5 for Mission Reach Coordination
Professional Services Agreement for Mission Reach Preliminary Design
Professional Services Agreement for Mission Reach Public Particiption
Professional Services Agreement for Mission Reach Public Particiption
Programmatic Agreement-Amendment 1 Mission Reach
Cooperative Agreement and Amendments for Mission Reach
Cooperative Agreement and Amendments for Mission Reach
Phase II Environmental Site Assessment
Removal and Disposal of Three Pole Mounted Transformers
Amendment for Archaelogical Services
Mission Reach Correspondence
TCEQ Comments to Site Investigation and Adjeacent Property Owner
Mission Reach Maintenance Facility RFQ and Amendments
Architectural Barriers-Inspection Response Form
HDRC letter of Authorization 2010/Agenda for Case No. 2004-137
Tree Preservation -Mitigation/Mitigation Alternative Methods Letter
Special Use Permit
Mission Reach Package 3-Major Stormwater Outfall Review and Recommendations
Mission Reach Package 3-Major Stormwater Outfall Review and Recommendations
San Antonio River Improvements Project-LOMR Report
Box
248 SARIP Museum Reach Preliminary Design Report
SARIP Museum Reach 50% Final Design
SARIP Museum Reach 50% Cad and Contract Documents
SARIP Mission Reach Preliminary Report
SARIP Mission Reach Phase 1 60% Plans
SARIP Turning Basin Plan set
Archaelogical Assessment of three Locations on the San Antonio River Techinal Report 23
Environmental Assessment-Eagleland Reach-
Supplemental Environmental Assessment for Land Acquisition and Transfer for Mission Reach
Supplemental Environmental Assessment for Land Acquisition and Transfer for Mission Reach-Draft
Supplemental Environmental Assessment for Land Acquisition and Transfer for Mission Reach-Draft
Contract Documents and Specifications for Mission Reach Ecosystem Restoration and Recreation project-Package 3-volume 1
Contract Documents and Specifications for Mission Reach Ecosystem Restoration and Recreation project-Package 3-volume 2
Contract Documents and Specifications for Mission Reach Ecosystem Restoration and Recreation project-Package 3-volume 3
Techincal Memorandum for Symphony Lane Neighborhood Flood Relief Study
Mission Reach Ecosystem Restoration and Recreation project (phases 1-4) Floodplain Study SARA
Phase III Proposed Irrigation solution for the San Antonio River Authority
Contract Documents and specifications for Mission Reach-Operations Center-Part 1
Contract Documents and Specifications for Mission Reach-Operations Center-Part 2
Mission Reach Operations Center Construction Documents Specification(Design Build) Volume 1- Architectural
Mission Reach Operations Center Construction Documents Specification(Design Build) Volume 2- Structural and Civil
Final- Supplemental Environmental Assessment for Land Acquisition and Transfer for Mission Reach Ecosystem Restoration and Recreation Project
Subsuface Site Assessment Activities-Former Sewge Spill Overflow Containment Pits
Archaelogical Assessment of the Potential Impact of the San Antonio River Improvement Project-Mission Reach-on Historic Properties
Box
239 Elmira Street Parking Lot
2009 Flood Debris Clean-Up Along the San Antonio River in Goliad County
Flood Debris removal Along Cibolo Creek in Bexar, Wilson, and Guadalupe Counties
Martinez Creek Watershed Floodwater Retarding Structure No. 6A rehabilitation
Asylum Creek and No Name Creek Channel Rectification Project Volume 1 of 2
Asylum Creek and No Name Creek Channel Rectification Project Volume 2 of 2
Archaeological Survey for Asylum and No Name Creek Channel Rectification Project
Contract Documents and Specifications for the Crofton and Constance Park
Nichols Creek Channel Repair Escondido Creek Watershed Project in Karnes County
Specifications for a renovation/addition to San Antonio River Authority
Contract Documents and Specifications for the Braunig Lake Courtesy Dock Project
Contract Documents and Specifications for the Calaveras Lake Parking Lot Improvements
Specifications and Contract Documents for Calaveras Lake Park and Braunig Lake Park Improvements

Return to the Table of Contents