Sanguinet and Staats, one of the most successful and influential
architectural firms in Texas from the turn of the century through the 1930s,
was founded in 1903 by Marshall R. Sanguinet and Carl G. Staats. Sanguinet, who
was twelve years older than Staats, moved to Fort Worth in 1883 and practiced
architecture there with a variety of partners until the turn of the century.
Staats, a native New Yorker, emigrated to Texas in 1891 and worked for noted
San Antonio architect James Riely Gordon before being hired by Sanguinet as a
draftsman in 1898.
In 1903, Charles D. Hill became the general superintendent for the
Sanguinet and Staats firm. He served in this position in Fort Worth until 1905.
In 1905, the firm Sanguinet, Staats and Hill, Architects, was established in
Dallas. Hill withdrew from the firm in 1907 and with D.F. Coburn and H.D.
Smith, he organized the architectural firm of C.D. Hill and Company.
Sanguinet and Staats, headquartered in Fort Worth, rapidly developed
into one of the state's largest architectural practices, producing buildings of
all types from factories and large hotels to churches and schools. It is best
known, however, for its contributions to the design of steel-framed
skyscrapers. The firm's work encompassed almost every tall building constructed
in Fort Worth before 1930 and--for a time--the tallest structures in Beaumont,
Houston, Midland, and San Antonio. The 20-story Amicable Insurance Co. Building
in Waco, completed in 1911, was for a brief time, the tallest building in the
Southwest. Other prominent examples include: First National Bank Building, Fort
Worth (1907); Scarbrough Building, Austin (1910); C.F. Carter Building, Houston
(1919); South Texas Building, San Antonio (1919); Neil P. Anderson Building,
Fort Worth (1920); and the Jackson Building, Jackson, Miss. (1923). Designed in
a variety of styles and forms, their numerous works transformed the scale and
style of the state's rapidly growing cities during the teens and twenties.
Despite Sanguinet and Staats' emphasis on large commercial
buildings, the firm also designed a number of large residences for some of the
state's cattle, cotton, timber, and oil magnates, prominent examples of which
may still be seen on Pennsylvania Ave. in Fort Worth and Courtland Place in
Houston.
Sanguinet and Staats were also instrumental in transforming the
practice of architectural offices to have a state-wide general architecture
practice with branch offices in Dallas, Wichita Falls, San Antonio, Waco, and
Houston.
In 1922, Sanguinet and Staats were joined by Wyatt C. Hedrick who
bought a partial interest in the firm. The practice was known as Sanguinet,
Staats, Hedrick and Gottlieb, under the direction of R.D. Gottlieb, a limited
partner. That arrangement lasted until 1926 when Sanguinet and Staats
officially retired and sold their share of the firm to Hedrick. Thereafter,
Hedrick continued the practice under his own name in Fort Worth, and in limited
partnerships in Houston and later Dallas.
Wyatt Cephas Hedrick (1888-1964) was born in Chatham, Va. He
attended Roanoke College and graduated from Washington and Lee College in 1910.
Employed as an engineer by Lane Brothers of Alta Vista, Va. from 1910 to 1913,
he became associated in 1913 with Stone and Webster Engineering Corp. of Boston
as a construction engineer in their Dallas office. Hedrick ran his own
construction company in Fort Worth from 1914 to 1921, when he became a partner
of the architecture firm Sanguinet, Staats and Hedrick, which had offices Fort
Worth and Houston. In 1925 Hedrick established his own architectural
enterprise, with offices in Fort Worth, Dallas, and Houston.
Hedrick's moderne-style buildings in Fort Worth include the Worth
Theatre (with Alfred C. Finn, 1927), Lone Star Gas Co. Building (1929),
Hollywood Theatre (with Alfred C. Finn, 1930), Aviation Building (1930),
Central Fire Station and Fire Alarm Signal Station (1930), Texas & Pacific
Terminal and Warehouse (1931), Will Rogers Memorial Center (1936) and City Hall
(1938), (both in association with Elmer G. Withers), and Mrs. Baird's Bakery
(1938).
Although his firm became one of the foremost exponents of the
moderne style in Fort Worth, Hedrick completed many more local commissions in
other stylistic idioms. He had an active practice in many cities (often with
partners, simultaneously maintaining Hedrick & Lindsley and Hedrick &
Stanley, for example) across the nation from the 1920s to the 1950s, and at one
time his was the third-largest architectural firm in the country. Hedrick's
other Fort Worth projects included the Medical Arts Building, Worth Hotel,
Electric Building, Fair Building, US Public Health Service Hospital, St.
Joseph's Hospital, and the Tarrant County Civil Courts Building of 1953, which
was resurfaced and given a disguising mural by artist Richard Haas in 1988. He
also designed the Sterlick Building in Memphis and scores of educational
facilities throughout Texas, including Texas Tech University in Lubbock, Texas
Christian University and Texas Wesleyan College in Fort Worth, and North Texas
State University in Denton. Other important Hedrick projects included the
Shamrock Hotel in Houston (object of a famous jeer by Frank Lloyd Wright, who,
on seeing the rooftop sign in 1949, said, "I can understand the `sham,' but
where's the rock'?"), Scott and White Memorial Hospital in Temple, and US Air
Force bases in Iceland (at $221 million, the largest in his portfolio) and
British Guiana. Hedrick is a charter member of TSA [Texas Society of
Architects].
Job lists, firm brochures, specifications, a feasibility study,
photographs, a book and drawings document the activities of Sanguinet, Staats
and Hedrick in its various permutations from 1910 to 1969. The 15,000 drawings
make up the vast bulk of the records; the archival materials measure.54 linear
feet (or one box).
The series, Job Lists, includes eight folders; these inventories are
arranged numerically by job number or alphabetically by city. One set of Job
Lists is entitled "Inventory of drawings in the possession of A.B. Cadenhead as
of 1989" (Box 1, Folder 7). Cadenhead sold some of the firm's drawings to the
owners of the buildings. This annotated list explains gaps in this set of
drawings.
Firm brochures reflect later work of the firm when it was called Wyatt
C. Hedrick Inc. The records include one set of specifications for the Thrasher
residence in Waco. Hedrick's firm produced a feasibility study for the US
Public Health Service Hospital in Fort Worth which is included here. The most
recent addition to the records is the book, a history of the Santa Fe Hospital
which was published by the hospital in 1991 for its 100th anniversary.
The Photograph series consists of 194 black and white prints of
Hedrick buildings. The prints represent a wide range of building types, styles
and geographic areas.
Included among the 15,000 drawings are the following buildings:
Amicable Insurance Building (Waco), First National Bank Building (Fort Worth),
Neil P. Anderson Building (Fort Worth), Lone Star Gas Co. Building (Fort
Worth), Texas & Pacific Terminal & Warehouse (Fort Worth), Tarrant
Civil Courts Building (Fort Worth).
Access is by appointment only to any serious scholar. Rolled materials
must be flattened before viewing. A three day advance notice is required to
flatten rolled materials. Portions of this collection are not processed and may
not be accessible.
Permission for publication is given on behalf of the University of
Texas as the owner of the collection and is not intended to include or imply
permission of the copyright holder which must be obtained by the researcher.
For more information please see the Alexander Architectural Archive's Use
Policy
Sanguinet, Staats and Hedrick, Drawings, photographs and archival
records, 1910-1969, 1991, Texas, Alexander Architectural Archive, University of
Texas Libraries, The University of Texas at Austin
Processing is not completed. Please see Archive's staff for more
information.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Series G1: Drawings, Client Names A-L |
|
Series Abstract |
|
Click on the series title above to see a listing of the contents
of this series. Entries are indexed in alphabetical order by Client's last
name. If the client is not identifiable the field will remain blank. Entries
without client names are sorted by Project Name and listed before those that
provide client's names. Project names are supplied by the cataloger, as title
blocks on the drawings prove to be inconsistent and many drawings are not
labeled. Dates are offered if they can be derived from the drawings or gathered
from other authoritative sources. The term "drawing" includes both original
works (such as pencil on trace paper, or ink on tracing cloth) as well as
copies (such as sepia prints, blueline prints, etc.). Please note that many
sets of drawings were sold before the collection was acquired by the University
of Texas. See Series A "Job Lists" and Series B "Firm Brochures" for an
inventory of project drawings sold. |
|
|
|
Project number: 2109 Project name: A.G. Hinn and Assoc. Hotel
building. Date on drawings: 1928 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: A. G. Hinn and Assoc. |
|
|
|
|
City: Plainview |
|
|
|
|
County: Hale |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2162 Project name: A.G. Hinn and Assoc. Theater
building. Date on drawings: 1929 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: A. G. Hinn and Assoc. |
|
|
|
|
City: Plainview |
|
|
|
|
County: Hale |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1562 Project name: Adam Clay Estate.
Garage. Primary archt/firm: Sanguinet, Staats and
Gottlieb |
|
|
|
|
|
|
|
|
Client: Adam Clay Estate |
|
|
|
|
City: Houston |
|
|
|
|
County: Harris |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2784 Project name: Albany I.S.D. school. Shop
building. Addition. Date on drawings: 1941 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Albany I.S.D. |
|
|
|
|
City: Albany |
|
|
|
|
County: Shackleford |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2074 Project name: Albert-Sidney Johnston School.
Additions and alterations. Date on drawings: 1928 Primary archt/firm: Hedrick and
Gottlieb |
|
|
|
|
|
|
|
|
Client: Albert-Sidney Johnston School |
|
|
|
|
City: Houston |
|
|
|
|
County: Harris |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2119 Project name: Alexander Bale Stores store
building. Date on drawings: 1928 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Alexander Bale Stores, Inc. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4123 Project name: Bill Alford residence. Date on drawings: 1950 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Alford, Bill |
|
|
|
|
City: Weatherford |
|
|
|
|
County: Parker |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project name: Reporter Telegraph
Building. Date on drawings: 1947 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Alison, Jim |
|
|
|
|
City: Midland |
|
|
|
|
County: Midland |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4530 Project name: A.A. Allen residence.
Addition. Date on drawings: 1953 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Allen, A. A. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 6079 Project name: Sands Motor Hotel. Date on drawings: 1962 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Allen, Allen, and McGibbon |
|
|
|
|
City: Perryton |
|
|
|
|
County: Ochiltree |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5570 Project name: Dr. Platt Allen medical
clinic. Date on drawings: 1958 Primary archt/firm: Hedrick and
Stanley |
|
|
|
|
|
|
|
|
Client: Allen, Dr. Platt |
|
|
|
|
City: Weatherford |
|
|
|
|
County: Parker |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4374B Project name: Alto I.S.D. Unidentified school.
Addition. Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Alto I.S.D. |
|
|
|
|
City: Alto |
|
|
|
|
County: Cherokee |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4374 Project name: Alto I.S.D. Unidentified school.
Addition and rehabilitation. Date on drawings: 1952 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Alto I.S.D. |
|
|
|
|
City: Alto |
|
|
|
|
County: Cherokee |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2434 Project name: Alvord I.S.D. Unidentified school
building. Addition. Date on drawings: 1938 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Alvord I.S.D. |
|
|
|
|
City: Alvord |
|
|
|
|
County: Wise |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2244 Project name: Amarillo Freight
House. Date on drawings: nd |
|
|
|
|
|
|
|
|
Client: Amarillo Freight House |
|
|
|
|
City: Amarillo |
|
|
|
|
County: Potter |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2715 Project name: American Asphalt Roof Corporation
factory and warehouse. Date on drawings: 1940 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: American Asphalt Roof Corp. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5657 Project name: American Bank of Commerce bank and
office building (Odessa, Tex.). Date on drawings: 1960 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: American Bank of Commerce |
|
|
|
|
City: Odessa |
|
|
|
|
County: Ector |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4612 Project name: American General Investment Corp.
building, Remodeling. Date on drawings: 1954 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: American General Investment
Corp. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3744 Project name: American Legion recreation
building (Breckenridge, Tex.). Date on drawings: 1948 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: American Legion |
|
|
|
|
City: Breckenridge |
|
|
|
|
County: Stephens |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2569 Project name: Amherst I.S.D. Unidentified
gymnasium. Date on drawings: 1938 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Amherst I.S.D. |
|
|
|
|
City: Amherst |
|
|
|
|
County: Lamb |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 928 Project name: Amicable Building (ALICO).
Annex. Date on drawings: 1912 Primary archt/firm: Sanguinet and
Staats |
|
|
|
|
|
|
|
|
Client: Amicable Life Insurance Company |
|
|
|
|
City: Waco |
|
|
|
|
County: McLennan |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 815 Project name: Amicable Office Building
(ALICO). Date on drawings: 1910 Primary archt/firm: Sanguinet & Staats,
Roy E. Lane Collaborators: Roy E. Lane, associate
architect Collaborators: Ellison Koeppe |
|
|
|
|
|
|
|
|
Client: Amicable Life Insurance Company |
|
|
|
|
City: Waco |
|
|
|
|
County: McLennan |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1844a Project name: Amicable Office Building (ALICO).
Addition. Date on drawings: 1926 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Amicable Life Insurance Company |
|
|
|
|
City: Waco |
|
|
|
|
County: McLennan |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 265 Project name: Anacacho Ranch. Headquarters.
Plans. Date on drawings: 1927 Primary archt/firm: Marriot |
|
|
|
|
|
|
|
|
Client: Anacacho Ranch |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1488 Project name: Neil P. Anderson office
building. Date on drawings: 1920 Primary archt/firm: Sanguinet and
Staats |
|
|
|
|
|
|
|
|
Client: Anderson, Neil P. |
|
|
|
|
Street address: 7th? and Lamar St |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1991 Project name: Percy Garrett Motor Co. garage
building. Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Anderson-Berney Investment Co. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2105 Project name: West Texas Auto Laundry
Building. Date on drawings: 1928 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Anderson-Berney Investment Co. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5485 Project name: Casa Del Club. Date on drawings: 1958 Primary archt/firm: Hedrick and
Stanley |
|
|
|
|
|
|
|
|
Client: Angostura Corp. S.A. |
|
|
|
|
City: Cuidad Bolivar |
|
|
|
|
Country: [UNK] |
|
|
|
Project number: 6342 Project name: Anson General Hospital.
Addition. Date on drawings: 1963 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Anson General Hospital |
|
|
|
|
City: Anson |
|
|
|
|
County: Jones |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5168 Project name: Anson General Hospital.
Additions. Date on drawings: 1958 Primary archt/firm: Hedrick and
Stanley |
|
|
|
|
|
|
|
|
Client: Anson General Hospital |
|
|
|
|
City: Anson |
|
|
|
|
County: Jones |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5169 Project name: Mr. and Mrs. Lee Armer
residence. Date on drawings: 1957 Primary archt/firm: Hedrick and
Stanley |
|
|
|
|
|
|
|
|
Client: Armer, Mr. and Mrs. Lee |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5288 Project name: Armour Plant. Additions and
Alterations. Date on drawings: 1957 Primary archt/firm: Hedrick and
Stanley |
|
|
|
|
|
|
|
|
Client: Armour |
|
|
|
|
City: Portland |
|
|
|
|
State/Province: Or. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5301 Project name: Armour Plant. Beef cooler
building. Date on drawings: 1957 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Armour |
|
|
|
|
City: St. Paul |
|
|
|
|
State/Province: Minn. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2628 Project name: Plains Clinic. Date on drawings: 1939 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Arnett, Key and Malone, Drs. |
|
|
|
|
City: Lubbock |
|
|
|
|
County: Lubbock |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2955 Project name: Arthur Viner Davis Foundation
office building. Proposed. Date on drawings: 1943 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Arthur Viner Davis Foundation |
|
|
|
|
City: Brownsville |
|
|
|
|
County: Cameron |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1456 Project name: E.H. Astin residence. Date on drawings: 1919 Primary archt/firm: Sanguinet, Staats and
Gottlieb |
|
|
|
|
|
|
|
|
Client: Astin, E. H. |
|
|
|
|
City: Bryan |
|
|
|
|
County: Brazos |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4080 Project name: Athens I.S.D. Athens Elementary
School. Date on drawings: 1950 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Athens I.S.D. |
|
|
|
|
City: Athens |
|
|
|
|
County: Henderson |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4209 Project name: Athens I.S.D. Negro auditorium and
physical education building. Date on drawings: 1950 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Athens I.S.D. |
|
|
|
|
City: Athens |
|
|
|
|
County: Henderson |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5343 Project name: Athens I.S.D. Unidentified
elementary school building. Date on drawings: 1958 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Athens I.S.D. |
|
|
|
|
City: Athens |
|
|
|
|
County: Henderson |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4742A Project name: Athens I.S.D. Unidentified
elementary school building. Unit A cafeteria. Addition. Date on drawings: 1955 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Athens I.S.D. |
|
|
|
|
City: Athens |
|
|
|
|
County: Henderson |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4742B Project name: Athens I.S.D. Unidentified high
school building. Date on drawings: 1955 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Athens I.S.D. |
|
|
|
|
City: Athens |
|
|
|
|
County: Henderson |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5345B Project name: Athens I.S.D. Unidentified school.
Band and shop building. Date on drawings: 1958 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Athens I.S.D. |
|
|
|
|
City: Athens |
|
|
|
|
County: Henderson |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3348 Project name: Atlantic Refining Company.
Laboratory building and auto repair shop. Date on drawings: 1947 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Atlantic Refining Company |
|
|
|
|
City: Dallas |
|
|
|
|
County: Dallas |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5829 Project name: Austin County
Courthouse. Date on drawings: 1960 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Austin County |
|
|
|
|
City: Beeville |
|
|
|
|
County: Austin |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2322 Project name: Azle Common Consolidated School
District #18. Unidentified high school building. Date on drawings: 1932 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Azle Common Consolidated School District
#18 |
|
|
|
|
City: Azle |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3484 Project name: B. K. Electric Co-op. R.E.A.
headquarters Date on drawings: 1947-1948 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: B. K. Electric Co-op |
|
|
|
|
City: Seymour |
|
|
|
|
County: Baylor |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2533 Project name: Ninnie Baird residence. Terrace.
Addition. Date on drawings: 1938 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Baird, Ninnie L. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1754 Project name: Bank of Baton Rouge including
store building. Additions and Alterations. Date on drawings: 1925 Primary archt/firm: Sanguinet, Staats and
Hedrick |
|
|
|
|
|
|
|
|
Client: Bank of Baton Rouge |
|
|
|
|
City: Baton Rouge |
|
|
|
|
State/Province: La. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5563 Project name: Bank of Georgia
Building. Date on drawings: 1959 Primary archt/firm: Hedrick and
Stanley |
|
|
|
|
|
|
|
|
Client: Bank of Georgia |
|
|
|
|
City: Atlanta |
|
|
|
|
State/Province: Ga. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5145 Project name: Mr. and Mrs. R.N. Barrett
residence. Additions and alterations. Date on drawings: 1956 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Barrett, Mr. and Mrs. R. N. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5145 Project name: Mr. and Mrs. R.N. Barrett
residence. Additions and Alterations. Date on drawings: 1957 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Barrett, Mr. and Mrs. R. N. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4634 Project name: Barwalk Investment Corp. parking
garage. Date on drawings: 1955 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Barwalk Investment Corp. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3163 Project name: Ridge Mountain Lake lakeshore
lodge. Date on drawings: 1945 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Barwise, Mr. and Mrs. Seth |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2986 Project name: W.H. Batcher ranch
house. Date on drawings: 1943 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Batcher, W. H. |
|
|
|
|
City: Mineral Wells |
|
|
|
|
County: Palo Pinto |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4438 Project name: Baylor University. Browning
Library. Flagpole. Date on drawings: 1952 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Baylor University |
|
|
|
|
City: Waco |
|
|
|
|
County: McLennan |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1445 Project name: Beaumont I.S.D. Beaumont High
School. Additions and alterations. Date on drawings: 1919 Primary archt/firm: Sanguinet and
Staats |
|
|
|
|
|
|
|
|
Client: Beaumont I.S.D. |
|
|
|
|
City: Beaumont |
|
|
|
|
County: Jefferson |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1400 Project name: Beaumont I.S.D. Ogden School
building. Addition and alterations. Date on drawings: 1918 Primary archt/firm: Sanguinet, Staats and
Gottlieb |
|
|
|
|
|
|
|
|
Client: Beaumont I.S.D. |
|
|
|
|
City: Beaumont |
|
|
|
|
County: Jefferson |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1360 Project name: Beaumont I.S.D. Refinery district
school. Date on drawings: 1917 Primary archt/firm: Sanguinet, Staats and
Gottlieb |
|
|
|
|
|
|
|
|
Client: Beaumont I.S.D. |
|
|
|
|
City: Beaumont |
|
|
|
|
County: Jefferson |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 6001 Project name: Memorial Hospital (Beeville,
Tex.). Date on drawings: 1962 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Beeville, City of |
|
|
|
|
City: Beeville |
|
|
|
|
County: Bee |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3240 Project name: Bell Seed Company.
Alterations. Date on drawings: 1945 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Bell, F. M. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3426 Project name: City of Bells sewage collection
system and sewage disposal plant. Date on drawings: 1951 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Bells, City of |
|
|
|
|
City: Bells |
|
|
|
|
County: Grayson |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1668 Project name: Belmar Business District.
Proposed. Date on drawings: 1946 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Belmar Business District. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2263 Project name: Bender Hotel.
Alterations. Date on drawings: 1930 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Bender Hotel |
|
|
|
|
City: Houston |
|
|
|
|
County: Harris |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3334 Project name: Dr. Jarrell Bennet clinic
building. Entrance. Remodeling. Date on drawings: 1946 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Bennett, Jarrell |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1797 Project name: Better Building Co. apartment
building. Date on drawings: 1926 Primary archt/firm: Hedrick and
Gottlieb |
|
|
|
|
|
|
|
|
Client: Better Building Co. |
|
|
|
|
City: Houston |
|
|
|
|
County: Harris |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4750 Project name: Big Cow Dam and Little Cow Dam.
Construction plans. Date on drawings: 1957 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Big Cow Dam and Little Cow Dam |
|
|
|
|
City: Newton |
|
|
|
|
County: Newton |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5775B Project name: Bishop College. Administrative
building Date on drawings: 1960 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Bishop College |
|
|
|
|
City: Dallas |
|
|
|
|
County: Dallas |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5775E Project name: Bishop College. Campus
development, gymnasium-auditorium building, and Date on drawings: 1960 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Bishop College |
|
|
|
|
City: Dallas |
|
|
|
|
County: Dallas |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5775E Project name: Bishop College. Campus
development, gymnasium-auditorium building, and Date on drawings: 1961 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Bishop College |
|
|
|
|
City: Dallas |
|
|
|
|
County: Dallas |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5775C Project name: Bishop College. Dormitories and
social hall. Date on drawings: 1960 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Bishop College |
|
|
|
|
City: Dallas |
|
|
|
|
County: Dallas |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5775 Project name: Bishop College. Faculty and
married students apartments. Date on drawings: 1961 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Bishop College |
|
|
|
|
City: Dallas |
|
|
|
|
County: Dallas |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 6055 Project name: Bishop College. Social Hall.
Additions. Date on drawings: 1962 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Bishop College |
|
|
|
|
City: Dallas |
|
|
|
|
County: Dallas |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4308 Project name: Blackstone Hotel. Addition and
alterations. Date on drawings: 1951 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Blackstone Hotel |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3815 Project name: Blackstone Hotel. Radio Tower
Base. Date on drawings: 1948 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Blackstone Hotel |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4242 Project name: Mrs. C.S. Block residence.
Remodeling. Date on drawings: 1950 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Block, Mrs. C. S. |
|
|
|
|
City: Weatherford |
|
|
|
|
County: Parker |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2975 Project name: Bowen Motor Coaches. Maintenance
and repair shop. Date on drawings: 1943 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Bowen Motor Coaches |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2616 Project name: Bowen Motor Coaches. Union Bus
Station. Date on drawings: 1939 Primary archt/firm: Hedrick and
Lindsley |
|
|
|
|
|
|
|
|
Client: Bowen Motor Coaches |
|
|
|
|
City: Houston |
|
|
|
|
County: Harris |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3757 Project name: Bowie-Cass Electric Co-op.
Headquarters facilities. Additions and alterations. Proposed. Date on drawings: 1948 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Bowie-Cass Electric Co-op |
|
|
|
|
City: Douglasville |
|
|
|
|
County: Cass |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5236 Project name: Branch House and Manufacturing
Plant. Refrigeration warehouse. Date on drawings: 1957 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Branch House and Manufacturing |
|
|
|
|
Street address: Thrift Rd and Freedom
Dr |
|
|
|
|
City: Charlotte |
|
|
|
|
State/Province: N.C. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2091 Project name: Brantley Draughon Business College
building. Alterations. Date on drawings: 1929 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Brantley Draughon Business
College |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4129 Project name: Low rent housing project #Tex 39-1
(Breckenridge, Tex.). Date on drawings: 1958 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Breckenridge, City of |
|
|
|
|
City: Breckenridge |
|
|
|
|
County: Stephens |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4338 Project name: British American Oil Producing Co.
tower building. Office layout. Date on drawings: 1952 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: British American Oil Producing
Co. |
|
|
|
|
City: Dallas |
|
|
|
|
County: Dallas |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3087 Project name: Broadway Baptist Church (Fort
Worth, Tex.). Date on drawings: 1948 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Broadway Baptist Church |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2448 Project name: Broadway Building. Date on drawings: 1938 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Broadway Building |
|
|
|
|
City: Lubbock |
|
|
|
|
County: Lubbock |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2346 Project name: Fred Browning
residence. Date on drawings: 1933 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Browning, Fred |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2822 Project name: Memorial Hospital (Brownwood,
Tex.). Addition. Date on drawings: 1942 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Brownwood, City of |
|
|
|
|
City: Brownwood |
|
|
|
|
County: Brown |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2823 Project name: Memorial Hospital (Brownwood,
Tex.). Nurse's Home. Drawing. Date on drawings: 1942 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Brownwood, City of |
|
|
|
|
City: Brownwood |
|
|
|
|
County: Brown |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2806 Project name: Recreation building (Brownwood,
Tex.). Date on drawings: 1941 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Brownwood, City of |
|
|
|
|
City: Brownwood |
|
|
|
|
County: Brown |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1632 Project name: Brownwood Country Club
building. Date on drawings: 1924 Primary archt/firm: Sanguinet, Staats, and
Hedrick |
|
|
|
|
|
|
|
|
Client: Brownwood Country Club |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1302 Project name: Brownwood I.S.D. Unidentified
graded school building. Date on drawings: 1917 Primary archt/firm: Sanguinet and
Staats |
|
|
|
|
|
|
|
|
Client: Brownwood I.S.D. |
|
|
|
|
City: Brownwood |
|
|
|
|
County: Brown |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3057 Project name: William Buber business building.
Addition. Date on drawings: 1944 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Buber, William |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3450 Project name: Buell Lumber Co. building.
Addition and alterations. Date on drawings: 1948 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Buell Lumber Co. |
|
|
|
|
City: Dallas |
|
|
|
|
County: Dallas |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4289 Project name: Mr. and Mrs. H.R. Burden
residence. Addition and remodeling. Date on drawings: 1951 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Burden, Mr. and Mrs. H. R. |
|
|
|
|
City: Ennis |
|
|
|
|
County: Ellis |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2739 Project name: Burk Burnett Building. Date on drawings: 1940 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Burk Burnett Building |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2732 Project name: Mrs. O.L. Burnet residence.
Remodeling. Date on drawings: 1940 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Burnet, Mrs. O. L. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1578 Project name: Mrs. Burnett garage and servant's
house. Date on drawings: 1923 Primary archt/firm: Sanguinet, Staats and
Hedrick |
|
|
|
|
|
|
|
|
Client: Burnett, Mrs. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1310 Project name: Mrs. Tom Burnett ranch
house. Date on drawings: 1917 Primary archt/firm: Sanguinet and
Staats |
|
|
|
|
|
|
|
|
Client: Burnett, Mrs. Tom |
|
|
|
|
Street address: 6666 Ranch Rd |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5741 Project name: Ramada Inn Roadside Hotel (Aurora,
Tex.). Date on drawings: 1960 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Burns Construction Co. |
|
|
|
|
City: Aurora |
|
|
|
|
County: Wise |
|
|
|
|
State/Province: Colo. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1676 Project name: Burns Mill and Electric Co.
building. Addition and alterations. Date on drawings: 1924 Primary archt/firm: Sanguinet, Staats and
Hedrick |
|
|
|
|
|
|
|
|
Client: Burns Mill and Electric Co. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1594 Project name: Burns Mill and Elevator Co.
building. Addition. Date on drawings: 1922 Primary archt/firm: Sanguinet and
Staats |
|
|
|
|
|
|
|
|
Client: Burns Mill and Elevator Co. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1495 Project name: T.E. Burns residence. Primary archt/firm: Sanguinet and
Staats |
|
|
|
|
|
|
|
|
Client: Burns, T.E. |
|
|
|
|
City: San Antonio |
|
|
|
|
County: Bexar |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2492 Project name: L.L. Burton residence. Date on drawings: 1933 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Burton, L.L. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5260 Project name: C.E.I. Building. Parking
garage. Date on drawings: 1957 Primary archt/firm: Hedrick and
Horley |
|
|
|
|
|
|
|
|
Client: C.E.I. Building |
|
|
|
|
City: Cleveland |
|
|
|
|
State/Province: Ohio |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 6359 Project name: Calhoun Packing Co. building.
Revisions and additions. Date on drawings: 1964 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Calhoun Packing Co. |
|
|
|
|
City: Palestine |
|
|
|
|
County: Anderson |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 6340 Project name: Caprock Hospital. Date on drawings: 1966 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Caprock Hospital |
|
|
|
|
City: Floydada |
|
|
|
|
County: Floyd |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3996 Project name: Caranay-Rhodes Memorial
Hall. Date on drawings: 1949 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Caranay-Rhodes Memorial Hall |
|
|
|
|
City: Tin Top |
|
|
|
|
County: Parker |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2742 Project name: Carbon I.S.D. Unidentified school.
Addition and remodeling. Date on drawings: 1940 |
|
|
|
|
|
|
|
|
Client: Carbon I.S.D. |
|
|
|
|
City: Carbon |
|
|
|
|
County: Eastland |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1685 Project name: Cargill Co. store and
factory. Date on drawings: 1924 Primary archt/firm: Sanguinet, Staats, Hedrick
and Gottlieb |
|
|
|
|
|
|
|
|
Client: Cargill Co. |
|
|
|
|
City: Houston |
|
|
|
|
County: Harris |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4995L Project name: Carnigie Library Building
(Stamford, Tex.). Alterations. Date on drawings: 1956 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Carnigie Library Building |
|
|
|
|
City: Stamford |
|
|
|
|
County: Jones |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4995L Project name: Carnigie Library Building
(Stamford, Tex.). Alterations Date on drawings: 1961 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Carnegie Library Building |
|
|
|
|
City: Stamford |
|
|
|
|
County: Jones |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2502 Project name: Mr. and Mrs. Amon G. Carter
residence. Remodeling. Date on drawings: 1938 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Carter, Mr. and Mrs. Amon G. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3522 Project name: Street improvements (Carthage,
Tex.). General layout. Date on drawings: 1946 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Carthage, City of |
|
|
|
|
City: Carthage |
|
|
|
|
County: Panola |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5404 Project name: Casa View Country Club. Club
house. Date on drawings: 1958 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Casa View Country Club |
|
|
|
|
City: Dallas |
|
|
|
|
County: Dallas |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2921 Project name: Castor Oil Mill
building. Date on drawings: 1943 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Castor Oil Mill |
|
|
|
|
City: Brownsville |
|
|
|
|
County: Cameron |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1673 Project name: W.T. Caswell, Esq. office
building. Date on drawings: 1924 Primary archt/firm: Sanguinet, Staats and
Hedrick |
|
|
|
|
|
|
|
|
Client: Caswell, W. T., Esq. |
|
|
|
|
City: Houston |
|
|
|
|
County: Harris |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2542 Project name: Cedar Bayou I.S.D. Unidentified
school building. Date on drawings: 1938 Primary archt/firm: Hedrick and
Lindsley |
|
|
|
|
|
|
|
|
Client: Cedar Bayou I.S.D. |
|
|
|
|
City: Cedar Bayou |
|
|
|
|
County: Harris |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5872 Project name: Cedar Hill I.S.D. Unidentified
elementary and high school. Additions. Date on drawings: 1960 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Cedar Hill I.S.D. |
|
|
|
|
City: Cedar Hill |
|
|
|
|
County: Dallas |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1489 Project name: Centenary College of Louisiana
school building. Primary archt/firm: Sanguinet, Staats and
Nield |
|
|
|
|
|
|
|
|
Client: Centenary College of Louisiana |
|
|
|
|
City: Shreveport |
|
|
|
|
State/Province: La. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5118 Project name: Central Christian Church. Church
building. Date on drawings: 1957 Primary archt/firm: Hedrick and
Stanley |
|
|
|
|
|
|
|
|
Client: Central Christian Church |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1383 Project name: Central Trust Company bank and
office building (San Antonio, Tex.). Date on drawings: 1918 Primary archt/firm: Sanguinet, Staats and
Boelhauwe Collaborators: Atlee B. Ayres, consulting
arch. |
|
|
|
|
|
|
|
|
Client: Central Trust Company |
|
|
|
|
City: San Antonio |
|
|
|
|
County: Bexar |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4965 Project name: Chance Vought Aircraft high speed
wind tunnel facilities. Date on drawings: 1956 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Chance Vought Aircraft |
|
|
|
|
City: Dallas |
|
|
|
|
County: Dallas |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1070 Project name: Chevrolet Motor Division Zone
Office. Office lighting and parts warehouse. Date on drawings: 1962 |
|
|
|
|
|
|
|
|
Client: Chevrolet Motor Division Zone
Office |
|
|
|
|
City: El Paso |
|
|
|
|
County: El Paso |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3564 Project name: Country Club building (Childress,
Tex.). Date on drawings: 1947 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Childress, City of |
|
|
|
|
City: Childress |
|
|
|
|
County: Childress |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1864 Project name: Municipal Building (Childress,
Tex.). Date on drawings: 1926 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Childress, City of |
|
|
|
|
City: Childress |
|
|
|
|
County: Childress |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3576 Project name: Chillicothe I.S.D. Unidentified
elementary school building. Date on drawings: 1947 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Chillicothe I.S.D. |
|
|
|
|
City: Chillicothe |
|
|
|
|
County: Hardeman |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4698 Project name: Citizen's Publishing Co. State
Times Building. Date on drawings: 1954 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Citizen's Publishing Co. |
|
|
|
|
City: Jackson |
|
|
|
|
State/Province: Miss. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1460 Project name: City National Bank and Office
Building Date on drawings: 1919 Primary archt/firm: Sanguinet, Staats and
Pate Collaborators: Pate |
|
|
|
|
|
|
|
|
Client: City National Bank |
|
|
|
|
City: Wichita Falls |
|
|
|
|
County: Wichita |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4403 Project name: Sewage collection system, water
distribution system, and sewage lift station (Daingerfield, Tex.). Date on drawings: 1951 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: City of Daingerfield |
|
|
|
|
City: Daingerfield |
|
|
|
|
County: Morris |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 6365 Project name: City Packing Co. new chill
cooler. Date on drawings: 1965 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: City Packing Co. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2608 Project name: Clairette I.S.D.
Gymnasium. Date on drawings: 1939 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Clairette I.S.D. |
|
|
|
|
City: Clairette |
|
|
|
|
County: Erath |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2608X Project name: Clairette I.S.D. Gymnasium and
girl's restroom. Date on drawings: 1940 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Clairette I.S.D. |
|
|
|
|
City: Clairette |
|
|
|
|
County: Erath |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4418 Project name: Clarksville I.S.D. Physical
education building. Date on drawings: 1953 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Clarksville I.S.D. |
|
|
|
|
City: Clarksville |
|
|
|
|
County: Red River |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1300 Project name: Clarksville I.S.D. Unidentified
high school building. Date on drawings: 1917 Primary archt/firm: Sanguinet and
Staats |
|
|
|
|
|
|
|
|
Client: Clarksville I.S.D. |
|
|
|
|
City: Clarksville |
|
|
|
|
County: Red River |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1333 Project name: Cleburne I.S.D. F.E. Adams
school Date on drawings: 1917 Primary archt/firm: Sanguinet and
Staats |
|
|
|
|
|
|
|
|
Client: Cleburne I.S.D. |
|
|
|
|
City: Cleburne |
|
|
|
|
County: Johnson |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1328 Project name: Cleburne I.S.D. Unidentified high
school building. Date on drawings: 1917 Primary archt/firm: Sanguinet and
Staats |
|
|
|
|
|
|
|
|
Client: Cleburne I.S.D. |
|
|
|
|
City: Cleburne |
|
|
|
|
County: Johnson |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1345 Project name: Cleburne I.S.D. Unidentified high
school. Remodeling. Primary archt/firm: Sanguinet and
Staats |
|
|
|
|
|
|
|
|
Client: Cleburne I.S.D. |
|
|
|
|
City: Cleburne |
|
|
|
|
County: Johnson |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1634 Project name: Coca-Cola Co. Utilities
Layout Date on drawings: 1946 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Coca-Cola Co. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1551 Project name: Cohen store building. Additions
and alterations. Date on drawings: 1921 Primary archt/firm: Sanguinet and
Staats |
|
|
|
|
|
|
|
|
Client: Cohen Mr. M. |
|
|
|
|
Street address: North of Fort Worth |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4693 Project name: Coke County
Courthouse. Date on drawings: 1954 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Coke County |
|
|
|
|
City: Robert Lee |
|
|
|
|
County: Coke |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3822 Project name: Coleman Co. Electric Coop. REA
headquarters building. Additions and alterations. Date on drawings: 1948 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Coleman Co. Electric Coop |
|
|
|
|
City: Coleman |
|
|
|
|
County: Coleman |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3822 Project name: Coleman Co. Electric Coop. REA
headquarters building. Additions and alterations. Date on drawings: 1949 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Coleman Co. Electric Coop |
|
|
|
|
City: Coleman |
|
|
|
|
County: Coleman |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3999 Project name: Collier Industries.
Remodeling. Date on drawings: 1949 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Collier Industries |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4732 Project name: Colorado and Southern Railway Co.
freight and passenger depot. Date on drawings: 1955 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Colorado and Southern Railway
Co. |
|
|
|
|
City: Cheyenne |
|
|
|
|
State/Province: Wyo. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5269 Project name: Colorado and Southern Railway
Company. freight and passenger depot. Date on drawings: 1957 Primary archt/firm: Hedrick and
Stanley |
|
|
|
|
|
|
|
|
Client: Colorado and Southern Railway
Company |
|
|
|
|
City: Bolder |
|
|
|
|
State/Province: Colo. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2584 Project name: Comanche County
Courthouse. Date on drawings: 1939 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Comanche County |
|
|
|
|
City: Comanche |
|
|
|
|
County: Comanche |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1563 Project name: Comanche I.S.D. Unidentified
school building. Date on drawings: 1920 Primary archt/firm: Sanguinet and
Staats |
|
|
|
|
|
|
|
|
Client: Comanche I.S.D. |
|
|
|
|
City: Comanche |
|
|
|
|
County: Comanche |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1563 Project name: Comanche I.S.D. Unidentified
school building. Date on drawings: 1921 Primary archt/firm: Sanguinet and
Staats |
|
|
|
|
|
|
|
|
Client: Comanche I.S.D. |
|
|
|
|
City: Comanche |
|
|
|
|
County: Comanche |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1235B Project name: Auxiliary Water supply (Commerce,
Tex.). Date on drawings: 1946 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Commerce, City of |
|
|
|
|
City: Commerce |
|
|
|
|
County: Hunt |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1235A Project name: Dam and spillway (Commerce,
Tex.). Date on drawings: 1946-1947 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Commerce, City of |
|
|
|
|
City: Commerce |
|
|
|
|
County: Hunt |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1235C Project name: Water clarification and storage
plant (Commerce, Tex.). Date on drawings: 1946 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Commerce, City of |
|
|
|
|
City: Commerce |
|
|
|
|
County: Hunt |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1235D Project name: Water clarification and storage
plant (Commerce, Tex.). Date on drawings: 1946 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Commerce, City of |
|
|
|
|
City: Commerce |
|
|
|
|
County: Hunt |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4419/2 Project name: Commerce I.S.D. A.L. Day
Elementary School. Rehabilitation. Date on drawings: 1953 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Commerce I.S.D. |
|
|
|
|
City: Commerce |
|
|
|
|
County: Hunt |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4419 Project name: Commerce I.S.D. Homemaking
cottage. Date on drawings: 1954 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Commerce I.S.D. |
|
|
|
|
City: Commerce |
|
|
|
|
County: Hunt |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4419/1 Project name: Commerce I.S.D. Norris Elementary
School. Date on drawings: 1953 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Commerce I.S.D. |
|
|
|
|
City: Commerce |
|
|
|
|
County: Hunt |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project name: Commerce I.S.D. Wheeler Elementary
School. Additions. Date on drawings: 1953 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Commerce I.S.D. |
|
|
|
|
City: Commerce |
|
|
|
|
County: Hunt |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2531 Project name: Bill and Ellis Conner store
building. Date on drawings: 1938 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Conner, Bill and Ellis |
|
|
|
|
City: Midland |
|
|
|
|
County: Midland |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5457 Project name: Container Corporation of America.
Folding Carton Division. Dallas-Fort Worth plant. Date on drawings: 1958 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Container Corporation of
America |
|
|
|
|
City: Dallas |
|
|
|
|
County: Dallas |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4411 Project name: Continental Bus System, Inc.
building. Remodeling. Date on drawings: 1933 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Continental Bus System, Inc. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4430 Project name: Continental Life Building.
Alterations. Date on drawings: 1952 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Continental Life Insurance Co. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5214 Project name: Cooke County Courthouse.
Remodeling. Primary archt/firm: Hedrick, Stanley and
Morey |
|
|
|
|
|
|
|
|
Client: Cooke County |
|
|
|
|
City: Gainsville |
|
|
|
|
County: Cooke |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2157 Project name: Ben Corley store
building. Date on drawings: 1929 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Corley, Ben |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3393 Project name: Jack Corn five room
residence. Date on drawings: 1946 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Corn, Jack |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5803 Project name: Coronado Petroleum
Tower. Date on drawings: 1960 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Coronado Center Inc. |
|
|
|
|
City: Pampa |
|
|
|
|
County: Gray |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1419 Project name: Crazy Well Pavilion. Additions and
alterations. Date on drawings: 1918 Primary archt/firm: Sanguinet and
Staats |
|
|
|
|
|
|
|
|
Client: Crazy Well Water Co. |
|
|
|
|
City: Mineral Wells |
|
|
|
|
County: Palo Pinto |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4723 Project name: Crockett Consolidated Common
School District. Unidentified cafetorium. Date on drawings: 1955 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Crockett Consolidated Common School
District |
|
|
|
|
City: Ozona |
|
|
|
|
County: Crockett |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4287 Project name: Crockett Consolidated Common
School District. Unidentified school. Band room and home econom Date on drawings: 1951 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Crockett Consolidated Common School
District |
|
|
|
|
City: Ozona |
|
|
|
|
County: Crockett |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4904 Project name: Crockett Consolidated Common
School District. Vocational agriculture classroom and shop buildir Date on drawings: 1955 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Crockett Consolidated Common School
District |
|
|
|
|
City: Ozona |
|
|
|
|
County: Crockett |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5847 Project name: Crockett Consolidated School
District. South Elementary School. Additions. Date on drawings: 1960 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Crockett Consolidated School
District |
|
|
|
|
City: Ozona |
|
|
|
|
County: Crockett |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5057 Project name: Crockett Consolidated School
District #1. South elementary school. Addition. Date on drawings: 1956 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Crockett Consolidated School District
#1 |
|
|
|
|
City: Ozona |
|
|
|
|
County: Crockett |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5058 Project name: Crockett County Common
Consolidated School District #1. Two and three bedroom residences. Date on drawings: 1956 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Crockett County Common Consolidated School
District #1 |
|
|
|
|
City: Ozona |
|
|
|
|
County: Crockett |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1584 Project name: Mr. W.H. Crouse filling station
and stores. Date on drawings: 1922 Primary archt/firm: Sanguinet and
Staats |
|
|
|
|
|
|
|
|
Client: Crouse, Mr. W. H. |
|
|
|
|
City: Arlington |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5953 Project name: Abattoir building. Additions and
alterations. Date on drawings: 1961 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Crow Packing Co. |
|
|
|
|
City: San Angelo |
|
|
|
|
County: Tom Green |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1921 Project name: Crystal Creamery Company
building. Date on drawings: 1927 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Crystal Creamery Company |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2841 Project name: Elks Club (Fort Worth, Tex.).
Remodeling. Date on drawings: 1941 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Curbertson, Mr. A. B. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5536 Project name: Low rent project #Tex 106.3
(Daingerfield, Tex.). Date on drawings: 1961 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Daingerfield, City of |
|
|
|
|
City: Daingerfield |
|
|
|
|
County: Morris |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4731 Project name: Dairypak Inc. plant facilities and
office building. Date on drawings: 1956 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Dairypak, Inc. |
|
|
|
|
City: Cleveland |
|
|
|
|
State/Province: Ohio |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5846 Project name: Dalhart I.S.D. Health and physical
education building. Date on drawings: 1961 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Dalhart I.S.D. |
|
|
|
|
City: Dalhart |
|
|
|
|
County: Dallam |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 926 Project name: Dallas Automatic Telephone Co.
North exchange building. Date on drawings: 1911 Primary archt/firm: Sanguinet and
Staats |
|
|
|
|
|
|
|
|
Client: Dallas Automatic Telephone Co. |
|
|
|
|
City: Dallas |
|
|
|
|
County: Dallas |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 900 Project name: Dallas Automatic Telephone Co. Oak
Cliff exchange building. Date on drawings: 1911 Primary archt/firm: Sanguinet, Staats and
Overbeck |
|
|
|
|
|
|
|
|
Client: Dallas Automatic Telephone Co. |
|
|
|
|
City: Dallas |
|
|
|
|
County: Dallas |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4656 Project name: Dallas Hotel Co. building. Cigar
store. Layout. Date on drawings: 1954 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Dallas Hotel Co. |
|
|
|
|
City: Dallas |
|
|
|
|
County: Dallas |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4740 Project name: Dallas Hotel Co. building.
Restaurant. Date on drawings: 1954-1955 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Dallas Hotel Co. |
|
|
|
|
Street address: Main and Akard |
|
|
|
|
City: Dallas |
|
|
|
|
County: Dallas |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 6121 Project name: Dan Dancigar Jewish Community
Center. Date on drawings: 1964 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Dan Dancigar Jewish Community
Center |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2435 Project name: Dr. I.E. Daniel store
building. Date on drawings: 1937 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Daniel, I. E., Dr. |
|
|
|
|
City: Midland |
|
|
|
|
County: Midland |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1923 Project name: Davidson Hotel. Date on drawings: 1927 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Davidson, Alex |
|
|
|
|
City: Amarillo |
|
|
|
|
County: Potter |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4396 Project name: Josephine Davidson Memorial
Chapel. Date on drawings: 1952 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Davidson, Whitfield, Judge |
|
|
|
|
City: New Diana |
|
|
|
|
County: Upshur |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1988 Project name: Metropolitan Hotel building.
Storefront. Date on drawings: 1926 Primary archt/firm: Sanguinet and
Staats |
|
|
|
|
|
|
|
|
Client: Davis, E. H. and A. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4692 Project name: Mrs. Tom W. Davis
residence. Date on drawings: 1954 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Davis, Mrs. Tom W. |
|
|
|
|
Street address: near the town of
Cleburne |
|
|
|
|
City: Cleburne |
|
|
|
|
County: Johnson |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1709 Project name: Deaf Smith County
Hospital. Date on drawings: 1924 Primary archt/firm: Sanguinet, Staats and
Hedrick |
|
|
|
|
|
|
|
|
Client: Deaf Smith County |
|
|
|
|
City: Hereford |
|
|
|
|
County: Deaf Smith |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4119 Project name: DeBerry Elementary
School. Date on drawings: 1950 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: DeBerry Elementary School |
|
|
|
|
City: DeBerry |
|
|
|
|
County: Panola |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5889 Project name: Decker Branch House.
Addition. Date on drawings: 1960 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Decker Branch House |
|
|
|
|
City: Texarkana |
|
|
|
|
County: Bowie |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4549 Project name: Dekalb I.S.D. Bethlehem
School. Date on drawings: 1954 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Dekalb I.S.D. |
|
|
|
|
City: Dekalb |
|
|
|
|
County: Bowie |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4316 Project name: Dekalb I.S.D. Dekalb Elementary
School Date on drawings: 1953 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Dekalb I.S.D. |
|
|
|
|
City: Dekalb |
|
|
|
|
County: Bowie |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4685 Project name: Dekalb I.S.D. Vocational
agriculture shop and homemaking cottage. Date on drawings: 1955 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Dekalb I.S.D. |
|
|
|
|
City: Dekalb |
|
|
|
|
County: Bowie |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5481 Project name: Low rent housing project # Tex
16-5 (Del Rio, Tex.). Date on drawings: 1960 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Del Rio, City of |
|
|
|
|
City: Del Rio |
|
|
|
|
County: Val Verde |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3664 Project name: Library building (Denton,
Tex.). Date on drawings: 1948 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Denton, City of |
|
|
|
|
City: Denton |
|
|
|
|
County: Denton |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3752 Project name: Denton I.S.D. Robert E. Lee
School. Kitchen. Addition. Date on drawings: 1949 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Denton I.S.D. |
|
|
|
|
City: Denton |
|
|
|
|
County: Denton |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3751 Project name: Denton I.S.D. Unidentified junior
high school building (condemned). Alterations. Date on drawings: 1948 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Denton I.S.D. |
|
|
|
|
City: Denton |
|
|
|
|
County: Denton |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1038 Project name: Denver Investment Co. office
building. Date on drawings: 1913 Primary archt/firm: Sanguinet and
Staats |
|
|
|
|
|
|
|
|
Client: Denver Investment Co. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3736 Project name: Department of Army. Ordnance
Maintenance Shop. Date on drawings: 1948 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Department of Army |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4371 Project name: Deport I.S.D. building.
Alterations & additions Date on drawings: 1952 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Deport I.S.D. |
|
|
|
|
City: Deport |
|
|
|
|
County: Lamar |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1403A Project name: Water distribution and sewage
collection system (Detroit, Tex.). Date on drawings: 1946 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Detroit, City of |
|
|
|
|
City: Detroit |
|
|
|
|
County: Red River |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1403 Project name: Water distribution and sewage
collection system (Detroit, Tex.). Proposed. Date on drawings: 1946 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Detroit, City of |
|
|
|
|
City: Detroit |
|
|
|
|
County: Red River |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5810 Project name: Diamond Oaks Country Club. Club
house Date on drawings: 1961 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Diamond Oaks Country Club |
|
|
|
|
City: Haltom City |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 6051 Project name: Disco Corp. store
building. Date on drawings: 1962 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Disco Corp. |
|
|
|
|
City: Greece |
|
|
|
|
State/Province: N.Y. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 6052 Project name: Disco Corp. store
building. Date on drawings: 1962 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Disco Corp. |
|
|
|
|
City: Maplewood |
|
|
|
|
State/Province: Minn. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3431 Project name: Sanitary Sewer system (Dodd City,
Tex.). Date on drawings: 1947 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Dodd City |
|
|
|
|
City: Dodd City |
|
|
|
|
County: Fannin |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1637 Project name: Sewage collection system (Dodd
City, Tex.). Date on drawings: 1946 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Dodd City |
|
|
|
|
City: Dodd City |
|
|
|
|
County: Fannin |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4127 Project name: Mrs. James Doss
residence. Date on drawings: 1950 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Doss, Mrs. James |
|
|
|
|
City: Weatherford |
|
|
|
|
County: Parker |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5562 Project name: Drilcheck Corp. office building.
Additions and alterations. Date on drawings: 1959 Primary archt/firm: Hedrick and
Stanley |
|
|
|
|
|
|
|
|
Client: Drilcheck Corp. |
|
|
|
|
City: Dallas |
|
|
|
|
County: Dallas |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2426 Project name: A. Morgan Duke
residence. Date on drawings: 1936 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Duke, A. Morgan |
|
|
|
|
City: Grand Prairie |
|
|
|
|
County: Dallas |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project name: Dunlap Store. Storefront.
Remodeling. Date on drawings: 1946 Primary archt/firm: ? |
|
|
|
|
|
|
|
|
Client: Dunlap Store |
|
|
|
|
City: Hobbs |
|
|
|
|
County: Fisher |
|
|
|
|
State/Province: N.M. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3880 Project name: Durham Chevrolet Company autombile
sales building. Date on drawings: 1949 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Durham Chevrolet Company |
|
|
|
|
City: Dublin |
|
|
|
|
County: Erath |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2699 Project name: Duster Community Consolidated
School District. Unidentified school building. Date on drawings: 1941 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Duster Community Consolidated School
District |
|
|
|
|
City: Duster |
|
|
|
|
County: Comanche |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project name: E.L. Wilson Hardware Co.
building. Primary archt/firm: Sanguinet, Staats, Hedrick
and Gottlieb |
|
|
|
|
|
|
|
|
Client: E. L. Wilson Hardware Co. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1492 Project name: E.M. Scarbrough Building.
Additional supports under the entrance. Date on drawings: 1919 Primary archt/firm: Sanguinet, Staats,
Hedrick, and Gottlieb |
|
|
|
|
|
|
|
|
Client: E. M. Scarbrough |
|
|
|
|
Street address: 512-518 Congress Ave |
|
|
|
|
City: Austin |
|
|
|
|
County: Travis |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4152-B Project name: East Baptist College. Sanderson
Hall. Date on drawings: 1952 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: East Baptist College |
|
|
|
|
City: Marshall |
|
|
|
|
County: Harrison |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4152A Project name: East Texas Baptist College. Harvey
Daniel Bruce Hall. Date on drawings: 1953 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: East Texas Baptist College |
|
|
|
|
City: Marshall |
|
|
|
|
County: Harrison |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4190 Project name: City Hall (Eastland, Tex.).
Repairs. Date on drawings: 1950 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Eastland, City of |
|
|
|
|
City: Eastland |
|
|
|
|
County: Eastland |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3340 Project name: Economy Forms Corp. concrete
foundation sales building. Date on drawings: 1946 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Economy Forms Corp. |
|
|
|
|
City: Dallas |
|
|
|
|
County: Dallas |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3432 Project name: Sanitary sewage system (Ector,
Tex.). Drawings. Date on drawings: 1947 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Ector, City of |
|
|
|
|
City: Ector |
|
|
|
|
County: Fannin |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1672 Project name: Street layout (Ector,
Tex.). Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Ector, City of |
|
|
|
|
City: Ector |
|
|
|
|
County: Fannin |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3673 Project name: Hillcrest Clinic
building. Date on drawings: 1948 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Elkins, O. W., Dr. |
|
|
|
|
City: Longview |
|
|
|
|
County: Gregg |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1705 Project name: Ellison Furniture and Carpet
Company's Store. Alterations. Date on drawings: 1924 Primary archt/firm: Sanguinet, Staats and
Hedrick |
|
|
|
|
|
|
|
|
Client: Ellison Furniture and Carpet
Company |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1604 Project name: R.A. Ellison
warehouse. Date on drawings: 1922 Primary archt/firm: Sanguinet, Staats and
Hedrick |
|
|
|
|
|
|
|
|
Client: Ellison, R. A. |
|
|
|
|
Street address: 4th and Terrry Sts |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4880 Project name: Elysian I.S.D. Elysian Fields High
School. Date on drawings: 1955 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Elysian I.S.D. |
|
|
|
|
City: Elysian Fields |
|
|
|
|
County: Harrison |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2231 Project name: Empire Development Company filling
station and garage. Date on drawings: 1930 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Empire Development Company |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2062 Project name: Empire Furniture Co. building.
Alterations and additions. Date on drawings: 1930 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Empire Furniture Co. |
|
|
|
|
City: Brownwood |
|
|
|
|
County: Brown |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project name: Earth County Courthouse.
Remodeling. Date on drawings: 1949 |
|
|
|
|
|
|
|
|
Client: Erath County |
|
|
|
|
City: Stephenville |
|
|
|
|
County: Erath |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 6320 Project name: Erath County Jail. Date on drawings: 1963 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Erath County |
|
|
|
|
City: Stephenville |
|
|
|
|
County: Erath |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5003 Project name: Mr. and Mrs. E.R. Esch
residence. Date on drawings: 1956 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Esch, Mr. and Mrs. E. R. |
|
|
|
|
City: McGregor |
|
|
|
|
County: McLennan |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3877 Project name: Estilline I.S.D. Unidentified
elementary school building. Date on drawings: 1949 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Estilline I.S.D. |
|
|
|
|
City: Estilline |
|
|
|
|
County: Hall |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3008 Project name: Evans Ave Baptist Church. Sunday
School Building. Remodeling. Date on drawings: 1944 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Evans Ave Baptist Church |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3447 Project name: Water extensions (Fairfield,
Tex.). Proposed. Date on drawings: 1948 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Fairfield, City of |
|
|
|
|
City: Fairfield |
|
|
|
|
County: Freestone |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5560 Project name: Farm and Home Savings Association
branch office space lease. Date on drawings: 1958-1959 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Farm and Home Savings
Association |
|
|
|
|
City: Dallas |
|
|
|
|
County: Dallas |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2024 Project name: Helpy-Selfy Grocery building
(Childress, Tex.). Date on drawings: 1928 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Farmer's and Mechanics Trust
Co. |
|
|
|
|
City: Childress |
|
|
|
|
County: Childress |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2036 Project name: Federal Land Bank Building
(Houston, Tex.). Date on drawings: 1928 Primary archt/firm: Hedrick and
Gottlieb |
|
|
|
|
|
|
|
|
Client: Federal Land Bank |
|
|
|
|
City: Houston |
|
|
|
|
County: Harris |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1645 Project name: Federal Land Bank (Houston, Tex.).
Alterations and additions. Date on drawings: 1923 Primary archt/firm: Sanguinet, Staats, Hedrick
and Gottlieb |
|
|
|
|
|
|
|
|
Client: Federal Land Bank |
|
|
|
|
City: Houston |
|
|
|
|
County: Harris |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1378 Project name: Federal Land Bank (Houston, Tex.).
Remodeling. Date on drawings: 1917 Primary archt/firm: Sanguinet, Staats and
Gottlieb |
|
|
|
|
|
|
|
|
Client: Federal Land Bank |
|
|
|
|
City: Houston |
|
|
|
|
County: Harris |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1581 Project name: Federal Land Bank (Houston, Tex.).
Vaults. Date on drawings: 1922 Primary archt/firm: Sanguinet, Staats and
Gottlieb |
|
|
|
|
|
|
|
|
Client: Federal Land Bank |
|
|
|
|
City: Houston |
|
|
|
|
County: Harris |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 41471-2 Project name: Federal Public Housing Authority
building. Date on drawings: 1942 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Federal Public Housing
Authority |
|
|
|
|
City: Dalhart |
|
|
|
|
County: Dallam |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5375 Project name: Mr. and Mrs. Fender Howard
residence. Additions and alterations. Date on drawings: 1959 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Fender, Mr. and Mrs. Howard |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4476 Project name: Fidelity Union Life office
building (Midland, Tex.). Date on drawings: 1952 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Fidelity Union Life |
|
|
|
|
City: Midland |
|
|
|
|
County: Midland |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3477 Project name: First Baptist Church (Brownwood,
Tex.). Rostrum and choir. Alterations. Date on drawings: 1946 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: First Baptist Church |
|
|
|
|
City: Brownwood |
|
|
|
|
County: Brown |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4417 Project name: First Baptist Church (Commerce,
Tex.). Additions and alterations. Date on drawings: 1953 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: First Baptist Church |
|
|
|
|
City: Commerce |
|
|
|
|
County: Hunt |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5216 Project name: First Baptist Church (Commerce,
Tex.). Additions and alterations. Date on drawings: 1957 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: First Baptist Church |
|
|
|
|
City: Commerce |
|
|
|
|
County: Hunt |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4417C Project name: First Baptist Church (Commerce,
Tex.). Educational building. Addition. Date on drawings: 1954 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: First Baptist Church |
|
|
|
|
City: Commerce |
|
|
|
|
County: Hunt |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1725 Project name: First Baptist Church (Denton,
Tex.). Roof truss. Repairs. Date on drawings: 1924 Primary archt/firm: Sanguinet, Staats, and
Hedrick |
|
|
|
|
|
|
|
|
Client: First Baptist Church |
|
|
|
|
City: Denton |
|
|
|
|
County: Denton |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4619 Project name: First Baptist Church (Graham,
Tex.). Date on drawings: 1955 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: First Baptist Church |
|
|
|
|
City: Graham |
|
|
|
|
County: Young |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3661 Project name: First Baptist Church (Jacksboro,
Tex.). Educational building Date on drawings: 1948 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: First Baptist Church |
|
|
|
|
City: Jacksboro |
|
|
|
|
County: Jack |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2613 Project name: First Baptist Church (Midland,
Tex.). Educational Building Date on drawings: 1939 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: First Baptist Church |
|
|
|
|
City: Midland |
|
|
|
|
County: Midland |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3284 Project name: First Baptist Church (Pecos,
Tex.). Education building. Addition and alteration. Date on drawings: 1948 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: First Baptist Church |
|
|
|
|
City: Pecos |
|
|
|
|
County: Reeves |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 700 Project name: First Christian Church (Fort
Worth, Tex.). Date on drawings: 1908 Primary archt/firm: Van Slyke and
Woodruff |
|
|
|
|
|
|
|
|
Client: First Christian Church |
|
|
|
|
Street address: Throckmorton, Fifth and
Taylor |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4568 Project name: First Christian Church (Fort
Worth, Tex.). Church and education building. Remodeling. Date on drawings: 1954 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: First Christian Church |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 818 Project name: First Christian Church (Fort
Worth, Tex.). Education building. Primary archt/firm: Woodruff |
|
|
|
|
|
|
|
|
Client: First Christian Church |
|
|
|
|
Street address: 605 and 607 Taylor St |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4487 Project name: First Christian Church (Plainview,
Tex.). Church and educational building. Date on drawings: 1954 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: First Christian Church |
|
|
|
|
City: Plainview |
|
|
|
|
County: Hale |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3147 Project name: First Christian Church (Seymour,
Tex.). Additions and remodeling. Date on drawings: 1945-1946 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: First Christian Church |
|
|
|
|
City: Seymour |
|
|
|
|
County: Baylor |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4432 Project name: First Federal Savings and Loan
Association building (Temple, Tex.). Date on drawings: 1952 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: First Federal Savings and Loan
Association |
|
|
|
|
City: Temple |
|
|
|
|
County: Bell |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4832 Project name: First Methodist Church (Ennis,
Tex.). Educational building. Addition. Date on drawings: 1960 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: First Methodist Church |
|
|
|
|
City: Ennis |
|
|
|
|
County: Ellis |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5859 Project name: First Methodist Church (Hamon,
Tex.). Chuch and educational building. Date on drawings: 1961 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: First Methodist Church |
|
|
|
|
City: Hamon |
|
|
|
|
County: Gonzales |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3928 Project name: First Methodist Church (Mineola,
Tex.). Date on drawings: 1949 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: First Methodist Church |
|
|
|
|
City: Mineola |
|
|
|
|
County: Wood |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1633 Project name: First Methodist Church (Wichita
Falls, Tex.). Date on drawings: 1926 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: First Methodist Church |
|
|
|
|
City: Wichita Falls |
|
|
|
|
County: Wichita |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4527-A Project name: First National Auto Bank (Waco,
Tex.). Date on drawings: 1954 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: First National Auto Bank |
|
|
|
|
City: Waco |
|
|
|
|
County: McLennan |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1601 Project name: First National Bank bank and
office building (Brenham, Tex.). Date on drawings: 1923 Primary archt/firm: Sanguinet, Staats, Hedrick
and Gottlieb |
|
|
|
|
|
|
|
|
Client: First National Bank |
|
|
|
|
City: Brenham |
|
|
|
|
County: Washington |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2082 Project name: First National Bank bank and
office building (Childress, Tex.). Date on drawings: 1929 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: First National Bank |
|
|
|
|
City: Childress |
|
|
|
|
County: Childress |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4188 Project name: First National Bank bank and
office building (Temple, Tex.). Date on drawings: 1950 |
|
|
|
|
|
|
|
|
Client: First National Bank |
|
|
|
|
City: Temple |
|
|
|
|
County: Bell |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2454R Project name: First National Bank bank building
(Midland, Tex.). Remodeling. Date on drawings: 1938 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: First National Bank |
|
|
|
|
City: Midland |
|
|
|
|
County: Midland |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5212 Project name: First National Bank building
(Dallas, Tex.). Fifth floor. Remodeling. Date on drawings: 1937 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: First National Bank |
|
|
|
|
City: Dallas |
|
|
|
|
County: Dallas |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4381 Project name: First National Bank (Fort Worth,
Tex.). Bank counter and cage. Remodeling. Date on drawings: 1952 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: First National Bank |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3740 Project name: First National Bank (Fort Worth,
Tex.). Lobby and bank stairs. Alterations. Date on drawings: 1948-1949 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: First National Bank |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4423 Project name: First National Bank (Midland,
Tex.). Drive-in depository and connecting underground passage. Date on drawings: 1952 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: First National Bank |
|
|
|
|
City: Midland |
|
|
|
|
County: Midland |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3578 Project name: First National Bank (Midland,
Tex.). Remodeling. Date on drawings: 1948-1949 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: First National Bank |
|
|
|
|
City: Midland |
|
|
|
|
County: Midland |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4334 Project name: First National Bank (O'Donnell,
Tex.). Date on drawings: 1952 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: First National Bank |
|
|
|
|
City: O'Donnell |
|
|
|
|
County: Lynn |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4296 Project name: First National Bank office
building (Fort Worth, Tex.). Night depository. Date on drawings: 1951 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: First National Bank |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4248 Project name: First National Bank (Temple,
Tex.). Temporary quarters. Date on drawings: 1951 |
|
|
|
|
|
|
|
|
Client: First National Bank |
|
|
|
|
City: Temple |
|
|
|
|
County: Bell |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4527 Project name: First National Bank (Waco,
Tex.). Date on drawings: 1954 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: First National Bank |
|
|
|
|
City: Waco |
|
|
|
|
County: McLennan |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4527 Project name: First National Bank (Waco,
Tex.). Date on drawings: 1955 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: First National Bank |
|
|
|
|
City: Waco |
|
|
|
|
County: McLennan |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4527-B Project name: First National Bank (Waco, Tex.).
Shop space. Tennant layout. Date on drawings: 1956 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: First National Bank |
|
|
|
|
City: Waco |
|
|
|
|
County: McLennan |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4310 Project name: First National Bank of Killeen.
Remodeling. Date on drawings: 1951 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: First National Bank of Killeen |
|
|
|
|
City: Killeen |
|
|
|
|
County: Bell |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 6099 Project name: First National Bank of Temple
Texas. Drive-in banking facilities. Date on drawings: 1962 Primary archt/firm: Wyatt C.
Hedrick |
|
|
|
|
|
|
|
|
Client: First National Bank of Temple
Texas |
|
|
|
|
City: Temple |
|
|
|
|
County: Bell |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3677 Project name: First Presbyterian Church
(Seagraves, Tex.). Addition and alterations. Date on drawings: 1948 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: First Presbyterian Church |
|
|
|
|
City: Seagraves |
|
|
|
|
County: Gaines |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4406 Project name: J.N. Fisher merchandise mart and
office building. Date on drawings: 1952 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Fisher, J. N. |
|
|
|
|
City: Dallas |
|
|
|
|
County: Dallas |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1389 Project name: Fletcher School. Additions and
alterations. Date on drawings: 1918 Primary archt/firm: Sanguinet,Staats, and
Gottlieb |
|
|
|
|
|
|
|
|
Client: Fletcher School |
|
|
|
|
City: Beaumont |
|
|
|
|
County: Jefferson |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1408 Project name: John W. Floore
residence. Date on drawings: 1918 Primary archt/firm: Sanguinet and
Staats |
|
|
|
|
|
|
|
|
Client: Floore, John W. |
|
|
|
|
City: Cleburne |
|
|
|
|
County: Johnson |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5654 Project name: Low rent housing project #Tex
189-1 (Floydada, Tex.). Date on drawings: 1962 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Floydada, City of |
|
|
|
|
City: Floydada |
|
|
|
|
County: Floyd |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4509 Project name: Guy H. Foley
residence. Date on drawings: 1953 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Foley, Guy H. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4925 Project name: Food Mart Inc. office and
warehouse. Date on drawings: 1956 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Food Mart Inc. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 6365 Project name: Ford Motor Company dealership
building (Fort Worth, Tex.). Additions and alterations. Date on drawings: 1964 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Ford Motor Company |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 6365 Project name: Ford Motor Company dealership
building (Fort Worth, Tex.). Additions and alterations. Date on drawings: 1965 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Ford Motor Company |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 6012 Project name: Ford Motor Company dealership
facility (Fort Worth, Tex.). Date on drawings: 1965 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Ford Motor Company |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 6374 Project name: Ford Motor Company Ford Truck
Center (Fort Worth, Tex.). Date on drawings: 1965 Primary archt/firm: Woodward Collaborators: Hedrick, consulting
archt. |
|
|
|
|
|
|
|
|
Client: Ford Motor Company |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2994 Project name: Fort Worth and Denver City
Railroad. Boiler and flue shop (Childress, Tex.). Repairs. Date on drawings: 1944 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Fort Worth and Denver City
Railroad |
|
|
|
|
City: Childress |
|
|
|
|
County: Childress |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1831 Project name: Fort Worth and Denver City
Railroad. Depot (Claredon, Tex.). Additions and alterations. Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Fort Worth and Denver City
Railroad |
|
|
|
|
City: Claredon |
|
|
|
|
County: Donley |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3103 Project name: Fort Worth and Denver City
Railroad. Enclosing freight of platform (Wichita Falls, Tex.). Date on drawings: 1945 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Fort Worth and Denver City
Railroad |
|
|
|
|
City: Wichita Falls |
|
|
|
|
County: Wichita |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4980 Project name: Fort Worth and Denver City
Railroad. Freight depot (Fort Worth, Tex.). Date on drawings: 1956 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Fort Worth and Denver City
Railroad |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5927 Project name: Fort Worth and Denver City
Railroad. Freight depot warehouse (Wichita Falls, Tex.). Date on drawings: 1960 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Fort Worth and Denver City
Railroad |
|
|
|
|
City: Wichita Falls |
|
|
|
|
County: Wichita |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3039 Project name: Fort Worth and Denver City
Railroad. Locker and washroom (Childress, Tex.). Date on drawings: 1944 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Fort Worth and Denver City
Railroad |
|
|
|
|
City: Childress |
|
|
|
|
County: Childress |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5376 Project name: Fort Worth and Denver City
Railroad. Mechanical building (Forth Worth, Tex.). Date on drawings: 1958 Primary archt/firm: Hedrick and
Stanley |
|
|
|
|
|
|
|
|
Client: Fort Worth and Denver City
Railroad |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2227 Project name: Fort Worth and Denver City
Railroad. Old Eating House (Amarillo, Tex.). Remodeling. Date on drawings: 1930 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Fort Worth and Denver City
Railroad |
|
|
|
|
City: Amarillo |
|
|
|
|
County: Potter |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3298 Project name: Fort Worth and Denver City
Railroad. Passenger station (Corsicana, Tex.). Repairs and
alteration Date on drawings: 1946 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Fort Worth and Denver City
Railroad |
|
|
|
|
City: Corsicana |
|
|
|
|
County: Navarro |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3339 Project name: Fort Worth and Denver City
Railroad. Plumbing section house Bowie (Fort Worth, Tex.)
installation Date on drawings: 1946 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Fort Worth and Denver City
Railroad |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3026 Project name: Fort Worth and Denver City
Railroad. Roundhouse Foremen's office (Childress, Tex.). Date on drawings: 1944 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Fort Worth and Denver City
Railroad |
|
|
|
|
City: Childress |
|
|
|
|
County: Childress |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3336 Project name: Fort Worth and Denver City
Railroad. Roundhouse locker and washroom (Amarillo, Tex.). Date on drawings: 1947 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Fort Worth and Denver City
Railroad |
|
|
|
|
City: Amarillo |
|
|
|
|
County: Potter |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3035 Project name: Fort Worth and Denver City
Railroad. Section house (Alvord, Tex.). Date on drawings: 1944 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Fort Worth and Denver City
Railroad |
|
|
|
|
City: Alvord |
|
|
|
|
County: Wise |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3038 Project name: Fort Worth and Denver City
Railroad. Smokestack (Childress, Tex.). Date on drawings: 1944 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Fort Worth and Denver City
Railroad |
|
|
|
|
City: Childress |
|
|
|
|
County: Childress |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3058 Project name: Fort Worth and Denver City
Railroad. Storage vault (Fort Worth, Tex.). Addition. Date on drawings: 1944 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Fort Worth and Denver City
Railroad |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2892 Project name: Fort Worth and Denver City
Railroad. Storehouse. Addition. Date on drawings: 1942 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Fort Worth and Denver City
Railroad |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4439 Project name: Fort Worth and Denver City
Railroad. Warehouse and offices (Lubbock, Tex.). Date on drawings: 1953 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Fort Worth and Denver City
Railroad |
|
|
|
|
City: Lubbock |
|
|
|
|
County: Lubbock |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2958 Project name: Fort Worth and Denver City Railway
Co. Decatur Passenger Station (Fort Worth, Tex.). Repair ar Date on drawings: 1943 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Fort Worth and Denver City Railway
Co. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2958 Project name: Fort Worth and Denver City Railway
Co. Decatur Passenger Station (Fort Worth, Tex.). Repair ar Date on drawings: 1945 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Fort Worth and Denver City Railway
Co. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2958 Project name: Fort Worth and Denver City Railway
Co. Decatur Passenger Station (Fort Worth, Tex.). Repair ar Date on drawings: 1946 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Fort Worth and Denver City Railway
Co. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4618 Project name: Fort Worth and Denver City Railway
Co. Office building (Fort Worth, Tex.). Additions and Date on drawings: 1954 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Fort Worth and Denver City Railway
Co. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project name: Fort Worth and Denver City Railway
Co. Passenger depot (Vernon, Tex.). Date on drawings: 1931 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Fort Worth and Denver City Railway
Co. |
|
|
|
|
City: Vernon |
|
|
|
|
County: Wilbarger |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project name: Fort Worth and Denver City Railway
Co. Passenger Station (Amarillo, Tex.). Date on drawings: 1930 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Fort Worth and Denver City Railway
Co. |
|
|
|
|
City: Amarillo |
|
|
|
|
County: Potter |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5884 Project name: Fort Worth and Denver City Railway
Co. Passenger Station (Amarillo, Tex.). Date on drawings: 1960 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Fort Worth and Denver City Railway
Co. |
|
|
|
|
City: Amarillo |
|
|
|
|
County: Potter |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2221 Project name: Fort Worth and Denver City
Southern Pacific Railroad Unidentified building (Turkey, Tex.). Date on drawings: 1930 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Fort Worth and Denver City Southern
Pacific Railroad |
|
|
|
|
City: Turkey |
|
|
|
|
County: Hall |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3106 Project name: Fort Worth and Denver Railroad.
Four apartments and five apartment bunkhouses (Fort Worth, Date on drawings: 1945 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Fort Worth and Denver Railroad |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2009 Project name: Metropolitan Hotel Building.
Alterations. Date on drawings: 1928 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Fort Worth Association of
Commerce |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3403 Project name: Auditorium and Coliseum (Fort
Worth, Tex.). Covered passage. Date on drawings: 1946 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Fort Worth, City of |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1707 Project name: Baby hospital (Fort Worth, Tex.).
Garage and servant's house. Date on drawings: 1924 Primary archt/firm: Sanguinet, Staats, and
Hedrick |
|
|
|
|
|
|
|
|
Client: Fort Worth, City of |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4556 Project name: Incinerator (Fort Worth, Tex.).
Construction plans. Date on drawings: 1955 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Fort Worth, City of |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2408H Project name: Pleasure grounds, parks and
playgrounds (Fort Worth, Tex.). Auditorium. Date on drawings: 1936 Primary archt/firm: Hedrick and
Withers |
|
|
|
|
|
|
|
|
Client: Fort Worth, City of |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2408H Project name: Pleasure grounds, parks and
playgrounds (Fort Worth, Tex.). Merchant's exhibit building. Date on drawings: 1936 Primary archt/firm: Hedrick and
Withers |
|
|
|
|
|
|
|
|
Client: Fort Worth, City of |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2408H Project name: Pleasure grounds, parks and
playgrounds (Forth Worth, Tex.). Cattle exhibit building. Date on drawings: 1936 Primary archt/firm: Hedrick and
Withers |
|
|
|
|
|
|
|
|
Client: Fort Worth, City of |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5881 Project name: View and Berry Sts incinerators
(Fort Worth, Tex.). Raising pit walls and ramp. Date on drawings: 1960 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Fort Worth, City of |
|
|
|
|
Street address: View and Berry Sts |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3171/31 Project name: Fort Worth Club building. Men's
cocktail bar and lounge. Alterations. Date on drawings: 1945 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Fort Worth Club |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3196 Project name: Fort Worth Club building. Store.
Remodeling. Date on drawings: 1945 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Fort Worth Club |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4631 Project name: Fort Worth I.S.D. Amon Carter
Riverside High School. Additions and alterations. Date on drawings: 1954 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Fort Worth I.S.D. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2367 Project name: Fort Worth I.S.D. R. Vickey
Elementary School. Additions and alterations. Date on drawings: 1935 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Fort Worth I.S.D. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2168 Project name: Fort Worth National Bank.
Elevator. Date on drawings: 1929 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Fort Worth National Bank |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1957 Project name: Fort Worth National Bank. Record
storage. Proposed. Date on drawings: 1927 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Fort Worth National Bank |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2182 Project name: Fort Worth National Bank. Stairs
(first floor to mezzanine). Date on drawings: 1929 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Fort Worth National Bank |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3879 Project name: Fort Worth National Bank.
Television unit. Date on drawings: 1948 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Fort Worth National Bank |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3101 Project name: Fort Worth Poultry and Egg Co.
building. Addition. Date on drawings: 1945 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Fort Worth Poultry and Egg Co. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1761 Project name: Fort Worth Power and Light Co.
Garage transformer storage. Date on drawings: 1925 Primary archt/firm: Sanguinet, Staats and
Hedrick |
|
|
|
|
|
|
|
|
Client: Fort Worth Power and Light Co. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2102 Project name: Fort Worth Public Market, Inc
building. Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Fort Worth Public Market, Inc. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2102 Project name: Fort Worth Public Market Inc.
store building. Date on drawings: 1928 Primary archt/firm: Wyatt C. Hedrick,
Inc. |
|
|
|
|
|
|
|
|
Client: Fort Worth Public Market Inc. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2673 Project name: Fort Worth Star Telegram Building.
Addition and remodeling. Date on drawings: 1939 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Fort Worth Star Telegram |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1778 Project name: Mr. L. Fred building.
Alterations. Date on drawings: 1925 Primary archt/firm: Sanguinet, Staats and
Hedrick |
|
|
|
|
|
|
|
|
Client: Fred, Mr. L. |
|
|
|
|
Street address: 1205 Main St |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 346 Project name: Fred Thom and Sons
Building. Primary archt/firm: Sanguinet, Staats and
Pate |
|
|
|
|
|
|
|
|
Client: Fred Thom and Sons |
|
|
|
|
City: Wichita Falls |
|
|
|
|
County: Wichita |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5675 Project name: Frito Co., Crispie Division office
and warehouse building. Date on drawings: 1959 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Frito Co., Crispie Division |
|
|
|
|
City: Stockton |
|
|
|
|
State/Province: Calif. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1083 Project name: Mr. J.H. Frost office building.
Sixth floor. Addition. Date on drawings: 1924 Primary archt/firm: Sanguinet,
Staats |
|
|
|
|
|
|
|
|
Client: Frost, Mr. J. H. |
|
|
|
|
City: San Antonio |
|
|
|
|
County: Bexar |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 505 Project name: Mr. J.H. Frost store and office
building. Date on drawings: 1907 Primary archt/firm: Sanguinet and
Staats Collaborators: King (draftsman) Collaborators: Allison
(draftsman) Collaborators: Taylor
(draftsman) |
|
|
|
|
|
|
|
|
Client: Frost, Mr. J. H. |
|
|
|
|
City: San Antonio |
|
|
|
|
County: Bexar |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1464 Project name: Mr. John Frost
building. Date on drawings: nd Primary archt/firm: Sanguinet, Staats, and
Boelhauwe |
|
|
|
|
|
|
|
|
Client: Frost, Mr. John |
|
|
|
|
Street address: Babcock Rd |
|
|
|
|
City: San Antonio |
|
|
|
|
County: Bexar |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1536 Project name: Mr. John Frost residence. Addition
and alteration. Date on drawings: 1921 Primary archt/firm: Sanguinet and
Staats |
|
|
|
|
|
|
|
|
Client: Frost, Mr. John |
|
|
|
|
Street address: Babcock Rd |
|
|
|
|
City: San Antonio |
|
|
|
|
County: Bexar |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1439 Project name: Frost National Bank bank and
office building (San Antonio, Tex.). Date on drawings: 1921 Primary archt/firm: Sanguinet and
Staats |
|
|
|
|
|
|
|
|
Client: Frost National Bank |
|
|
|
|
City: San Antonio |
|
|
|
|
County: Bexar |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1439 Project name: Frost National Bank building (San
Antonio, Tex.). Date on drawings: 1921 Primary archt/firm: Sanguinet and
Staats |
|
|
|
|
|
|
|
|
Client: Frost National Bank |
|
|
|
|
City: San Antonio |
|
|
|
|
County: Bexar |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2775 Project name: Mr. J.V. Fry
residence. Date on drawings: 1941 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Fry, Mr. J. V. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4658 Project name: Fulton National Bank building
(Atlanta, Ga.). Date on drawings: 1955 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Fulton National Bank |
|
|
|
|
City: Atlanta |
|
|
|
|
State/Province: Ga. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1640 Project name: Gabert Auto Works
building. Date on drawings: 1923 Primary archt/firm: Sanguinet, Staats and
Hedrick |
|
|
|
|
|
|
|
|
Client: Gabert Auto Works |
|
|
|
|
Street address: Third and Throckmorten
Strs |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 6352 Project name: Gabriel Packing Co. building.
Sheep Arattoir. Date on drawings: 1963 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Gabriel Packing Co. |
|
|
|
|
City: Gooding |
|
|
|
|
State/Province: Idaho |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3668 Project name: Bath house, swimming pool, and
sewage disposal plant (Gainsville, Tex.). Date on drawings: 1951 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Gainsville, City of |
|
|
|
|
City: Gainsville |
|
|
|
|
County: Cooke |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4807 Project name: Bridge (Gainsville,
Tex.). Date on drawings: 1955 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Gainsville, City of |
|
|
|
|
City: Gainsville |
|
|
|
|
County: Cooke |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4542 Project name: Sewer extensions (Gainsville,
Tex.). Date on drawings: 1954 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Gainsville, City of |
|
|
|
|
City: Gainsville |
|
|
|
|
County: Cooke |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4743 Project name: Street and sewer improvements
(Gainsville, Tex.). Date on drawings: 1956 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Gainsville, City of |
|
|
|
|
City: Gainsville |
|
|
|
|
County: Cooke |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1986 Project name: Gainsville I.S.D. Girl's training
school school building. Date on drawings: 1927 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Gainsville I.S.D. |
|
|
|
|
City: Gainsville |
|
|
|
|
County: Cooke |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1148A Project name: Sewer details (Galena Park,
Tex.). Date on drawings: 1946 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Galena Park, City of |
|
|
|
|
City: Galena Park |
|
|
|
|
County: Harris |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1148A Project name: Sewer details (Galena Park,
Tex.). Date on drawings: 1947 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Galena Park, City of |
|
|
|
|
City: Galena Park |
|
|
|
|
County: Harris |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1148C Project name: Street and drainage program
(Galena Park, Tex.). Date on drawings: 1946 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Galena Park, City of |
|
|
|
|
City: Galena Park |
|
|
|
|
County: Harris |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1241 Project name: Topographical map (Galena Park,
Tex.). Date on drawings: 1945 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Galena Park, City of |
|
|
|
|
City: Galena Park |
|
|
|
|
County: Harris |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4154 Project name: Garland I.S.D. Garland High
School. Electrical and lighting system. Date on drawings: 1950 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Garland I.S.D. |
|
|
|
|
City: Garland |
|
|
|
|
County: Dallas |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5130 Project name: Garland I.S.D. W.C. Daugherty
Elementary School. Addition. Date on drawings: 1956 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Garland I.S.D. |
|
|
|
|
City: Garland |
|
|
|
|
County: Dallas |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2756 Project name: Mr. and Mrs. J.C. Garlitz
residence. Date on drawings: 1940 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Garlitz, Mr. and Mrs. J. C. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5207 Project name: Gatesville School for Boys.
Chapel. Date on drawings: 1957 Primary archt/firm: Hedrick and
Stanley |
|
|
|
|
|
|
|
|
Client: Gatesville School for Boys |
|
|
|
|
City: Gatesville |
|
|
|
|
County: Coryell |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 6344 Project name: General Motors Corp. training
building (El Paso, Tex.). Addition and alteration. Date on drawings: 1964 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: General Motors Corp. |
|
|
|
|
City: El Paso |
|
|
|
|
County: El Paso |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 6345 Project name: General Motors Corp. Training
Center (Salt Lake City, Utah.). Addition and alteration. Date on drawings: 1963 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: General Motors Corp. |
|
|
|
|
City: Salt Lake City |
|
|
|
|
State/Province: Utah |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5028 Project name: Mr and Mrs. R.B. Gibson
residence. Date on drawings: 1957 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Gibson, Mr and Mrs. R.B. |
|
|
|
|
City: Weatherford |
|
|
|
|
County: Parker |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project name: Gifford and Hill Pipe Co.
manufacturing plant. Date on drawings: 1950 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Gifford and Hill Pipe Co. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4062-A Project name: Gifford and Hill Pipe Co. office
building. Date on drawings: 1950 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Gifford and Hill Pipe Co. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2142A Project name: Max Gilbert store building.
Alterations. Date on drawings: 1929 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Gilbert, Max |
|
|
|
|
Street address: Fifth and Houston Sts |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4378B Project name: Gilmer I.S.D. Gilmer Elementary
School. Additions and alterations. Date on drawings: 1952 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Gilmer I.S.D. |
|
|
|
|
City: Gilmer |
|
|
|
|
County: Upshur |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project name: Gilmer I.S.D. Gilmer Elementary
School. Remodeling of old high school building. Date on drawings: 1952 02 Primary archt/firm: Wyatt C.
Hedrick |
|
|
|
|
|
|
|
|
Client: Gilmer I.S.D. |
|
|
|
|
City: Gilmer |
|
|
|
|
County: Upshur |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4378A Project name: Gilmer I.S.D. Gilmer Junior High
School. Alterations. Date on drawings: 1952 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Gilmer I.S.D. |
|
|
|
|
City: Gilmer |
|
|
|
|
County: Upshur |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project name: Gilmer I.S.D. Gilmer school
revisions. Addition to elementary school? Date on drawings: 1952 05 Primary archt/firm: Wyatt C.
Hedrick |
|
|
|
|
|
|
|
|
Client: Gilmer I.S.D. |
|
|
|
|
City: Gilmer |
|
|
|
|
County: Upshur |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3760 Project name: Sewer extensions (Gladewater,
Tex.). Plans. Date on drawings: 1949 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Gladewater, City of |
|
|
|
|
City: Gladewater |
|
|
|
|
County: Gregg |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3759A Project name: Street improvement (Gladewater,
Tex.). Plans. Date on drawings: 1948 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Gladewater, City of |
|
|
|
|
City: Gladewater |
|
|
|
|
County: Gregg |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3759 Project name: Streets extension (Gladewater,
Tex.). Plans. Date on drawings: 1948 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Gladewater, City of |
|
|
|
|
City: Gladewater |
|
|
|
|
County: Gregg |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3771 Project name: Gladewater Municipal Airport.
Construction plans. Date on drawings: 1948 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Gladewater Municipal Airport |
|
|
|
|
City: Gladewater |
|
|
|
|
County: Gregg |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4765 Project name: Mrs. Edna Gladney girls'
dormitory. Date on drawings: 1955 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Gladney, Mrs. Edna |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1517 Project name: Mr. P.E. Glenn
residence. Date on drawings: 1920 Primary archt/firm: Sanguinet, Staats, and
Hedrick |
|
|
|
|
|
|
|
|
Client: Glenn, Mr. P.E. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2724 Project name: Globe Aircraft Corporation
assembly plant. Date on drawings: 1942 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Globe Aircraft Corporation |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2967 Project name: Globe Aircraft Corporation ferry
pilots lounge. Date on drawings: 1943 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Globe Aircraft Corporation |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1490 Project name: John F. Goodhue store
building. Date on drawings: 1919-1920 Primary archt/firm: Sanguinet, Staats, and
Gottlieb |
|
|
|
|
|
|
|
|
Client: Goodhue, John F. |
|
|
|
|
City: Beaumont |
|
|
|
|
County: Jefferson |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3287 Project name: Dr. T.L. Goodman residence.
Addition. Date on drawings: 1946 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Goodman, Dr. T. L. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2012 Project name: City jail (Goose Creek,
Tex.). Date on drawings: 1927 Primary archt/firm: Hedrick and
Gottlieb |
|
|
|
|
|
|
|
|
Client: Goose Creek, City of |
|
|
|
|
City: Baytown |
|
|
|
|
County: Harris |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5200 Project name: Graham I.S.D. Adminstrative
building. Date on drawings: 1956 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Graham I.S.D. |
|
|
|
|
City: Graham |
|
|
|
|
County: Young |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3072 Project name: Home for Aged Masons for Grand
Chapter of Texas. Addition. Date on drawings: 1946 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Grand Chapter of Texas Masons |
|
|
|
|
City: Arlington |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3667 Project name: Community center building
(Grandfalls, Tex.). Date on drawings: 1948 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Grandfalls, City of |
|
|
|
|
City: Grandfalls |
|
|
|
|
County: Ward |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: FAA941 Project name: Greater Fort Worth International
Airport. Amon G. Carter Field. Street lighting, apron, runway [UNK] Date on drawings: 1950-1953 Primary archt/firm: Wyatt C.
Hedrick Collaborators: Joseph R. Pelich,
associated Collaborators: Preston M. Geren,
associated |
|
|
|
|
|
|
|
|
Client: Greater Fort Worth International
Airport |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4830 Project name: W.A. Green Building.
Addition. Date on drawings: 1956 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Green, W.A. |
|
|
|
|
City: Dallas |
|
|
|
|
County: Dallas |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4830B Project name: W.A. Green Building.
Alterations. Date on drawings: 1956 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Green, W.A. |
|
|
|
|
City: Dallas |
|
|
|
|
County: Dallas |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4830C Project name: W.A. Green Building. Elm St
Annex. Date on drawings: 1956 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Green, W.A. |
|
|
|
|
City: Dallas |
|
|
|
|
County: Dallas |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1736 Project name: Gulf Colorado and Santa Fe
Hospital hospital. Fire escape. Date on drawings: 1925 Primary archt/firm: Sanguinet, Staats and
Hedrick |
|
|
|
|
|
|
|
|
Client: Gulf Colorado and Santa Fe
Hospital |
|
|
|
|
City: Temple |
|
|
|
|
County: Bell |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1565 Project name: Gulf Colorado and Santa Fe
Hospital Association hospital. South wing. Addition. Date on drawings: 1925 Primary archt/firm: Sanguinrt, Staats and
Hedrick |
|
|
|
|
|
|
|
|
Client: Gulf Colorado and Santa Fe Hospital
Association |
|
|
|
|
City: Temple |
|
|
|
|
County: Bell |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1875 Project name: Gulf Publishing Co.
building. Date on drawings: 1927 Primary archt/firm: Hedrick and
Gottlieb |
|
|
|
|
|
|
|
|
Client: Gulf Publishing Co. |
|
|
|
|
City: Houston |
|
|
|
|
County: Harris |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2149 Project name: Gulf Publishing Co. building.
Southwest corner. One story addition. Date on drawings: 1929 Primary archt/firm: Hedrick and
Gottlieb |
|
|
|
|
|
|
|
|
Client: Gulf Publishing Co. |
|
|
|
|
City: Houston |
|
|
|
|
County: Harris |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5132 Project name: H. and N.T. Motor and Freight
Lines Inc. office and terminal building. Date on drawings: 1957 Primary archt/firm: Hedrick, Stanley, and
Morey |
|
|
|
|
|
|
|
|
Client: H. and N.T. Motor and Freight Lines
Inc. |
|
|
|
|
City: Dallas |
|
|
|
|
County: Dallas |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5609 Project name: Haitian American Meat and
Provisions Co. packing plant. Date on drawings: 1959 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Haitian American Meat and Provisions
Co. |
|
|
|
|
City: Port Au Prince |
|
|
|
|
State/Province: W.I. |
|
|
|
|
Country: [UNK] |
|
|
|
Project name: Hall Building. Date on drawings: 1921 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Hall Building |
|
|
|
|
City: Houston |
|
|
|
|
County: Harris |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1726 Project name: Gladstone Apartment
Houses. |
|
|
|
|
|
|
|
|
Client: Hall, Don |
|
|
|
|
City: Houston |
|
|
|
|
County: Harris |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1715 Project name: Sterling Myer Residence. Sleeping
porch. Primary archt/firm: Sanguinet, Staats, Hedrick
and Gottlieb |
|
|
|
|
|
|
|
|
Client: Hall, Don |
|
|
|
|
City: Houston |
|
|
|
|
County: Harris |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1851 Project name: Carter Music Co.
building. Date on drawings: 1926 Primary archt/firm: Hedrick and
Gottlieb |
|
|
|
|
|
|
|
|
Client: Hall, Don (owner) |
|
|
|
|
City: Houston |
|
|
|
|
County: Harris |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1529 Project name: W.E. Hamsell
residence. Primary archt/firm: Sanguinet and
Staats |
|
|
|
|
|
|
|
|
Client: Hamsell, W. E. |
|
|
|
|
Street address: High Mound |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2807 Project name: Hardin-Simmons University.
Sandefer Memorial Library and Administration Building. Date on drawings: 1946 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Hardin-Simmons University |
|
|
|
|
City: Abilene |
|
|
|
|
County: Taylor |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3493 Project name: Harris Clinic Building.
Alterations. Date on drawings: 1949 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Harris Clinic Building |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1845 Project name: Harris County Criminal Courts and
Jail Building. Date on drawings: 1926 Primary archt/firm: Hedrick and
Gottlieb |
|
|
|
|
|
|
|
|
Client: Harris County |
|
|
|
|
County: Harris |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5824 Project name: Home for neglected and dependent
children (Harris County, Tex.). Date on drawings: 1960 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Harris County |
|
|
|
|
County: Harris |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2453 Project name: Harris Memorial Methodist
Hospital. Additions and alterations. Date on drawings: 1937 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Harris Memorial Methodist
Hospital |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2786 Project name: Harris Memorial Methodist
Hospital. Remodeling. Date on drawings: 1941 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Harris Memorial Methodist
Hospital |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3995 Project name: T. L. Harris restaurant
building. Date on drawings: 1949 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Harris, T. L. |
|
|
|
|
City: Big Spring |
|
|
|
|
County: Howard |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4799 Project name: Hart I.S.D. Existing building.
Addtions. Date on drawings: 1955 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Hart I.S.D. |
|
|
|
|
City: Hart |
|
|
|
|
County: Castro |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4148 Project name: Floyd Ranch house. Date on drawings: 1958 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Harvey, A. E. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2727 Project name: Hasse I.S.D. school building and
gymnasium. Date on drawings: 1940 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Hasse I.S.D. |
|
|
|
|
City: Hasse |
|
|
|
|
County: Comanche |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1966 Project name: Mrs. Wyatt C. Hedrick children's
playhouse. Date on drawings: 1928 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Hedrick, Mrs. Wyatt C. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1961 Project name: Mrs. Wyatt C. Hedrick
residence. Date on drawings: 1927 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Hedrick, Mrs. Wyatt C. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3000 Project name: Three Circle Ranch. Date on drawings: 1943 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Hedrick, W. C. |
|
|
|
|
City: Bluffdale |
|
|
|
|
County: Erath |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5204 Project name: Meacham Field. Hangar
building. Date on drawings: 1937 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Hedrick, Wyatt C. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1913 Project name: Frank Heidelberg store
building. Date on drawings: 1926 Primary archt/firm: Hedrick and
Gottlieb |
|
|
|
|
|
|
|
|
Client: Heidelberg, Frank |
|
|
|
|
City: Houston |
|
|
|
|
County: Harris |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4836 Project name: Henderson County Memorial
Hospital. Additions and alterations. Date on drawings: 1957 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Henderson County |
|
|
|
|
County: Henderson |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2924 Project name: Hillcrest Memorial Hospital.
Morningside Apartments. Addition and alteration. Date on drawings: 1943 - 1944 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Hillcrest Memorial Hospital |
|
|
|
|
City: Tulsa |
|
|
|
|
State/Province: Okla. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5239 Project name: Dr. and Mrs. A.W. Hiller
residence. Date on drawings: 1957 Primary archt/firm: Hedrick and
Stanley |
|
|
|
|
|
|
|
|
Client: Hiller, Dr. and Mrs. A. W. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4551 Project name: Hilton Hotel (Fort Worth, Tex.).
Hotel decorating contract. Date on drawings: 1954 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Hilton Hotel |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2042 Project name: Mr. T. S. Hogan filling station
and shops. Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Hogan, Mr. T.S. |
|
|
|
|
City: Midland |
|
|
|
|
County: Midland |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2013 Project name: Mr. T.S. Hogan petroleum
building. Date on drawings: 1928 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Hogan, Mr. T.S. |
|
|
|
|
City: Midland |
|
|
|
|
County: Midland |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2031 Project name: Mr. T.S. Hogan store and apartment
building. Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Hogan, Mr. T.S. |
|
|
|
|
City: Midland |
|
|
|
|
County: Midland |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5091 Project name: Mr. and Mrs. Sterling Holloway
residence. Date on drawings: 1956 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Holloway, Mr. and Mrs. Sterling |
|
|
|
|
City: Austin |
|
|
|
|
County: Travis |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4372 Project name: Tower Building. Office
layout. Date on drawings: 1952 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Home Insurance Company |
|
|
|
|
City: Dallas |
|
|
|
|
County: Dallas |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1615 Project name: George A. Hormel and Co. building.
Retaining wall. Date on drawings: 1946 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Hormel, George A., and Co. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3390 Project name: L.L. Horne store and office
building. Date on drawings: 1946 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Horne, L.L. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4389 Project name: Hotel Coriga building
(Albuquerque, N.M.). Date on drawings: 1952 Primary archt/firm: Hedrick Collaborators: Brittelle and Ginner,
assoc. |
|
|
|
|
|
|
|
|
Client: Hotel Coriga |
|
|
|
|
City: Albuquerque |
|
|
|
|
State/Province: N.M. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1966 Project name: Hotel Edson building (Beaumont,
Tex.). Date on drawings: 1928 06 23 Primary archt/firm: F. W. and D. E. Steinman
Architects Collaborators: Hedrick and Gottlieb, assoc.
archts. |
|
|
|
|
|
|
|
|
Client: Hotel Edson |
|
|
|
|
City: Beaumont |
|
|
|
|
County: Jefferson |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1817 Project name: Hotel San Luis building
(Galveston, Tex.). Date on drawings: 1927 Primary archt/firm: Hedrick and
Gottlieb |
|
|
|
|
|
|
|
|
Client: Hotel San Luis |
|
|
|
|
City: Galveston |
|
|
|
|
County: Galveston |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1863 Project name: Hotel Sheffield building (Weslaco,
Tex.). Date on drawings: 1926 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Hotel Sheffield |
|
|
|
|
City: Weslaco |
|
|
|
|
County: Hidalgo |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1642 Project name: Hotel Southern building
(Brownwood, Tex.). Addition and alteration. Primary archt/firm: Sanguinet, Staats and
Hedrick |
|
|
|
|
|
|
|
|
Client: Hotel Southern |
|
|
|
|
City: Brownwood |
|
|
|
|
County: Brown |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1602 Project name: Houston Cotton Exchange office
building. Date on drawings: 1923 Primary archt/firm: Sanguinet, Staats, Hedrick
and Gottlieb |
|
|
|
|
|
|
|
|
Client: Houston Cotton Exchange |
|
|
|
|
City: Houston |
|
|
|
|
County: Harris |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1938 Project name: Houston I.S.D. Brackenridge
Elementary School. Additions and alterations. Primary archt/firm: Hedrick and
Gottlieb |
|
|
|
|
|
|
|
|
Client: Houston I.S.D. |
|
|
|
|
Street address: Quitman and Campbell between Clark
and Whitty Streets |
|
|
|
|
City: Houston |
|
|
|
|
County: Harris |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1846 Project name: Houston I.S.D. Bruce School.
Addition. Date on drawings: 1926 Primary archt/firm: Hedrick and
Gottlieb |
|
|
|
|
|
|
|
|
Client: Houston I.S.D. |
|
|
|
|
Street address: Gage and Bringhurst
Strs |
|
|
|
|
City: Houston |
|
|
|
|
County: Harris |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1852 Project name: Houston I.S.D. Harper Colored
School. New building. Date on drawings: 1926 Primary archt/firm: Hedrick and
Gottlieb |
|
|
|
|
|
|
|
|
Client: Houston I.S.D. |
|
|
|
|
City: Houston |
|
|
|
|
County: Harris |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2076 Project name: Houston I.S.D. Jefferson Davis
Senior High School. Additions and alterations. Date on drawings: 1928 Primary archt/firm: Hedrick and
Gottlieb |
|
|
|
|
|
|
|
|
Client: Houston I.S.D. |
|
|
|
|
City: Houston |
|
|
|
|
County: Harris |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1933 Project name: Houston I.S.D. John Marshall
Junior High School. Additions and alterations. Date on drawings: 1927 Primary archt/firm: Hedrick and
Gottlieb Collaborators: Harry D. Payne (super.
archts.) |
|
|
|
|
|
|
|
|
Client: Houston I.S.D. |
|
|
|
|
Street address: Lee and Cochran Sts |
|
|
|
|
City: Houston |
|
|
|
|
County: Harris |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2075 Project name: Houston I.S.D. John Marshall
Junior High School. Additions and alterations. Date on drawings: 1929 Primary archt/firm: Hedrick and
Gottlieb |
|
|
|
|
|
|
|
|
Client: Houston I.S.D. |
|
|
|
|
Street address: Lee and Cochran Sts |
|
|
|
|
City: Houston |
|
|
|
|
County: Harris |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2073 Project name: Houston I.S.D. John Reagan School.
Addition. Date on drawings: 1928 Primary archt/firm: Hedrick and
Gottlieb |
|
|
|
|
|
|
|
|
Client: Houston I.S.D. |
|
|
|
|
City: Houston |
|
|
|
|
County: Harris |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1518 Project name: Houston Land and Trust Co.
building. Alterations. Primary archt/firm: Sanguinet, Staats and
Gottlieb |
|
|
|
|
|
|
|
|
Client: Houston Land and Trust Co. |
|
|
|
|
City: Houston |
|
|
|
|
County: Harris |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1881 Project name: Houston Launch Club club
building. Date on drawings: 1926 Primary archt/firm: Hedrick and
Gottlieb |
|
|
|
|
|
|
|
|
Client: Houston Launch Club |
|
|
|
|
City: Houston |
|
|
|
|
County: Harris |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3433 Project name: Sewage collection system (Howe,
Tex.). Date on drawings: 1953-1954 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Howe, City of |
|
|
|
|
City: Howe |
|
|
|
|
County: Grayson |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2225 Project name: City jail (Humble,
Tex.). Date on drawings: 1928 Primary archt/firm: Hedrick and
Gottlieb |
|
|
|
|
|
|
|
|
Client: Humble, City of |
|
|
|
|
City: Humble |
|
|
|
|
County: Harris |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1680 Project name: W.L. Hutt residence. Date on drawings: 1924 Primary archt/firm: Sanguinet, Staats and
Hedrick |
|
|
|
|
|
|
|
|
Client: Hutt, W. L. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4256 Project name: I.B.M. Corp. building.
Alterations. Date on drawings: 1951 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: I.B.M. Corp. |
|
|
|
|
Street address: Bryan and Pearl Sts |
|
|
|
|
City: Dallas |
|
|
|
|
County: Dallas |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5070 Project name: Stadium site (Irving,
Tex.). Date on drawings: 1956 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Irving, City of |
|
|
|
|
City: Irving |
|
|
|
|
County: Dallas |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4837A Project name: Irving I.S.D. Conflans Elementary
School. Date on drawings: 1955 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Irving I.S.D. |
|
|
|
|
City: Irving |
|
|
|
|
County: Dallas |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4837D Project name: Irving I.S.D. Davis Elementary
School. Addition. Date on drawings: 1956 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Irving I.S.D. |
|
|
|
|
City: Irving |
|
|
|
|
County: Dallas |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4837B Project name: Irving I.S.D. Rochelle Elementary
School. Date on drawings: 1955 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Irving I.S.D. |
|
|
|
|
City: Irving |
|
|
|
|
County: Dallas |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4837 Project name: Irving I.S.D. Unidentified
elementary school. Proposed. Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Irving I.S.D. |
|
|
|
|
City: Irving |
|
|
|
|
County: Dallas |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4837C Project name: Irving I.S.D. Unidentified junior
high school. Date on drawings: 1955 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Irving I.S.D. |
|
|
|
|
City: Irving |
|
|
|
|
County: Dallas |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5076 Project name: Irving I.S.D. Unidentified senior
high school. Addition. Date on drawings: 1956 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Irving I.S.D. |
|
|
|
|
City: Irving |
|
|
|
|
County: Dallas |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4837E Project name: Irving I.S.D. Unidentified
stadium. Date on drawings: 1956 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Irving I.S.D. |
|
|
|
|
City: Irving |
|
|
|
|
County: Dallas |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2097 Project name: J.C. Penny Co.
building. Date on drawings: 1928 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: J.C. Penny Co. |
|
|
|
|
City: Plainview |
|
|
|
|
County: Hale |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5917 Project name: J.C. Penny Co. store 688.
Additions and alterations. Date on drawings: 1960 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: J.C. Penny Co. |
|
|
|
|
City: Laredo |
|
|
|
|
County: Webb |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1613 Project name: J. E. Hutt Contracting Co.
building. Alterations. Date on drawings: 1922 Primary archt/firm: Sanguinet and
Staats |
|
|
|
|
|
|
|
|
Client: J. E. Hutt Contracting Co. |
|
|
|
|
Street address: 15th and Calhoun Sts |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5332 Project name: Jackson Chevrolet Co. sales and
service buildings. Date on drawings: 1957 Primary archt/firm: Hedrick, Stanley and
Morey |
|
|
|
|
|
|
|
|
Client: Jackson Chevrolet Co. |
|
|
|
|
City: Garland |
|
|
|
|
County: Dallas |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5281 Project name: Jayton Rural High School. Existing
building and new building. Date on drawings: 1957 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Jayton Rural High School |
|
|
|
|
City: Jayton |
|
|
|
|
County: Kent |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1871 Project name: Peter Jenkins manufacturing
building. Date on drawings: 1926 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Jenkins, Peter |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1927 Project name: Connelle Hotel (Eastland,
Tex.). Date on drawings: 1927 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: John T. Jones and Assoc. |
|
|
|
|
City: Eastland |
|
|
|
|
County: Eastland |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1544 Project name: Joint city and county hospital
(Wichita Falls, Tex.). Additions and alterations. Date on drawings: 1921 Primary archt/firm: Sanguinet, Staats and
Pate |
|
|
|
|
|
|
|
|
Client: Joint city and county hospital |
|
|
|
|
City: Wichita Falls |
|
|
|
|
County: Wichita |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4246 Project name: Drs. Kahler, Surman, and Williams
clinic (Post, Tex.). Date on drawings: 1951 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Kahler, Surman, and Williams,
Drs. |
|
|
|
|
City: Post |
|
|
|
|
County: Garza |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2633 Project name: Mr. and Mrs. Darrold A. Kahn
residence. Date on drawings: 1939 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Kahn, Mr. and Mrs. Darrold A. |
|
|
|
|
City: Wichita Falls |
|
|
|
|
County: Wichita |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1728 Project name: L.H. Kassel store.
Alteration. Date on drawings: 1924 Primary archt/firm: Sanguinet, Staats and
Hedrick |
|
|
|
|
|
|
|
|
Client: Kassel, L. H. |
|
|
|
|
Street address: 1st and Houston |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4326 Project name: Katherine Fairley apartment
buildings. Date on drawings: 1953 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Katherine Fairley apartment |
|
|
|
|
City: Dallas |
|
|
|
|
County: Dallas |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4307 Project name: KCRS radio station
building. Date on drawings: 1951 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: KCRS radio station |
|
|
|
|
City: Midland |
|
|
|
|
County: Midland |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1514 Project name: Antionette Apartments. Date on drawings: 1920 Primary archt/firm: Sanguinet,Staats and
Gottlieb |
|
|
|
|
|
|
|
|
Client: Kellner, G. A. and Voss, Mrs.
A. |
|
|
|
|
City: Houston |
|
|
|
|
County: Harris |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4573 Project name: Kerrville State Home. Ward
building project 3. Date on drawings: 1956 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Kerrville State Home |
|
|
|
|
City: Kerrville |
|
|
|
|
County: Kerr |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2433 Project name: KGFG radio station
building. Date on drawings: 1937 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: KGFG radio station |
|
|
|
|
Street address: 1800 West Main St |
|
|
|
|
City: Oklahoma City |
|
|
|
|
State/Province: Okla. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2494 Project name: KGKO broadcasting station
building. Date on drawings: 1938 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: KGKO radio station |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2493 Project name: KGKO radio station building.
Studio. Alterations. Date on drawings: 1938 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: KGKO radio station |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1593 Project name: King Candy Co.
building. Date on drawings: 1922 Primary archt/firm: Sanguinet and
Staats |
|
|
|
|
|
|
|
|
Client: King Candy Co. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3497 Project name: King Candy Co. plant.
Alterations. Date on drawings: 1947 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: King Candy Co. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1506 Project name: James W. Knox residence and
garage. Alterations. Primary archt/firm: Sanguinet and
Staats |
|
|
|
|
|
|
|
|
Client: Knox, James W. |
|
|
|
|
City: Jacksboro |
|
|
|
|
County: Jack |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1506 Project name: James W. Knox tea
house. Primary archt/firm: Sanguinet and
Staats |
|
|
|
|
|
|
|
|
Client: Knox, James W. |
|
|
|
|
City: Jacksboro |
|
|
|
|
County: Jack |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2174 Project name: KPRC station.
Transmitter. Date on drawings: 1929 Primary archt/firm: Hedrick and
Gottlieb |
|
|
|
|
|
|
|
|
Client: KPRC station |
|
|
|
|
City: Sugarland |
|
|
|
|
County: Fort Bend |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4392 Project name: Lakeview I.S.D. Unidentified
elementary school building. Additions and alterations. Date on drawings: 1952 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Lakeview I.S.D. |
|
|
|
|
City: Lakeview |
|
|
|
|
County: Floyd |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3764 Project name: Lamar Co. Electrical Coop Assn.
Headquarters building. Proposed. Date on drawings: 1948 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Lamar Co. Electrical Coop Assn. |
|
|
|
|
City: Paris |
|
|
|
|
County: Lamar |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1636 Project name: Lamar Life Insurance Co. office
building. Date on drawings: 1923 Primary archt/firm: Sanguinet, Staats and
Hedrick |
|
|
|
|
|
|
|
|
Client: Lamar Life Insurance Co. |
|
|
|
|
City: Jackson |
|
|
|
|
State/Province: Miss. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1504 Project name: Edwin Larendon
building. Date on drawings: 1920 Primary archt/firm: Sanguinet, Staats and
Gottlieb |
|
|
|
|
|
|
|
|
Client: Larendon, Edwin |
|
|
|
|
City: Houston |
|
|
|
|
County: Harris |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1303 Project name: F.B. Lary residence. Date on drawings: 1917 Primary archt/firm: Sanguinet and
Staats |
|
|
|
|
|
|
|
|
Client: Lary, F. B. |
|
|
|
|
City: Arlington |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 6070 Project name: Mr. and Mrs. Gary Laughlin
residence. Additions. Date on drawings: 1962 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Laughlin, Mr. and Mrs. Gary |
|
|
|
|
Street address: 38 Valley Ridge Rd |
|
|
|
|
City: Westover Hills |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3339 Project name: Mr. and Mrs. O.R. Lee cafe.
Refrigeration vault. Date on drawings: 1946 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Lee, Mr. and Mrs. O.R. |
|
|
|
|
City: Arlington |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1838 Project name: Medical Arts Building. Date on drawings: 1926 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Lee, Mr. W. E. (owner) |
|
|
|
|
City: Tampa |
|
|
|
|
State/Province: Fla. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5800 Project name: Ramada Inn (Berkeley,
Mo.). Date on drawings: 1961 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Lee-Rai Co, Inc. |
|
|
|
|
City: Berkeley |
|
|
|
|
State/Province: Mo. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1614 Project name: L. Lentz residence. Date on drawings: 1922 Primary archt/firm: Sanguinet, Staats and
Hedrick |
|
|
|
|
|
|
|
|
Client: Lentz, L. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2228 Project name: Leonard Brothers department
store. Date on drawings: 1930 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Leonard Brothers |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2267 Project name: Leonard Brothers garage
building. Date on drawings: 1930 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Leonard Brothers |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3028 Project name: Leonard Brothers
warehouse. Date on drawings: 1946 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Leonard Brothers |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5001 Project name: Shady Oak Country Club
buliding. Date on drawings: 1956 Primary archt/firm: Hedrick and
Stanley? Collaborators: Stanley |
|
|
|
|
|
|
|
|
Client: Leonard, John Marvin |
|
|
|
|
Street address: 320 Roaring Springs
Road |
|
|
|
|
City: Westworth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5374A Project name: Lewter Corp. cooling building and
slaughtering facilities. Date on drawings: 1958 Primary archt/firm: Hedrick and
Stanley |
|
|
|
|
|
|
|
|
Client: Lewter Corp. |
|
|
|
|
City: Lubbock |
|
|
|
|
County: Lubbock |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3991 Project name: Limestone Electric Corp., Inc.
headquarters building. Date on drawings: 1950 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Limestone Electric Corp., Inc. |
|
|
|
|
City: Mart |
|
|
|
|
County: McLennan |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 6384 Project name: Loggins Meat Company. Meat
processing plant. Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Loggins Meat Co. |
|
|
|
|
City: Tyler |
|
|
|
|
County: Smith |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3820 Project name: Lone Star Gas Co. garage
building. Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Lone Star Gas Co. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3491 Project name: Lone Star Gas Co. warehouse
building. Additions. Date on drawings: 1947 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Lone Star Gas Co. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 6346 Project name: Lone Star Ordnance Plant.
Ammunition load and pack facilities. Date on drawings: 1964 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Lone Star Ordnance Plant |
|
|
|
|
City: Texarkana |
|
|
|
|
County: Bowie |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2577 Project name: Charles Long hotel
building. Date on drawings: 1938 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Long, Charles |
|
|
|
|
City: Stephensville |
|
|
|
|
County: Erath |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3151 Project name: Louis Schwartz Store.
Remodeling. Date on drawings: 1946 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Louis Schwartz Store |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1552 Project name: Louisiana National Bank
building. Date on drawings: 1924 Primary archt/firm: Sanguinet, Staats and
Hedrick |
|
|
|
|
|
|
|
|
Client: Louisiana National Bank |
|
|
|
|
City: Baton Rouge |
|
|
|
|
State/Province: La. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1732 Project name: Unidentified hotel building
(Lubbock, Tex.). Date on drawings: 1925 Primary archt/firm: Sanguinet, Staats and
Hedrick |
|
|
|
|
|
|
|
|
Client: Lubbock Chamber of Commerce |
|
|
|
|
City: Lubbock |
|
|
|
|
County: Lubbock |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1667 Project name: City Hall (Lubbock,
Tex.). Date on drawings: 1924 Primary archt/firm: Sanguinet, Staats and
Hedrick |
|
|
|
|
|
|
|
|
Client: Lubbock, City of |
|
|
|
|
City: Lubbock |
|
|
|
|
County: Lubbock |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2112 Project name: Lubbock Hotel Co. hotel building.
Addition. Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Lubbock Hotel Co. |
|
|
|
|
City: Lubbock |
|
|
|
|
County: Lubbock |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1668 Project name: Lubbock State Bank. Date on drawings: 1924 Primary archt/firm: Sanguinet, Staats and
Hedrick |
|
|
|
|
|
|
|
|
Client: Lubbock State Bank |
|
|
|
|
City: Lubbock |
|
|
|
|
County: Lubbock |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Series G2: Drawings, Client Names M-Z |
|
Series Abstract |
|
Click on the series title above to see a listing of the contents
of this series. Entries are indexed in alphabetical order by Client's last
name. If the client is not identifiable the field will remain blank. Entries
without client names are sorted by Project Name and listed before those that
provide client's names. Project names are supplied by the cataloger, as title
blocks on the drawings prove to be inconsistent and many drawings are not
labeled. Dates are offered if they can be derived from the drawings or gathered
from other authoritative sources. The term "drawing" includes both original
works (such as pencil on trace paper, or ink on tracing cloth) as well as
copies (such as sepia prints, blueline prints, etc.). Please note that many
sets of drawings were sold before the collection was acquired by the University
of Texas. See Series A "Job Lists" and Series B "Firm Brochures" for an
inventory of project drawings sold. |
|
|
|
Project number: 3258 Project name: Mr. Webb Maddox ice storage vault.
Remodeling. Date on drawings: 1945 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Maddox, Mr. Webb |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3258 Project name: Mr. Webb Maddox ice storage vault.
Remodeling. Date on drawings: 1946 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Maddox, Mr. Webb |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3231 Project name: Mr. Webb Maddox office
building. Date on drawings: 1945 |
|
|
|
|
|
|
|
|
Client: Maddox, Mr. Webb |
|
|
|
|
Street address: 301 East Magnolia |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 6302 Project name: Grand Apartments. Date on drawings: 1963 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Maddox, W. A., Dr. |
|
|
|
|
City: Amarillo |
|
|
|
|
County: Potter |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2372 Project name: Magnolia Paper Co. warehouse and
print shop. Date on drawings: 1934 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Magnolia Paper Co. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1922 Project name: Manford Cadillac Co.
building. Date on drawings: 1927 Primary archt/firm: Hedrick and
Gottlieb |
|
|
|
|
|
|
|
|
Client: Manford Cadillac Co. |
|
|
|
|
City: Houston |
|
|
|
|
County: Harris |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2718 Project name: Mr. and Mrs. G.F. Mann
residence. Date on drawings: 1940 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Mann, Mr. and Mrs. G. F. |
|
|
|
|
City: Weatherford |
|
|
|
|
County: Parker |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5816 Project name: Marfa I.S.D. Unidentified
vocational agricultural and shop building. Date on drawings: 1960 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Marfa I.S.D. |
|
|
|
|
City: Marfa |
|
|
|
|
County: Presidio |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1690 Project name: Marsalis Club building. Lift
station. Addition. Date on drawings: 1947 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Marsalis Club |
|
|
|
|
City: Dallas |
|
|
|
|
County: Dallas |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2030 Project name: Martha Washington Candies Co.
building. Additions and alterations. Date on drawings: 1928 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Martha Washington Candies Co. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4187 Project name: Martin County Courthouse.
Additions and alterations. Date on drawings: 1950 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Martin County |
|
|
|
|
City: Stanton |
|
|
|
|
County: Martin |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2874 Project name: Masonic Grand Lodge (Waco, Tex.).
Alterations. Proposed. Date on drawings: 1942 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Masons |
|
|
|
|
City: Waco |
|
|
|
|
County: McLennan |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3743 Project name: Mastin Motor Co. garage building
and ramp. Date on drawings: 1948 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Mastin Motor Co. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5622 Project name: Mastin Motor Company.
Remodeling. Date on drawings: 1959 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Mastin Motor Company |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5983 Project name: Mastin Building. Addition and
alteration. Date on drawings: 1961 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Mastin, Mr. Tom |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5519 Project name: Low rent housing project #Tex
164-1 (Mathis, Tex.). Date on drawings: 1959 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Mathis, City of |
|
|
|
|
City: Mathis |
|
|
|
|
County: San Patricio |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2481 Project name: Mr. and Mrs. J.C. Maxwell
residence. Date on drawings: 1938 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Maxwell, Mr. and Mrs. J. C. |
|
|
|
|
City: Westover |
|
|
|
|
County: Baylor |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 6033 Project name: Bien Venido Motel
Restaurant. Date on drawings: 1963 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: McBride, Mr. and Mrs. H. J. |
|
|
|
|
City: Alpine |
|
|
|
|
County: Brewster |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3312 Project name: McCarthy I.S.D. Unidentified
cafeteria building. Date on drawings: 1946 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: McCarthy I.S.D. |
|
|
|
|
City: McCarthy |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3672 Project name: McCarthy I.S.D. Unidentified
teacher's dwelling. Date on drawings: 1948 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: McCarthy I.S.D. |
|
|
|
|
City: McCarthy |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4194 Project name: McClinton Brothers office
building. Date on drawings: 1950 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: McClinton Brothers |
|
|
|
|
City: Midland |
|
|
|
|
County: Midland |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5514 Project name: Jay's Supermarket. Date on drawings: 1958 Primary archt/firm: Hedrick and
Stanley |
|
|
|
|
|
|
|
|
Client: McCollum, Jay |
|
|
|
|
City: Gallup |
|
|
|
|
State/Province: N.M. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4955 Project name: R.A. McCormick lakefront
development. Date on drawings: 1956 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: McCormick, R. A. |
|
|
|
|
City: Cleveland |
|
|
|
|
State/Province: Ohio |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4258/5 Project name: McKinney I.S.D. E.S. Doty Negro
School. Additions and alterations. Date on drawings: 1952 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: McKinney I.S.D. |
|
|
|
|
City: McKinney |
|
|
|
|
County: Collin |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4655 Project name: McKinney Production Credit
Association building. Alterations. Date on drawings: 1954 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: McKinney Production Credit
Association |
|
|
|
|
City: McKinney |
|
|
|
|
County: Collin |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1484 Project name: H.C. Meacham
residence. Date on drawings: 1900 Primary archt/firm: Sanguinet and
Staats |
|
|
|
|
|
|
|
|
Client: Meacham, H. C. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4130 Project name: Meacham's building. Office floors.
Remodeling. Date on drawings: 1950 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Meacham's |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4130A Project name: Meacham's building. Office floors.
Remodeling. Date on drawings: 1952 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Meacham's |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2534 Project name: Meacham's store. New store
windows. Date on drawings: 1938 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Meacham's |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 6346 Project name: Mease Hospital. Additions and
remodeling. Date on drawings: 1965 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Mease Hospital |
|
|
|
|
City: Dunedin |
|
|
|
|
State/Province: Fla. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 6364A Project name: Mease Hospital. Cafeteria-dining
(temporary nursing ward). Addition. Date on drawings: 1965 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Mease Hospital |
|
|
|
|
City: Dunedin |
|
|
|
|
State/Province: Fla. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 6364B Project name: Mease Hospital. Existing "CSR" and
Surgery. Electrical service. Date on drawings: 1965 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Mease Hospital |
|
|
|
|
City: Dunedin |
|
|
|
|
State/Province: Fla. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 6063 Project name: Mease Manor. Date on drawings: 1962 - 1963 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Mease Manor |
|
|
|
|
City: Dunedin |
|
|
|
|
State/Province: Fla. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 6140 Project name: Menasco Manufacturing Co. plant
(Fort Worth, Tex.). Additions. Date on drawings: 1963 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Menasco Manufacturing Co. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2023 Project name: Merchant's and Manufacturer's
Building. Date on drawings: 1929 Primary archt/firm: Giesecke and
Harris Collaborators: Hedrick and Gottlieb, consult
archts. |
|
|
|
|
|
|
|
|
Client: Merchant's and Manufacturer's
Building |
|
|
|
|
City: Houston |
|
|
|
|
County: Harris |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 105-H Project name: Merchant's and Manufacturere's
Building. Date on drawings: 1929 Primary archt/firm: Giesecke and
Harris Collaborators: Hedrick and Gottlieb, consult.
archts. |
|
|
|
|
|
|
|
|
Client: Merchant's and Manufacturere's
Building |
|
|
|
|
City: Houston |
|
|
|
|
County: Harris |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4622 Project name: Texas and Pacific Railway Co. Hot
brine defrost system. Date on drawings: 1954 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Merchant's Cold Storage Co. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4780 Project name: Texas and Pacific terminal
warehouse. Relocation of cooling towers. Date on drawings: 1957 Primary archt/firm: Hedrick and
Stanley |
|
|
|
|
|
|
|
|
Client: Merchant's Cold Storage Co. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3762 Project name: Mesquite I.S.D. Mesquite High
School. Additions and alterations. Date on drawings: 1949 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Mesquite I.S.D. |
|
|
|
|
City: Mesquite |
|
|
|
|
County: Dallas |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1674 Project name: Methodist Girl's Dormitory at
University of Texas (Kirby Hall School). Date on drawings: 1924 Primary archt/firm: Sanguinet, Staats and
Hedrick Collaborators: Roy Thomas |
|
|
|
|
|
|
|
|
Client: Methodist Girl's Dormitory |
|
|
|
|
Street address: 306 West 29th St |
|
|
|
|
City: Austin |
|
|
|
|
County: Travis |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4923 Project name: Methodist Student Center building
(Stephenville, Tex.). Date on drawings: 1958 Primary archt/firm: Hedrick and
Stanley |
|
|
|
|
|
|
|
|
Client: Methodist Student Center |
|
|
|
|
City: Stephenville |
|
|
|
|
County: Erath |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2151 Project name: City Hall and fire department
(Midland, Tex.). Date on drawings: 1929 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Midland, City of |
|
|
|
|
City: Midland |
|
|
|
|
County: Midland |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2827 Project name: Midland I.S.D. Unidentified school
building. Date on drawings: 1942 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Midland I.S.D. |
|
|
|
|
City: Midland |
|
|
|
|
County: Midland |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3199 Project name: Midland Memorial Foundation
nurse's home. Date on drawings: 1948 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Midland Memorial Foundation |
|
|
|
|
City: Midland |
|
|
|
|
County: Midland |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3199 Project name: Midland Memorial Hospital
Building. Date on drawings: 1948 Primary archt/firm: Hedrick Collaborators: Castle, assoc
archts. |
|
|
|
|
|
|
|
|
Client: Midland Memorial Hospital |
|
|
|
|
City: Midland |
|
|
|
|
County: Midland |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5453C Project name: Midwestern Baptist Theological
Seminary dormitory building (Kansas City, Mo.). Date on drawings: 1959 Primary archt/firm: Hedrick and
Stanley |
|
|
|
|
|
|
|
|
Client: Midwestern Baptist Theological
Seminary |
|
|
|
|
City: Kansas City |
|
|
|
|
State/Province: Mo. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5453D Project name: Midwestern Baptist Theological
Seminary married couples apartments (Kansas City, Mo.). Date on drawings: 1959 Primary archt/firm: Hedrick and
Stanley |
|
|
|
|
|
|
|
|
Client: Midwestern Baptist Theological
Seminary |
|
|
|
|
City: Kansas City |
|
|
|
|
State/Province: Mo. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1382B Project name: Sewage collection system.
Extensions. Sewage treatment plant. Remodeling. (Mineola, Tex.). Date on drawings: 1946 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Mineola, City of |
|
|
|
|
City: Mineola |
|
|
|
|
County: Wood |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4540A Project name: Mineola I.S.D. McFarland School
gymnasium. Date on drawings: 1955 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Mineola I.S.D. |
|
|
|
|
City: Mineola |
|
|
|
|
County: Wood |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4540D Project name: Mineola I.S.D. Mineola Elementary
School. Stairs. Alteration. Date on drawings: 1955 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Mineola I.S.D. |
|
|
|
|
City: Mineola |
|
|
|
|
County: Wood |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4540C Project name: Mineola I.S.D. Mineola High
School. Stair. Alteration. Date on drawings: 1955 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Mineola I.S.D. |
|
|
|
|
City: Mineola |
|
|
|
|
County: Wood |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3675 Project name: Mineola I.S.D. Mineola Junoir High
School building. Date on drawings: 1948 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Mineola I.S.D. |
|
|
|
|
City: Mineola |
|
|
|
|
County: Wood |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4540B Project name: Mineola I.S.D. Unidentified
elementary school. Date on drawings: 1955 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Mineola I.S.D. |
|
|
|
|
City: Mineola |
|
|
|
|
County: Wood |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project name: Mineral Wells Hotel. Air
conditioning. Date on drawings: 1928 10 17 Primary archt/firm: Wyatt C. Hedrick
Architect |
|
|
|
|
|
|
|
|
Client: Mineral Wells Hotel |
|
|
|
|
City: Mineral Wells |
|
|
|
|
County: Palo Pinto |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1762 Project name: Mission Exchange Building.
Additions and alterations. Date on drawings: 1925 Primary archt/firm: Sanguinet, Staats and
Hedrick |
|
|
|
|
|
|
|
|
Client: Mission Exchange Building |
|
|
|
|
City: San Antonio |
|
|
|
|
County: Bexar |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1342 Project name: Missley Creamery Co.
building. Date on drawings: 1917 Primary archt/firm: Sanguinet and
Staats |
|
|
|
|
|
|
|
|
Client: Missley Creamery Co. |
|
|
|
|
City: Amarillo |
|
|
|
|
County: Potter |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1771 Project name: Mistletoe Creamery building.
Additions and alterations. Date on drawings: 1925 Primary archt/firm: Sanguinet, Staats and
Hedrick |
|
|
|
|
|
|
|
|
Client: Mistletoe Creamery |
|
|
|
|
City: Amarillo |
|
|
|
|
County: Potter |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1396 Project name: J.W. Mitchell residence. Additions
and alterations. Primary archt/firm: Sanguinet and
Staats |
|
|
|
|
|
|
|
|
Client: Mitchell, J. W. |
|
|
|
|
Street address: Rivercrest |
|
|
|
|
City: Forth Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2556 Project name: Monahans-Wickett I.S.D.
Unidentified school. Bandhouse building. Date on drawings: 1938 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Monahans-Wickett I.S.D. |
|
|
|
|
City: Monahans |
|
|
|
|
County: Ward |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1684 Project name: Monning Dry Goods Co. building.
Additions and alterations. Date on drawings: 1924 Primary archt/firm: Sanguinet, Staats and
Hedrick |
|
|
|
|
|
|
|
|
Client: Monning Dry Goods Co. |
|
|
|
|
Street address: Throckmorton and Fifth
Sts |
|
|
|
|
City: Houston |
|
|
|
|
County: Harris |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2070 Project name: Montgomery Ward Co. store building
(Childress, Tex.). Date on drawings: 1928 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Montgomery Ward Co. |
|
|
|
|
City: Childress |
|
|
|
|
County: Childress |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2113 Project name: Montgomery Ward Co. store building
(Hillsboro, Tex.). Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Montgomery Ward Co. |
|
|
|
|
City: Hillsboro |
|
|
|
|
County: Hill |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2163 Project name: Montgomery Ward Co. store building
(Shreveport, La.). Date on drawings: 1929 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Montgomery Ward Co. |
|
|
|
|
City: Shreveport |
|
|
|
|
State/Province: La. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2513 Project name: Mr. and Mrs. W.D. Morris
residence. Remodeling. Date on drawings: 1938 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Morris, Mr. and Mrs. W. D. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3479 Project name: Motley County
Courthouse. Date on drawings: 1948 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Motley County |
|
|
|
|
City: Matador |
|
|
|
|
County: Motley |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3800 Project name: Mrs. Baird's Bakery building. New
paving and retaining wall. Date on drawings: 1948 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Mrs. Baird's Bakery |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1677 Project name: Mt. Gilead Baptist Church
hospital. Remodeling. Date on drawings: 1924 Primary archt/firm: Sanguinet, Staats, and
Hedrick |
|
|
|
|
|
|
|
|
Client: Mt. Gilead Baptist Church |
|
|
|
|
Street address: 509 Grove St |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2521 Project name: General John A. Mulen bay shore
cottage. Date on drawings: 1941 Primary archt/firm: Hedrick and
Lindsley |
|
|
|
|
|
|
|
|
Client: Mulen, John A., General |
|
|
|
|
City: Palacios |
|
|
|
|
County: Matagorda |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2521 Project name: General John A. Mulen bay shore
cottage. Garage and servant's quarters. Date on drawings: 1940 Primary archt/firm: Hedrick and
Lindsley |
|
|
|
|
|
|
|
|
Client: Mulen, John A., General |
|
|
|
|
City: Palacios |
|
|
|
|
County: Matagorda |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4683 Project name: Municipal Buildings (Gainsville,
Tex.). Date on drawings: 1957 Primary archt/firm: Hedrick, Stanley and
Morey |
|
|
|
|
|
|
|
|
Client: Municipal Buildings (Gainsville,
Tex.) |
|
|
|
|
City: Gainsville |
|
|
|
|
County: Cooke |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3442 Project name: Sanitary sewer system (Naples,
Tex.). Drawings. Date on drawings: 1947 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Naples, City of |
|
|
|
|
City: Naples |
|
|
|
|
County: Morris |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3442B Project name: Streets improvement. (Naples,
Tex.). Plans. Date on drawings: 1947 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Naples, City of |
|
|
|
|
City: Naples |
|
|
|
|
County: Morris |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5922 Project name: National Aeronautics and Space
Administration (N.A.S.A.) central laboratory and office building Date on drawings: 1961 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: National Aeronautics and Space
Administration (N.A.S.A.) |
|
|
|
|
City: Huntsville |
|
|
|
|
State/Province: Ala. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5922 Project name: National Aeronautics and Space
Administration (N.A.S.A.) central laboratory and office building Date on drawings: 1962 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: National Aeronautics and Space
Administration (N.A.S.A.) |
|
|
|
|
City: Huntsville |
|
|
|
|
State/Province: Ala. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2636 Project name: National Aircraft Corp. factory
building. Date on drawings: 1939 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: National Aircraft Corp. |
|
|
|
|
City: San Antonio |
|
|
|
|
County: Bexar |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4794 Project name: National Bank bank building
(Graham, Tex.). Addition and alteration. Date on drawings: 1955 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: National Bank (Graham, Tex.) |
|
|
|
|
City: Graham |
|
|
|
|
County: Young |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1916 Project name: Mr. A. Nave hotel
building. Date on drawings: 1927 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Nave, Mr. A. |
|
|
|
|
City: Childress |
|
|
|
|
County: Childress |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4821 Project name: Nazareth I.S.D. Nazareth High
School. Addition. Date on drawings: 1955 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Nazareth I.S.D. |
|
|
|
|
City: Nazareth |
|
|
|
|
County: Castro |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4821B Project name: Nazareth I.S.D. Nazareth High
School. Gymnasium. Date on drawings: 1955 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Nazareth I.S.D. |
|
|
|
|
City: Nazareth |
|
|
|
|
County: Castro |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2675 Project name: Ben Nedow store and office
building. Date on drawings: 1940 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Nedow, Ben |
|
|
|
|
City: Odessa |
|
|
|
|
County: Ector |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2646 Project name: Mr. and Mrs. John Nobles
residence. Date on drawings: 1929 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Nobles, Mr. and Mrs. John |
|
|
|
|
City: Midland |
|
|
|
|
County: Midland |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3495 Project name: Winfield Garage.
Addition. Date on drawings: 1947 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: North, J. M., Jr. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2548 Project name: North Texas State Teachers
College. Home Management House. Date on drawings: 1938 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: North Texas State Teachers
College |
|
|
|
|
City: Denton |
|
|
|
|
County: Denton |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2398 Project name: North Texas State Teachers
College. Hospital. Addition. Date on drawings: 1935 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: North Texas State Teachers
College |
|
|
|
|
City: Denton |
|
|
|
|
County: Denton |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2641 Project name: North Texas State Teachers
College. Post office building. Date on drawings: 1939 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: North Texas State Teachers
College |
|
|
|
|
City: Denton |
|
|
|
|
County: Denton |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2691 Project name: North Texas State Teachers
College. Women's music building. Date on drawings: 1940 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: North Texas State Teachers
College |
|
|
|
|
City: Denton |
|
|
|
|
County: Denton |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2040 Project name: Northern Texas Traction Co. club
house. Date on drawings: 1928 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Northern Texas Traction Co. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2005 Project name: Northern Texas Traction Co.
terminal building. Date on drawings: 1928 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Northern Texas Traction Co. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1304 Project name: Joe Novy residence. Date on drawings: 1918 Primary archt/firm: Sanguinet and
Staats |
|
|
|
|
|
|
|
|
Client: Novy, Joe |
|
|
|
|
City: Ennis |
|
|
|
|
County: Ellis |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5833 Project name: Oak Cliff Country Club.
Addition. Date on drawings: 1960 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Oak Cliff Country Club |
|
|
|
|
City: Dallas |
|
|
|
|
County: Dallas |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 6145 Project name: Oakcrest Women's Club. Assembly
building. Date on drawings: 1965 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Oakcrest Women's Club |
|
|
|
|
City: Hurst |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1746 Project name: Oliver Rea Eakle
Building. Date on drawings: 1926 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Oliver Rea Eakle Building |
|
|
|
|
City: Amarillo |
|
|
|
|
County: Potter |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3449 Project name: Olney I.S.D. Unidentified
elementary school. Additions and alterations. Date on drawings: 1947 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Olney I.S.D. |
|
|
|
|
City: Olney |
|
|
|
|
County: Young |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3489 Project name: Olney I.S.D. Unidentified
gymnasium. Additions and alterations. Proposed. Date on drawings: 1947 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Olney I.S.D. |
|
|
|
|
City: Olney |
|
|
|
|
County: Young |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4086A Project name: Olney I.S.D. Unidentified
gymnasium and bandroom. Date on drawings: 1950 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Olney I.S.D. |
|
|
|
|
City: Olney |
|
|
|
|
County: Young |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1486 Project name: Olympic Theater. Date on drawings: 1919-1920 Primary archt/firm: Sanguinet, Staats and
Pate |
|
|
|
|
|
|
|
|
Client: Olympic Theater |
|
|
|
|
City: Wichita Falls |
|
|
|
|
County: Wichita |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 561 Project name: Orange Hotel Building. Date on drawings: 1925 Primary archt/firm: Hedrick and
Schoeppl |
|
|
|
|
|
|
|
|
Client: Orange Hotel |
|
|
|
|
City: Inverness |
|
|
|
|
State/Province: Fla. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2020 Project name: Our Lady of Victory Academy (Fort
Worth, Tex.). Addition. Date on drawings: 1928 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Our Lady of Victory Academy |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 6144 Project name: R.W. Ourham building.
Alterations. Date on drawings: 1962 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Ourham, R. W. |
|
|
|
|
City: Hamilton |
|
|
|
|
County: Hamilton |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4386 Project name: Overall Memorial Hospital.
Electrical system. Addition and alteration. Date on drawings: 1951 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Overall Memorial Hospital |
|
|
|
|
City: Coleman |
|
|
|
|
County: Coleman |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2276 Project name: P.M. Devitt Trust business
building. Date on drawings: 1930 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: P.M. Devitt Trust |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2213 Project name: P.M. Devitt Trust store
building. Date on drawings: 1929 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: P.M. Devitt Trust |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4333 Project name: City Hall (Paducah, Tex.).
Repairs. Date on drawings: 1951 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Paducah, City of |
|
|
|
|
City: Paducah |
|
|
|
|
County: Cottle |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 6375 Project name: Panther Boy's Club. Locker room.
Addition. Date on drawings: 1965 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Panther Boy's Club |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5762 Project name: Panther Boys Club. Swimming pool
building. Foundation plan and details. Date on drawings: 1961 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Panther Boys Club |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrnt |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4920 Project name: Mr. and Mrs. Earl Parker
residence. Additions and alterations. Date on drawings: 1955-1956 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Parker, Mr. and Mrs. Earl |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2962 Project name: Federal Public Housing Authority
commercial facilities building. Project Pecos, Tex., 48556 Com. Date on drawings: 1943 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Pecos, City of |
|
|
|
|
City: Pecos |
|
|
|
|
County: Reeves |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5765 Project name: Pecos I.S.D. Unidentified
gymnasium. Additions. Date on drawings: 1960 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Pecos I.S.D. |
|
|
|
|
City: Pecos |
|
|
|
|
County: Reeves |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5098 Project name: Mr. and Mrs. J.R. Penn
residence. Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Penn, Mr. and Mrs. J. R. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1649 Project name: Percy Garrett Motor Co. garage
sales/service station. Date on drawings: 1923 Primary archt/firm: Sanguinet, Staats and
Hedrick |
|
|
|
|
|
|
|
|
Client: Percy Garrett Motor Co. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1743 Project name: Perkins and Snider office
building. Date on drawings: 1925 Primary archt/firm: Sanguinet, Staats, Hedrick
and Pate |
|
|
|
|
|
|
|
|
Client: Perkins and Snider |
|
|
|
|
City: Wichita Falls |
|
|
|
|
County: Wichita |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2171A Project name: Perkins Brothers Dry Goods Co.
store. Store front. Alterations. Date on drawings: 1928 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Perkins Brothers Dry Goods Co. |
|
|
|
|
City: Longview |
|
|
|
|
County: Gregg |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5323 Project name: Mr. Elmer Perkins residence.
Additions and alterations. Date on drawings: 1957 Primary archt/firm: Hedrick and
Stanley |
|
|
|
|
|
|
|
|
Client: Perkins, Mr. Elmer |
|
|
|
|
City: Wichtia Falls |
|
|
|
|
County: Wichita |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5323 Project name: Mr. Elmer Perkins residence.
Additions and alterations. Date on drawings: 1958 Primary archt/firm: Hedrick and
Stanley |
|
|
|
|
|
|
|
|
Client: Perkins, Mr. Elmer |
|
|
|
|
City: Wichtia Falls |
|
|
|
|
County: Wichita |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2183 Project name: Mr. S.B. Perkins business
building. Date on drawings: 1929 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Perkins, Mr. S. B. |
|
|
|
|
City: Corpus Christi |
|
|
|
|
County: Nueces |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1472 Project name: Perkins Timberlake Co. department
store building. Date on drawings: 1919-1920 Primary archt/firm: Sanguinet, Staats and
Pate |
|
|
|
|
|
|
|
|
Client: Perkins Timberlake Co. |
|
|
|
|
City: Wichita Falls |
|
|
|
|
County: Wichita |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2014 Project name: Mr. Tom Peters apartment
building. Date on drawings: 1927 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Peters, Mr. Tom |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3264 Project name: Petroleum Building. Air
conditioning. Date on drawings: 1946 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Petroleum Building |
|
|
|
|
City: Midland |
|
|
|
|
County: Midland |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4617 Project name: Petroleum Building. Heating plant.
Replacement and improvements. Date on drawings: 1954 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Petroleum Building |
|
|
|
|
City: Midland |
|
|
|
|
County: Midland |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3404 Project name: Petroleum Building. Store
building. Date on drawings: 1946 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Petroleum Building |
|
|
|
|
City: Midland |
|
|
|
|
County: Midland |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2474 Project name: Mr. Ernest Petteway residence and
garage. Date on drawings: 1937 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Petteway, Mr. Ernest |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4159 Project name: Southern Methodist University. Phi
Gamma Delta fraternity house. Date on drawings: 1957 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Phi Gamma Delta Fraternity |
|
|
|
|
City: University Park |
|
|
|
|
County: Dallas |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4198 Project name: Mr. and Mrs. Ben Pinkston
residence. Date on drawings: 1950 |
|
|
|
|
|
|
|
|
Client: Pinkston, Mr. and Mrs. Ben |
|
|
|
|
City: Vernon |
|
|
|
|
County: Wilbarger |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4988-49 Project name: Plainview I.S.D. All elementary
schools. Additions. Date on drawings: 1956 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Plainview I.S.D. |
|
|
|
|
City: Plainview |
|
|
|
|
County: Hale |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4434 Project name: Plainview I.S.D. Booker T.
Washington High School. Date on drawings: 1953 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Plainview I.S.D. |
|
|
|
|
City: Plainview |
|
|
|
|
County: Hale |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4489 Project name: Plainview I.S.D. College Hill
Elementary School. Date on drawings: 1953 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Plainview I.S.D. |
|
|
|
|
City: Plainview |
|
|
|
|
County: Hale |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5748 Project name: Plainview I.S.D. Frisco Elementary
School. Additions. Date on drawings: 1960 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Plainview I.S.D. |
|
|
|
|
City: Plainview |
|
|
|
|
County: Hale |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4503 Project name: Plainview I.S.D. Hillcrest
Elementary School. Date on drawings: 1953 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Plainview I.S.D. |
|
|
|
|
City: Plainview |
|
|
|
|
County: Hale |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5928 Project name: Plainview I.S.D. Lakeside and
College Hill Schools. Additions. Date on drawings: 1961 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Plainview I.S.D. |
|
|
|
|
City: Plainview |
|
|
|
|
County: Hale |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4733 Project name: Plainview I.S.D. Unidentified
elementary schools. Addition. Date on drawings: 1955 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Plainview I.S.D. |
|
|
|
|
City: Plainview |
|
|
|
|
County: Hale |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5052 Project name: Plainview I.S.D. Unidentified high
school. Athletic field. Date on drawings: 1956 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Plainview I.S.D. |
|
|
|
|
City: Plainview |
|
|
|
|
County: Hale |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3997 Project name: Plainview I.S.D. Unidentified high
school building. Date on drawings: 1950 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Plainview I.S.D. |
|
|
|
|
City: Plainview |
|
|
|
|
County: Hale |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4828 Project name: Plainview I.S.D. Unidentified
locker and dressing room building. Date on drawings: 1955 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Plainview I.S.D. |
|
|
|
|
City: Plainview |
|
|
|
|
County: Hale |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5745 Project name: Plainview I.S.D. Unidentified
schools. Additions. Date on drawings: 1960 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Plainview I.S.D. |
|
|
|
|
City: Plainview |
|
|
|
|
County: Hale |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5036 Project name: Plumbers and Steamfitters Local #1
union headquarters. Date on drawings: 1957 Primary archt/firm: Hedrick, Stanley and
Morey |
|
|
|
|
|
|
|
|
Client: Plumbers and Steamfitters Local
#1 |
|
|
|
|
City: Dallas |
|
|
|
|
County: Dallas |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4969 Project name: Plymouth Park Inc. shopping
center. Date on drawings: 1956 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Plymouth Park Inc. |
|
|
|
|
City: Irving |
|
|
|
|
County: Dallas |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4195 Project name: Polytechnic Methodist Church and
educational building (Fort Worth, Tex.). Date on drawings: 1951 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Polytechnic Methodist Church |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5542 Project name: Low rent housing project #Tex
179-1 (Post, Tex.). Date on drawings: 1964 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Post, City of |
|
|
|
|
City: Post |
|
|
|
|
County: Garza |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3143 Project name: Petroleum Building office.
Remodeling. Date on drawings: 1945 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Post, Mr. Foster |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2609 Project name: Proctor I.S.D. Unidentified
gymnasium and school building. Date on drawings: 1939 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Proctor I.S.D. |
|
|
|
|
City: Proctor |
|
|
|
|
County: Comanche |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5845 Project name: Quitaque I.S.D. Unidentified
elementary school. Additions and alterations. Date on drawings: 1960 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Quitaque I.S.D. |
|
|
|
|
City: Quitaque |
|
|
|
|
County: Briscoe |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4823 Project name: Pescom Garage and
Warehouse. Date on drawings: 1956 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: R. A. McCormick Co. |
|
|
|
|
City: Pittsburgh |
|
|
|
|
State/Province: Pa. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4930 Project name: R.A. McCormick Co. office
building. Date on drawings: 1956 Primary archt/firm: Hedrick Collaborators: Horley, Roberts, Conwell -
assoc. |
|
|
|
|
|
|
|
|
Client: R. A. McCormick Co. |
|
|
|
|
City: Pittsburgh |
|
|
|
|
County: Allegheny |
|
|
|
|
State/Province: Pa. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5620 Project name: Ramada Inn Roadside Hotel (Dallas,
Tex.). Date on drawings: 1959 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Ramada Inn Roadside Hotel |
|
|
|
|
City: Dallas |
|
|
|
|
County: Dallas |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5655 Project name: Ramada Inn Roadside Hotel (San
Antonio, Tex.). Date on drawings: 1959 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Ramada Inn Roadside Hotel |
|
|
|
|
City: San Antonio |
|
|
|
|
County: Bexar |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3987 Project name: REA Headquarters
Building. Date on drawings: 1950 Primary archt/firm: Hedrick Collaborators: Brittelle, Ginner, Never,
assoc. |
|
|
|
|
|
|
|
|
Client: REA Headquarters Building |
|
|
|
|
City: Portales |
|
|
|
|
State/Province: N.M. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3809 Project name: REA Headquarters
Buildings. Date on drawings: 1948 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: REA Headquarters Buildings |
|
|
|
|
City: Hamilton |
|
|
|
|
County: Hamilton |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3767 Project name: Rebel Stadium.
Remodeling. Date on drawings: 1949 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Rebel Stadium |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1387 Project name: Mr. C.W. Reid
residence. Date on drawings: 1918 Primary archt/firm: Sanguinet, Staats and
Pate |
|
|
|
|
|
|
|
|
Client: Reid, Mr. C. W. |
|
|
|
|
City: Wichita Falls |
|
|
|
|
County: Wichita |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1591 Project name: Reynolds and Gayle Building.
Alterations. Date on drawings: 1922 Primary archt/firm: Sanguinet and
Staats |
|
|
|
|
|
|
|
|
Client: Reynolds and Gayle Building |
|
|
|
|
Street address: 1006 1/2 Main St |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2027 Project name: Reynolds Investment Co. store
building. Remodeling. Date on drawings: 1929 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Reynolds Investment Co. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1586 Project name: Mr. George T. Reynolds building.
New wash basins and bath room location. Date on drawings: 1922 Primary archt/firm: Sanguinet and
Staats |
|
|
|
|
|
|
|
|
Client: Reynolds, Mr. George T. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3438 Project name: Fire station and utility building
(Richardson, Tex.). Date on drawings: 1947 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Richardson, City of |
|
|
|
|
City: Richardson |
|
|
|
|
County: Dallas |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4379 Project name: Ground storage tank (Richardson,
Tex.). Date on drawings: 1957 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Richardson, City of |
|
|
|
|
City: Richardson |
|
|
|
|
County: Dallas |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1645A/ Project name: Sewage collection system
(Richardson, Tex.). Extensions. Date on drawings: 1947 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Richardson, City of |
|
|
|
|
City: Richardson |
|
|
|
|
County: Dallas |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3443 Project name: Sewage treatment plant
(Richardson, Tex.). Date on drawings: 1947 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Richardson, City of |
|
|
|
|
City: Richardson |
|
|
|
|
County: Dallas |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1645A/ Project name: Water system (Richardson, Tex.).
Extensions. Date on drawings: 1947 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Richardson, City of |
|
|
|
|
City: Richardson |
|
|
|
|
County: Dallas |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 6310 Project name: Ridglea Country Club building.
Garden room. Addition. Date on drawings: 1963 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Ridglea Country Club |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2619 Project name: Ridglea Gardens. Date on drawings: 1939 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Ridglea Gardens |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5776 Project name: River Valley Country Club. Club
House. Date on drawings: 1960 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: River Valley Country Club |
|
|
|
|
City: Gainesville |
|
|
|
|
County: Cooke |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3011 Project name: Riverside Y.M.C.A.
building. Date on drawings: 1944 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Riverside Y.M.C.A. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2450 Project name: Robert Driscoll Hotel. Date on drawings: 1939 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Robert Driscoll Hotel |
|
|
|
|
City: Corpus Christi |
|
|
|
|
County: Nueces |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1998 Project name: Unidentified Roman Catholic Church
(Baytown, Tex.). Date on drawings: 1928 Primary archt/firm: Hedrick and
Gottlieb |
|
|
|
|
|
|
|
|
Client: Roman Catholic Church |
|
|
|
|
City: Baytown |
|
|
|
|
County: Harris |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2956 Project name: Rosen Heights I.S.D. Lakeworth
Elementary School. Date on drawings: 1943 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Rosen Heights I.S.D. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4696 Project name: Rosen Heights I.S.D. Unidentified
elementary school building. Date on drawings: 1954 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Rosen Heights I.S.D. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4959 Project name: Rosen Heights I.S.D. Unidentified
elementary school building. Date on drawings: 1956 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Rosen Heights I.S.D. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 6356 Project name: Rosenthal Packing Co.
building. Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Rosenthal Packing Co. |
|
|
|
|
City: Paris |
|
|
|
|
County: Lamar |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3098 Project name: Dr. E.M. Rossell medical and
surgical clinic. Addition. Date on drawings: 1945 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Rossell, E. M., Dr. |
|
|
|
|
City: Weatherford |
|
|
|
|
County: Parker |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3399 Project name: Dr. K.S. Round and Dr. R.I.
Flowers clinic building. Date on drawings: 1946 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Round, K. S., Dr. and Flowers, R. l.,
Dr. |
|
|
|
|
City: San Angelo |
|
|
|
|
County: Tom Green |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2480 Project name: Rowen Motor Coaches bus
station. Date on drawings: 1938 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Rowen Motor Coaches |
|
|
|
|
City: Corsicana |
|
|
|
|
County: Navarro |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2325 Project name: Rusk State Hospital
building. Date on drawings: 1932 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Rusk State Hospital |
|
|
|
|
City: Rusk |
|
|
|
|
County: Cherokee |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2312 Project name: Rusk State Hospital building.
Employees' dormitory. Date on drawings: 1931 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Rusk State Hospital |
|
|
|
|
City: Rusk |
|
|
|
|
County: Cherokee |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1639 Project name: Safeway Store Building. Check
survey. Date on drawings: 1946 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Safeway Store Building |
|
|
|
|
Street address: North Dallas and West Baylor
Sts |
|
|
|
|
City: Ennis |
|
|
|
|
County: Ellis |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2788 Project name: San Angelo College
buildings. Date on drawings: 1941 Primary archt/firm: Hedrick and
Lovett |
|
|
|
|
|
|
|
|
Client: San Angelo College |
|
|
|
|
City: San Angelo |
|
|
|
|
County: Tom Green |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5912 Project name: San Angelo Municipal Airport. High
intensity lighting and runway regulator vault. Date on drawings: 1961 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: San Angelo Municipal Airport |
|
|
|
|
City: San Angelo |
|
|
|
|
County: Tom Green |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5912 Project name: San Angelo Municipal Airport. High
intensity lighting and runway regulator vault. Date on drawings: 1963 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: San Angelo Municipal Airport |
|
|
|
|
City: San Angelo |
|
|
|
|
County: Tom Green |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1540 Project name: San Jacinto Life Insurance Co.
building. Old building foundation plan. Date on drawings: 1921 Primary archt/firm: Sanguinet, Staats and
Gottlieb |
|
|
|
|
|
|
|
|
Client: San Jacinto Life Insurance Co. |
|
|
|
|
City: Beaumont |
|
|
|
|
County: Jefferson |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1890 Project name: San Jacinto Life Insurance Co.
office building. Alteration. Date on drawings: 1926 Primary archt/firm: Hedrick and
Gottlieb |
|
|
|
|
|
|
|
|
Client: San Jacinto Life Insurance Co. |
|
|
|
|
City: Beaumont |
|
|
|
|
County: Jefferson |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1622 Project name: San Jacinto Life Insurance Co.
building. Alterations to old building. Date on drawings: 1923 Primary archt/firm: Sanguinet, Staats, Hedrick
and Gottlieb |
|
|
|
|
|
|
|
|
Client: San Jacinto Life Insurance Co. alter. to
old building for Jos. C. Beck |
|
|
|
|
City: Beaumont |
|
|
|
|
County: Jefferson |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2235 Project name: San Jose Catholic Church (Fort
Worth, Tex.). Date on drawings: 1930 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: San Jose Catholic Church |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4362A Project name: San Marcos Baptist Academy.
Dormitory. Date on drawings: 1952 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: San Marcos Baptist Academy |
|
|
|
|
City: San Marcos |
|
|
|
|
County: Hays |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1603 Project name: Mr. J.W. Sanders garden house.
Alteration. Date on drawings: 1922 Primary archt/firm: Sanguinet, Staats, and
Gottlieb |
|
|
|
|
|
|
|
|
Client: Sanders, Mr. J. W. |
|
|
|
|
City: Houston |
|
|
|
|
County: Harris |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5342 Project name: Mr. J.D. Sandlin tourist court and
office. Date on drawings: 1957 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Sandlin, Mr. J. D. |
|
|
|
|
City: Eunice |
|
|
|
|
State/Province: La. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1570 Project name: Mr. M.R. Sanguinet
residence. Date on drawings: 1922 Primary archt/firm: Sanguinet and
Staats |
|
|
|
|
|
|
|
|
Client: Sanguinet, Mr. M. R. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2602 Project name: Scharbauer Hotel. Date on drawings: 1939 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Scharbauer Hotel |
|
|
|
|
City: Midland |
|
|
|
|
County: Midland |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1941 Project name: Mr. Clarence Scharbauer hotel
building. Addition. Date on drawings: 1929 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Scharbauer, Mr. Clarence |
|
|
|
|
City: Midland |
|
|
|
|
County: Midland |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4244 Project name: Scharbauer Hotel. Addition and
alteration. Date on drawings: 1951 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Scharbauer, Mr. Clarence |
|
|
|
|
City: Midland |
|
|
|
|
County: Midland |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 981 Project name: Dr. Scott and Dr. White
sanatarium. Date on drawings: 1912 Primary archt/firm: Sanguinet and
Staats |
|
|
|
|
|
|
|
|
Client: Scott, Dr. and White, Dr. |
|
|
|
|
City: Temple |
|
|
|
|
County: Bell |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1605 Project name: Mrs. Winfield Scott ranch
house. Date on drawings: 1922 Primary archt/firm: Sanguinet and
Staats |
|
|
|
|
|
|
|
|
Client: Scott, Mrs. Winfield |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1717 Project name: Sanitary sewer (Seagoville, Tex.).
Extensions. Drawings. Date on drawings: 1946 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Seagoville, City of |
|
|
|
|
City: Seagoville |
|
|
|
|
County: Dallas |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1717 Project name: Sanitary sewer (Seagoville, Tex.).
Extensions. Drawings. Date on drawings: 1948 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Seagoville, City of |
|
|
|
|
City: Seagoville |
|
|
|
|
County: Dallas |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1711 Project name: Seaport National Bank (Houston,
Tex.). Date on drawings: 1924 Primary archt/firm: Sanguinet, Staats,Hedrick
and Gottlieb |
|
|
|
|
|
|
|
|
Client: Seaport National Bank |
|
|
|
|
City: Houston |
|
|
|
|
County: Harris |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2139 Project name: Second National Bank Building
(Houston, Tex.). Alterations. Date on drawings: 1929 Primary archt/firm: Hedrick and
Gottlieb |
|
|
|
|
|
|
|
|
Client: Second National Bank |
|
|
|
|
City: Houston |
|
|
|
|
County: Harris |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1409 Project name: Second Ward School (Fort Worth,
Tex.). Additions and alterations. Date on drawings: 1918 Primary archt/firm: Sanguinet and
Staats |
|
|
|
|
|
|
|
|
Client: Second Ward School |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1386 Project name: Mr. Richard Sellman
residence. Date on drawings: 1918 Primary archt/firm: Sanguinet and
Staats |
|
|
|
|
|
|
|
|
Client: Sellman, Mr. Richard |
|
|
|
|
City: Rochelle |
|
|
|
|
County: McCulloch |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2525 Project name: Seminole Consolidated School
District #1. Unidentified grade and high school. Date on drawings: 1938 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Seminole Consolidated School District
#1 |
|
|
|
|
City: Seminole |
|
|
|
|
County: Gaines |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2525 Project name: Seminole Consolidated School
District #1. Unidentified school building. Date on drawings: 1938 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Seminole Consolidated School District
#1 |
|
|
|
|
City: Seminole |
|
|
|
|
County: Gaines |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1411 Project name: Seventh Ward School (Fort Worth,
Tex.). Additions and alterations. Date on drawings: 1918 Primary archt/firm: Sanguinet and
Staats |
|
|
|
|
|
|
|
|
Client: Seventh Ward School |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1930 Project name: Shaw Jewelry Co. Store.
Remodeling. Date on drawings: 1927 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Shaw Jewelry Co. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2438 Project name: Shaw Jewelry Co. Store. Store
front and interior. Remodeling. Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Shaw Jewelry Co. |
|
|
|
|
Street address: Main St and 7th Ave |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2681 Project name: Mr. C.A. Sheffield
hotel. Date on drawings: 1940 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Sheffield, Mr. C. A. |
|
|
|
|
City: Seagaves |
|
|
|
|
County: Gaines |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2744 Project name: Tech Apartments, Inc.
building. Date on drawings: 1940 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Sheffield, Mr. C. A. |
|
|
|
|
City: Lubbock |
|
|
|
|
County: Lubbock |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2603 Project name: Shell Building. Lobby and
entrance. Remodeling. Primary archt/firm: Hedrick and
Lindsley |
|
|
|
|
|
|
|
|
Client: Shell Building |
|
|
|
|
City: Houston |
|
|
|
|
County: Harris |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3699 Project name: Petroleum Building. 12th floor.
Addition. Date on drawings: 1948 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Shell Oil Co. |
|
|
|
|
City: Midland |
|
|
|
|
County: Midland |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1987 Project name: Shelor Motor Company
building. Date on drawings: 1927 Primary archt/firm: Hedrick and
Gottlieb |
|
|
|
|
|
|
|
|
Client: Shelor Motor Company |
|
|
|
|
City: Houston |
|
|
|
|
County: Harris |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2604 Project name: Shiloh I.S.D. Unidentified
gymnasium. Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Shiloh I.S.D. |
|
|
|
|
City: Shiloh |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5527 Project name: Shippers Warehouse Co. warehouse
and office. Date on drawings: 1958 Primary archt/firm: Hedrick and
Stanley |
|
|
|
|
|
|
|
|
Client: Shippers Warehouse Co. |
|
|
|
|
City: Dallas |
|
|
|
|
County: Dallas |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2579 Project name: Mr. E.A. Shotts business
building. Date on drawings: 1938 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Shotts, Mr. E. A. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4442 Project name: School buildings (Silver, Tex.).
Additions and alterations. Date on drawings: 1952 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Silver, City of |
|
|
|
|
City: Silver |
|
|
|
|
County: Coke |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4508 Project name: R.Q. Silverthorne store
building. Date on drawings: 1953 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Silverthorne, R. Q. |
|
|
|
|
City: Plainview |
|
|
|
|
County: Hale |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 6324 Project name: Simmons Memorial Hospital.
Additions and alterations. Date on drawings: 1963 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Simmons Memorial Hospital |
|
|
|
|
City: Sweetwater |
|
|
|
|
County: Nolan |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2785 Project name: Mr. and Mrs. L.G. Simon
residence. Date on drawings: 1941 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Simon, Mr. and Mrs. L. G. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5683 Project name: Sinclair Building. Office
remodeling. Date on drawings: 1959 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Sinclair Building |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4236 Project name: Mrs. Alpha Singleton funeral
home. Date on drawings: 1951 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Singleton, Mrs. Alpha |
|
|
|
|
City: Seminole |
|
|
|
|
County: Gaines |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1734 Project name: St. Martin's Academy for the
Sisters of Notre Dame. Date on drawings: 1925 Primary archt/firm: Sanguinet, Staats and
Hedrick |
|
|
|
|
|
|
|
|
Client: Sisters of Notre Dame |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2506 Project name: Sligo I.S.D. Unidentified school
building. Date on drawings: 1938 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Sligo I.S.D. |
|
|
|
|
City: Sligo |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3932 Project name: Smith Clinic. Addition and
alteration. Date on drawings: 1949-1950 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Smith Clinic |
|
|
|
|
City: Hillsboro |
|
|
|
|
County: Hill |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 6311 Project name: Lonnie Smith offices.
Proposed. Date on drawings: 1963 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Smith, Lonnie |
|
|
|
|
Street address: 3000 West 27th St |
|
|
|
|
City: Amarillo |
|
|
|
|
County: Potter |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1924 Project name: Smith-Swinney Motor Co.
Building. Date on drawings: 1927 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Smith-Swinney Motor Co. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1740 Project name: Snider and Harvey office
building. Date on drawings: 1925 Primary archt/firm: Sanguinet, Staats,
Hedrick, and Pate |
|
|
|
|
|
|
|
|
Client: Snider and Harvey |
|
|
|
|
City: Wichita Falls |
|
|
|
|
County: Wichita |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1735 Project name: Mr. C. W. Snider residence.
Heating layout. Primary archt/firm: Sanguinet, Staats and
Hedrick |
|
|
|
|
|
|
|
|
Client: Snider, Mr. C. W. |
|
|
|
|
City: Wichita Falls |
|
|
|
|
County: Wichita |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2134 Project name: Mr. C.W. Snider store
building. Date on drawings: 1929 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Snider, Mr. C. W. |
|
|
|
|
City: Dallas |
|
|
|
|
County: Dallas |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2140 Project name: Snider Plaza theater and store
building. Date on drawings: 1929 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Snider Plaza |
|
|
|
|
City: Dallas |
|
|
|
|
County: Dallas |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3289 Project name: Sol Dey Rey Farms. Date on drawings: 1958 Primary archt/firm: Hedrick, Stanley and
Lightfoot |
|
|
|
|
|
|
|
|
Client: Sol Dey Rey Farms |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1650 Project name: Soldiers and Sailors Memorial
Hall. Date on drawings: 1923 Primary archt/firm: Sanguinet, Staats and
Hedrick |
|
|
|
|
|
|
|
|
Client: Soldiers and Sailors Memorial
Hall |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1849 Project name: South End Christian
Church. Date on drawings: 1927 Primary archt/firm: Hedrick and
Gottlieb |
|
|
|
|
|
|
|
|
Client: South End Christian Church |
|
|
|
|
City: Houston |
|
|
|
|
County: Harris |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1733 Project name: South End Junior High
School. Date on drawings: 1925 Primary archt/firm: Sanguinet, Staats, Hedrick
and Gottlieb |
|
|
|
|
|
|
|
|
Client: South End Junior High School |
|
|
|
|
City: Houston |
|
|
|
|
County: Harris |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2107 Project name: South Texas National Bank
(Galveston, Tex.). Primary archt/firm: Hedrick and
Gottlieb |
|
|
|
|
|
|
|
|
Client: South Texas National Bank |
|
|
|
|
City: Galveston |
|
|
|
|
County: Galveston |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1821 Project name: Southern Methodist University.
Dormitory. Date on drawings: 1926 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Southern Methodist University. |
|
|
|
|
City: Dallas |
|
|
|
|
County: Dallas |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2029 Project name: Southern Pacific Lines passenger
station (Houston, Tex.). Date on drawings: 1931 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Southern Pacific Lines |
|
|
|
|
City: Houston |
|
|
|
|
County: Harris |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2338 Project name: Southern Pacific Lines Passenger
Station (Houston, Tex.). Date on drawings: 1933 Primary archt/firm: Wyatt C.
Hedrick |
|
|
|
|
|
|
|
|
Client: Southern Pacific Lines |
|
|
|
|
City: Houston |
|
|
|
|
County: Harris |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4318 Project name: Southland Life Building. Additions
and alterations. Date on drawings: 1951-1952 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Southland Life Building |
|
|
|
|
City: Dallas |
|
|
|
|
County: Dallas |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1748 Project name: Southside Hardware Business
Building. Date on drawings: 1925 |
|
|
|
|
|
|
|
|
Client: Southside Hardware Business
Building |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2760 Project name: Southwestern Associated Telephone
Co. Telephone exchange building (Post, Tex.). Date on drawings: 1941 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Southwestern Associated Telephone
Co. |
|
|
|
|
City: Post |
|
|
|
|
County: Garza |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3840 Project name: Southwestern Associated Telephone
Co. Telephone exchange building (Perryton, Tex.). Date on drawings: 1948 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Southwestern Associated Telephone
Co. |
|
|
|
|
City: Perryton |
|
|
|
|
County: Ochiltree |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4212 Project name: Southwestern Associated Telephone
Co. Telephone exchange building (Sulphur Springs, Tex.). Date on drawings: 1951 |
|
|
|
|
|
|
|
|
Client: Southwestern Associated Telephone
Co. |
|
|
|
|
City: Sulphur Springs |
|
|
|
|
County: Hopkins |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5273 Project name: Southwestern Bell Telephone Co.
Arminister "2" No. 5 Crossbar Building (Fort Worth, Tex.). Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Southwestern Bell Telephone Co. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5274 Project name: Southwestern Bell Telephone Co.
Arminister "3" No. 5 Crossbar Building (Fort Worth, Tex.). Date on drawings: 1957 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Southwestern Bell Telephone Co. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5866 Project name: Southwestern Bell Telephone Co.
Atlas "1" No. 5 X-Bar Dial Building (Watauga, Tex.). Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Southwestern Bell Telephone Co. |
|
|
|
|
City: Watauga |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3657 Project name: Southwestern Bell Telephone Co.
Central Office Building (Corpus Christi, Tex.). Additions and Date on drawings: 1948 Primary archt/firm: Wyatt C. Hedrick,
Architect and Engineer |
|
|
|
|
|
|
|
|
Client: Southwestern Bell Telephone Co. |
|
|
|
|
City: Corpus Christi |
|
|
|
|
County: Nueces |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3535 Project name: Southwestern Bell Telephone Co.
Central Office Building (Midland, Tex.). Additions and Date on drawings: 1948 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Southwestern Bell Telephone Co. |
|
|
|
|
City: Midland |
|
|
|
|
County: Midland |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3671 Project name: Southwestern Bell Telephone Co.
Central Office Building (Pasedena, Tex.). Additions and Date on drawings: 1948 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Southwestern Bell Telephone Co. |
|
|
|
|
City: Pasedena |
|
|
|
|
County: Harris |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5275 Project name: Southwestern Bell Telephone Co.
Circle "4" No. 5 Crossbar Building (Fort Worth, Tex.). Primary archt/firm: Hedrick, Stanley and
Lightfoot |
|
|
|
|
|
|
|
|
Client: Southwestern Bell Telephone Co. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1092 Project name: Southwestern Bell Telephone Co.
Cliff Exchange Building (Dallas, Tex.). Date on drawings: 1913 Primary archt/firm: Sanguinet and
Staats |
|
|
|
|
|
|
|
|
Client: Southwestern Bell Telephone Co. |
|
|
|
|
City: Dallas |
|
|
|
|
County: Dallas |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5325 Project name: Southwestern Bell Telephone Co.
Crestview "2" Dial Building (Fort Worth, Tex.). Primary archt/firm: Hedrick, Stanley and
Lightfoot |
|
|
|
|
|
|
|
|
Client: Southwestern Bell Telephone Co. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5798 Project name: Southwestern Bell Telephone Co.
Crestview "4" office building (Arlington, Tex.). Additions and Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Southwestern Bell Telephone Co. |
|
|
|
|
City: Arlington |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5944 Project name: Southwestern Bell Telephone Co.
Dallas Cherry "4" Dial Building (Seagoville, Tex.). Date on drawings: 1961 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Southwestern Bell Telephone Co. |
|
|
|
|
City: Seagoville |
|
|
|
|
County: Dallas |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1555 Project name: Southwestern Bell telephone Co.
Dallas Cliff Exchange Building (Dallas, Tex.). Additions and Date on drawings: 1921 Primary archt/firm: Sanguinet and
Staats |
|
|
|
|
|
|
|
|
Client: Southwestern Bell telephone Co. |
|
|
|
|
City: Dallas |
|
|
|
|
County: Dallas |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1019 Project name: Southwestern Bell Telephone Co.
Dallas Oak Lawn Exchange Building (Dallas, Tex.). Date on drawings: 1913 Primary archt/firm: Sanguinet and
Staats |
|
|
|
|
|
|
|
|
Client: Southwestern Bell Telephone Co. |
|
|
|
|
City: Dallas |
|
|
|
|
County: Dallas |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1520 Project name: Southwestern Bell Telephone Co.
Exchange Building (Eastland, Tex.). Date on drawings: 1920 Primary archt/firm: Sanguinet and
Staats |
|
|
|
|
|
|
|
|
Client: Southwestern Bell Telephone Co. |
|
|
|
|
City: Eastland |
|
|
|
|
County: Eastland |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1722 Project name: Southwestern Bell Telephone Co.
Main Telephone Exchange Date on drawings: 1924-1925 Primary archt/firm: Sanguinet, Staats and
Hedrick Collaborators: R. F. Taylor, Mechanical
Engineer |
|
|
|
|
|
|
|
|
Client: Southwestern Bell Telephone Co. |
|
|
|
|
City: San Antonio |
|
|
|
|
County: Bexar |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5753 Project name: Southwestern Bell Telephone Co.
Pershing "7" Dial Building (Fort Worth, Tex.). Date on drawings: 1960 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Southwestern Bell Telephone Co. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1766 Project name: Southwestern Bell Telephone Co.
Preston Exchange Building (Houston, Tex.). Addition. Date on drawings: 1925 Primary archt/firm: Sanguinet, Staats, Hedrick
and Gottlieb |
|
|
|
|
|
|
|
|
Client: Southwestern Bell Telephone Co. |
|
|
|
|
City: Houston |
|
|
|
|
County: Harris |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1782 Project name: Southwestern Bell Telephone Co.
Preston Exchange Building (Houston, Tex.). Addition. Primary archt/firm: Sanguinet, Staats, Hedrick
and Gottlieb |
|
|
|
|
|
|
|
|
Client: Southwestern Bell Telephone Co. |
|
|
|
|
City: Houston |
|
|
|
|
County: Harris |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3659 Project name: Southwestern Bell Telephone Co. S.
A. Pershing Parkview (San Antonio, Tex.). Additions and Date on drawings: 1948 Primary archt/firm: Wyatt Hedrick, architect
engineer |
|
|
|
|
|
|
|
|
Client: Southwestern Bell Telephone Co. |
|
|
|
|
City: San Antonio |
|
|
|
|
County: Bexar |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3658 Project name: Southwestern Bell Telephone Co.
San Antonio travis building (San Antonio, Tex.). Additions and Date on drawings: 1948 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Southwestern Bell Telephone Co. |
|
|
|
|
City: San Antonio |
|
|
|
|
County: Bexar |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1505 Project name: Southwestern Bell Telephone
Seminary central heating plant (Fort Worth, Tex.). Date on drawings: 1920 Primary archt/firm: Sanguinet and
Staats |
|
|
|
|
|
|
|
|
Client: Southwestern Bell Telephone
Seminary |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2173 Project name: Southwestern Exposition.
Exhibition building. Date on drawings: 1929 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Southwestern Exposition |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1787 Project name: Southwestern Exposition and Fat
Stock Show. Auction sale building and hog pens. Date on drawings: 1925 Primary archt/firm: Sanguinet and
Staats |
|
|
|
|
|
|
|
|
Client: Southwestern Exposition and Fat Stock
Show |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1091 Project name: Southwestern Telegraph and
Telephone Co. Dallas Oakland Exchange Building (Dallas, Tex.). Primary archt/firm: Sanguinet and
Staats |
|
|
|
|
|
|
|
|
Client: Southwestern Telegraph and Telephone
Co. |
|
|
|
|
City: Dallas |
|
|
|
|
County: Dallas |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1475 Project name: Southwestern Telegraph and
Telephone Co. Lamar Exchange (Fort Worth, Tex.). Addition. Date on drawings: 1920 Primary archt/firm: Sanguinet and
Staats |
|
|
|
|
|
|
|
|
Client: Southwestern Telegraph and Telephone
Co. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 918 Project name: Southwestern Telegraph and
Telephone Co. Taylor Exchange Building (Houston, Tex.). Date on drawings: 1911 Primary archt/firm: Sanguinet, Staats and
Barnes |
|
|
|
|
|
|
|
|
Client: Southwestern Telegraph and Telephone
Co. |
|
|
|
|
City: Houston |
|
|
|
|
County: Harris |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 758 Project name: Southwestern Telegraph and
Telephone Co. Telephone Exchange Building (San Antonio, Tex.). Date on drawings: 1910 Primary archt/firm: Sanguinet and
Staats |
|
|
|
|
|
|
|
|
Client: Southwestern Telegraph and Telephone
Co. |
|
|
|
|
City: San Antonio |
|
|
|
|
County: Bexar |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1317 Project name: Southwestern Telegraph and
Telephone Co. Telephone Exchange Building (Houston, Tex.). Date on drawings: 1917 Primary archt/firm: Sanguinet and
Staats |
|
|
|
|
|
|
|
|
Client: Southwestern Telegraph and Telephone
Co. |
|
|
|
|
City: Houston |
|
|
|
|
County: Harris |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1316 Project name: Southwestern Telegraph and
Telephone Co. Telephone Exchange Building (San Antonio, Tex.). Date on drawings: 1917 Primary archt/firm: Sanguinet and
Staats |
|
|
|
|
|
|
|
|
Client: Southwestern Telegraph and Telephone
Co. |
|
|
|
|
City: San Antonio |
|
|
|
|
County: Bexar |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1318 Project name: Southwestern Telegraph and
Telephone Co. Telephone Exchange Building (Galveston, Tex.). Date on drawings: 1917 Primary archt/firm: Sanguinet, Staats and
Gottlieb |
|
|
|
|
|
|
|
|
Client: Southwestern Telegraph and Telephone
Co. |
|
|
|
|
City: Galveston |
|
|
|
|
County: Galveston |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1398 Project name: Southwestern Telephone and
Telegraph Co. Main Telephone Exchange Building (San Antonio, Tex.). Date on drawings: nd Primary archt/firm: Sanguinet and
Staats |
|
|
|
|
|
|
|
|
Client: Southwestern Telephone and Telegraph
Co. |
|
|
|
|
City: San Antonio |
|
|
|
|
County: Bexar |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 852 Project name: Southwestern Telephone and
Telegraph Co. Telephone Exchange Building (Houston, Tex.). Date on drawings: 1911 Primary archt/firm: Sanguinet, Staats and
Barnes Collaborators: Barnes |
|
|
|
|
|
|
|
|
Client: Southwestern Telephone and Telegraph
Co. |
|
|
|
|
City: Houston |
|
|
|
|
County: Harris |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2560 Project name: Springlake I.S.D. Unidentified
school building. Date on drawings: 1939 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Springlake I.S.D. |
|
|
|
|
City: Earth |
|
|
|
|
County: Lamb |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1951 Project name: St. Anthony's Hospital
building. Date on drawings: 1927 |
|
|
|
|
|
|
|
|
Client: St. Anthony's Hospital |
|
|
|
|
City: Amarillo |
|
|
|
|
County: Potter |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1582 Project name: St. Joseph's Parish school
building (Houston, Tex.). Primary archt/firm: Sanguinet, Staats and
Gottlieb |
|
|
|
|
|
|
|
|
Client: St. Joseph's Parish |
|
|
|
|
City: Houston |
|
|
|
|
County: Harris |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2813 Project name: St. Mary's Catholic Church (Fort
Worth, Tex.). Grade school building. Date on drawings: 1946 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: St. Mary's Catholic Church |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1428 Project name: C.G. Staats flat
building. Date on drawings: 1918 Primary archt/firm: Sanguinet and
Staats |
|
|
|
|
|
|
|
|
Client: Staats, C. G. |
|
|
|
|
Street address: Arlington Heights |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4995 Project name: City Hall and firestation building
(Stamford, Tex.). Alteration. Date on drawings: 1961 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Stamford, City of |
|
|
|
|
City: Stamford |
|
|
|
|
County: Jones |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2600 Project name: Standard Time Building. Air
conditioning and heating system. Date on drawings: 1938 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Standard Time Building |
|
|
|
|
City: San Angelo |
|
|
|
|
County: Tom Green |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2576 Project name: Star I.S.D. Star High
School. Date on drawings: 1939 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Star I.S.D. |
|
|
|
|
City: Star |
|
|
|
|
County: Mills |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2576A Project name: Star I.S.D. Star High School.
Addition. Date on drawings: 1940 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Star I.S.D. |
|
|
|
|
City: Star |
|
|
|
|
County: Mills |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2719 Project name: Star I.S.D. Unidentified
gymnasium. Date on drawings: 1940 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Star I.S.D. |
|
|
|
|
City: Star |
|
|
|
|
County: Mills |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2792 Project name: Star I.S.D. Unidentified
gymnasium. Date on drawings: 1941 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Star I.S.D. |
|
|
|
|
City: Star |
|
|
|
|
County: Mills |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1745 Project name: Star Telegram paper
warehouse. Date on drawings: 1925 Primary archt/firm: Sanguinet, Staats and
Hedrick |
|
|
|
|
|
|
|
|
Client: Star Telegram |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1801 Project name: State Bank of Lakeland Building
(Lakeland, Fla.). Date on drawings: 1926 Primary archt/firm: Hedrick and
Schoeppl |
|
|
|
|
|
|
|
|
Client: State Bank of Lakeland |
|
|
|
|
City: Lakeland |
|
|
|
|
State/Province: Fla. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3219 Project name: Trading Post Limited
building. Date on drawings: 1945 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: State building group for Mr. F. L.
Carmichael and Mr. A. C. Luther |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2210 Project name: Psychopathic Hospital (Galveston,
Tex.). Date on drawings: 1930 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: State of Texas Board Control |
|
|
|
|
City: Galveston |
|
|
|
|
County: Galveston |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1499 Project name: State Tuberculosis Sanatarium.
Bakery. Primary archt/firm: Sanguinet and
Staats |
|
|
|
|
|
|
|
|
Client: State Tuberculosis Sanatarium |
|
|
|
|
City: Carlsbad |
|
|
|
|
County: Tom Green |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1343 Project name: State Tuberculosis Sanatarium.
Combination dormitory. Date on drawings: 1917 Primary archt/firm: Sanguinet and
Staats |
|
|
|
|
|
|
|
|
Client: State Tuberculosis Sanatarium |
|
|
|
|
City: Carlsbad |
|
|
|
|
County: Tom Green |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1355 Project name: State Tuberculosis Sanatarium.
Laundry building Date on drawings: 1917 Primary archt/firm: Sanguinet and
Staats |
|
|
|
|
|
|
|
|
Client: State Tuberculosis Sanatarium |
|
|
|
|
City: Carlsbad |
|
|
|
|
County: Tom Green |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1353 Project name: State Tuberculosis Sanatarium.
Nurse's home. Date on drawings: 1917 Primary archt/firm: Sanguinet and
Staats |
|
|
|
|
|
|
|
|
Client: State Tuberculosis Sanatarium |
|
|
|
|
City: Carlsbad |
|
|
|
|
County: Tom Green |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1356 Project name: State Tuberculosis Sanatarium.
Store house. Date on drawings: 1917 Primary archt/firm: Sanguinet and
Staats |
|
|
|
|
|
|
|
|
Client: State Tuberculosis Sanatarium |
|
|
|
|
City: Carlsbad |
|
|
|
|
County: Tom Green |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1354 Project name: State Tuberculosis Sanatarium.
Superintendent's home. Date on drawings: 1917 Primary archt/firm: Sanguinet and
Staats |
|
|
|
|
|
|
|
|
Client: State Tuberculosis Sanatarium |
|
|
|
|
City: Carlsbad |
|
|
|
|
County: Tom Green |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1352 Project name: State Tuberculosis Sanatarium.
Women's dormitory Date on drawings: 1917 Primary archt/firm: Sanguinet and
Staats |
|
|
|
|
|
|
|
|
Client: State Tuberculosis Sanatarium |
|
|
|
|
City: Carlsbad |
|
|
|
|
County: Tom Green |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1497 Project name: State Tuberculosis Sanitarium.
Dairy barn. Addition. Primary archt/firm: Sanguinet and
Staats |
|
|
|
|
|
|
|
|
Client: State Tuberculosis Sanitarium |
|
|
|
|
City: Carlsbad |
|
|
|
|
County: Tom Green |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2627 Project name: Mr. and Mrs. Lisle Steele
residence. Date on drawings: 1939 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Steele, Mr. and Mrs. Lisle |
|
|
|
|
City: Mexia |
|
|
|
|
County: Limestone |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1966 Project name: Hotel Edson (Beaumont,
Tex.) Date on drawings: 1928 Primary archt/firm: F.W. and D.E.
Steinman Collaborators: Hedrick and Gottlieb, assoc.
archts. |
|
|
|
|
|
|
|
|
Client: Steinman, F. W. and D. E. |
|
|
|
|
City: Beaumont |
|
|
|
|
County: Jefferson |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2456 Project name: Stephen F. Austin State Teacher's
College. Science building. Date on drawings: 1937 Primary archt/firm: Hedrick and
Lindsley |
|
|
|
|
|
|
|
|
Client: Stephen F. Austin State Teacher's
College |
|
|
|
|
City: Necogdoches |
|
|
|
|
County: Nacogdoches |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4437 Project name: Stephen's Memorial Hospital.
Additions and alterations. Date on drawings: 1956 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Stephen's Memorial Hospital |
|
|
|
|
City: Breckenridge |
|
|
|
|
County: Stephens |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2406 Project name: Recreation building and swimming
pool (Stephenville, Tex.). Date on drawings: 1938 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Stephenville, City of |
|
|
|
|
City: Stephenville |
|
|
|
|
County: Erath |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2026 Project name: Stephenville Hotel Co. hotel
building. Date on drawings: 1930 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Stephenville Hotel Co. |
|
|
|
|
City: Stephenville |
|
|
|
|
County: Erath |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1765 Project name: Sterling Hotel (Houston,
Tex.). Date on drawings: 1927 Primary archt/firm: Sanguinet, Staats and
Hedrick? |
|
|
|
|
|
|
|
|
Client: Sterling Hotel |
|
|
|
|
City: Houston |
|
|
|
|
County: Harris |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1739 Project name: Houston Post Dispatch
building. Date on drawings: 1925 Primary archt/firm: Sanguinet, Staats, Hedrick
and Gottlieb |
|
|
|
|
|
|
|
|
Client: Sterling, R. S. |
|
|
|
|
City: Houston |
|
|
|
|
County: Harris |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2686 Project name: R.S. Sterling garage
building. Date on drawings: 1924 Primary archt/firm: Sanguinet, Staats, Hedrick
and Gottlieb |
|
|
|
|
|
|
|
|
Client: Sterling, R. S. |
|
|
|
|
City: Houston |
|
|
|
|
County: Harris |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2972 Project name: Mr. and Mrs. W.W. Stevens earth
dam and stone water trough. Date on drawings: 1943 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Stevens, Mr. and Mrs. W. W. |
|
|
|
|
County: Parker |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2923 Project name: Mr. and Mrs. W.W. Stevens
residence. Remodeling. Tenant's house, garage and shops. Date on drawings: 1943 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Stevens, Mr. and Mrs. W. W. |
|
|
|
|
County: Parker |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2923 Project name: Mr. and Mrs. W.W. Stevens
residence. Additions and alterations. Farm buildings. Date on drawings: 1943 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Stevens, Mr. and Mrs. W. W.,
estate |
|
|
|
|
County: Parker |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2199 Project name: Stewars store.
Remodeling. Date on drawings: 1929 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Stewars |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1558 Project name: Stonestreet and Davis store. New
store front on 8th St. and new mezzanine floor. Date on drawings: 1921 Primary archt/firm: Sanguinet and
Staats |
|
|
|
|
|
|
|
|
Client: Stonestreet and Davis |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1714? Project name: Stonestreet and Davis store.
Storefront. Remodeling. Date on drawings: 1924 Primary archt/firm: Sanguinet, Staats and
Hedrick |
|
|
|
|
|
|
|
|
Client: Stonestreet and Davis |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5055 Project name: Sudan I.S.D. Unidentified
elementary school and agricultural buildings. Date on drawings: 1956 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Sudan I.S.D. |
|
|
|
|
City: Sudan |
|
|
|
|
County: Lamb |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5285 Project name: Sudan I.S.D. Unidentified school.
Homemaking building. Date on drawings: 1957 Primary archt/firm: Hedrick and
Stanley |
|
|
|
|
|
|
|
|
Client: Sudan I.S.D. |
|
|
|
|
City: Sudan |
|
|
|
|
County: Lamb |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3933 Project name: Sulphur Springs I.S.D.
Unidentified junior high school. Additions and alterations. Date on drawings: 1950 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Sulphur Springs I.S.D. |
|
|
|
|
City: Sulphur Springs |
|
|
|
|
County: Hopkins |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3490 Project name: Sundown I.S.D. Unidentified
school. Gym and shop. Addition. Date on drawings: 1947 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Sundown I.S.D. |
|
|
|
|
City: Sundown |
|
|
|
|
County: Hockley |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2355 Project name: Superior Brewing Co.
building. Date on drawings: 1933 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Superior Brewing Co. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5817 Project name: Supreme Beef Co. building. Carcass
holding cooler. Addition. Date on drawings: 1960 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Supreme Beef Co. |
|
|
|
|
City: Lubbock |
|
|
|
|
County: Lubbock |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2538 Project name: Sweeny I.S.D. Unidentified school
building. Date on drawings: 1938 Primary archt/firm: Hedrick and
Lindsley |
|
|
|
|
|
|
|
|
Client: Sweeny I.S.D. |
|
|
|
|
City: Sweeny |
|
|
|
|
County: Brazoria |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5264 Project name: Sweetwater Hospital. Kitchen area.
Alterations and additions. Date on drawings: 1957 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Sweetwater Hospital |
|
|
|
|
City: Sweetwater |
|
|
|
|
County: Nolan |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5054 Project name: Sweetwater Municipal Hospital.
Electrical and air conditioning systems. Additions and alteration Date on drawings: 1956 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Sweetwater Municipal Hospital |
|
|
|
|
City: Sweetwater |
|
|
|
|
County: Nolan |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4922 Project name: Sweetwater Municipal Hospital.
Solaria. Addition. Date on drawings: 1956 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Sweetwater Municipal Hospital |
|
|
|
|
City: Sweetwater |
|
|
|
|
County: Nolan |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1617 Project name: Stephen F. Austin Hotel (Texas
Hotel). Primary archt/firm: Sanguinet, Staats, and
Hedrick? |
|
|
|
|
|
|
|
|
Client: T.B. Baker of Baker Hotels and City of
Austin (per bonds) |
|
|
|
|
Street address: Congress Avenue |
|
|
|
|
City: Austin |
|
|
|
|
County: Travis |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4125 Project name: Tarelton State College. Frey and
Yearwood Halls. Date on drawings: 1950 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Tarelton State College |
|
|
|
|
City: Stephenville |
|
|
|
|
County: Erath |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5842 Project name: Tarelton State College. Science
building. Repairs and rehabilitation. Date on drawings: 1960 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Tarelton State College |
|
|
|
|
City: Stephenville |
|
|
|
|
County: Erath |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project name: physical education department
dressing room and stands Date on drawings: 1950 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Tarleton State College |
|
|
|
|
City: Stephenville |
|
|
|
|
County: Erath |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project name: shop building dust collection
system Date on drawings: 1952 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Tarleton State College |
|
|
|
|
City: Stephenville |
|
|
|
|
County: Erath |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project name: Tarleton State College.
Agriculture building Date on drawings: 1950 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Tarleton State College |
|
|
|
|
City: Stephenville |
|
|
|
|
County: Erath |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4555 Project name: Tarleton State College.
Agriculture Building. Lecture room. Air conditioning equipment. Date on drawings: 1955 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Tarleton State College |
|
|
|
|
City: Stephenville |
|
|
|
|
County: Erath |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4553 Project name: Tarleton State College. Auditorium
building. New sound system. Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Tarleton State College |
|
|
|
|
City: Stephenville |
|
|
|
|
County: Erath |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4065 Project name: Tarleton State College. Electrical
distribution system. Addition. Date on drawings: 1950 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Tarleton State College |
|
|
|
|
City: Stephenville |
|
|
|
|
County: Erath |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5888 Project name: Tarleton State College. Home
economics building. Additions and alterations. Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Tarleton State College |
|
|
|
|
City: Stephenville |
|
|
|
|
County: Erath |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5511 Project name: Tarleton State College. New
boiler. Date on drawings: 1958 Primary archt/firm: Hedrick and
Stanley |
|
|
|
|
|
|
|
|
Client: Tarleton State College |
|
|
|
|
City: Stephenville |
|
|
|
|
County: Erath |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5510 Project name: Tarleton State College. Parking
lots. Date on drawings: 1958 Primary archt/firm: Hedrick and
Stanley |
|
|
|
|
|
|
|
|
Client: Tarleton State College |
|
|
|
|
City: Stephenville |
|
|
|
|
County: Erath |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4199A Project name: Tarleton State College. Physical
education department. Concrete grandstand. Date on drawings: 1952 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Tarleton State College |
|
|
|
|
City: Stephenville |
|
|
|
|
County: Erath |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5760 Project name: Tarleton State College.
President's residence. Repairs and rehabilitation. Date on drawings: 1960 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Tarleton State College |
|
|
|
|
City: Stephenville |
|
|
|
|
County: Erath |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5621 Project name: Tarleton State College. Repairs
and rehabilitation. Date on drawings: 1959 Primary archt/firm: Hedrick and
Stanley |
|
|
|
|
|
|
|
|
Client: Tarleton State College |
|
|
|
|
City: Stephenville |
|
|
|
|
County: Erath |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5761 Project name: Tarleton State College. Science
building. Repairs and rehabilitation. Date on drawings: 1960 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Tarleton State College |
|
|
|
|
City: Stephenville |
|
|
|
|
County: Erath |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 6319 Project name: Tarleton State College. South
entrance. Date on drawings: 1963 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Tarleton State College |
|
|
|
|
City: Stephenville |
|
|
|
|
County: Erath |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4768 Project name: Tarleton State College. Steam
plant rehabilitation. Date on drawings: 1955 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Tarleton State College |
|
|
|
|
City: Stephenville |
|
|
|
|
County: Erath |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5606 Project name: Tarleton State College. Streets
and parking. Date on drawings: 1959 Primary archt/firm: Hedrick and
Stanley |
|
|
|
|
|
|
|
|
Client: Tarleton State College |
|
|
|
|
City: Stephenville |
|
|
|
|
County: Erath |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4424 Project name: Tarleton State College. Telephone,
clock and bell distribution system. Date on drawings: 1952 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Tarleton State College |
|
|
|
|
City: Stephenville |
|
|
|
|
County: Erath |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3604 Project name: Tarrant County Courthouse.
Alterations. Date on drawings: 1947 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Tarrant County |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4133 Project name: Tarrant County Courthouse.
Electrical service and distribution system. Date on drawings: 1950 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Tarrant County |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3034 Project name: Tarrant County Courthouse.
Underground steam and water supply system. Date on drawings: 1944 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Tarrant County |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4302 Project name: Tarrant County Home for the Aged.
Additions and alterations. Date on drawings: 1951 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Tarrant County |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4066 Project name: Tarrant County Home of the Aged.
Additions and alterations. Date on drawings: 1950 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Tarrant County |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3747 Project name: Tarrant County Old Folk's
Home. Date on drawings: 1948 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Tarrant County |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project name: Home for boys Date on drawings: 1957 Primary archt/firm: Hedrick &
Stanley |
|
|
|
|
|
|
|
|
Client: Tarrant County Youth Center. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4854 Project name: Telephone Exchange
Building. Date on drawings: 1942 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Telephone Exchange Building |
|
|
|
|
City: Perryton |
|
|
|
|
County: Ochiltree |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project name: Crestview school. Additions and
alterations. Date on drawings: 1955 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Temple I.S.D. |
|
|
|
|
City: Temple |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project name: Dunbar Junior High School.
Addition. Date on drawings: 1955 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Temple I.S.D. |
|
|
|
|
City: Temple |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project name: North and South (Lamar and Travis)
Jr. High School. Date on drawings: 1955 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Temple I.S.D. |
|
|
|
|
City: Temple |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1496 Project name: Temple Lodge #4 A.F. and
A.M. Primary archt/firm: Sanguinet, Staats and
Gottlieb |
|
|
|
|
|
|
|
|
Client: Temple Lodge #4 A.F. and A.M. |
|
|
|
|
Street address: Northwest Corner Fannin St and
Bremond Ave |
|
|
|
|
City: Houston |
|
|
|
|
County: Harris |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2239 Project name: Western State Hospital
Building. Date on drawings: 1930 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Tennessee, State of |
|
|
|
|
City: Bolivar |
|
|
|
|
State/Province: Tenn. |
|
|
|
|
Country: U.S. |
|
|
|
Project name: clinic building Date on drawings: 1945 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Terrell, C. O., Dr. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project name: new Mexican school, gymnasium
addition, etc. Date on drawings: 1938 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Terrell County Com. School
District |
|
|
|
|
City: Sanderson |
|
|
|
|
County: Terrell |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project name: new Mexican school, gymnasium
addition, etc. Date on drawings: 1939 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Terrell County Com. School
District |
|
|
|
|
City: Sanderson |
|
|
|
|
County: Terrell |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1982 Project name: Terrell State
Hospital. Date on drawings: 1927 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Terrell State Hospital |
|
|
|
|
City: Terrell |
|
|
|
|
County: Kaufman |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project name: City of Texarkana sewage treatment
plant. Date on drawings: 1947 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Texarkana, City of |
|
|
|
|
City: Texarkana |
|
|
|
|
State/Province: Ark. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3445B Project name: Sewage collection system
(Texarkana, Tex.). Extensions. Date on drawings: 1947 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Texarkana, City of |
|
|
|
|
City: Texarkana |
|
|
|
|
County: Bowie |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3445B Project name: Sewage collection system
(Texarkana, Tex.). Extensions. Date on drawings: 1948 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Texarkana, City of |
|
|
|
|
City: Texarkana |
|
|
|
|
County: Bowie |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3445 Project name: Sewage treatment system
(Texarkana, Tex.). Date on drawings: 1949 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Texarkana, City of |
|
|
|
|
City: Texarkana |
|
|
|
|
County: Bowie |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project name: Dunbar High School Date on drawings: 1952 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Texarkana I.S.D. |
|
|
|
|
City: Texarkana |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project name: gymnasium Date on drawings: 1952 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Texarkana I.S.D. |
|
|
|
|
City: Texarkana |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4653 Project name: Texarkana I.S.D. Texarkana Junoir
High School. Alteration. Date on drawings: 1954 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Texarkana I.S.D. |
|
|
|
|
City: Texarkana |
|
|
|
|
County: Bowie |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3534 Project name: Texarkana Municipal
Airport. Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Texarkana Municipal Airport |
|
|
|
|
City: Texarkana |
|
|
|
|
State/Province: Ark. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3445A Project name: Cities of Texarkana, Tex. and
Texarkana, Ark. sewage collection system. Extensions plans. Date on drawings: 1947 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Texarkana, Tex. and Texarkana, Ark.,
Cities of |
|
|
|
|
City: Texarkana |
|
|
|
|
County: Bowie (Tex.) |
|
|
|
|
State/Province: Tex. and Ark. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3445A Project name: Cities of Texarkana, Tex. and
Texarkana, Ark. sewage collection system. Extensions plans. Date on drawings: 1948 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Texarkana, Tex. and Texarkana, Ark.,
Cities of |
|
|
|
|
City: Texarkana |
|
|
|
|
County: Bowie (Tex.) |
|
|
|
|
State/Province: Tex. and Ark. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4763 Project name: Texas and Pacific Railway Co. Fort
Worth Freight Office. Alterations and air conditioning. Date on drawings: 1955 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Texas and Pacific Railway Co. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4607 Project name: Texas and Pacific Railway Co.
warehouse and office building. Date on drawings: 1954 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Texas and Pacific Railway Co. |
|
|
|
|
City: Dallas |
|
|
|
|
County: Dallas |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4202/42 Project name: Texas and Pacific Railway Co.
warehouse and office building. Date on drawings: 1951 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Texas and Pacific Railway Co. |
|
|
|
|
City: Dallas |
|
|
|
|
County: Dallas |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4205 Project name: Texas & Pacific Railway Co.
warehouse and office building. Date on drawings: 1951 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Texas and Pacific Railway Co. |
|
|
|
|
City: Dallas |
|
|
|
|
County: Dallas |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project name: educational and sanctuary
building Date on drawings: 1954 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Texas Ave. Baptist Church |
|
|
|
|
City: Longview |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2733 Project name: Texas Childrens Home and Aid
Society building. Date on drawings: 1940 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Texas Childrens Home and Aid
Society |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2790 Project name: Texas Christian University.
Central power house and distribution system. Date on drawings: 1941 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Texas Christian University |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2668 Project name: Texas Christian University. Girls'
residence. Date on drawings: 1939 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Texas Christian University |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2668 Project name: Texas Christian University. Girls'
residence Date on drawings: 1940 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Texas Christian University |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2668 Project name: Texas Christian University. Girls'
residence Date on drawings: 1941 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Texas Christian University |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3813 Project name: Texas Christian University.
Library. Remodeling. Primary archt/firm: Hedrick Collaborators: Pelich and Geren,
assoc. |
|
|
|
|
|
|
|
|
Client: Texas Christian University |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2940 Project name: Texas Christian University. Naval
subsistence building. Date on drawings: 1943 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Texas Christian University |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2565 Project name: Texas Christian University.
Stadium. Additions and alterations. Date on drawings: 1938 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Texas Christian University |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3378 Project name: Texas Christian University. Water
and sewer system. Date on drawings: 1946 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Texas Christian University |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project name: Radio station. Date on drawings: 1946 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Texas Dept Public Safety |
|
|
|
|
City: Arlington |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2273 Project name: Texas Electrical Service Co.
building. Date on drawings: 1930 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Texas Electrical Service Co. |
|
|
|
|
City: Big Spring |
|
|
|
|
County: Howard |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project name: district headquarters
buildings Date on drawings: 1957 Primary archt/firm: Hedrick, Stanley &
Morey |
|
|
|
|
|
|
|
|
Client: Texas Highway Dept. |
|
|
|
|
City: Paris |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project name: Camp Mabry motor transport
building. Date on drawings: 1941 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Texas National Guard |
|
|
|
|
City: Austin |
|
|
|
|
County: Travis |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project name: Camp Mabry. Motor transport
building. Date on drawings: 1941 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Texas National Guard |
|
|
|
|
City: Austin |
|
|
|
|
County: Travis |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project name: One unit armory Date on drawings: 1957 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Texas National Guard |
|
|
|
|
City: Weatherford |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project name: One unit armory Date on drawings: 1958 Primary archt/firm: Hedrick &
Stanley |
|
|
|
|
|
|
|
|
Client: Texas National Guard |
|
|
|
|
City: Weatherford |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4616 Project name: Texas National Guard. 3 Unit
Armory and 3 Headquarters #1 Medical detachment. Date on drawings: 1955 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Texas National Guard |
|
|
|
|
Street address: Seminary Hill |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4561 Project name: Texas National Guard. 5 Unit
Armory modification of National Guard Board Type K Armory. Date on drawings: 1956 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Texas National Guard |
|
|
|
|
Street address: Cobb Park |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4477 Project name: Texas National Guard building.
Proposed. Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Texas National Guard |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4536 Project name: Texas National Guard five unit
armory. Modification of N.G.B. Type "r". Date on drawings: 1953 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Texas National Guard |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2559 Project name: Texas National Guard Armory Board.
Armory building. Date on drawings: 1942 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Texas National Guard Armory
Board |
|
|
|
|
City: Mexia |
|
|
|
|
County: Limestone |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3660 Project name: Texas National Guard B 49th
Armoured division buildings 57A and 57B. Apartment conversions. Date on drawings: 1948 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Texas National Guard B 49th Armoured
division |
|
|
|
|
Country: U.S. |
|
|
|
Project name: Office building Date on drawings: 1930 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Texas Pacific Coal & Oil
Co. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project name: Office building Date on drawings: 1951 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Texas Pacific Coal & Oil
Co. |
|
|
|
|
City: Midland |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project name: Texas Pacific Coal & Oil Co.
filling station #1. Date on drawings: 1927 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Texas Pacific Coal & Oil
Co. |
|
|
|
|
Street address: Camp Bowie Blvd. and West 7th
St. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project name: Dining car comm. cold storage
additions and alterations Date on drawings: 1954 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Texas & Pacific Railway Co. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5135 Project name: Employee's hospital.
Alterations. Date on drawings: 1958 Primary archt/firm: Hedrick &
Stanley |
|
|
|
|
|
|
|
|
Client: Texas & Pacific Railway Co. |
|
|
|
|
City: Marshall |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3899 Project name: Texas & Pacific Railway Co.
freight station. Date on drawings: 1949 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Texas & Pacific Railway Co. |
|
|
|
|
City: Longview |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3606 Project name: Texas & Pacific Railway Co.
freight terminal. Date on drawings: 1948 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Texas & Pacific Railway Co. |
|
|
|
|
City: Dallas |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3697 Project name: Texas & Pacific Railway Co.
garage building. Date on drawings: 1948 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Texas & Pacific Railway Co. |
|
|
|
|
City: Dallas |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3729 Project name: Texas & Pacific Railway Co.
passenger station. Date on drawings: 1948 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Texas & Pacific Railway Co. |
|
|
|
|
City: Midland |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3300 Project name: Texas & Pacific Railway Co.
refrigeration plant and storage warehouse. Date on drawings: 1948 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Texas & Pacific Railway Co. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project name: Office Warehouse &
Manufacturing building. Date on drawings: 1952 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Texas Power & Light Co. |
|
|
|
|
City: Sandon |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project name: Lake-O-the Pines. Waterfront
development. Date on drawings: 1961 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Texas Properties Inc. |
|
|
|
|
City: Jefferson |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1415 Project name: Texas State Bank (Fort Worth,
Tex.). Additions and alterations. Date on drawings: 1918 Primary archt/firm: Sanguinet and
Staats |
|
|
|
|
|
|
|
|
Client: Texas State Bank |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project name: Pattern Shop & Storage
building Date on drawings: 1940-1941 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Texas Steel Co. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3739 Project name: Texas Technological College.
Chemistry building. Freight elevator. Date on drawings: 1948 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Texas Technological College |
|
|
|
|
City: Lubbock |
|
|
|
|
County: Lubbock |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2401 Project name: Texas Technological College. Dairy
manufacturing building. Date on drawings: 1935 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Texas Technological College |
|
|
|
|
City: Lubbock |
|
|
|
|
County: Lubbock |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1857 Project name: Texas Technological College.
Machine shops. Date on drawings: 1926 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Texas Technological College |
|
|
|
|
City: Lubbock |
|
|
|
|
County: Lubbock |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2400 Project name: Texas Technological College.
Stadium. Date on drawings: 1935 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Texas Technological College |
|
|
|
|
City: Lubbock |
|
|
|
|
County: Lubbock |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1836 Project name: Texas Technological College.
Textile and Engineering building. Addition. Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Texas Technological College |
|
|
|
|
City: Lubbock |
|
|
|
|
County: Lubbock |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2060 Project name: Texas Technological College.
Tunnel system. Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Texas Technological College |
|
|
|
|
City: Lubbock |
|
|
|
|
County: Lubbock |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4934 Project name: Texas Vitrified Pipe Corp. office
building. Addition. Date on drawings: 1956 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Texas Vitrified Pipe Corp. |
|
|
|
|
City: Mineral Wells |
|
|
|
|
County: Palo Pinto |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project name: Safeway Store building Date on drawings: 1937 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Texas Wesleyan College |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 6147 Project name: Texas Wesleyan College.
Administration building. Alterations. Date on drawings: 1963 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Texas Wesleyan College |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5628 Project name: Texas Wesleyan College. Steam
boiler and water heater installation. Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Texas Wesleyan College |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1832 Project name: Texas Women's College. Auditorium.
Addition and alteration. Date on drawings: 1925 |
|
|
|
|
|
|
|
|
Client: Texas Women's College |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1312 Project name: Texas Women's College. Dormitory
building. Date on drawings: 1917 Primary archt/firm: Sanguinet and
Staats |
|
|
|
|
|
|
|
|
Client: Texas Women's College |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1624 Project name: Texas Women's College. Fine Arts
Building. Date on drawings: 1922 Primary archt/firm: Sanguinet, Staats and
Hedrick |
|
|
|
|
|
|
|
|
Client: Texas Women's College |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1624 Project name: Texas Women's College. Fine Arts
Building. Date on drawings: 1923 Primary archt/firm: Sanguinet, Staats and
Hedrick |
|
|
|
|
|
|
|
|
Client: Texas Women's College |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: ?1072 Project name: Texas Women's College. Swimming
pool. Date on drawings: 1923 Primary archt/firm: Sanguinet, Staats, Hedrick
and Gottlieb |
|
|
|
|
|
|
|
|
Client: Texas Women's College |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 743-11 Project name: Texasteer Manufacturing Co.
women's bathhouse. Date on drawings: 1942 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Texasteer Manufacturing Co. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project name: Mr. and Mrs. Pat Thomas
residence. Date on drawings: 1953 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Thomas, Mr. and Mrs. Pat |
|
|
|
|
City: Fort Scott |
|
|
|
|
State/Province: Kan. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1566 Project name: W.J. Thrasher
residence. Date on drawings: 1921 Primary archt/firm: Sanguinet &
Staats |
|
|
|
|
|
|
|
|
Client: Thrasher, W. J. |
|
|
|
|
City: Waco |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project name: Building alterations Date on drawings: 1922 Primary archt/firm: Sanguinet &
Staats |
|
|
|
|
|
|
|
|
Client: Tillar, B. J. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project name: Mr. Ben J. Tillar
mausoleum. Date on drawings: 1922 Primary archt/firm: Sanguinet and
Staats |
|
|
|
|
|
|
|
|
Client: Tillar, Mr. Ben J. |
|
|
|
|
City: Little Rock |
|
|
|
|
State/Province: Ark. |
|
|
|
|
Country: U.S. |
|
|
|
Project name: Mr. Ben J. Tillar store
building. Date on drawings: 1929 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Tillar, Mr. Ben J. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4208 Project name: Titus County Memorial
Hospital. Date on drawings: 1952 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Titus County Memorial Hospital |
|
|
|
|
City: Mount Pleasant |
|
|
|
|
County: Titus |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project name: Office building Date on drawings: 1948 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Tracy-Barton and Graves, Dr. |
|
|
|
|
City: Kermit |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project name: Office building Date on drawings: 1918 Primary archt/firm: Sanguinet &
Staats |
|
|
|
|
|
|
|
|
Client: Traders Oil Mill Co. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1521 Project name: Traders State Bank bank and office
building. Date on drawings: 1920 Primary archt/firm: Sanguinet &
Staats |
|
|
|
|
|
|
|
|
Client: Traders State Bank |
|
|
|
|
City: Cleburne |
|
|
|
|
County: Johnson |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project name: Office & display
building Date on drawings: 1940 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Tri-County Electrical Coop |
|
|
|
|
City: Azle |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project name: Dr. Ross Trigg
residence. Date on drawings: 1937 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Trigg, Ross, Dr. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2317 Project name: Trinity Bond Investment Corp.
& Trinity Reserve Life Insurance Co. building. Date on drawings: 1932 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Trinity Bond Investment Corp. &
Trinity Reserve Life Insurance Co. |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project name: Church and educational
building Date on drawings: 1955 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Trinity Methodist Church |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5532 Project name: Trinity Methodist Church (Fort
Worth, Tex.). Sanctuary. Date on drawings: 1958 Primary archt/firm: Hedrick and
Stanley |
|
|
|
|
|
|
|
|
Client: Trinity Methodist Church |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4075 Project name: Trinity Portland Cement Co. power
house. Repairs and reconstruction. Date on drawings: 1949 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Trinity Portland Cement Co. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3146 Project name: School building (Truscott, Tex.).
Rebuilding. Date on drawings: 1945 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Truscott, City of |
|
|
|
|
City: Truscott |
|
|
|
|
County: Knox |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1915 Project name: Unidentified automobile
building. Date on drawings: 1926 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Unidentified automobile
building |
|
|
|
|
Street address: 7th and Lexington Sts |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 5577 Project name: Unidentified building
(Stephenville, Tex.). Alterations and additions. Date on drawings: 1959 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Unidentified building (Stephenville,
Tex.) |
|
|
|
|
City: Stephenville |
|
|
|
|
County: Erath |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2260 Project name: Unidentified depot (Dalhart,
Tex.). Additions and alterations. Date on drawings: 1930 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Unidentified depot (Dalhart,
Tex.) |
|
|
|
|
City: Dalhart |
|
|
|
|
County: Dallam |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1826 Project name: Unidentified hotel (Beaumont,
Tex.). Proposed. Date on drawings: 1920 Primary archt/firm: Hedrick and
Gottlieb |
|
|
|
|
|
|
|
|
Client: Unidentified hotel (Beaumont,
Tex.) |
|
|
|
|
City: Beaumont |
|
|
|
|
County: Jefferson |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3050 Project name: Unidentified hotel (Texline,
Tex.). Addition. Date on drawings: 1944 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Unidentified hotel (Texline,
Tex.) |
|
|
|
|
City: Texline |
|
|
|
|
County: Dallam |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2429 Project name: Unidentified
mausoleum. Date on drawings: 1938 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Unidentified mausoleum |
|
|
|
|
Country: U.S. |
|
|
|
Project number: Misc. Project name: Unidentified misc.
surveys. Date on drawings: 1946 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Unidentified misc. surveys |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3532 Project name: Unidentified office building (San
Angelo, Tex.). Date on drawings: 1948 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Unidentified office building (San Angelo,
Tex.) |
|
|
|
|
City: San Angelo |
|
|
|
|
County: Tom Green |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2018 Project name: Unidentified one story Automobile
Sales and Service building (Houston, Tex.). Date on drawings: 1928 Primary archt/firm: Hedrick and
Gottlieb |
|
|
|
|
|
|
|
|
Client: Unidentified one story Automobile Sales
and Service building (Houston, Tex.) |
|
|
|
|
City: Houston |
|
|
|
|
County: Harris |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2729 Project name: Unidentified power
plant. Date on drawings: 1940 Primary archt/firm: Wyatt C.
Hedrick |
|
|
|
|
|
|
|
|
Client: Unidentified power plant |
|
|
|
|
Country: U.S. |
|
|
|
Project name: Unidentified powerhouse (Amarillo,
Tex.). Repairs. Date on drawings: 1943-1944 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Unidentified powerhouse (Amarillo,
Tex.) |
|
|
|
|
City: Amarillo |
|
|
|
|
County: Potter |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4473 Project name: Unidentified private membership
club (Fort Worth, Tex.). Date on drawings: 1953 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Unidentified private membership club (Fort
Worth, Tex.) |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2716 Project name: Unidentified radio station.
Broadcasting studio. Remodeling. Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Unidentified radio station |
|
|
|
|
City: Fort Worth? |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project name: Unidentified railroad depot
(1932). Date on drawings: 1932 Primary archt/firm: Hedrick,
Inc. |
|
|
|
|
|
|
|
|
Client: Unidentified railroad |
|
|
|
|
Street address: Wellington and Shamrock |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3335 Project name: Unidentified railroad freight
terminal and office building (Fort Worth, Tex.). Date on drawings: 1946 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Unidentified railroad |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2196 Project name: Unidentified railroad depot
(Sterley, Tex.). Additions and alterations. Date on drawings: 1929 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Unidentified railroad (Sterley,
Tex.) |
|
|
|
|
City: Sterley |
|
|
|
|
County: Flody |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2124 Project name: Unidentified residence.
Plans. Date on drawings: 1928 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Unidentified residence |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2129 Project name: Unidentified residence.
Plans. Date on drawings: 1929 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Unidentified residence |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4149 Project name: Unidentified Sales and Service
building (Muenster, Tex.). Date on drawings: 1950 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Unidentified Sales and Service building
(Muenster, Tex.) |
|
|
|
|
City: Muenster |
|
|
|
|
County: Cooke |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3133 Project name: Unidentified shop building
(Childress, Tex.). Remodeling and repair. Date on drawings: 1945 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Unidentified shop building (Childress,
Tex.) |
|
|
|
|
City: Childress |
|
|
|
|
County: Childress |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2537 Project name: Unidentified store and office
building (Odessa, Tex.). Date on drawings: 1938 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Unidentified store and office building
(Odessa, Tex.) |
|
|
|
|
City: Odessa |
|
|
|
|
County: Ector |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project name: Unidentified Street
extensions. Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Unidentified Street extensions |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 4520 Project name: Unidentified warehouse (Fort
Worth, Tex.). Cold storage Date on drawings: 1953 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Unidentified warehouse (Fort Worth,
Tex.) |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 1823 Project name: Union Transfer Company garage
building. Date on drawings: 1926 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Union Transfer Company |
|
|
|
|
City: Fort Worth |
|
|
|
|
County: Tarrant |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project name: Office building additions and
alterations Date on drawings: 1960 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: United Fidelity Life Insurance |
|
|
|
|
City: Dallas |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project name: Project Pecos, Tex
41556-7 Date on drawings: 1943 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: United States Federal Public Housing
Authority |
|
|
|
|
City: Pecos |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 2952 Project name: United States Federal Public
Housing Authority war housing project. Date on drawings: 1943 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: United States Federal Public Housing
Authority |
|
|
|
|
City: Pecos |
|
|
|
|
County: Reeves |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project name: United States Naval Air Station.
Public works maintenance & transportation building. Prelimina Date on drawings: 1958 Primary archt/firm: Hedrick, Stanley &
Morey |
|
|
|
|
|
|
|
|
Client: United States Naval Air Station |
|
|
|
|
City: Dallas |
|
|
|
|
State/Province: Tex. |
|
|
|
|
Country: U.S. |
|
|
|
Project number: 3167 Project name: Urbandale Church of Christ
(Dallas, Tex.). Date on drawings: 1945 Primary archt/firm: Hedrick |
|
|
|
|
|
|
|
|
Client: Urbandale Church of Christ |
|
|
|
|
|