Texas Archival Resources Online

TABLE OF CONTENTS


Descriptive Summary

Biographical Sketch

Scope and Content

Organization

Restrictions

Index Terms

Related Material

Administrative Information

Description of Series

Manuscripts

Southwest Collection/Special Collections Library, Texas Tech University

Physical Plant:

An Inventory of Its Records, 1947-2010, at the Southwest Collection/Special Collections Library



Descriptive Summary

Creator Texas Tech University
Title: Physical Plant,
Dates: 1947-2010
Abstract: The collection contains records of the Physical Plant at Texas Tech University dating from 1947-2010.
Collection # U 294.3
Quantity: 55 boxes (55.0 linear feet)
Language English
Repository: Southwest Collection/Special Collections Library, Texas Tech University

Biographical Sketch

The Physical Plant consists of many departments, shops, and employees who are dedicated to insuring that Texas Tech has the resources it needs to maintain all buildings and functions, runs efficiently, and looks good for the community, students, faculty, and staff. They are responsible for the maintenance and repair of education and general building structural, mechanical, utility and electrical infrastructure.

Return to the Table of Contents


Scope and Content

This 55 box collection is consists of project and renovation files from the Texas Tech Physical Plant, which has digitized the files before sending the boxes to the University Archives.

Return to the Table of Contents


 

Organization

The files were kept in the original order established by the Physical Plant.

Return to the Table of Contents


Restrictions

Access Restrictions

Open for research

Return to the Table of Contents


Index Terms

The subject headings used by the Southwest Collection/Special Collections Library are derived from the Library of Congress and/or locally developed.
Subjects (Organizations)
Texas Tech University--Buildings
Texas Tech University--Buildings--Design and construction
Texas Tech University--Buildings--Designs and plans
Texas Tech University--Buildings, structures, etc.
Subjects (Places)
Lubbock (Tex.)
Subjects
Architecture--Texas--Lubbock
Campus planning--Texas--Lubbock
College buildings--Texas--Lubbock
College facilities--Texas--Lubbock--Planning
Public buildings--Design

Return to the Table of Contents


Related Material

Physical Plant Records, 1994-2004, Southwest Collection/Special Collections Library, Texas Tech University, Lubbock, Texas.

Physical Plant Records, 1937-2008, Southwest Collection/Special Collections Library, Texas Tech University, Lubbock, Texas.

Return to the Table of Contents


Administrative Information

Preferred Citation

Physical Plant, 1947-2010, Southwest Collection/Special Collections Library, Texas Tech University, Lubbock, Texas

Acquisition

Collection accession #(s):
?

Donated, ?

Processed by

Conner Davis, July 2011

Return to the Table of Contents


Collection Inventory

 

Manuscripts

box folder
1 1 Meat Laboratory Kitchen Ventilation Air Distribution Submittal, 1998
2 Meat Laboratory Kitchen Ventilation Electrical Submittal, 1998
3 Meat Labs Kitchen Ventilation Final Inspection Punch List: Exhaust Hood Problems, 1998
4 Fire Alarm Submittal, 1998
5 Meat Laboratory Kitchen Ventilation Hood Fire Protection Submittal, 1998
6 Meat Laboratory Kitchen Ventilation Insulation Submittal, 1998
7 Meat Laboratory Kitchen Ventilation Mechanical Submittal, 1998
8 Meat Lab Kitchen Renovation, 1998
9 Meat Laboratory Kitchen Ventilation Tab Report, 1997
10 Livestock Arena: Closeout Docs, 1997
11 Meat Lab Renovation: Electrical Submittal, 1987
12 Meat Lab Equipment Specifications, 1988
13 Meat Lab Renovation: Freezer and Cooler monitoring System, 1988
14 High Pressure Washer Meat Lab: Animal Sciences, 1988
15 Livestock Arena Mechanical Operation Manual, 1989
16 Meat Lab Renovation: HVAC ID/Thermometers/Shower Heads/Flex Connectors, 1988
17 Meats Lab Renovation Submittal, 1987
18 Meat Lab Renovation Proposed Lighting Layout, 1988
19 Meat Lab Renovation Roof Top Units #5 and #6 (York), 1988
20 Meat Lab Renovation Fire Alarm System/Sound System, 1987
21 Meat Lab Renovation Sound Equipment/Fire Alarm Equipment, 1988
22 Meat Lab Renovation Temperature Controls (Johnson), 1987
23 Meat Lab Renovation Thermostat Operating Manual: Operating/Maintenance Manuals, 1989
24 Meat Lab Renovation Pip hangers/Valves, 1988
25 Livestock Arena: Reconstruction Electrical Submittal, 1985
26 Livestock Arena: Fire Alarm, 1985
27 Livestock Arena Fire Alarm: Comments on Plans and Specifications, 1984
28 Livestock Arena: Reconstruction Hardware Submittal, 1984
29 Livestock Arena: Reconstruction 83, 1984
30 Livestock Arena Mechanical Submittal, 1984
31 Livestock Arena Reconstruction Miscellaneous Initial Documents, 1984
32 Livestock Arena Notice to Proceed , 1984
33 Livestock Arena: Sound System, 1984
34 Chain Hoists (Lodestar), 1961
35 Meat Labs Mechanical: Submittal Data, 1960
36 Meat Lab: Refrigeration Equipment (Hermatic Chiller moved to T.V. Station) (Carrier Unit), 1962
37 Meat Lab: Temperature Controls (Honeywell), 1960
38 Meats Lab Comments: Revised Drawings, 1987
39 Meat Labs Correspondence: De-Hairing Machine, 1989
40 Agriculture Pavilion Electrical Submittal, 1977
41 New Meats Lab: Refrigeration Equipment, 1990
42 Meat Labs: Tube Bundle (ADSCO), 1969
43 Water Cooler M-1 Building, 1959
44 Sewer Lift Station #1 Line to West: North 4th & Indiana, 1961-1963
45 Sewer Lift Station #1: 4th & Indiana, 1962-1963
46 Sewer Lift Station: Generator (Onan), 1973
47 Instructions Manual and Parts Catalog: Onan Electric Generating Plants, undated
48 Sump Pumps: Autocon Controls Sewage Lift Station: 4th & Indiana, 1973
49 Electrical Controls (New) Sewer Lift Station #1, 1974
50 Valve (Dresser Butterfly) Misson DUO-CK. TTUSM: Storm Sewer Lift Station, 1974
51 Air Pressure Regulators (Speedaire) TTUSM: Sewer Lift Station, 1975
52 Sewage Lift Station: Piping Modifications, 1978
53 Electrical/Mechanical Submittals: 4th Street North Lift Station Renovation, 1988
54 Pump Controls/Flow Meters 4th Street Lift Station, 1988
55 Dialer Alarm Monitor (Capital) Sewer Lift Station, 1989
56 Operating Manual (BM-1150) 4th Street North Sewer Lift Station, 1989
57 Infrastructure, 2007
58 Womens Gym Addition: Temperature Controls Barber Colman, 1961
59 Womens Gym Basement: Ventilating System, 1961
60 Basketball Scoreboard: Womens Gym Nissen Scoremaster, 1969
61 Womens Gym Air Conditioning System Thermol: Moved from Student Union Building, 1957
62 Womens Gym Temperature Controls Honeywell, 1963
63 Womens Gym Water Conditioning Treatment L.A. Water Conditioning Company, 1959
64 Womens Gym Gas Heaters Space Ray, 1961
65 Womens Gym Plumbing Fixtures, 1960
66 Tennis Court Lighting: Zenith, 1965
67 Womens Gym Water Softener (Moved from Bookstore) Bruner, 1964
box folder
2 1 04-03483 RM.79, 2004
2 Holden Hall Coil Replacement, 1999
3 Holden Hall Coil Replacement: 120302CR, 1999
4 Holden Hall Lecture Hall Ph II: Johnson Controls, 1995
5 Holden Hall Lecture Hall Air Handlers: Mechanical, 1995
6 Holden Hall Lecture Hall: Test, Adjust & Balance Report, 1996
7 Holden Hall Phase II: TAB Specs, 1995
8 Holden Hall: Air Balance Report Social Science Addition, 1977
9 Holden Hall: Social Science Add-Air Balance Report, 1977
10 Holden Hall: Air Handler Submittal (Temptrol) Social Science Addition, 1974
11 Holden Hall Social Science/Addition: Air Measuring Devices Cambridge Filter, 1974
12 Social Science/Addition to Holden Hall: Clock & Fire Alarm System, 1974
13 Social Science/Addition to Holden Hall: Color Code Wiring (Bill Tarver Electrical), 1976
14 Social Science/Addition to Holden Hall: Distribution Panels, Switchgear/Bus Duct, 1975
15 Holden Hall Social Science Addition: Electrical Submittal, 1974
16 Social Science Addition to Holden Hall: Convertor & Expansion Tank, 1974
17 Social Science Addition Holden Hall: Emergency Generators (Ford), 1976
18 Social Science/Addition to Holden Hall: Generator (Emergency) Onan, 1976gf
19 Unnamed: MD-30 Holden Hall Controls, 1974
20 Social Science/Holden Hall: Lantern Posts (Courtyard) HADCO, undated
21 Social Science/Addition to Holden Hall: Dimming Equipment (Hub Electric) Operating Instructions, 1976
22 Social Science/Addition to Holden Hall: Lighting Fixtures, 1976
23 Social Science/Holden Hall: Loudspeakers, Microphones, Amplifiers (Tarver Electric), undated
24 Mechanical Submittal Literatures & Operation Instructions Holden Hall Texas Tech #4 O.W. Chisum & Company, 1976
25 Mechanical Submittal Literatures Holden Hall Texas Tech #6 O.W. Chisum & Company, 1974
26 Social Science Addition to Holden Hall: Pool Fitting (Decorative), 1974
27 Social Science Addition to Holden Hall: Pumps (Hot Water/Chilled Water), 1975
28 Social Science/Addition to Holden Hall: Sound System, 1975
29 Social Science Addition to Holden Hall: Air Balance Tab Specifications, 1975
30 Social Science/Addition to Holden Hall: Transformers (Dry-Tape Square "D"), 1975
31 Old Museum: Chilled Water Coils, 1969
32 Social Science: Temperature Controls (A/C Units 1-4) Johnson Controls, 1970
33 Holden Hall Heat-X 'PS' Pressure Stabilizers, undated
34 Social Science Pumps: Heating/Cooling Aurora, 1970
35 Social Science: Temperature Controls Johnson Service (Stack Rooms/ARMS Room), undated
36 Museum (Revision 1968) Shop Drawings Buffalo Fans-Curves, Dunham Bush Pumps (Condensate-Duplex), Trane Traps: American Air Filters, 1968
37 Holden Hall 1/3 Octave 4400 Graphic Equalizer, undated
38 Social Science ROTC Arms Room Alarm System (Honeywell), 1966
39 Holden Hall Stair Hand Rails: De Wees-Liver Bronze Company, 1972
box folder
3 1 Goddard Range & Wildlife: Interior Painting Paint Specs, 2000
2 Goddard Range & Wildlife Basement Automatic Sprinkler Drawings, 1979
3 Goddard Range & Wildlife Basement: Electrical Submittal, 1979
4 Goddard Range & Wildlife 1979 Renovation: Operation & Maintenance, 1979
5 Goddard Range & Wildlife: Air Filters (Continental), 1974
6 Goddard Range & Wildlife: Clock/Fire Alarm Operation (Simplex), 1974
7 Goddard Range & Wildlife: Electrical Submittal, 1974
8 Goddard Range & Wildlife: Fire Hose Cabinets W. D. Allen, 1974
9 Goddard Range & Wildlife: Mechanical Submittal, 1974
10 Goddard Range & Wildlife Fire Hangers, 1974
11 Goddard Range & Wildlife Plumbing Submittal, 1974
12 Goddard Range & Wildlife Stills, 1975
13 Goddard Range & Wildlife Transmittals, 1974
14 Valves: Domestic Water-Air/Vacuum/Gas, Distilled Water-Chilled Water, Steam/Condensate/High Pressure, 1974
15 Chemical Engineering 07-06150 Room 3 Wood Cabinets & Paint, 2007
16 Chemical Engineering Temp Lab: Exhaust for Fume Hood Operation & Maintenance Information, 2005
17 Chemical Engineering 04-03293 Fume Hood Lab B-1, undated
18 Chemical Engineering Temp Lab Construct Metal Building Casework, undated
19 Chemical Engineering Temp Lab Contruct Metal Building Electrical Submittals, 2003
20 Chemical Engineering Temp Lab Construct Metal Building Fume Hood Submittal, undated
21 Chemical Engineering Temp Lab Construct Metal Building Furnace Submittal, undated
22 Chemical Engineering Temp Lab Construct Metal Building Metal Building, 2003
23 Chemical Engineering Temp Lab Construct Metal Building Water Heater, undated
24 Chemical Engineering Basement Lab Renovation Doors & Finish Hardware, 2002
25 Chemical Engineering Basement Lab Renovation Electrical Operation & Maintenance, 2002
26 Chemical Engineering Basement Lab Renovation Fire Alarm Operation & Maintenance, undated
27 Chemical Engineering Basement Lab Renovation Mechanical Operation & Maintenance, undated
28 Chemical Engineering Basement Lab Renovation Plumbing Operation & Maintenance, undated
29 Chemical Engineering Basement Lab Renovation Plumbing Submittal, 2002
30 Chemical Engineering Air Handlers (Trane), 1962
31 Chemical Engineering Fume Hoods Airflow, 1962
32 Chemical Engineering Mechanical Room, 1974
33 Chemical Engineering TAB Report, 1986
34 Chemical Engineering Temperature Control Powers, 1961
35 Plant Science Reroof, 2001
36 Plant Science Buffalo Forge Stangel-Murdough/Hulen-Clement: Air Conditioning/Heating/Belts/Bearings, 1960
37 Agriculture Plant Science Chemical Pumps Betz, 1960
38 Plant Science Convertor (Two-pass type) Davis Eng., undated
39 Plant Science Building Drains: (Floor/Roof/Etc) Josam MFG., undated
40 Plant Science Fans: (Exhaust) Penn Domex, undated
41 Plant Science Air Distribution: Grills: Diffusers: Mixing Boxes Welco Sales, 1960
42 Plant Science Generators (Hot Water) Watts Expansion Tanks: Pipe Line Installation, undated
43 Plant Science Generator (Hot Water) Control Valves: Tube Bundle, 1960
44 Agriculture Plant Science Originals Miscellaneous Bundles (14 blueprints), 1960
45 Plant Science Building Plumbing Specifications: Crane, 1960
46 Plant Science Pumps: Condensate-Circulating: Aurora (Also Pump Curves), 1957
47 Plant Science Building Pumps (Sump) Chicago Duplex LB2-7-75, 1960
48 Agriculture Plant Science Originals Temperature Controls, 1960
49 Plant Science Thermometers: Hot Water Generating Palmer, 1960
50 Plant Science Traps (Steam) Armstrong-Webster, 1960
51 Plant Science Valves Air Pressure Reducing Valves Watts: Relief Valves Kunkle, undated
52 Plant Science Valves: Pressure Reducing: Spence, 1974
53 Plant Science Mixing Valves (Powers), 1974
54 Agriculture Plant Science Study, 1986
box folder
4 1 Clocks Central Foods Addition Housing Service Electrical Floor Boxes/Wireway/Time, 1985
2 Central Foods Addition Housing Service Electrical Fixtures, 1984
3 Central Foods Addition Housing Services Electrical Inserts/End Caps/Brackets, 1985
4 Central Foods Addition Housing Services Electrical Switches, 1984
5 Central Food Addition Housing Services Fire Protection (Alarms/Sound/Sprinklers), 1984
6 Central Food Facilities Addition Housing Services Hot Water Generators (Reco Thermo-Master), 1984
7 Housing Services Central Food Facility: Operating & Maintenance Manual Mechanical, 1986
8 Central Food Addition Housing Services Mechanical Submittal FPC 83-23, 1984
9 Central Food Facility Addition Mechanical Submittal, 1985
10 Central Foods Addition Food Vaults Refrigeration Operation/Maintenance Manuals, 1984
11 Housing Services Punch List, 1986
12 Housing Services Testing/Balancing Report (Tab) Central Foods Addition, 1984
13 Central Foods Addition Housing Services Valve Submittal (Steam/Cond/CWSR/Domestic), 1984
14 Central Food Addition Housing Services Water Softener Submittal (Continental, Amberlite), 1984
15 Central Foods Facilities Air Curtain Fan Instruct & Electrical H. K. Porter, 1964
16 Central Foods Facilities Air handlers, Air Washers, Vent Fans/Condensers Temptrol, 1964
17 Central Foods Facilities Boiler Feed Pump Condensate Aurora, 1964
18 Central Food Facilities Chemical Feeder Bleed-Trol, 1964
19 Central Food Facilities Pump: Chilled Water Pacific Model #Ij-183-442 (BA-19231) (in Basement), 1964
20 Central Food Facilities Compressor/Condenser Carrier 5F-H Vaults, 1964
21 Central Food Facilities Pump, Condenser Water Pacific Model #IJ-193-622 (BA-19232-1) (BA-19232-2), 1964
22 Central Food Facilities Cooling Tower to Serve Refrigeration Equipment Install and Maintenance, 1964
23 Central Foods Facilities Dock Boards Kelly Co., undated
24 Central Food Facilities Door Hinges (Shelby Spring) Food Storage #17, 1964
25 Central Foods Facilities Cooler Electrical Defrost Unit-Krack, 1964
26 Central Food Freezer Addition, 1985
27 Central Foods Freezer Vault Schematic Design, 1986
28 Central Food Facilities Pump/Heating Water Pacific, 1964
29 Central Food Facilities Pump/Hot Water Circulating Thursh, 1964
30 Central Food Facilities Pump/Hot Water Peerless, 1964
31 Central Food Facilities (Refrigeration/Food Vaults), 1981
32 Central Food Facilities Refrigerators-Roll In Traulsen, 1964
33 Central Food Facilities Pump Sump Duplex Pacific, undated
34 Central Food Facilities Temperature Controls: Johnson Service, 1964
35 Central Food Facilities Water Chillers & Coolers Filtrine, 1964
36 Central Food Facilities Water Coolers Larco, 1965
37 McClellan Hall 112008CR: Elevator Upgrade, 1998
38 McClellan Hall First Floor: Architectural Woodwork, 2003
39 McClellan Hall First Floor: Door Hardware, 2003
40 McClellan Hall First Floor: Metal, Wood Doors, Light Frames, 2003
41 McClellan Hall First Floor: Fire Extinguishers, 2003
42 McClellan Hall First Floor: Floor Leveler, 2003
43 McClellan Hall First Floor: Interior Lighting, Controls, 2003
44 McClellan Hall First Floor: Plumbing Fixtures, 2003
45 McClellan Hall First Floor: Toilet Accessories, 2003
46 McClellan Hall First Floor: Toilet Partitions, 2003
47 McClellan Hall First Floor: Wood Blinds, 2003
48 Student Health Chiller Carrier 30D, 1956
49 Student Health Condenser (Air Cooled) Kramer, 1957
50 Student Health Convector Valves Barber Colman, undated
51 Student Health Humidifier (Walton), 1964
52 McClellan HVAC Marlo & Controls, 1951
53 Student Health Addition: Mechanical/Electrical, 1964
54 Infirmary Shower Mixer Controls Powers Acctriem, undated
55 Student Health (New Part): Shower Valves Leonard, 1964
56 Student Health Temperature Controls Barber Coleman: See Mens Gym, 1964
57 Student Health Water Softener Bruner Corp., 1964
58 Journalism: Air Handlers/Grilles/Diffusers Barber Coleman, 1962
59 Journalism Clock Simplex, 1962
60 Journalism Convertors Bell Gossett, 1962
61 Journalism Electrical Submittal Panels-Fixtures, 1962
62 Journalism Connectors Flexible Keflex BH, 1962
63 Journalism Mechanical Submittal, 1962
64 Journalism Plumbing Kohler, 1962
65 Journalism Pressure Gauges Thermometers, 1962
66 Journalism Pumps/Sump/Condensate Circulating Aurora, 1962
67 Journalism Temperature Controls Johnson Service, 1962
68 Journalism Fire Alarm System Operating & Maintenance Manuals, 1994
69 Journalism Water Heater Replacement, 1988
box folder
5 1 Sneed Hall Mechanical Submittal: H/W Generator, 1985
2 Sneed Hall Hot Water Generator Operating Manual FPC 85-14, 1986
3 Sneed Hall Renovation Phase II: Electrical Submittal, 1979
4 Sneed Hall Renovation Phase II: Electrical Submittal, 1978
5 Sneed Hall Renovation Phase II Fire Alarm System, 1979
6 Sneed Hall Renovation Phase II Hardware Submittal (3 blueprints), 1979
7 Sneed Hall Renovation Phase II Plumbing Fixtures: Fields & Co., 1978
8 Sneed Hall Dining Room Remodel: Electrical Submittal, 1975
9 Sneed Remodeling Filters (Cambridge Model HAR & HMR), 1975
10 Sneed Dining Room Remodel Mechanical Submittal, 1975
11 Sneed Hall Dining Room Remodeling Operation Manual, 1976
12 Sneed Hall Dining Room Remodel Temperature Controls Johnson Service, 1975
13 Sneed Kitchen Physical Plant Air Conditioning Worthington Moved from Central Foods to Physical Plant, 1970
14 Sneed Kitchen Physical Plant Compressor F-12 Removed (Replaced with Compressor from Central Foods), 1970
15 Sneed Kitchen Condensers (Air Cooled) Temptrol Moved from Central Foods to Physical Plant, 1970
16 Sneed Hall Energy Elevator Company: Dumbwaiter, 1954
17 Sneed Hall Electrical Panel: Square "D" Shop Drawing, 1965
18 Sneed Hall Cafeteria Counter Electrical Submittal, 1966
19 Sneed Telephone Room Fiberoptics Installation, 1986
20 Sneed Hall: Hot Water Heater Patterson/Kelly, 1957
21 Sneed Hall Transformer Load (Panelboards, etc.), 1963
22 Chitwood/Weymouth Hall Sam's Place Toilets Remodeling Proposal, 2009
23 Weymouth/Chitwood Hall Asbestos Abatement Report: Project BM & C 119847-ACR, 1998
24 Weymouth/Chitwood Halls: Replacement Hot Water Heater-119847CR, Mechanical Submittal Instantaneous Water heater Hot Water Circulating Pump, 1998
25 Chitwood/Weymouth Hall: 119847CR Replace Hot Water Mechanical Submittal Valves/Steam Traps, 1998
26 Chitwood/Weymouth Hall: Water Heater Replacement Operating & Maintenance Manual, undated
27 Chitwood/Weymouth Hall: Water Heater Replacement Project File, 1999
28 Weymouth Hall 100045CR Elevator Renovation, 1999
29 Chitwood/Weymouth Light Fixtures: Replace H/W Lines FPC 86-35, 1987
30 Chitwood/Weymouth Hot Water Lines Mechanical Equipment FPC 86-35, 1987
31 Chitwood/Weymouth Mechanical Submittal: Con. WT. Replace, 1988
32 Chitwood/Weymouth: Replace H/W Lines Preconstruction Meeting Contract #751 FPC 86-35 Notice to Proceed, 1987
33 Chitwood/Weymouth: Bids/Contracts Door Replacement, 1986
34 Chitwood/Weymouth Door Replacement Hardware Comments, Plans, Correspondence: 1 Blue Print, 1986
35 Chitwood Weymouth Hardware Schedule, Inspection, Door Replacement, 1985
36 Chitwood/Weymouth Inspection Report: Door Replacement, 1986
37 Chitwood/Weymouth Hall Miscellaneous Chitwood Flowmeter, undated
38 Weymouth Apartment Renovate (Handicapped): Fan Coil Units (International), 1981
39 Chitwood/Weymouth Hall Miscellaneous Weymouth Flowmeter, undated
box folder
6 1 Housing Office: Air Handlers McQuay, 1965
2 Development Office Condensing Units/Blower Coil Units, 1984
3 Housing Office: Controls/Chillers, 1960
4 Development Office Dishwasher/Disposal Submittal FPC 82-28, 1984
5 Development Office Electrical Submittal FPC 82-28, 1984
6 Development Office Mechanical Submittal FPC82-28, 1984
7 Development Office Meters (Badger Disc) Weskler PPS FPC 82-28, 1984
8 Development Office Operating/Maintenance Manuals FPC 82-28, 1984
9 Development Office Pumps (Chilled Water/Closed Coupling), 1984
10 Development Office Roof Replacement Final Inspection, 1995
11 Housing Office Air Conditioning (Roof Top) Lennox, 1964
12 Development Office Steam Specialties FPC 82-28, 1984
13 Development Office Air balance Reports (TAB), 1984-1985
14 Development Office Temperature Controls (Honeywell), 1984
15 Development Office Water Heater (State) FPC 82-28, 1984
16 Greenhouse Moving Chambers Growth Chamber Operating & Maintenance Manual 10-08162, 1997
17 University Greenhouse Replace Unit Heaters Project #03008 Operations & Maintenance Manual, 2003-2004
18 University Greenhouse Addition: Cast in Place Concrete, 2000
19 Greenhouse Addition & Renovation Closeout Book 2, 2000
20 University Greenhouse Addition: Door, Frames, & Hardware, 2000
21 University Greenhouse Addition: Electrical Submittal, 2000
22 University Greenhouse Addition: Fire Extinguisher & Cabinet, 2000
23 University Greenhouse Addition: Gyp. Wall System & Ceiling, 2000
24 University Greenhouse Addition: HVAC Resubmittal, 2000
25 University Greenhouse Addition: HVAC Submittal, 2000
26 University Greenhouse Addition: Markerboard, 2000
27 University Greenhouse Addition: Metal Fabrication, 2000
28 University Greenhouse Addition: Overhead Door, 2000
29 University Greenhouse Addition: Paint, 200-2001
30 University Greenhouse Addition: Patio Enclosure, 2000
31 U.C. Greenhouse Plumbing Fixtures, 2000
32 University Greenhouse Addition: Projection Screen, 2000
33 University Greenhouse Addition: Structural Shop Drawings, 2000
34 University Greenhouse Addition: Toilet Accessories, 2000
35 University Greenhouse Addition: TV Mounting Bracket, 1997
36 University Greenhouse Steam/Condensate Lines: Mechanical Submittal, 1995
37 University Greenhouse Steam/Condensate Lines: Operation & Maintenance Manual, 1994
38 University Greenhouse, Phase II: Electrical Submittal (AMCO Electric), 1975
39 University Greenhouse, Phase II: Mechanical Submittal (H. Riley), 1975
40 University Greenhouse Original: Mechanical Submittal, 1973
41 University Greenhouse Wadsworth Environmental Control System, 1985
42 Greenhouse (Horticulture): Temperature Controls (Honeywell), 1958
43 Greenhouse (Old Greenhouse Behind Library) Temperature Controls Honeywell, 1953
box folder
7 1 Math Fire Alarm System: Operation & Maintenance Manual, 2006
2 Math Fire Alarm System Submittal: Technical Submittals, 2006
3 Math Asbestos Abatement 2 of 2, 2001
4 Math Asbestos Abatement 1 of 2, 2002
5 Math Retrofit, 1997
6 Math Roof Tamko Asphalt Products, Inc. 021514CR, 1995
7 Math ECP, 1985
8 Math ECP II, 1985
9 Math (ECP) Exit Lights (Lithonia ES-1R), 1984
10 Math (ECP II) Fire Alarms Elkhart FPC 81-78a, 1984
11 Math (ECP) G.E. Starters C/W Pumps Condensate Pumps, 1984
12 Math (ECP II) Light Fixtures Lithonia FPC 81-78a, 1985
13 Math (ECP): Lighting Fixtures for Room 08, undated
14 Math (ECP I) Mechanical Submittal FPC 81-78a, 1985
15 Math Operating & Maintenance Manuals ECPII FPC 81-78a, 1986
16 Math Project I: Testing & Balancing, 1984
17 Math TAB Report, 1984
18 Math (ECP) TAB Report PEBSCO Testing/Balancing, 1985
19 Math Building Testing & Balancing (TAB) ECP II, 1987
20 Math ECP II TAB, 1986
21 Math Temperature Controls (Honeywell) ECP II FPC 81-78a, 1986
22 Math (ECP I) Temperature Controls (Honeywell), 1985
23 Math (ECP) Tork Time Clock, 1984
24 Math Building (Old Library) Electrical Submittal: Tech Electric, 1978
25 Math Building (Old Library) Elevators (Old Social Science), 1978
26 Math Building 07 (Old Library Building) Emergency Lighting (Light Alarms), 1978
27 Math Building (Old Library) Mechanical Submittal: Operating & Maintenance Manual, 1978
28 Math: Mechanical Submittal, 1979
29 Math Building (Old Library) Temperature Controls: Honeywell, 1978
30 Social Science Temperature Controls Room #119 Powers (Old Library), 1962
31 Social Science Fan Units Buffalo Forge (Old Library), 1969
32 Social Science: Mechanical Equipment (Also Filter Information) Old Library, 1955
box folder
8 1 Animal Science Lab Modifications: HVAC Work BMC 040885CR, 1996
2 Animal Science Lab Modifications: HVAC Work BMC 040885CR Operating & Maintenance Manual, 1996
3 Animal Science Establish Additional Lab Space 040885CR, 1994
4 Animal Science (Roof Top) Heating/Cooling Lennox Units, 1974
5 Animal Science Alteration & AC Plumbing Fixtures, 1974
6 Electrical Submittal: Phase II Animal Science, 1978
7 Animal Science Renovation Mechanical Submittal/ Temperature Controls, 1978
8 Veterinary Science Steam Lines, 1950
9 Veterinary Science Air Handlers (Heating), 1947
10 Foreign Language EMS 086464CR: Johnson Controls, 1998
11 Math/Foreign Language Doors: (Fold Type) American Accordian, 1966
12 Foreign Language AHUs and Fans, 1968
13 Math Foreign Language: Filters-American Air, 1985
14 Math/Foreign Language: Air Conditioning Carrier Operation Maintenance, 1966
15 Math/Foreign Language Chalkboards & Tackboards, 1966
16 Math/Foreign Language Pumps: (Condensate) Skidmore Boiler Feed and Duplex Condensate, 1966
17 Math/Foreign Language: Electrical Submittal, 1966
18 Math/Foreign Language: Electrical Submittals II, 1966
19 Foreign Language & Math: Fire Protection Equipment Elkhart Brass Manufacturing, 1966
20 Fixture Proposal for Foreign Language/Mathematics Building, 1966
21 Math/Foreign Language Pumps: (Hot & Chill Water) Weiman, 1966
22 Foreign Languages Mathematics Lighting Fixtures, 1966
23 Animal Science Lab Modifications: HVAC Work BMC 040885CR, 1996
24 Foreign Languages Mathematics Building, 1966
25 Math/Foreign Language Submittal Data, 1966
26 Math/Foreign Language Insulation: Owens-Corning, 1966
27 Math/Foreign Language Plumbing Submittal, 1966
28 Math/Foreign Language Pumps (Sump & Bilge) Chicago, 1966
29 Foreign Language/Math: Temperature Continued: Pump Curves Johnson Service, Also: Air Balance, 1968
30 Math/Foreign Language Terrazzo, 1968
31 Math/Foreign Language: Thermal Air Handlers Mixing Boxes: Johnson Service Book: pg #3, Operating & Maintenance Manual, 1960
32 Math/Foreign Language: Valves: Royal Flush Urinal Flush, 1968
33 Math/Foreign Language: Water Coolers: HAWS, 1967
34 Foreign Language Champion Blowers, 1971
35 Math/Foreign Language Building Engineered Air Balance Report, 1969
box folder
9 1 South Plains Steel: Structural Shop Drawings, 1997
2 Doak Hall: Renovate Southeast Area/Operating & Maintenance Information 10-08418, 2010
3 Doak Hall: Renovate Southeast Area TAB Report 10-08418, 2010
4 Doak Hall: Communication Services HVAC System Controls Operating & Maintenance Manual, 2002
5 Doak Hall: Communication Services HVAC System Johnson Controls, 1999
6 Doak Hall: Communication Services HVAC System Operating & Maintenance, 1999
7 Doak Hall: Communication Services HVAC System Operating & Maintenance Information, 2003
8 Doak Hall: Communication Services HVAC System Project File, 1998
9 Doak Hall: Communication Services Renovate HVAC System 092010CR, 2000
10 Doak/Weeks Kitchen Bidders Sewer Renovation (Kitchen) FPC 87-10, 1987
11 Doak Hall: Housing Office Air Conditioning Submittal FPC 85-22, 1986
12 Doak (Identification Office) Air Conditioning/Mechanical Submittal, 1985
13 Doak Hall: Air Conditioning Operating/Maintenance Manuals ID Office FPC 84-59, 1986
14 Doak Hall (Housing Office) Electrical Submittal: FPC 81-46, 1982
15 Doak Hall (Housing) Mechanical Submittal: FPC 81-46, 1982
16 Doak Hall (Housing) Temperature Controls: FPC 81-46, 1982
17 Doak/Weeks Hall: Submittal Evaporation Cooling Unit, 1991
18 Doak Hall Telephone Office Heating Units Lennox, 1966
19 Doak Hot Water Heater ADSCO: (Tube Bundle), 1965
20 Doak Hall Transformers Square "D", 1967
21 Doak Hall Valves Powers Hydroguard, undated
22 Naval Reserve Center Renovation Plan, 1999
23 Naval Reserve Building Renovation Stainless Steel Counter Fire Doors, 1998
24 Naval Reserve Center Renovation Dry Wall & Ceiling Tile Installation, 1999
25 Naval Reserve Building Renovation Electrical Operating & Maintenance, 1999
26 Naval reserve Building Renovation Electrical Commodity, 1997
27 Naval Reserve Renovation Electrical Submittal, 1998
28 Naval Reserve Building Renovation Electrical Power & Light, 1997
29 Administrative Support Center (Naval reserve) Elevator QEI Inspection, 1998
30 Naval Reserve Building Renovation Fire Extinguishers & Cabinets, 1999
31 Naval Reserve Building: Renovation for Administration Services, 1998
32 Naval Reserve Building Renovation Fire Smoke Dampers, 1999
33 Administrations Support Center Geothermal Heat/Cool System, 1998
34 Naval Reserve Renovation Geothermal Loop Submittal, 1998
35 Naval Reserve Renovation Heat Pump Submittal, 1998
36 Naval Reserve Renovation HVAC Wall Units Submittal, 1998
37 Naval Reserve Mechanical Operation & Maintenance Manual, 1999
38 Naval Reserve Renovation A/C: Mechanical Resubmittal, 1998
39 Renovation of Naval Reserve Building: Mechanical Submittal, 1999
40 Naval Reserve Renovation Pipe Insulation Submittal, 1998
41 Naval Reserve Building Renovation PPES Project Manual, 1997
42 Room Pressure Controller Operation and Service Manual, 1998
43 Naval Reserve Building Renovation TA & B Report, 1999
44 Naval Reserve Building Renovation Warranty Manual, 1999
45 Naval Reserve Center Building Wood Doors, 1999
46 Administration Support Center Miscellaneous Roof Assessment, 2007
47 Administration Support Center Miscellaneous Roofing Proposal, 2008
48 Naval Reserve Wiring Diagram: Room #10, 1971
box folder
10 1 Texas Tech Plaza: Grease Trap Operating & Maintenance, 2007
2 Texas Tech Plaza: Basement HVAC Electrical Submittal, 2003
3 Texas Tech Plaza: Basement HVAC Mechanical Submittal, 2003
4 Texas Tech Plaza: Basement HVAC TAB Report, 2003
5 Texas Tech Plaza: Skyview Renovation AHU Submittal, 2002
6 Texas Tech Plaza: Skyview Renovation Indoor Air Quality, 2001
7 University Plaza Tremco Roof, 2001
8 Texas Tech Plaza: Chiller Operating & Maintenance Manual, 2000
9 PrinTech: Replace Roof Closeout Documents, 2000
10 PrinTech Lower Roof Owners Manual, 2000
11 PrinTech Replace Lower Roof Submittals & Warranty 00894, 2000
12 PrinTech Roof Replacement Submittals & Warranty 2 00894, 2000
13 Tech Press Addition Pumps (Centrifugal) Dunham Bush, 1976
14 Tech Press Addition Electrical Submittal (AMCO), 1976
15 Tech Press Addition Electrical Submittal: FPC 83-34, 1986
16 Tech Press Addition Electric Radiant Ceiling Heat Panel (Chromalox), 1977
17 Tech Press Addition Fire Alarm Submittal: FPC 83-34, 1986
18 Tech Press Addition: Hardware & Electric Comments, 1985
19 PrinTech: Tech Press Addition Manuals & Reports, 1986
20 Tech Press Addition Miscellaneous Transmittal Correspondence etc., 1976
21 PrinTech: Tech Press Addition Mechanical Submittal, 1977
22 PrinTech: Tech Press Addition Mechanical Submittal, 1962
23 Tech Press Addition: Partial Mechanical Submittal, 1986
24 PrinTech: Tech Press Addition Pressure Reducing Valve Station, 1986
25 Tech Press Addition Resubmittal, Sink SB (ELKAY), 1976
26 Tech Press Addition: Anchor Detail Steam Pipe, Insulation, Installation, 1986
27 Tech Press Addition Temperature Controls FPC 83-34, 1986
28 Tech Press: Air Conditioning Renovate Shop Drawings, 1962
29 PrinTech: Acid Resistant Sink & Fittings, 1959
30 PrinTech: Air Distribution Equipment, 1955
31 PrinTech: Fire Alarm System Renovation, 2006-2007
32 PrinTech: Fire Alarm Remodel Operating & Maintenance Manual (1 blueprint), 2006
33 PrinTech Johnson Controls, 1968
34 Tech Press: Johnson Controls, 1977
35 Tech Press: Robert Mason's Files Air Conditioning, Pump, Etc., 1968
box folder
11 1 Agriculture Science: Reroof Auditorium Closeout Documents, 2002
2 Agriculture Science: Renovate Energy Management System Johnson Controls Submittal, 1998
3 Agriculture Science/Agriculture English Air Handling Units (Trane), 1974
4 Agriculture Science/Agriculture Engineering Air Distribution Equipment (Ceiling Diff.), 1998
5 Agriculture Science/Agriculture Engineering Air Distribution Equipment (Ceiling Diff.) (Titus), 1974
6 Agriculture Science/Agriculture Engineering Air Filters (Continental), 1974
7 Agriculture Science/Agriculture Engineering Air Separators (Thrush), 1974
8 Agriculture Science/Agriculture Engineering Chilled Water Prv. Valve (McAlear), 1974
9 Cold Room (Copeland Electrical) Operation, Maintenance, & Parts Book, 1973
10 Agriculture Science/Agriculture Engineering Condensing Units (Copeland), 1974
11 Agriculture Science/Agriculture Engineering Convertors & Flash Tank (Ace Tank/Heater), 1974
12 Drinking Fountains Operation, Maintenance, & Parts Book, undated
13 Agriculture Science/Agriculture Engineering Electrical Submittal: Animal Science, 1974
14 Agriculture Science/Agriculture Engineering Expansion Tanks/Diffusers (Bell-Gossett), 1974
15 Agriculture Science/Animal Science Fan Units (Loern Cook), 1974
16 Agriculture Science/Agriculture Engineering Fire Dampers (Air Balance), 1974
17 Agriculture Science/Agriculture Engineering Flow Measuring Elements (Ellison-Annubar), 1974
18 Agriculture Science/Agriculture Engineering Mixing boxes (Anesmostat), 1974
19 Agriculture Science: Operating & Maintenance and Parts Book, 1974
20 Agriculture Science/English Plumbing Submittal: American Standard, 1974
21 Agriculture Science/Agriculture Engineering Pumps: (Allis Chalmers-Skidmore), 1974
22 Agriculture Science Alterations & AC: Pumps Operation & Maintenance, 1974
23 Steam Traps: LRP Pressure Reducing Valves (McAlear), Strainers (McAlear), Air Vents (Clark), 1974
24 Agriculture Science/Agriculture Engineering Valves (Gate) & Floor Drains, 1974
25 Agriculture Science/Agriculture Engineering Vibration Isolator, 1974
26 Agriculture Building Compressors on A/C Room #227, undated
27 Air Handling Unit New Class Room Building, 1958
28 Agriculture Building Air Conditioning Room #201 Deans Offices, 1960
29 Agriculture Building Air Conditioners Rooms # 319-320 Gibson Guarantee, 1967
30 Agriculture Science Asbestos Survey Cover Letter, 1999
31 Agriculture Building Electrical Panels (Distribution), 1966
32 Agriculture Science Lighting Survey, 1997
33 Agriculture Building Pump-Sump (Chicago): Also: See Student Union-Weil Pump, 1959
34 Agriculture Building Pump-Vacuum (Wheeler-Economy) Also: See Chemistry Building, 1960
35 Agriculture Education & Communication Distance Learning Facility: Closeout Documents 96-40, 1998
36 Agriculture Education Communication Distance Learning Center Electrical Submittals, 1997
37 Agricultural Education & Communications Room 116: Distance Learning Facility Final Inspection Report, 1997
38 Agriculture Education & Communication Distance Learning Room Finish Hardware, 1997
39 Agriculture Education & Distance Learning Center Mechanical Submittals, 1997
40 Agriculture Education & Communications Distance Learning Facility TAB Report 96-40, 1997
41 Acceptance Letter Agriculture Education & Communications Reroof F P & C #92-12/PP, 1994
42 Agriculture Education & Communication Reroof Final Inspection, 1993
43 Agricultural Education & Communication Reroof: Precon Agenda, 1993
44 Agriculture Education Auditorium Renovation 11/93 Automatic Sprinkler System (2 blueprints), 1993
45 Agriculture Education & Communication Auditorium Renovation Electrical Submittal 92-08, 1993
46 Agriculture Education & Communication Auditorium Renovation Fire Alarm System 92-08, 1993
47 Agriculture Education & Communication: Auditorium Renovation Johnson Controls Drawings 92-08, 1993
48 Agriculture Education & Communication Auditorium Renovation Mechanical & Plumbing Submittal 92-08, 1994
49 Agriculture Education Auditorium Renovation Pipe Insulation & Control Valve, 1993
50 Agriculture Education & Communication Auditorium Renovation Sound System 92-08, 1993
51 Agriculture Education & Communication AC & Alterations Johnson Controls, 1974
52 Aggie Engineering Condenser (Air Cooler) Bohn, 1964
53 Aggie Engineering Heat Pump Carrier Weathermaker, 1958
54 Aggie Engineering Controls (A/C) Minneapolis Honeywell Auditorium, 1964
55 Aggie Engineering Hot Water Circulating Pump Scot/Trane, 1964
56 Aggie Engineering/Press Building Vacuum Pump Whittington, 1960
box folder
12 1 Hulen/Clement: Life Safety Upgrade/Fire Alarms, 2004
2 Hulen/Clement Hall: Life Safety Upgrades Fire Protection, 2004
3 Hulen/Clement: Life Safety Upgrade/Fire Pump, 2004
4 Hulen/Clement Hall: Life Safety Upgrades Masonry & Mortar, 2004
5 Hulen/Clement Hall: Life Safety Upgrades Operating & Maintenance Manual, 2004
6 Hulen/Clement Hall: Life Safety Upgrades Painting, 2004
7 Hulen/Clement: Dining Tremco Reroof, 2001
8 Hulen/Clement Hall: Elevators Equipment Room HVAC Remodel, 1997
9 Hulen/Clement Hall: Elevator Equipment Room HVAC Remodel Operating & Maintenance Manual, 1997
10 Hulen/Clement: A/C Controls Submittal, 1997
11 Hulen/Clement: A/C Mechanical Submittal, 1997
12 Hulen/Clement: Kitchen HVAC Renovation Operating & Maintenance Manual, 1997
13 Hulen/Clement/Chitwood: Elevator Modernization 96-39, 1999
14 Hulen/Clement: Fire Alarm System Meeting Minutes FP & C 86-05, 1986
15 Hulen/Clement: Serving Counters Equipment, 1986
16 Hulen/Clement: Handicapped Final Inspection Access, 1984
17 Hulen/Clement: Handicapped Access Specs, 1984
18 Hulen/Clement Hall: Originals AC Units, 1961
19 Hulen/Clement: Air Conditioning Belts/Bearings Buffalo Forge, 1968
20 Hulen/Clement Kitchen: Air Conditioning Louvers & Dampers Payne, 1963
21 Hulen/Clement: Air Conditioning Modine, 1963
22 Hulen/Clement: Air Filters (Roll-O-Matic), 1964
23 Hulen/Clement: Apartments, 1963
24 Hulen/Clement: Bathroom Heaters Berko, 1963
25 Hulen/Clement: Campus Lights (Photo Cells), 1963
26 Hulen/Clement: Centrifugal Water Pump Allis Chalmers, 1963
27 Hulen/Clement: Chilled Water Pump Weiman, 1959
28 Hulen/Clement: Clock/Bell System Simplex, undated
29 Hulen/Clement: Condensate Pump Skidmore, 1963
30 Hulen/Clement: Converter/Expansion Tank Boiler Feed Water, 1963
31 Hulen/Clement: Deep Fat Fryers, 1968
32 Hulen/Clement: Door Alarms Edwards, 1961
33 Hulen Hall: Elevator Wiring Diagrams, 1985
34 Hulen/Clement: Elevators (ESCO), 1968
35 Hulen/Clement: Exhaust Fans #11-#15 Brundage (Duct Blower), 1964
36 Hulen/Clement: Fire Protection Alarm System, 1963
37 Hulen/Clement: Grilles, Registers, Diffusers, Air Valves, 1962
38 Hulen/Clement: Hardware, Locks, Keying, 1963
39 Hulen/Clement: Hot Water Circulating Pump #2 Thursh, 1959
40 Hulen/Clement: Hot Water Generator Coil/Temperature Regulator, 1962
41 Hulen/Clement: Hot Water Generators Shower Mixing Valves Adsco Powers, 1966
42 Hulen/Clement: Incinerator, 1964
43 Hulen/Clement: Insulation, 1963
44 Hulen/Clement: Light Fixtures, 1963
45 Hulen/Clement: Lockers for Kitchen Restrooms, 1964
46 Hulen/Clement: Panels & Breakers G.E., 1963
47 Hulen/Clement: Plumbing, 1963
48 Hulen/Clement: Plumbing & Kitchen Drains, 1963
49 Hulen/Clement: Roof Exhaust Fans, 1963
50 Hulen/Clement: Shower Mixing Valves Powers, 1963
51 Hulen/Clement: Steam Chef Cleveland, 1964
52 Hulen/Clement: Steam Traps, Strainers Valves, Balance Cocks, 1963
53 Hulen/Clement: Sump Pumps (Weiman) Sewage Ejector, 1965
54 Hulen/Clement: Temperature Controls Honeywell, 1963
55 Hulen/Clement: Toilet Partitions, 1963
56 Hulen/Clement: Walk In Refrigeration Dunham Bush, 1963
57 Hulen/Clement: Water Fountains Chiller, 1963
58 Hulen/Clement: Water Softener Allis Chalmers, 1963
59 Hulen/Clement Residence Hall: Booster Pump Replacement Final Inspection, 1988
60 Hulen/Clement: Elevators (Miprom Controls), 1986
box folder
13 1 Hazardous Waste Storage Building: HVAC Replacement Electrical Submittal, 1996
2 Hazardous Waste Storage: HVAC Final Inspection Report, 1996
3 Hazardous Waste Storage Building: HVAC Replacement Mechanical Submittal, 1996
4 Hazardous Waste Storage: Operating & Maintenance Manual, 1996
5 Hazardous Waste Storage Building: HVAC Renovation Temperature Controls Submittal, 1996
6 Hazardous Storage Facility: Fire Suppression System, 1995
7 Hazardous Chemical Storage: Clean Agent Fire System Operating & Maintenance Manual, 1995
8 Grantham-Hazardous Waste Storage: Submittal, See UBM 13193, 1992
9 Hazardous Chemical Storage: Electrical Submittal, 1979
10 Hazardous Chemical Storage: Halon System Pyrotronics, 1979
11 Hazardous Chemical Storage: Mechanical Submittal, 1979
12 Hazardous Chemical Storage: Temperature Controls Johnson Service, 1979
13 Hazardous Chemical Storage: Tremco Roof Warranty, 2004
14 Texas Tech University Police Department: Ventilation Mechanical Operation & Maintenance Manual, 2005
15 University Police Department Asbestos Report, 2003
16 Texas Tech University Police Department: University Police Department Mods Doors, Frames, & Hardware, 2003
17 Texas Tech University Police Department: University Police Department Mods Electrical Submittal, 2003
18 University Police Department Asbestos Final Abatement Submittal, 2003
19 Texas Tech University Police Department: University Police Department Mods Fire & Security System, 2003
20 Texas Tech University Police Department: University Police Department Mods Fire Alarm System, 2003
21 Texas Tech University Police Department: University Police Department Mods Glazing, 2003
22 Texas Tech University Police Department: University Police Department Mods Gyp. Wall System & Ceiling, 2003
23 Texas Tech University Police Department: University Police Department Mechanical Submittal, 2003
24 Texas Tech University Police Department: University Police Department Mods Millwork, 2003
25 University Police Department Asbestos Report, 2003
26 Texas Tech University Police Department: University Police Department Mods Open-end Contract with Condray, 2002
27 Texas Tech University Police Department: University Police Department Mods Overhead Door, 2003
28 Texas Tech University Police Department: University Police Department Mods Paint, 2003
29 University Police Department: Demolish East Wing, Replace Offices Within Existing Building, 2002
30 Texas Tech University Police Department: University Police Department Mods RFI #2, 2003
31 Texas Tech University Police Department: University Police Department Mods Structural Shop Drawings, 2003
32 University Police Department Building modification SWP3, 2003
33 University Police Department Building Modifications Warranty & Operating & Maintenance Manuals, 2003
box folder
14 1 Marsha Sharp Center: Originals Adjustable Frequency Drives, 2003
2 Marsha Sharp Center: Originals Mechanical Operating & Maintenance Manual, 2004
3 Marsha Sharp Center: Originals Mechanical Resubmittal, 2003
4 Marsha Sharp Center: Originals Mechanical Submittal, 2003
5 Marsha Sharp Center: Originals TAB Report, 2004
6 Marsha Sharp Center: Originals TAB Report Opposite Season, 2005
7 Marsha Sharp Center: Originals Warranty Manual, 2005
8 Weeks Exterior Doors: Finish Hardware Comments, 1989
9 Weeks Hall Air Washer Repair: Air Washer Submittal, 1972
10 Weeks Hall: Addendums, 1956
11 Weeks Hall: Air Compressors DeVilbiss, 1951
12 Weeks Hall: Air Handlers Clarage, 1952
13 Weeks Hall: Pumps (Circulating) Bell-Gossett, 1956
14 Weeks Hall: Dole Plates (Cold), 1957
15 Weeks Hall: Compressor Copelametic, undated
16 Weeks Hall: Electrical Switch Panel Square "D", 1956
17 Weeks Hall: Elevators Rotary Lift, 1957
18 Weeks Hall: Exhaust Fans Clarage Fan Company, 1952
19 Weeks Hall: Expansion Joints, 1957
20 Weeks Hall: Filters (Air) Continental, 1957
21 Weeks Hall: Grease Filters (Kitchen) Airsam, 1956
22 Weeks Hall: Grilles, 1956
23 Weeks Hall: Ice Machine Carrier Flakemaster, 1957
24 Weeks Hall: Incinerator Kellog Mann, 1957
25 Weeks Hall: Mechanical Submittal, 1957
26 Weeks Hall: Insulation (Steam Piping) Owens-Corning, 1957
27 Weeks Hall: Plumbing, 1956
28 Weeks Hall: Refrigerators Koch, 1957
29 Weeks Hall: Sewage Ejector Pump Yeoman, 1957
30 Weeks Hall: Telephone/Sound System, 1957
31 Weeks Hall: Temperature Controls Johnson, 1956
32 Weeks Hall: Transformers, 1956
33 Weeks Hall: Traps, Strainers, Valves Trane, 1956
34 Weeks Hall: Unit Heaters National Radiator, 1957
35 Weeks Hall: Pumps (Vacuum Heating) Nash, 1956
36 Weeks Hall: Valves (Brass Gate) Valves (Copper Sweat Gate), 1956
37 Weeks Hall: Ventilators Trade Wind, 1957
38 Weeks Hall: Water Cooler Larco #576109, 1957
39 Weeks Hall: Water heater/Valves Old Dominion Kunkle Valve Company, 1957
40 Weeks Hall: Water Softener Bruner, undated
41 Weeks Hall: Asbestos Analysis, 1990
42 Weeks Hall: Condenser Water Pumps Weiman, 1962
43 Weeks Hall: Electrical Service Submittal, 1982
44 Weeks Hall: Hot Water Circulating Pumps Weiman, 1962
45 Weeks Hall: Lighting Informal Lounge, 1965
46 Weeks Hall: Sump Pumps (South End) Yeoman, 1970
47 Weeks Hall: Tube Bundle Adsco, 1965
48 Weeks Kitchen: Freezer Walk-in #4, 1969
box folder
15 1 Agriculture Pavilion: WO # 096849 50 Ton HVAC Unit, 1986
2 Agriculture Pavilion: 50 Ton HVAC Unit Electrical Submittal, 2002
3 Agriculture Pavilion: HVAC Replacement, 2002
4 Agriculture Pavilion: 50 Ton HVAC Unit Mechanical Submittal, 2002
5 Agriculture Pavilion: Replace HVAC System Operating & Maintenance Manual, 2002
6 Landscape Architecture Pavilion: Project Number 120494CR Computer Power, 1999
7 Agriculture Pavilion: Computer Power Electrical Submittal, 1999
8 Aggie Pavilion: Air Handling Units Govenair (Che), 1973
9 Agriculture Pavilion: Mechanical Submittal, 1977
10 Agriculture Pavilion: Mechanical Submittal, 1977
11 Lubbock Lake Landmark: Addition Concrete, 2006
12 Lubbock Lake Landmark: Addition Cove Base, VCT, Ceiling Tile & Grid, 2006
13 Lubbock Lake Landmark: Addition EIFS, 2006
14 Lubbock Lake Landmark: Addition Electrical Submittal, 2006
15 Lubbock Lake Landmark: Building Addition 05-04845 HVAC Resubmittal, 2006
16 Lubbock Lake Landmark: Building Addition 05-04845 Mechanical Submittal, 2006
17 Lubbock Lake Landmark: Addition Millwork Shop Drawings, 2006
18 Lubbock Lake Landmark: Building Addition Owner Operator Manual, 2007
19 Lubbock Lake Landmark: Building Addition Record Submittals, 2006
20 Lubbock Lake Landmark: Addition Roofing, 2006
21 Lubbock Lake Landmark: Addition Structural Submittals, 2006
22 Lubbock Lake Landmark: Building Addition Warranty, 2006
23 Golf Course As Builts, 2002
24 Rawls Golf Course: Backflow Preventer, 2003
25 Rawls Golf Course: FP & C 97-18, 2003
26 Rawls Golf Course: Concrete Mix Design, 2003
27 Rawls Golf Course: Electrical Submittal, 2003
28 Rawls Golf Course: Finish Hardware, 2003
29 Rawls Golf Course: Flexible Base, 2003
30 Rawls Golf Course: Hollow Metal Doors & Frames, 2003
31 Rawls Golf Course: Mechanical Submittal, 2003
32 Rawls Golf Course: Overhead Doors, 2003
33 Rawls Golf Course: Paint and Deck Carpet, 2003
34 Rawls Golf Course: Roofing, 2003
35 Rawls Golf Course: Septic Tank System, 2003
36 Rawls Golf Course: Structural Submittal, undated
37 Rawls Golf Course: Window Details, 2003
box folder
16 1 KTXT TV: Roof Replacement Roof Submittals, 2001
2 KTXT: Roof Replacement Warranty, 2001
3 A/C Units Resubmittal: Education TV Addition FPC 8623/1-2J, 1987
4 Electrical Equipment (Miscellaneous) Educational TV Addition FPC 86-23, 1987
5 KTXT TV Addition: Electrical Submittal FPC 8623, 1988
6 KTXT: Education TV Addition Fire Alarm System, 1987
7 KTXT TV Addition: Mechanical Operating & Maintenance FPC 8623, 1988
8 KTXT TV Addition: Mechanical Submittal FPC 8623, 1987
9 KTXT TV Addition: TAB Test Reports FPC 8623, 1988
10 Refrigeration Temperature Controls Educational TV Addition FPC 8623/1/21, 1987
11 KTXT TV: Carrier Hermatic Chiller 30HH-HJ, 1969
12 TV Station: Transmitter Building Heating/Cooling Unit, 1982
13 TV Station Controls, Honeywell, 1962
14 TV Station: Formerly Stock Judging Pavilion Floor Plans: Mosher Steel Company, undated
15 KTXT: Temperature Problem, 1988
16 KTXT: Thermal AC Units, 1961
17 KOHM/KTXT Transmitter Building: Cable Bridge, 2003
18 KOHM/KTXT Transmitter Building Concrete, 2003
19 KOHM/KTXT Transmitter Building Concrete Sidewalk, 2003
20 KOHM/KTXT Transmitter Building Contract Documents, 2003
21 KOHM/KTXT Transmitter Building Electrical Submittal, 2003
22 KOHM/KTXT Transmitter Building Hollow Metal Door & Frame, 2003
23 KOHM/KTXT Transmitter Building HVAC AC Unit, 2003
24 KOHM/KTXT Transmitter Building Ice Screens, 2003
25 KOHM/KTXT Transmitter Building Joist, Bridging & Deck Anchors, 2003
26 KTXT TV Transmitter Building Expansion Project #03275, 2003
27 KOHM/KTXT Transmitter Building: Specification & Drawings, Operations & Maintenance Manual, 2003
28 KOHM/KTXT Transmitter Building Roof Drain, 2003
29 KOHM/KTXT Transmitter Building Roofing, 2003
30 KOHM/KTXT Transmitter Building Steel Reinforcing, Joists & Deck, 2003
31 KOHM/KTXT Transmitter Building Stucco Color & Correspondence, 2003
32 KOHM/KTXT Transmitter Building SWPPP, 2003
33 KOHM/KTXT Transmitter Building Exhaust Fans, 1989
34 KOHM/KTXT Transmitter Building Operating & Maintenance Manuals (Intake/Exhaust Fans), 1986
35 KOHM/KTXT Transmitter Building Structural Analysis, 2002
box folder
17 1 Fisheries & Wildlife Renovation Phase 3 & 4 Concrete Mix Report, 1993
2 Fisheries & Wildlife Renovation Phase 3 & 4, 1993
3 Fisheries & Wildlife Renovation Final Inspection Report Phase 3 & 4, 1993
4 Fisheries & Wildlife Renovation Phase 3 & 4 Hardware, Doors, Windows and Drywall Submittal, 1993
5 Fisheries & Wildlife Renovation Phase 3 & 4 Mechanical Submittal, 1993
6 Fisheries & Wildlife Renovation Phase 3 & 4 Mechanical Submittal, 1993
7 Fisheries & Wildlife Renovation Phase 3 & 4 Operation & Maintenance Manual, 1993
8 Fisheries & Wildlife Renovation Phase 3 & 4 Paint Submittal, 1993
9 Fisheries & Wildlife Renovation Phase 3 & 4 Plumbing Submittal, 1993
10 Fisheries & Wildlife Renovation Phase 3 & 4 Steel Framing Drawings, 1993
11 Fisheries & Wildlife Renovation Phase 3 & 4 Supplemental Drawings, 1993
12 Fisheries & Wildlife Renovation Phase 3 & 4 TAB Report, 1993
13 Fisheries & Wildlife Renovation Phase 3 & 4 Temperature Controls, 1993
14 Fisheries & Wildlife Renovation Phase 3 & 4 Mechanical Resubmittal Trench Drain System, 1993
15 Fisheries & Wildlife Warranties Operating & Maintenance Manuals, 1993
16 Fisheries & Wildlife Electrical Submittal, 1990
17 Fisheries & Wildlife Submittal Fire Alarm, 1990
18 Fisheries & Wildlife Renovation Frequency Controller, 1990
19 Fisheries & Wildlife Johnson Controls, 1990
20 Fisheries & Wildlife Renovation Mechanical Resubmittal, 1991
21 Fisheries & Wildlife Mechanical Submittal, 1992
22 Fisheries & Wildlife Minutes Meeting Old Meats Lab Renovation, 1989
23 Fisheries & Wildlife Pump By-Pass Control Valve, 1991
24 Fisheries & Wildlife Renovation Roof Hatch, 1990
25 Fisheries & Wildlife Renovation Submittal Steam Pressure Reduction Stations Hot Water Generator, 1990
26 Fisheries & Wildlife Renovation TAB Correspondence, 1990
27 Fisheries & Wildlife Phase 1 TAB, 1993
28 Fisheries & Wildlife Resubmittal Walk In Cooler/Freezer & Refrigeration, 1991
29 Fisheries & Wildlife Renovation Warranties & Owners/Operator Manuals, 1991
30 Fisheries & Wildlife Correspondence/Reports Old Meats Lab FPC 89-16, 1989
box folder
18 1 Texas Tech University Petroleum Engineering Fume Hood Operating & Maintenance, 2004
2 Petroleum Engineering Room 101, 2001
3 Petroleum Engineering Renovation Rooms 201-202 Architectural Submittals, 2004
4 Petroleum Engineering Renovation Rooms 201-202 Blinds Submittal, 2000
5 Petroleum Engineering Renovation Rooms 201-202 Carpet Submittal, 2000
6 Petroleum Engineering Renovate Rooms 201-202 Data Equipment Submittal, 2000
7 Petroleum Engineering Renovate Rooms 201-202 Door Hardware, 2000
8 Petroleum Engineering Renovate Rooms 201-202, 2000
9 Petroleum Engineering Renovate Rooms 201-202 Fire Alarm Equipment Submittal, 2000
10 Petroleum Engineering Renovate Rooms 201-202 Fire Extinguisher & Cabinet Submittal, 2000
11 Petroleum Engineering Renovate Rooms 201-202 Fire Protection Sprinkler System, 2000
12 Petroleum Engineering Renovate Rooms 201-202 Fire Stopping Submittal, 2000
13 Petroleum Engineering Renovate Rooms 201-202 Floor Care Info 120604CR, 2000
14 Petroleum Engineering Renovate Rooms 201-202 Flooring Submittal, 2000
15 Petroleum Engineering Renovate Rooms 201-202 Glazing & Storefront Submittal, 2000
16 Petroleum Engineering Renovate Rooms 201-202 Hollow Metal Frames, 2000
17 Petroleum Engineering Renovate Rooms 201-202 Johnson Controls, 2000
18 Petroleum Engineering Renovate Rooms 201-202 Laboratory Casework, 2000
19 Texas Tech University Chemical Engineering Renovation of Rooms 201-202 Operation & Maintenance, 2000
20 Petroleum Engineering Renovate Rooms 201-202 Mechanical Submittal, 2000
21 Petroleum Engineering Renovate Rooms 201-202 Metal Fabrications, 2000
22 Petroleum Engineering Renovate Rooms 201-202 Paint Submittal, 2000
23 Chemical Engineering Renovation of Rooms 201-202, 2000
24 Petroleum Engineering Renovate Rooms 201-202 Roofing Submittal, 2000
25 Petroleum Engineering Renovation of Rooms 201-202 TAB Report, 2000
26 Petroleum Engineering Renovate Rooms 201-202 Tile Submittal, 2000
27 Petroleum Engineering Renovate Rooms 201-202 Toilet Accessories, 2000
28 Petroleum Engineering Renovate Rooms 201-202 Visual Display Boards Submittal, 2000
29 Old Petroleum Engineering Renovation Electrical Submittal, 1984
30 Petroleum Engineering FP & C 81-42 Renovation Mechanical Operating & Maintenance Manual, 1983
31 Petroleum Engineering Renovation Mechanical Submittal Data, 1984
32 Petroleum Engineering Temperature Controls (Honeywell), 1984
33 Petroleum Engineering Air Handlers (Carrier), 1982
34 Petroleum Engineering Addition Air Compressor, 1984
35 Petroleum Engineering Addition backflow Prevention Devices, 1984
36 Petroleum Engineering Pumps/Chilled Water (PACO), 1982
37 Petroleum Engineering Climate Changers (A/H Trane), 1982
38 Petroleum Engineering Pumps/Condensate Return (Duplex) Weiman, 1982
39 Petroleum Engineering Duct (FRP-Spunstrand), 1982
40 Petroleum Engineering Exhaust Fans (Swartwout), 1982
41 Petroleum Engineering Expansion Joints, Steam/Condensate Hyspan, 1982
42 Petroleum Engineering Expansion Tank (H/W Storage) Wessels, 1982
43 Petroleum Engineering Fan Curves, 1982
44 Petroleum Engineering Fans, Wall, Vent (Loren Cook), 1982
45 Petroleum Engineering Filter Cartridge (Cuno), 1982
46 Petroleum Engineering Fire Alarm/Clock System, 1983
47 Petroleum Engineering Fire Dampers (Ruskin), 1982
48 Petroleum Engineering Fire Sprinkler System, 1982
49 Petroleum Engineering Grilles/Register (Titus), 1982
50 Petroleum Engineering Heat Exchanger (Thrush), 1982
51 Petroleum Engineering Pump/Hot Water (PACO), 1982
52 Petroleum Engineering Insulation (Heating, A/C, and Plumbing), 1982
53 Petroleum Engineering Addition Fixtures, 1983
54 Petroleum Engineering Johnson Control Proposal Lo-Limit Thermostat, 1983
55 Petroleum Engineering FP & C 80-12 Addition Mechanical Operating & Maintenance Manual, 1982
56 Petroleum Engineering Minor Lighting Changes, 1982
57 Petroleum Engineering Mud Traps FPC 80-12, 1983
58 Petroleum Engineering Plumbing Submittal, 1982
59 Petroleum Engineering Pressure Relief Valves/Hot Water Kunkle, 1982
60 Petroleum Engineering Pressure Reducing Valves-Steam, 1982
61 Petroleum Engineering Operating & Maintenance Manuals (Water Service), 1985
62 Petroleum Engineering Spec. Review, 1985
63 Petroleum Engineering Pump/Sump (Hydromatic), 1982
64 Petroleum Engineering Switchgear, 1982
box folder
19 1 Petroleum Engineering TAB Bills, 1985
2 Petroleum Engineering TAB Report, 1984
3 Petroleum Engineering TAB Report, 1984
4 Petroleum Engineering TAB Specs., 1984
5 Petroleum Engineering Temperature Controls (Johnson), 1983
6 Petroleum Engineering Ventilators (Roof) Bermuda Type C, 1982
7 Petroleum Engineering Vibration Isolation Schedule, 1982
8 Petroleum Engineering Air Conditioning (Lennox), 1975
9 Petroleum Engineering "Approved" Copies, 1950
10 Petroleum Engineering Cooling Units Roof (Lennox), 1976
11 Petroleum Engineering Purchase Orders, 1950
12 Petroleum Engineering Water Coolers, General Electric, 1960
13 Mass Communication: AV Upgrade Rooms 257,258,276 Operating & Maintenance Manuals, 2008
14 Mass Communication: Renovate Office Space in Lobby Area Closeout Documents, 2007
15 Mass Communication: 02709 Replace Chilled Water to Photo Lab Operating & Maintenance Manuals, 2003
16 Mass Communication: Fan Powered Boxes (Titus), 1982
17 Mass Communication: Fire Dampers, 1982
18 Mass Communication: Insulation Johns Manville, 19820
19 Mass Communication: Meters Badger, 1982
20 Mass Communication: Energy Conservation Project Operating & Maintenance Manual, 1982
21 Mass Communication: Panelboards ITE, 1982
22 Mass Communication: Pump (Uniflow) Weiman In-Line, 1982
23 Mass Communication: Steam Flow Meters Cadillac, 1982
24 Mass Communication: Energy Conservation Project TAB Report, 1984
25 Mass Communication: ECP TAB 81-26 Testing, Adjusting & Balancing, 1982
26 Mass Communication: Temperature Controls Johnson Controls, 1982
27 Mass Communication: Temperature Measuring Devices Thermo Sensors, 1982
28 Mass Communication: Acid Dilution Basins Grace Expoxtite, 1974
29 Mass Communication: Air Handling Units (Carrier), 1974
30 Mass Communication: Clocks, 1974
31 Mass Communication: Dimmers Hub Electric, 1975
32 Mass Communication: Duct Access Doors (Panels), 1974
33 Mass Communication: Fans #6 & #7 Loren Cook Company, 1974
34 Mass Communication: Fire Alarm System (Simplex), 1974
35 Mass Communication: Generator (Onan), 1974
36 Mass Communication: Electric Generating Parts (Onan) Instruction Manual, 1976
37 Mass Communication: Hot Water Heater Patterson-Kelley, 1974
38 Mass Communication: Light Fixtures, 1975
39 Mass Communication: Lighting Control Drawings, 1975
box folder
20 1 Mass Communication Originals: Mechanical Submittals, 1974
2 Mass Communication: Operating & Maintenance, 1976
3 Mass Communication: Overhead Door, 1974
4 Mass Communication: Panelboards, Switchboards, Etc., 1974
5 Mass Communication: Sound System (Balco), 1974
6 Mass Communication: Sound Trap (Attenuators) Semco, 1974
7 Mass Communication: Sprinkler System (Summer Falcon) (1 blueprint), 1974
8 Mass Communication: Sump Pump/Sewage Pump (Armstrong), 1974
9 Mass Communication: Air Balance Specs & Report Delta-T, 1976
10 Mass Communication: Temperature Controls Johnson Service, 1974
11 Mass Communication: Vibration Isolation Schedule V.M.C., 1974
12 Mass Communication: Air Handling Units 2D, 1992
13 Mass Communication: Light Fixtures, 1975
14 Mass Communication: Monitoring System (Johnson), 1986
15 Mass Communication: Photo Lab Equipment (BM3-500DC), 1978-1979
16 Drane Hall: ADA Renovation of the South Wing First Floor Project File, 2004
17 Drane Hall: Controls Submittal, 1997
18 Drane Hall: Controls Submittal, 1997
19 Drane Hall: Drane/Holden Controls Engineering Manual Volume 2, 1997
20 Holden & Drane Renovate EMS: Operating & Maintenance Manual, 1996
21 Drane Hall: Renovate Room 170 Mechanical Operating & Maintenance Manual, 1998
22 Drane Hall: Room 170 Renovation Mechanical Submittal, 1998
23 Bursar's Office Control Systems International, 1998
24 Drane Hall: HVAC Renovation Submittals, Operating & Maintenance Manuals and Parts List, 1975
box folder
21 1 Drane Hall: Renovation HVAC System at Bursar's Office Project File 089143CR, 1997
2 Drane Hall: Replace Stairwell Roofs Final Inspection, 1996
3 Drane Hall: Replace Stairwell Roofs Guarantees, 1996
4 Drane Hall: Replace Stairwell Roofs Roofing Submittal, 1996
5 Drane Hall: Fire Alarm Warranties, 1994
6 Drane Hall: Electrical Submittal, Fanning, 1988
7 Drane Hall: Operating & Maintenance Manuals/Submittal, 1988
8 Drane Hall: Replace Computer HVAC Windows, 1988
9 Drane Hall: Light Fixture Submittal, 1987
10 Drane Hall: Mail Room Project 85-35, 1986
11 Drane Hall: Testing/Balancing Report, 1987
12 Drane Hall: Electrical, Replace Water/Condensate Piping, 1988
13 Drane Hall: Fire/Jockey Pumps, 1988
14 Drane Hall: Mechanical Submittal/Replace Water/Condensate Lines, 1988
15 Drane Hall: Operating & Maintenance Manuals, Water/Condensate Replacement, 1989
16 Drane Hall: Pipe Hangers/Pipe Insulation/Valves, 1988
17 Drane Hall: Electrical Service Revisions Distribution Switchboard Manual, 1982
18 Drane Hall: Electrical Revisions/Electrical Submittal, 1983
19 Drane Hall: Fire Equipment, Computer Room, 1978
20 Drane Hall: Electrical Submittal, 1971
21 Drane Hall: Renovation Electrical Submittal, 1971
22 Drane Hall: Filters (Continental), 1972
23 Drane Hall: Mechanical Submittal, 1971
24 Drane Hall: Operation & Maintenance Manuals, 1971
25 Drane Hall: Pump (Chilled Water) Pacific, 1971
26 Drane Hall: Pump (Circulating Water) Weiman, 1971
27 Drane Hall: Air Balance Report (Engineered Air Balance Company), 1972
28 Drane Hall: Temperature Controls Johnson Service, 1971
29 Drane Hall: Renovation Transmittals, 1971
30 Drane Hall: Johnson Controls, 1958
31 Drane Hall: Johnson Controls, 1958
32 Drane Hall: Sump Pump (Chicago), 1958
33 Drane Hall: Sump Pump (Penberthy), 1958
34 Drane Hall: Test & Balance, 1998
35 Drane Hall: Transformers, 1981
36 Murray Hall: New Residence Hall Closeout Documents Volume 1, 2005
37 Murray Hall: New Residence Hall Closeout Documents Volume 2, 2005
box folder
22 1 Murray Hall: New Residence Hall Closeout Documents Volume 3, 2005
2 Murray Hall: New Residence Hall Closeout Documents Volume 4, 2005
3 Murray Hall: Concrete, 2004
4 Murray Hall: New Residence Hall Food Service Equipment, 2005
5 Murray Hall: Project #0401 Ludowici Clay Tile Warranty, 2005
6 Murray Hall: New Residence Hall Opposite Season Heating Test, 2005
7 Murray Hall: New Residence Hall Plumbing Fixtures, 2004
8 Murray Hall: New Residence Hall Revised Civil Drawings, 2005
9 Murray Hall: Section 05600-Site Utility Potable & Fire Protection H2O, 2004
10 Murray Hall: New Residence Hall Specs 1 of 3, 2004
11 Murray Hall: New Residence Hall Specs 2 of 3, 2004
12 Murray Hall: New Residence Hall Specs 3 of 3, 2004
13 Murray Hall: Termite Control Submittal, 2004
14 Quaker Research Farm: Submittal Package (Basic Idiq, Inc.), 2002
15 Quaker Research Farm: Agriculture Science Relocation Irrigation Equipment, 2002
16 Agriculture Building Relocation: Electrical Submittal, 1974
17 Agriculture Building Relocation: Mechanical Operating & Maintenance, 1984
18 Agriculture Facilities Security Fencing, 1984
19 Range & Wildlife Field House: Duct Furnaces, Oven Rooms (Reznor), undated
20 Range & Wildlife: Electric Furnace (Thermolyne), 1969
21 Murray Hall: Termite Control Submittal, 2004
22 Frazier Pavilion: Electrical Submittal, 2000
23 Frazier Pavilion: Mechanical Submittal, 1998
box folder
23 1 President's Shower Project File, 2004
2 Administration Stone Restoration: Closeout Documents 1 of 2, 2005
3 Administration Stone Restoration: Closeout Documents 2 of 2, 2005
4 Administration West Wing Renovation: Closeout Documents, 1998
5 Administration West Wing Renovation: Electrical Submittal, 1997
6 Administration West Wing Renovation: Fire Alarm Submittal, 1997
7 Administration West Wing Renovation: Hardware Proposal, 1997
8 Administration West Wing Renovation: Mechanical Submittal, 1997
9 Administration West Wing Renovation: Operating & Maintenance Manual, 1998
10 Administration West Wing Renovation: Punchlist, 1998
11 Administration Building West Wing Renovation: TAB Report, 1998
12 Administration West Wing Renovation: Temperature Controls Submittal, 1998
13 Administration Building AHU #5 Replacement: Ceiling Tile Submittal, 1995
14 Administration Replace AHU #5: Final Inspection, 1995
15 Administration AHU #5: Operating & Maintenance Manual, 1996
16 Administration Building HVAC Renovation: AHU #5 Punchlist, 1996
17 Administration Repair HVAC AHU #5: Submittal Data, 1995
18 Administration Building AHU #5 Replacement Temperature Controls Submittal, 1995
19 Administrative Building Electrical Submittal: University News & Publications Studio, 1986
20 Administration News & Publications: Mechanical Submittal, 1986
21 Administrative Building University News: Testing/Balancing Preliminary TAB, 1987
22 Administration Building Renovation: Fire Alarm Submittal, 1984
23 Administrative ECP/HVAC Revisions: Air Volume Dampers (Varimark), 1982
24 Administration: Energy Conservation Project Deficiency File, 1983
25 Administrative ECP/HVAC Revisions: Fan Powered Duct Boxes (Titus), 1983
26 Administration ECP/HVAC Revisions: Meters (Steam Flow) Badger, 1982
27 Administrative ECP/HVAC Revisions: Air Balancing/Testing Reports (TAB), 1984
28 Administration Building: Air Balancing Specifications, 1975
29 Administrative ECP/HVAC Revisions: Temperature Controls (Barber/Coleman), 1982
30 Administration ECP/HVAC Revisions: Temperature Measuring Elements, 1982
31 Administrative Air Conditioning: Air Distribution Equipment (Titus), 1975
32 Administration Air Conditioning: Clock & Signal System, 1975
33 Administrative Building: Communications Equipment (Amplicall), 1975
box folder
24 1 Administrative Air Conditioning: Dampers (Fire & Balancing) Ruskin, 1975
2 Administration Air Conditioning: Electrical Submittal, 1975
3 Administrative Air Conditioning: Filters (Air) Continental, 1975
4 Administration Air Conditioning: Filters (Chilled Water) Cuno, 1975
5 Administrative Building Renovation: Finish Schedule, 1975
6 Administration Air Conditioning: Insulation (Piping/Chilled Water Lines), 1975
7 Administrative Building: Kitchen Units (Dwyer), 1975
8 Administration Air Conditioning: Mechanical Submittal, 1977
9 Administrative Air Conditioning: Mechanical Submittal 2, 1975
10 Administration Air Conditioning: Mixing Boxes (Titus), 1975
11 Administrative Building: Operating & Maintenance, 1977
12 Administration Air Conditioning: Operating & Maintenance Manual, 1977
13 Administrative Air Conditioning: Plumbing (Sinks), 1975
14 Administration Air Conditioning: Pump (Condensate Return Unit) Economy, 1975
15 Administrative Building: West Tower Siren/ Vertical (Federal), 1975
16 Administration Air Conditioning: Sound System, 1975
17 Administrative Building: Air Balance & Test Report Delta-T, 1978
18 Administration Air Conditioning: Temperature Controls (Johnson Service), 1975
19 Administrative Air Conditioning: Wiring Diagram Board of Regents Room, 1968
20 Administration Air Compressor (Kellog/American), 1962
21 Administrative Building West Basement: Air Handler (Westinghouse) Curves, 1965
22 Administration Data Processing Center: Centrifugal Unipump (Weiman), 1957
23 Administrative Building: Clocks Board Room/Committee Rooms, Howard Schmidt Shop Drawings, 1975
24 Administration Building Registrars Office: Air Conditioning, Compressors, Condensers, 1959
25 Administrative Building West Basement: Compressors & Condensing Units, 1970
26 Administration Building: Condensers & Coolers (York) Board of Regents Room, 1968
27 Administrative Building: #219 Research Serv. Cooling System, undated
28 Administration Building: Heater (Unit) Room #117-119, undated
29 Administrative Visitors Center: Submittal Fan Coil Units, 1990
30 Administration Building Board of Regents Rooms: Flow Measuring Equipment (Rinco), 1964
31 Administrative Miscellaneous: Kitchen Cabinet, 1959
32 Administration Building Board Room: Lighting Revision (Howard Schmidt), 1969
33 Administrative Building Board of Directors Suite: Pressure Controllers (Taylor), 1968
34 Administration Building: Pump/Vacuum & Heating (Hoffman), 1957
35 Administrative Building Board of Regents Room: Pumps/Centrifugal (Thursh/Vertical), undated
36 Administration East Basement: Submittal Sump Pumps 1993
37 Administrative Building: Switchgear (G E Basement) East Wing, 1969
38 Administration Building Provost Area: Cooling Air Supply System, 1991
39 Administrative Building DDC Renovation: Temperature Control Drawings, 1990
40 Administration Building Basement: Temperature Controls (Johnson Service), 1972
41 Administrative Registrar Office IBM Room: Temperature Controls (Honeywell), 1963
42 Administration FP & C Interiors Finishout Room 41: Warranties & Operating/Maintenance Manual, 2001
43 Administrative: Water Cooler (Filtrine), 1963
44 Administration Building West Basement: Wiring Diagram, 1970
box folder
25 1 Business Administration Roof, 2002
2 Business Administration Rotunda: Asbestos Abatement, 2000
3 Business Administration Exterior Repairs: Project File, 2000
4 Business Administration A/H's: VFD Submittal, 1998
5 Business Administration: Install VSD's for A/H, 1999
6 Business Administration Plate Heat Exchanger: Insulation Submittal, 1996
7 Business Administration Plate Heat Exchanger Controls (Johnson), 1996
8 Business Administration Plate Heat Exchanger: Mechanical Submittal, 1996
9 Business Administration: Install Plate Heat Exchanger For Chilled Water System: Operating & Maintenance Manual, 1996
10 Business Administration Heat Exchanger for Chilled Water Systems: Operating & Maintenance Manual TAB Report, 1996
11 Business Administration Plate Heat Exchanger: Pump Resubmittal, 1996
12 Business Administration Plate Heat Exchanger Pump/Insulation Submittal, 1996
13 Business Administration Install Plate Heat Exchanger for Chilled Water Systems Submittal, 1996
14 Business Administration Install Plate Heat Exchanger: TAB Report, 1996
15 Business Administration Plate Heat Exchanger: Valves Submittal, 1996
16 Business Administration Plate Heat Exchanger Valve Submittal, 1996
17 Business Administration Energy Management System (Johnson Controls), 1996
18 Business Administration Room 67-69 Renovation Electrical Submittal, 1991
19 Business Administration Room 67-69 Electrical as Builts, 1991
20 Business Administration Computer Center: Balancing Dampers (Ruskin), 1986
21 Business Administration Computer Center: Ceiling Diffusers (Titus), 1986
22 Business Administration Controls (Valve Boxes, Thermostats, Etc.) Honeywell, 1986
23 Business Administration Computer Center: Electrical Submittal, 1986
24 Business Administration Computer Center: Fire Extinguishers (De Wees), 1987
25 Business Administration Computer Center: Floor Drains (Wade/Tyler), 1986
26 Business Administration Computer Center: Interior Insulation, 1986
27 Business Administration Computer Center: Miscellaneous Arch/Millwork, 1986
28 Business Administration Computer Center: Insulation Pipe Duct (Round Spiral), 1986
29 Business Administration Computer Room TAB, 1987
30 Business Administration Computer Center: Air Balance (Testing/Balancing), 1986
31 Business Administration Computer Center: Air Terminal Units (Vav) Titus, 1986
32 Business Administration Auditorium: Fixtures/Panelboard Electrical Submittal, 1985
33 Business Administration Fire Alarm System (Elkhart), 1984
34 Business Administration Stairway Electrical Submittal, 1983
35 Business Administration Stairway Fire Alarms, 1983
36 Business Administration Stairway Mechanical Operating & Maintenance, 1986
37 Business Administration Stairway Addition: Mechanical Submittal, 1985
38 Business Administration Stairtower Steel Drawing, 1986
39 Business Administration ECP Johnson Controls: Operating & Maintenance Manual, 1983
40 Business Administration Energy Measuring Devices Badger Meters: Mechanical Submittal, 1982
41 Business Administration ECP, 1982
42 Business Administration Testing/Balancing Report (Pebsco), 1984
43 Business Administration Temperature Controls (Johnson), 1983
44 Business Administration Aluminum Windows, Doors, and Wall System (Alenco), 1967
45 Business Administration Chalkboards/Bulletin Boards, 1969
46 Business Administration Chilled Water Pump & Hot Water Pump (PACO), 1967
47 Business Administration Clock & Fire Alarm System: Submittal (Simplex), 1969
48 Business Administration Condensate Pump (Skidmore), 1967
49 Business Administration Conduit Routing & Concealed Cables Shop Drawings, 1969
50 Business Administration Doors & Windows, 1969
51 Business Administration Doors, Blinds, Windows, 1969
52 Business Administration Ducting (Flexible) Thermaflex, 1967
53 Business Administration Electrical Submittal: Unit Power Center, Panels, Dry Transformers, Underfloor Duct (Duke), 1967
54 Business Administration Electrical Switchgear (Powermaster), 1969
55 Business Administration Elevators (Westinghouse), 1969
box folder
26 1 Business Administration Ceiling Fan (Penn Ventilator), 1967
2 Business Administration Filters (American Air), 1969
3 Business Administration Fire Hose Cabinets & Dampers (W.D. Allen Co.), 1969
4 Business Administration Fire Pumps (PACO), 1969
5 Business Administration Fixtures Submittal, Air Diffusers (Troffers), 1967
6 Business Administration Fountain Lighting (Kim) Shop Drawings, 1969
7 Business Administration Flow Charts: Hot and Chilled Water Pumps, undated
8 Business Administration Hot Water Generators, Valves, Traps, Heaters, Strainers, 1967
9 Business Administration Hot Water Circulator (Thrush), 1967
10 Business Administration Pump House Submittal (Synro-Flo System), 1981
11 Business Administration Insulation for Plumbing, Heating, A/C, 1967
12 Business Administration Meters Condensate Flow Water, 1969
13 Business Administration Miscellaneous Documents, 1967
14 Business Administration Mixing Boxes, Grille, Diffusers (Tuttle Bailey), 1967
15 Business Administration Paint Schedule Grasscloth, 1969
16 Business Administration Parts & Maintenance, 1967
17 Business Administration Plumbing Submittal, Fixtures, Drains (Eljer-Wade Co.) 1967
18 Business Administration Fire Pumps: Time Delay Relay (Pneumatic), undated
19 Business Administration Power Communication Plan: First Floor Management Simulation Lab, 1969
20 Business Administration Screens (Da-Lite Jr. Electrol), 1969
21 Business Administration Sewage Pump (Duplex) PACO, 1967
22 Business Administration Sounds System and TV System: Submittal, 1969
23 Business Administration Sump Pump (Duplex) PACO, 1967
24 Business Administration Temperature Controls (Johnson Service), 1969
25 Business Administration Thermometers for Hot Water & Chilled Water, Converters, Plumbing, 1969
26 Business Administration Trash Enclosure, 1969
27 Business Administration Ventilation Test Reports, undated
28 Business Administration Vibration Isolators (Amber Booth), 1967
29 Business Administration A/C Dean's Office, 1975
30 Business Administration Air Handler Correspondence, 1972
31 Business Administration Domestic Water Pump Replacement Mechanical Submittal, 1996
32 Business Administration Tower Elevators Controls: Owners Manual, 1989
33 Business Administration Operating & Maintenance Data (West Texas Mechanical, Inc.), 1982
34 Business Administration Replaced House Pumps (Booster), 1981
35 Business Administration Window Light Replacement Warranty (C & G Improvement Co.), 1976
36 Coleman, Weymouth, Stangel, Murdough: Operating & Maintenance Manual Booster Pump Replacement, 1998
37 Residence Halls: Sidewalks & Playing Courts Contract #683, 1986
38 Residence Hall Kitchen: Kitchen Fire Suppression System, 1987
39 Residence Halls: Kitchen Hood Fire Mechanical & Electrical Submittal, 1986
40 Residence Halls: Kitchen Fire Hood Suppression System Contract #699 Correspondence, Notice to Proceed, 1986
41 Horn/Knapp: Light Fixtures, Bath & Patio Tile, 1987
42 Horn/Knapp: Bath & Patio Tile Mechanical Submittal, 1987
43 Bledsoe/Gordon: Bath & Patio Tile Operating & Maintenance, 1987
44 Residence Hall: Outside Electrical Conduit, Fitting & Wire, 1986
45 Residence Halls: Outside Electrical Renovation Phase II, 1986
46 Residence Halls: Outside Electrical Renovation II Submittal, 1986
47 Residence Halls: Outside Electrical Renovation Switchboard Switches, 1985
48 Residence Hall: Exterior Windows Contract #663, Notice to Proceed, 1986
49 Residence Hall: Serving Counters, Fixtures & Panelboards, 1986
50 Residence Halls: Serving Counters, Hardware Schedule, 1985
51 Residence Halls: Serving Counters Inspection Report Phase I & II, 1985
52 Residence Halls: Serving Counters Mechanical Submittal, 1986
53 Residence Halls: Serving Counters Contracts, Acceptance, Bids, Notice to Proceed, 1985
54 Residence Halls: Serving Counters Operating & Maintenance Manual, 1986
55 Residence Halls: Air Balancing & Testing Reports (TAB) Serving Counters, 1986
56 Residence Halls: Serving Counters, Temperature Controls (Johnson), 1986
57 Residence Halls: Bath Renovation Electrical Submittal (Larcon), 1986
58 Residence Halls: Bath Renovations Contract #669, Bid Sheets & Notice to Proceed, 1986
59 Residence Halls: Inspection Reports, Sewer Renovations, 1985
60 Residence Halls: Sewer Renovations, Contract 538001 Notice to Proceed, Contract & Bid Info, 1985
61 Residence Halls: Pluming Fixtures (Eljer) Serving Counters, 1985
62 Residence Halls: Hardware/Hollow Metal Wall Gates Serving Counters, 1984
63 Residence Halls: Miscellaneous Renovations Inspection Reports, 1984
64 Residence Halls: Exterior Doors, Addendum #I Contract 613, 1984
65 Residence Halls: Exterior Doors Hardware Submittals, 1985
66 Residence Halls: Exterior Doors Inspection, 1985
box folder
27 1 Physical Plant: Window Shade & HVAC Control Mechanical Submittal, 1998
2 Traffic & Parking Reroof & GM Sheds, Asbestos Abatement Submittal, 1998
3 Traffic & Parking: Roof Replacement Grounds Maintenance Shed Reroof, 1998
4 Physical Plant Room 9: Install Partition Maintenance Manual & Warranty, 1997
5 Physical Plant: Repaint Exterior Facades Paint Submittal, 1996
6 Physical Plant Complex: Repaint Exterior Facade, Warranties/Submittal, 1996
7 Physical Plant: Motor Pool Closeout Documents, 1996
8 Physical Plant: Motor Pool Phase 2 Mechanical Submittal, 1996
9 Physical Plant parking Expansion: Electrical Submittal, 1994
10 Physical Plant Parking & Renovation: Mechanical Submittal & Insulation, 1994
11 Physical Plant Parking Expansion: Phase II Schematics & Design, 1993
12 Physical Plant: Parking Phase 2 Warranties & Guarantees, 1994
13 Physical Plant Administration & Shop Roofs: Final Inspection Report, 1994
14 Physical Plant Office Renovation: Electrical Submittal, 1994
15 Physical Plant Office Renovation: Final Inspection Reports, 1994
16 Physical Plant Office Renovation: Fire Protection System Submittal, 1994
17 Physical Plant Office Renovation: Hardware Submittal, 1994
18 Physical Plant Office Renovation: Lighting Fixture Submittal, 1994
19 Physical Plant Office Renovation: Mechanical Operating & Maintenance Manual, 1994
20 Physical Plant Office Renovation: Mechanical Submittal, 1994
21 Physical Plant Office Renovation: TAB Report, 1995
22 Physical Plant: Renovation of Existing Offices, 1994
23 Physical Plant Office Renovation: Temperature Controls Submittal, 1994
24 Physical Plant Office Renovation: V/D Wall Raceway, 1993
25 Physical Plant Office Renovation: Warranties, 1994
26 Physical Plant Phase III: AHU Submittal Warehouse, 1993
27 Physical Plant Warehouse Office Renovation: Final Inspection Reports, 1993
28 Physical Plant Phase III: Warehouse Inspection & Warranties, 1993
29 Physical Plant Phase III: Warehouse (Johnson Controls), 1993
30 Physical Plant Phase III: Proposed Communications Changes, 1992
31 Physical Plant Phase 2: A/E Instructions, 1991
32 Physical Plant Phase 2: AHU 1 Submittal, 1992
33 Physical Plant II: Electrical Operation Manual, 1991
34 Physical Plant Phase II: Electrical Submittal, 1992
35 Physical Plant Phase 2: Elevator Shop Drawings, 1991
36 Physical Plant Estimates, 1990
37 Physical Plant Phase II: Fire Alarm Enunciator Panel Operating & Maintenance Manual, 1993
38 Physical Plant Phase II: Fire Alarm Submittal, 1992
39 Physical Plant Phase 2: Fire Extinguisher and Cabinet Submittal, 1991
40 Physical Plant Phase II: ABCO Fire Protection Resubmittal, 1992
41 Physical Plant Phase II: Submittal Fire Protection/Sprinkler, 1992
42 Physical Plant Phase 2: Flow Measure & Convertor, 1992
43 Physical Plant Phase 2: Hardware Schedule, 1992
44 Physical Plant Phase II: Inspection & Warranties, 1994
45 Physical Plant Phase II: Mechanical Operating & Maintenance Manual, 1993
46 Physical Plant Phase II: Mechanical Resubmittal, 1992
47 Physical Plant Phase II: Mechanical Submittal Volume I & II, 1993
48 Physical Plant Phase II: Mechanical Submittal Volume I & II, 1993
49 Physical Plant Phase II: Mechanical Submittal, 1992
50 Physical Plant Phase II: Mechanical Submittal, 1992
box folder
28 1 Physical Plant Phase II: North Areaway Gate, 1993
2 Physical Plant Phase II: Official Room Numbers, 1993
3 Physical Plant Phase II: Pipe Insulation Submittal, 1992
4 Physical Plant Phase II: Architectural Submittal (Projection Screen), 1991
5 Physical Plant Phase II: Proposed Communications Changes Not Accepted, 1991
6 Physical Plant Phase II: Stair Treads, 1992
7 Physical Plant Phase II: TAB Report, 1993
8 Physical Plant Phase II: TAB, Specifications, Comments, 1992
9 Physical Plant Phase II: Office Facilities Temperature Controls (Johnson Controls), 1993
10 Physical Plant Phase II: Warranties, undated
11 Physical Plant Phase II: V/D Conduit System, 1992
12 Physical Plant Phase II: Warranty & Guarantee, 1993
13 Physical Plant Site & Utilities: Welding & Compaction Tests, 1991
14 Physical Plant Phase I: Cabinet Shop Trench, 1993
15 Physical Plant Expansion: Design Development Comments, 1988
16 Physical Plant Paint & Cabinet Shop, 1991
17 Physical Plant Site Work: Electrical Submittal, 1990
18 Physical Plant Lumber Storage Building: Electrical Submittal, 1990
19 Physical Plant Paint & Cabinet Submittal: Electrical (P & C), 1990
20 Physical Plant Phase I: Paint & Cabinet Shop Finish Hardware Inspection, 1991
21 Physical Plant Paint & Cabinet Submittal: Fire Alarm, 1990
22 Physical Plant Site: Fire Line Piping, 1991
23 Physical Plant Addition & Renovation: Fire Protection System, 1991
24 Physical Plant Renovation: Handicapped Toilets, 1989
25 Physical Plant Paint & Cabinet Hardware Changes: Extra Charges, 1991
26 Physical Plant New Lumber Storage Building Inspection, 1991
27 Physical Plant Site Work & Utilities Inspection, 1991
28 Physical Plant Paint & Cabinet Building: Inspection & Miscellaneous, 1991
29 Physical Plant Master Plan, 1990
30 Physical Plant New Paint & Cabinet: Mechanical Submittal, 1990
31 Physical Plant New Paint & Cabinet Shops Building, 1990
32 Physical Plant: Miscellaneous II, 1984
33 Physical Plant Phase I: Lumber Storage Building Project Operating & Maintenance Manual, 1993
34 Physical Plant Paint & Cabinet Shop Cabinet Operating & Maintenance Manual, 1992
35 Physical Plant Phase 1 Paint & Cabinet Shop Operating & Maintenance Manual, 1992
36 Physical Plant Paint & Cabinet Operating & Maintenance, 1990
37 Physical Plant Paint & Cabinet Operating & Maintenance, 1993
38 Physical Plant Paint & Cabinet Shop Paint Booth, 1986
39 Physical Plant Phase I Paint & Cabinet Shop: Paint Booth Operating & Maintenance Manual, 1992
40 Physical Plant Paint & Cabinet Submittal: paint Booth Air Replacement Units, 1991
41 Physical Plant Paint Spray Booth, 1991
42 Physical Plant PCOs, 1991
43 Physical Plant Review Comments, 1989
box folder
29 1 Physical Plant Phase I: Paint & Cabinet Roofing Submittal, 1991
2 Physical Plant Site Mechanical Submittal, 1991
3 Physical Plant Phase I & II: Site Related Parking, 1991
4 Physical Plant Paint & Cabinet Shop: Site Utilities, 1991
5 Physical Plant Spray Booth Paint Shop (DeVilbiss), 1966
6 Physical Plant Phase I: Paint & Cabinet TAB (Review Specifications), 1992
7 Physical Plant Paint & Cabinet Shop Submittal: Unit Heaters, 1991
8 Physical Plant Shops: Heating Remodel Electrical Submittal, 1983
9 Physical Plant Shops Heating & Remodeling Mechanical Submittal, 1983
10 Physical Plant Heating for Shops, 1984
11 Physical Plant Air Conditioning Units (McQuay), 1960
12 Physical Plant Air Filters (Airsan), 1960
13 Physical Plant Amp Voltage Recorder G.E. Electric Campus Use Shops, undated
14 Physical Plant Approved Submittal, 1960
15 Physical Plant Circulating Pump (Aurora), 1960
16 Physical Plant Air Compressor (Curtis), 1960
17 Physical Plant Condensers (Air Cooled) McQuay, 1960
18 Physical Plant Convectors (Trane), 1959
19 Physical Plant Electrical Submittal, 1960
20 Physical Plant Evaporative Coolers (Kruger-Tuttle Bailey), 1960
21 Physical Plant Exhaust Fans (Penn Domex Exhausters), 1960
22 Physical Plant Exhaust System for Cabinet/Mill Shops, 1960
23 Physical Plant Garage Equipment, Dumpster, 1960
24 Physical Plant Heaters, Gas Units (Trane), 1960
25 Physical Plant Electrical Lights & Panels, 1960
26 Physical Plant Plumbing, 1960
27 Physical Plant Return Air Grilles (Titus), 1960
28 Physical Plant Sawdust Collection, 1960
29 Physical Plant Speaker System (Standard Electric), 1960
30 Physical Plant Steam Accumulator (Peerless), 1959
31 Physical Plant Sump Pump (Yeomans), 1960
32 Physical Plant Unit Heaters (McQuay), 1960
33 Physical Plant Ventilators (Penn), 1959
34 Physical Plant Vibration Eliminators (Trane Co.), 1960
35 Physical Plant Water Coolers (Halsey Taylor), 1954
36 Physical Plant Garage: Student Union Building Air Compressors, 1968
37 Physical Plant Air Compressor Unit/Wisconsin Paint Shop, 1972
38 Physical Plant Centrifugal Pumps (Briggs Stratton AMCO), undated
39 Physical Plant Controls for Boilers: Magnetrol Water Level, 1959
40 Traffic and Parking: Electric, Wiring Diagrams, 1961
41 Physical Plant Electrical Shop: Onan Electric Generating Plants, undated
42 Physical Plant Emergency Generator (Winco), 1974
43 Physical Plant Portable Generator (Onan), 1970
44 Physical Plant Temperature Controls (Johnson Service), 1970
45 Physical Plant Lathe Machine Shop, 1972
46 Physical Plant Lubbock Electrical Submittals, undated
47 Traffic/Parking Counselors Office: Mechanical Submittal, 1969
48 Physical Plant Replace Garage Heaters, 1987
49 Physical Plant basement Equipment Room: Piping/Heating Water Supply & Return C/W, 1970
50 Physical Plant Roof Warranty, 1983
51 Physical Plant Electric Shop: Skil Roto Hammer #728, undated
52 Physical Plant Band Saws: Carpenter Shop, 1970
53 Traffic/Parking Office Renovation: Air Balance Test, 1989
54 Physical Plant Warehouse Office Renovation: TAB Report, 1993
55 Physical Plant Underground Storage Tank Submittal, 1992
56 Wiggins Dining: Air Wash Fan Replacement, 2009
57 Wiggins Dining Complex: Renovate 3 Training Rooms, TDLR Compliance Letter, 2007
58 Athletic Dining Complex: Tremco Roof Warranty, 2004
59 Wiggins Career Center: Tremco Roof Warranties, 2004
60 Wiggins Career Center: Aluminum Storefront, 2002
61 Wiggins Career Center: Ceramic Tile Grout, 2002
62 Wiggins Career Center: Concrete Mix, Window Treatment, 2002
63 Wiggins Career Center: Doors, Frames, & Hardware, 2002
64 Wiggins Career Center: Electrical Submittal, 2002
65 Wiggins Dining: Engineering Manual, 2002
66 Wiggins Career Center: Fire Alarm System, 2002
67 Wiggins Career Center: Fire Sprinkler Design & Equipment, 2002
68 Wiggins Career Center: Masonry, 2002
69 Wiggins Career Center: Millwork 3 Blue Prints, 2002
box folder
30 1 Wiggins Career Center: Operating & Maintenance Manual, 2002
2 Wiggins Career Center: Paint, 2002
3 Wiggins Career Center: Partitions, Metal Studs, Fire Extinguishers, Gypboard, 2002
4 Wiggins Career Center: Plumbing & Mechanical Submittal, 2002
5 Wiggins Career Center: Projection Screen, Toilets, 2002
6 Wiggins Career Center: Reinforcing & Structural Steel, 2002
7 Wiggins Fire Protection Phase 2: Automatic Fire Sprinkler System, 2000
8 Wiggins Fire Suppression: Electrical/System Submittal, 2000
9 Wiggins Fire Protection: Fire Suppression Draws/Calc Submittal, 2000
10 Wiggins Fire Protection System: Mechanical Diffuser Submittal, 2000
11 Wiggins: Parking Expansion & Renovation Project File, 2000
12 Wiggins Kitchen: Operating & Maintenance Manuals Hot Water Heater Replacement, 1989
13 Athletic Dining Hall: Operating & Maintenance Manuals Domestic Water Heater, 1990
14 Wiggins Complex: Trash Chutes Detection Equipment, 1992
15 Wiggins Roof Replacement: Addendum #1 (4 blueprints), 1987
16 Wiggins Roof Replacement: Addendum #2 (4 blueprints), 1987
17 Wiggins Roof Replacement: Review Documents, 1987
18 Wiggins Complex: Shop Heating Saddle Tramp Shop, 1986
19 Wiggins Kitchen: Sewer Renovation Bid Sheet, 1986
20 Wiggins Complex: Fire Safety Alarms II Submittal, 1983
21 Wiggins Kitchen/Dining Room: Air Washer Pre-Heat Coils, 1983
22 Wiggins Dining Renovation: Electrical Submittal, 1983
23 Wiggins Complex: Exhaust Register (Barber/Coleman), 1983
24 Wiggins Dorm Cafeteria: Plumbing Submittal (Fields), 1983
25 Wiggins/Weymouth Complex: Pumps (Domestic Cold Water Booster) Aurora, 1980
26 Wiggins/Wall/Gates Dining Hall: Temperature Controls (Johnson), 1983
27 Wiggins Complex: Fire Alarm Upgrade Phase 1, 1982
28 Wiggins Complex: Mechanical Submittal, 1981
29 Wiggins Complex: Metering Devices (Change Orders), 1983
30 Athletic Dining: Cooler & Freezer Units, 1970
31 Athletic Dining Electrical Submittal: Fixtures, Circuits, Breakers, Panel Boards, 1964
32 Wiggins Complex: Fan Units (Curves for Air Handler) Barry Blower Co., 1970
33 Athletic Dining Facilities: Filters (American Air), undated
34 Wiggins Dining Facilities: Fire Alarm & Clock System (Amco/Simplex), 1970
35 Wiggins Complex: Hot Water Storage (Adamson Tube Bundle), 1972
36 Athletic Dining: Kitchen Hoods, 1970
37 Athletic Dining Facilities: Kitchen Submittal, 1971
box folder
31 1 Athletic Dining Facilities: Air Washer, Fan Coil for A/C Units Submittal, 1970
2 Athletic Dining Facilities: Mechanical Submittal, 1970
3 Athletic Dining Facilities: Meters (Condensate) Neptune, 1976
4 Athletic Dining Facilities: Sound System Amplifiers, Tuners, TV, Baffal, 1970
5 Athletic Dining Facilities: Temperature Controls (Johnson Service), 1970
6 Wiggins Originals: Adjust-a-lip Dockboards, 1966
7 Wiggins Complex: Air Unites (Built-Up) Shop Drawings, 1966
8 Wiggins Complex: Anchor Bolts, Frames & Screens Shop Drawings, 1966
9 Wiggins Complex: Balco Resistance Elements (Honeywell Inc.), 1968
10 Wiggins Complex: Built-In Furniture Shop Drawings (9 blueprints), 1966
11 Wiggins Complex: Clock and Fire Alarm System (Simplex), 1970
12 Wiggins Complex: Cold Storage Doors Shop Drawings, 1966
13 Wiggins Complex (Penthouse): Kitchen Area Condensing Units Walk-In Coolers, 1967
14 Wiggins Originals: Electrical Distribution Equipment 1, 1967
15 Wiggins Originals: Electrical Distribution Equipment 2, 1967
16 Wiggins Originals: Electrical Distribution Equipment 3, 1966
17 Wiggins Complex: Electric Doors (Dock) Clark Wiring Diagram, 1966
18 Wiggins Complex: Electric Folding Doors (Wayne Iron Works) Wiring Diagram, 1966
19 Wiggins Complex: Elevator (Hunter Hayes), 1966
20 Wiggins Originals: Emergency Generator Operating Instructions, undated
21 Wiggins Complex: Emergency Generator (Onan), 1961
22 Wiggins Complex: Emergency Generator Waukesha Parts List, Model F817G, 1966
23 Wiggins Complex: Exterior Treads (Stone) Shop Drawings, 1966
24 Wiggins Complex: Fan Plenums Industrial Acoustics Shop Drawings, 1966
25 Wiggins Complex: Fire Sprinkler System (Viking), 1967
26 Wiggins Complex: Folding Partitions, Folding Doors Shop Drawings (Pella Co.), 1966
27 Wiggins Complex: Framing/Roofing Deck (Texteel), 1967
28 Wiggins Complex: Granite Shop Drawings, 1966
29 Wiggins Complex: Hardware Schedule, 1966
30 Wiggins Complex: Intrusion Alarm System (Thompson Lighting), 1966
31 Wiggins Complex: Kitchen Duct & Exhaust Shop Drawings, 1966
32 Wiggins Complex: Kitchen Time Clock, 1967
33 Wiggins Complex: Lighting Fixture Dimmerboard Submittal, 1970
box folder
32 1 Wiggins Complex: Lighting Protection Inc. Shop Drawings, 1969
2 Wiggins Complex: Lockers Shop Drawings, 1966
3 Wiggins Complex: Mail Boxes Shop Drawings, 1966
4 Wiggins Originals: Mechanical Operating & Maintenance Manual, 1967
5 Wiggins Complex: Miscellaneous Electrical, 1966
6 Wiggins Complex: Overhead Door (Kitchen to Tunnel), undated
7 Wiggins Complex: Paint Schedule, 1967
8 Wiggins Complex: Parking Facilities Lighting, 1966
9 Wiggins Originals: Plumbing Manual, 1967
10 Wiggins Complex: Plumbing Specs (Kohler Co.), 1966
11 Wiggins Complex: Refrigeration Equipment (Drinking Water Chiller) Package Chillers, 1967
12 Wiggins Complex: Rolling Doors/Grills Shop Drawings (Lawrence Co.), 1966
13 Wiggins Complex: Roof Scuttles Shop Drawings, 1966
14 Wiggins Originals: Shop Drawings Volume 1 of 2, 1966
15 Wiggins Originals: Shop Drawings Volume 2 of 2, 1969
16 Wiggins Complex: Shower Receptors (U.S. Art Marble) Terrazzo Shop Drawings, 1966
17 Wiggins Complex: Signs Shop Drawings, 1966
18 Wiggins Complex: Silver Washer (Wiring Diagram) Kraeft, 1967
19 Wiggins Complex: Skylights Shop Drawings, 1966
20 Wiggins Originals: Sound Equipment, 1967
21 Wiggins Originals: Specs Mechanical & Electrical, 1966
22 Wiggins Complex: Steel Corner Guards Kitchen/Dining Area Shop Drawings (40 blueprints), 1966
23 Wiggins Complex: Tackboards/Chalkboards Shop Drawings, 1966
24 Wiggins Originals: Temperature Controls (Honeywell), undated
25 Wiggins Originals: Temperature Controls (Honeywell), undated
box folder
33 1 Wiggins Originals: Temperature Controls (Honeywell), undated
2 Wiggins Originals: Temperature Controls (Honeywell), 1966
3 Wiggins Originals: Temperature Controls (Honeywell), 1966
4 Wiggins Originals: Temperature Controls (Honeywell), undated
5 Wiggins: Temperature Controls (Honeywell), 1966
6 Wiggins Complex: Terminal Reheat Units, Refrigeration/AC Shop Drawings, 1966
7 Wiggins Complex: Terra Cotta Coping Shop Drawings, 1966
8 Wiggins Complex: Toilet Room Accessories Traverse Tracks Shop Drawings, 1966
9 Wiggins Complex: Toilet/Shower Partitions Shop Drawings (23 blueprints), 1966
10 Wiggins Complex: Towing/Trash Chutes Shop Drawings, Jet Trailers (Medley-Kysor), 1966
11 Wiggins Complex: Trash Chutes (Lehman Steel) Shop Drawings (3 blueprints), 1966
12 Wiggins Complex: Valves Hot Water Reheat (Units for Dorms) Honeywell, 1966
13 Wiggins Complex: Water Pressure Booster System (Syncroflo), 1966
14 Wiggins: Water Treatment Equipment (General Ionics), 1966
15 Wiggins Complex: Windows (American Windows Co.) Shop Drawings 4 Blue Prints, 1966
16 Wiggins Miscellaneous Controls Drawings, undated
17 Wiggins Miscellaneous Elevator Letter, 1986
18 Wiggins Complex: Water Softener (Bruner Model 900 IBR-3), 1975
19 Wall/Gates Hall: Life Safety Improvements TAB Report, 2005
20 Wall/Gates Hall: Life Safety Improvements Warranty & Operating & Maintenance Manual, 2005
21 Wall/Gates Hall: Replace West Roof Wing Closeout Documents, 2002
22 Wall/Gates & Hulen/Clement Halls: Kitchen Waste Line Rehabilitation Mechanical Submittal, 1999
23 Wall/Gates Halls: Elevator Renovation Cab Submittal, 1999
24 Wall/Gates Halls: Elevator Renovation Car Station Drawings Submittal, 1999
25 Wall/Gates Hall: Elevator Renovation Comments & Specs, 1998
26 Wall/Gates Halls: Elevator Renovation Fire Status Drawing Submittal, 1999
27 Wall/Gates Halls: Elevator Renovation Equipment Room HVAC Remodel (Johnson Controls), 1999
28 Wall/Gates Halls: Elevator Renovation Long In-Car Lantern Submittal, 1999
29 Wall/Gates: Elevator Machine Room Mechanical Submittal, 1999
30 Wall/Gates: Common Area Roofs Close-Out & Warranties, 1995
31 Wall/Gates: Common Area Roofs Preliminary Inspection Report, 1995
32 Wall/Gates Hall Roof Repair: Addendum, 1993
33 Wall/Gates Roof Repairs, 1993
34 Wall/Gates Serving Line & Handicap Renovation, 1991
35 Wall/Gates: Air Washer (Johnson Controls), 1983
36 Wall/Gates Dorm Kitchen: Mechanical Submittal, 1983
37 Wall/Gates: Hot Water Generator Mechanical Submittal, 1983
38 Wall/Gates Hall: Hot Water Generator Mechanical Submittal, 1983
39 Wall & Gates: Absorption Log Sheet on 16 E 354, 1966
40 Wall/Gates: Absorption Machines (Carrier Model 16E), 1964
box folder
34 1 Wall/Gates: A/C & Heating Units Kitchen Offices-Supervisors and Dieticians Apartments (Kritzer), 1962
2 Wall/Gates: Air Conditioning Units (Buffalo Units), 1963
3 Wall/Gates: Air Filters (Continental), 1964
4 Wall/Gates: Air Handlers & Fan Motors (Thermol), 1964
5 Wall/Gates: Bathroom & Window Accessories, 1962
6 Wall/Gates: Carrier Corporation, 1966
7 Wall/Gates: Chemical Pump & Softeners Precision Chemical, undated
8 Wall/Gates: Cooling Tower (Ceramic), 1962
9 Wall/Gates: Deep Fat Fryers, 1970
10 Wall/Gates & Hulen/Clement: Door Alarm Circuit Supervisors Apartment, 1963
11 Wall/Gates, Hulen/Clement, & Stangel Murdough: Door (Wood Folding) Pella, undated
12 Wall/Gates: Electrical Submittal, 1962
13 Wall/Gates: Elevators, 1962
14 Wall/Gates: Exhaust Fan for Kitchen, 1962
15 Wall/Gates: Exhaust Fans & Laundry & Elevator Equipment Room (Brundage), 1962
16 Wall/Gates: Filters (Kitchen Range) Hood for Grease (Airsan), 1962
17 Wall/Gates: Fire Protection Equipment, 1962
18 Wall/Gates Hall Originals: Fire Sprinkler System, 1953
19 Wall/Gates: Hardware, 1962
20 Wall/Gates: Heat Exchanger on Absorption Machine (Patterson Kelly), 1961
21 Wall/Gates: Heating Coils Ceiling Units (Wing), undated
22 Wall/Gates Hall Originals: Honeywell Controls Drawings, 1963
23 Wall/Gates: Hot Water Convertor (Paterson Kelly), 1962
24 Wall/Gates: Hot Water Regulators For Showers (Powers), 1962
25 Wall/Gates & Hulen/Clement: Incinerator Alarms For Doors, 1963
26 Wall/Gates, Hulen/Clement, & Stangel/Murdough: Incinerators Maintenance (Alamo Mfg. Co.) 1970
27 Wall/Gates: Index of Major Items Specified and the Items Furnished, 1962
28 Wall/Gates: Insulation Piping (Viking), 1962
29 Wall/Gates: Refrigeration, Chillers Pumps, Condensing Units (Larco), 1962
30 Wall/Gates: Refrigeration Walk-In (Krack), 1962
31 Wall/Gates: Refrigeration Units (Carrier Units), 1963
32 Wall/Gates: Sewage Ejector Pump (Weiman), 1962
33 Wall/Gates: Steam Specialties, 1962
34 Wall/Gates: Temperature Controls (Honeywell), 1963
35 Wall/Gates: Thermometers Gauges for Hot/Cold Water (Weskler), 1961
36 Wall/Gates: Toilet Partitions, 1962
37 Wall/Gates: Water Coolers (Halsey Taylor), 1962
38 Wall/Gates: Water Softener (Bruner Brine Controls), 1962
39 Wall/Gates: Windows, 1962
40 Wall/Gates Roof, 2004
41 Psychology Building: CIP-ADA Renovation, 2004
42 Psychology Renovate Room B2 Electrical Submittal, undated
43 Psychology B2 Teinert Product Specifications, 2001
44 Psychology: Replace Roof Owner's Manual, 1999
45 Psychology: Fourth Floor Renovation Close Out Meeting Minutes, 1996
46 Psychology Building: 4th Floor Renovation Control Submittal, 1995
47 Psychology Building: Fourth Floor Renovation Electrical Submittal, 1995
48 Psychology Building: 4th Floor Renovation Elevator Control System Submittal, 1995
49 Psychology Building: 4th Floor Renovation Elevator Manual, 1995
50 Psychology: 4th Floor Renovation Final Inspection, 1995
51 Psychology Building: Fourth Floor Renovation Fire Alarm Submittal, 1995
52 Psychology Building: Fourth Floor Renovation Mechanical Submittal, 1995
53 Psychology: 4th Floor Renovation Refrigeration Operating & Maintenance Manual, 1989
54 Psychology Building: 4th Floor Renovation Operating & Maintenance Manual Rooftop Unit, 1995
55 Psychology Building: 4th Floor Renovation Warranties, Guarantees, & Certificate of Substantial Completion, 1995
56 Psychology/Speech: Acoustical Doors, 1963
57 Psychology/Speech: Air Distribution Equipment (Barber Colman), 1963
58 Psychology/Speech: Condensate Pump (Skidmore), 1963
59 Psychology/Speech: Condensing Units (Payne), 1963
60 Psychology/Speech: Conduit Underground (Carlon), 1963
box folder
35 1 Psychology/Speech: Control Systems (Heating/AC) Simplex, 1964
2 Psychology/Speech: Steam Convertor (Patterson-Kelley), 1963
3 Psychology/Speech: Dimmer/Control Board Speech Clinic Theatre, 1964
4 Psychology/Speech: Dimming System Theatre, undated
5 Psychology/Speech: Main Switchboard Oil Fused Cutouts Relay Controls Electrical Submittal, 1963
6 Psychology/Speech: Exhaust Fans (Ammerman), 1963
7 Psychology/Speech: Filters (American Air), 1963
8 Psychology/Speech: Fire Protection Equipment (W.D. Allen), 1963
9 Psychology/Speech: Fixture Schedule, 1963
10 Old Speech Building: Heating & Cooling Units (Lennox), 1966
11 Psychology/Speech: Hot Water Circulating Pump (Thrush), 1963
12 Psychology/Speech: Hot Water Heater (Wendland), 1963
13 Psychology/Speech: Index of Major items Specified & Furnished, 1964
14 Psychology/Speech: Insulation/Piping, 1963
15 Psychology/Speech: Lockers (Republic Steel), 1964
16 Psychology/Speech: Louvers & Access Doors Fire Dampers 1963
17 Psychology/Speech: Speech Hearing Clinic Metal Signs (Colite), 1963
18 Psychology/Speech: Plumbing, 1963
19 Psychology/Speech: Pressure Reduction Valves (Krunkle), 1963
20 Psychology/Speech: Chilled Water Pumps, Heating Water Pumps, Sewage Ejector Pumps (Weiman), 1963
21 Psychology/Speech: Sound Equipment, 1964
22 Psychology/Speech: Sprinkler System, 1963
23 Psychology Originals: Strainers, 1963
24 Psychology/Speech: Temperature Controls (Powers), 1963
25 Psychology/Speech: Thermometers Pressure Gauges, 1963
26 Psychology/Speech: Traps (Thermo) Warren-Webster, 1963
27 Psychology/Speech: Unit Heaters (Nesbitt), 1963
28 Psychology/Speech: Valves Hydrogaurd (Powers), 1963
29 Psychology Originals: Valves, Drains, & Cleanouts, 1963
30 Psychology/Speech: Water Coolers (Larco), 1963
31 Psychology: Air Handler #3 4th Floor Test Stand Check List (Tersco), 1987
32 Men's Gym Guardrail, 2004
33 Exercise Science Center: HVAC Renovation Controls Engineering Manual, 1999
34 Exercise Science Center: HVAC Renovation Notice to Bidders, 1999
35 Exercise Science Center: HVAC Renovation Operating & Maintenance Manual, 2000
36 Exercise Science Center: HVAC Renovation Submittal Data, 1963
37 Exercise Science Center: Roof Replacement & Pool Recoating Precon Agenda, 1998
38 Exercise Science Center: Roof replacement & Pool Recoating Project Manual, 1999
39 Men's Gym Reroof & Pool Recoating Project Record, 1999
40 Exercise Science Center: Roof Replacement & Pool Recoating Warranties, Guarantees, & Bonds, 1999
41 Men's Gym Pool Renovation: Convertor (Control Scheme), 1987
42 Men's Gym (Pool Renovation): Electrical Submittal, 1986
43 Men's Gym Pool Renovation: Mechanical Submittal, 1986
44 Exercise Science Center: Pool Renovation Operating & Maintenance Manual, 1987
45 Men's Gym Pool Operating Manual: Pool Filtration Equipment Chlorine Equipment, 1987
46 Exercise Science Center: Renovation of HPER AHU & Coils, 1982
47 Men's Gym: Dryers (Athletic Gear) Belco, 1983
48 Men's Gym Renovation for HPER: Electrical Submittal, 1982
49 Men's Gym Renovation for HPER: Fire Alarm and Clock Submittal, 1982
50 Exercise Science Center: Renovation for HPER Mechanical Equipment Submittal, 1982
51 Men's Gym Renovation Miscellaneous, 1984
52 Exercise Science Center: Renovation for HPER Operating & Maintenance Instructions for Mechanical Equipment, 1982
53 Exercise Science Center: Renovation of HPER Sump Pump Submittal, 1982
54 Men's Gym TAB: Testing & Balancing, 1984
55 Texas Tech University, Physical Education & Recreation Temperature Controls, 1982
56 Men's Gym Originals A/C Units, 1956
57 Exercise Science Center Originals: Automated Chemist Operating & Maintenance Manual, 1970
58 Men's Gym: Basketball Electrical Scoreboard (M.D. Brown Co.), 1953
59 Men's Gym/Natatorium: Centrifugal Pump (Bell-Gossett), 1956
60 Men's Gym/Natatorium: Condensate Pump (Aurora), 1956
61 Men's Gym: Convertor for Swimming Pool, 1956
62 Men's Gym/Natatorium: Duct & Grills (Standard & Barber Coleman), undated
box folder
36 1 Men's Gym/Natatorium: Exhaust Fans (Jenn Aire), 1956
2 Men's Gym/Natatorium: Expansion Joints (Adsco), 1956
3 Men's Gym/Natatorium: Fire Protection Equipment (Elkhart), 1956
4 Men's Gym/Natatorium: Heating/Ventilation Units (Barber-Coleman), 1956
5 Men's Gym/Natatorium: Plumbing, 1956
6 Men's Gym/Natatorium: Proposal List, 1956
7 Men's Gym/Natatorium: Electrical (Square "D"), 1956
8 Men's Gym/Natatorium: Sump Pump (Fairbanks Morse), 1956
9 Men's Gym/Natatorium: Temperature Controls (Barber Coleman), 1956
10 Men's Gym/Natatorium: Unit Heaters (Modine), 1956
11 Men's Gym/Natatorium: Shower Valves (Temptrol), 1966
12 Men's Gym: Water Conditioner Submittal, 1963
13 Men's Gym/Natatorium: Swimming Pool Equipment, Water Conditioning Equipment, Filters, 1957
14 Men's Gym/Natatorium: Pool Equipment, Diving Equipment, 1966
15 Men's Gym: Hydrology Filter, 1990
16 Men's Gym: Submittal Pool Drain, Sump Pump, 1992
17 Exercise Science Center: Miscellaneous Quotes, 2004
18 Men's Gym: Generator (Hot Water) Valves (Honeywell), undated
19 Men's Gym/Natatorium: Parts Manual Washer/Extractor (Wascator), 1982
20 Gordon/Bledsoe Hall: Replace RTU-1 RTU Submittal, 2010
21 Gordon/Bledsoe Hall: Renovate Dining Hall Electrical Design, 2007
22 Gordon/Bledsoe Hall: Renovate Dining Hall Electrical Panel Schedules, undated
23 Gordon/Bledsoe Hall: Dining Hall Electrical Submittal, 2007
24 Gordon/Bledsoe Hall: Renovate Dining Hall Equipment Specs, undated
25 Gordon/Bledsoe Hall: Dining Hall Koroguard & Corner Guard, 2007
26 Gordon/Bledsoe Hall: Dining Hall Mechanical Submittal, 2007
27 Gordon/Bledsoe Hall: Renovate Dining Hall Project Log, 2007
28 Gordon/Bledsoe Hall: Dining Hall Tile Thin-set Mortar, 2007
29 Gordon/Bledsoe: Air Wash Unit Operating & Maintenance, 2004
30 Bledsoe/Horn Elevators: Drywall Submittal, 1998
31 Bledsoe/Horn/Weymouth: Elevators Electrical Submittal, 1998
32 Bledsoe/Horn Elevator Submittal, 1998
33 Horn/Bledsoe/Weymouth: Elevator Upgrade, 1998
34 Elevators Hardware Submittal, 1998
35 Bledsoe/Horn Elevators: Mechanical Submittal, 1998
36 Gordon/Bledsoe Hall: Dining Hall HVAC Replacement HVAC Operating & Maintenance Manual, 1995
37 Gordon Apartments: Air Handling Units, 1987
38 Gordon Apartments: Air Separators (B & G) AS # 1, 2, 3, 1987
39 Gordon Apartments: Auto-Flow Devices/Chillers, 1987
40 Gordon Apartments: Balancing & Backdraft Dampers, 1987
41 Gordon Apartments: Centrifugal Pumps, 1987
42 Gordon Apartments Renovate: Chilled Water Pump, 1987
43 Gordon Apartments: Chillers (Packaged), 1987
44 Gordon Apartments: Condensate Pumps, 1987
45 Gordon Apartments: Domestic Hot Water Heaters, 1987
46 Gordon Apartment Renovate: Electric Wall Heaters, 1987
47 Men's Gym/Natatorium: Exhaust Fans (Jenn Aire), 1956
48 Gordon Apartment Renovation: Electrical Submittal, 1987
49 Gordon Apartments: Emergency Generator (IBAB), 1987
50 Gordon Apartments: Equipment Isolation (Amber Booth), 1987
51 Gordon Apartments: Exhaust Fans, 1987
52 Gordon Apartments: Expansion Tanks (Air Bladder), 1987
53 Gordon Apartments: Fan Coil Units, 1987
54 Gordon Apartments: Fire Alarm System, 1987
55 Gordon Apartments: Fire Ceiling Dampers, 1987
56 Gordon Apartments: Fire Extinguishers Cabinet, 1988
57 Gordon Apartments: Fire Protection System (Falcon Water Sprinklers), 1987
58 Gordon Apartments: Fire Pump, 1987
59 Gordon Apartments: Flash Tank, 1987
60 Gordon Apartments: Floor Care (Terrazzo), 1987
61 Gordon Apartments: Floor Sleeve Details/Firestop, 1987
62 Gordon Apartments: Flow Stations (Venturi) Portable Meters, 1987
63 Gordon Apartments: Grilles, Registers & Diffusers, 1987
64 Gordon Apartment Renovate: Heat Exchangers, 1987
65 Gordon Apartments: Heating Water Filters, 1987
66 Gordon Apartments: Horizontal Unit Heaters, 1987
67 Gordon Apartments: Hot Water Cabinet/Unit Heaters, 1987
68 Gordon Apartments: Pumps Hot Water Circulating, 1987
69 Gordon Apartments: Light Fixtures, 1987
box folder
37 1 Gordon/Bledsoe Hall: Mechanical Operating & Maintenance Manual, 1989
2 Gordon Apartments: Panelboards & Transformers, 1987
3 Gordon Apartments: Plumbing Submittal, 1987
4 Gordon Apartments: Plumbing Supports & Drawings, 1987
5 Gordon Apartments: Pot Feeder, 1987
6 Gordon Apartments: Radiant Panels, 1987
7 Gordon Apartments: Range, Dishwashers, Vent Hood, 1987
8 Gordon Apartments: Steam Pressure Reducing Station, 1987
9 Gordon Apartments: Steam Traps & Strainers, 1987
10 Gordon Apartments Renovation: Temperature Controls (Johnson) Operating & Maintenance Manual, 1987
11 Gordon Apartments: Thermal Insulation for Piping & HVAC, 1987
12 Gordon Apartments Renovate: Pumps #3, 4, 5, 6 (Cold/Hot Water), 1987
13 Gordon Apartments: Water Treatment System, 1987
14 Gordon/Bledsoe: Counter Project, 1959
15 Gordon/Bledsoe Hall: Dining Room Ceiling Lighting Submittal, 1984
16 Gordon/Bledsoe Air Washer, Acoustical Ceilings, 1984
17 Gordon/Bledsoe Hall: Air Washer, undated
18 Gordon/Bledsoe Kitchen Air Washer: Electrical Submittal, 1984
19 Gordon/Bledsoe Kitchen Air Washer: Inspection Report, 1984
20 Gordon/Bledsoe Air Washer: Mechanical Submittal, 1984
21 Gordon/Bledsoe Air Washer: Operating & Maintenance Manuals, 1984
22 Gordon/Bledsoe Kitchen Air Washer: Preconstruction Conference/Bids, 1984
23 Gordon/Bledsoe Kitchen Air Washer: Steam Heaters/Steam Bucket Traps, 1984
24 Gordon/Bledsoe Kitchen Air Wash Units: TAB Reports, 1984
25 Gordon/Bledsoe Kitchen Air Washer: Temperature Controls, 1984
26 Gordon/Bledsoe Air Washer: Warranties, 1985
27 Gordon Hall Bathroom Remodel: Addendum #1, 1981
28 Gordon Hall Bathroom Remodel: Electrical, 1982
29 Gordon Hall Bathroom Remodel: Hardware Schedule, 1981
30 Gordon Hall Bathroom Remodel: Hardware, 1982
31 Gordon/Bledsoe Bathroom Remodel: Mechanical & Electrical Submittal, 1981
32 Gordon Hall Bathroom Remodel: Mechanical, 1982
33 Gordon/Bledsoe: Primary Electrical Distribution System, 1981
34 Bledsoe Bathroom Remodel Submittal: Hardware, 1980
35 Bledsoe & Doak Hall: Light Fixtures, 1977
36 Gordon/Bledsoe Hall: Bledsoe Bathroom Remodeling Mechanical & Electrical Submittal, 1980
37 Bledsoe Hall Bathroom Remodeling, 1977
38 Bledsoe Renovation: Convectors (Modine), 1971
39 Bledsoe Renovation: Electrical Submittal (Fixtures), 1971
40 Gordon Hall Remodel: Light Fixtures, 1972
41 Bledsoe Renovation Millwork & Paint Schedule, 1971
42 Bledsoe Renovation: Plumbing Submittal, 1971
43 Bledsoe: Air Handling Equipment (Temptrol) Consolidated Food Services, 1965
44 Gordon/Bledsoe Circulating Water System, 1968
45 Bledsoe Dining Room: Condensing Unit (Freezing & Cooling Fan Coil Weather Units), 1964
46 Bledsoe: Condensing Units & Enclosures on Cols Pans Display Shelves (Tecumseh), 1965
47 Condensing Unit/Compressor Consolidated Food Service (Copeland), 1965
48 Bledsoe: Electric Defrost Heaters Consolidated Food Services (Recold), 1965
49 Bledsoe: Ice Cream Cabinets Consolidated Food Services (Kelvinator), 1965
50 Gordon/Bledsoe: Silverwasher (Kraeft Wiring Diagram), 1969
51 Gordon/Bledsoe: Steam Chefs (Cleveland Range), 1965
52 Bledsoe: Temperature Controls Consolidated Food Services (Johnson Service), 1965
53 Gordon/Bledsoe: Water Pressure Booster System (Syncroflo), 1966
54 Gordon/Bledsoe: Water Softener Control (Brunermatic), 1966
55 Gordon/Bledsoe: Compressor (Worthington), 1957
56 Gordon/Bledsoe: Condensate Pump (Nash), undated
57 Gordon/Bledsoe Hall: Garage Disposal System, 1959
58 Gordon/Bledsoe: Hot Water Circulating Pump (Gould), 1979
59 Gordon/Bledsoe Hall: Mixing Valves (Powers), 1963
60 Gordon Apartments: Skylights Drawings & Warranty (3 blueprints), 1988
61 Gordon/Bledsoe: Tube Bundles (Adsco) Water Heater, 1962
62 Gordon/Bledsoe: Controls (Accritem for Hot Water Heaters), 1966
63 Civil Engineering Rooms 225 & 227 Closeout Documents, 2007
64 Civil Engineering Renovate Room 193: Project File (8 blueprints), 2006
65 Civil Engineering Tremco Roof Warranty, 2004
66 Civil Engineering Elevator Renovation: Closeout Documents, 2003
67 Civil Engineering Controller Installation Manual, 2003
68 Civil Engineering Elevator Variance Approval, 2004
69 Civil/Mechanical Engineering Renovation: Air Handlers, Curves, Filters, 1986
70 Civil & Agriculture Engineering Renovation: Compressor, Temperature Controls, Generator, Warranty Problem, 1988
71 Civil/Mechanical Engineering Renovation: Air Compressor Air Dryer, 1986
box folder
38 1 Civil/Mechanical Engineering Renovation: Annunciator (Graphic Notifier) For Fire Alarm System Resubmittal, 1986
2 Civil/Mechanical Engineering Renovation: Asbestos Abatement, 1986
3 Civil/Mechanical Engineering Renovation: Emergency Generator (Kohler), 1986
4 Civil/Mechanical Engineering Renovation: Exhaust Fans (Remote Annunciator Reject), 1986
5 Civil/Mechanical Engineering Renovation: Fire Alarm Panels (Notifier), 1988
6 Civil/Mechanical Engineering Renovation: Fire Alarm Submittal (Lubbock Sound), 1986
7 Civil/Mechanical Engineering Renovation: Fire Protection/Sprinkler System, 1986
8 Civil/Mechanical Engineering Renovation: Fire Sprinkler System (Falcon), 1988
9 Civil/Mechanical Engineering Renovation: Fixture Submittal (Nunn Electric), 1986
10 Civil/Mechanical Engineering Renovation: Generator (Kohler), 1988
11 Civil/Mechanical Engineering Renovation: Link Seals, 1986
12 Civil/Mechanical Engineering Renovation: Louvers & Louver Substitution, 1986
13 Civil/Mechanical Engineering Building: Submittal Literature for Mechanical Equipment, 1986
14 Civil/Mechanical Engineering Renovation: Mixing Boxes & Terminal Reheat Boxes, 1986
15 Civil/Mechanical Engineering Building: Operations & Maintenance Instructions, 1987
16 Civil/Mechanical Engineering Renovation: Operating & Maintenance Manuals, 1988
17 Civil/Mechanical Engineering Renovation: Panelboards, Transformers, Switches, Tans (Nunn Electric), 1986
18 Civil/Mechanical Engineering Renovation: Pipe Identification Submittal, 1987
19 Civil/Mechanical Engineering Renovation: Pressure Booster System (Liquitrol) Gages, Strainers, Thermometers, Gas Regulators, 1986
20 Civil/Mechanical Engineering Renovation: Steam Specialties (Convertor Flash Tank) Steam Traps (Hoffman), 1986
21 Civil/Mechanical Engineering Renovation: Tab Deficiencies, 1988
22 Civil/Mechanical Engineering Renovation: TAB Report Final, 1988
23 Civil/Agriculture Engineering: TAB Reports Opposite Season, 1988
24 Civil/Mechanical Engineering Renovation: Preliminary TAB Report, 1987
25 Civil/Mechanical Engineering Renovation: Temperature Controls (Johnson Service), 1986
26 Civil/Mechanical Engineering Renovation: Variable Speed Drives (Parametrics), 1988
27 Civil/Mechanical Engineering Renovation: Vav Boxes, Controller, Air Valves Leakage, 1986
28 Civil/Mechanical Engineering: Chill Water Pumps (Weiman), 1961
29 Civil Engineering Addition: Condensing Units (Ref) (Copelametic), 1971
30 Civil Engineering Addition: Cranes/Hoists, 1971
31 Civil Engineering Addition: Door Threshold Equipment, 1971
32 Civil Engineering Addition: Drinking Water Chiller (Filtrine), 1971
33 Civil Engineering Addition: Electrical, 1969
34 Civil Engineering Addition: Fans (Exhaust Fans EF-1 & EF-5) Powerline, 1971
35 Civil Engineering Addition: Fire Alarm System Submittal (Simplex), 1969
36 Civil Engineering: Fire Hose Cabinets (J & L Industry), 1970
37 Civil Engineering Addition: Fire Sprinkler Systems (Falcon), 1971
box folder
39 1 Civil Engineering Addition: Mechanical Submittal 1, 1968
2 Civil Engineering Addition: Mechanical Submittal 2, 1969
3 Civil Engineering Addition: Paint Color Formulas, 1971
4 Civil Engineering: Plumbing Submittal (Sinks), 1970
5 Civil Engineering Addition: Fans (Return Air #2) York, 1971
6 Civil Engineering Addition: Air Balance Report TAB Report, 1971
7 Civil/Mechanical Engineering Addition: Temperature Controls (Johnson), 1970
8 Civil Engineering Addition: Temperature Controls (Johnson Service), 1971
9 Civil Engineering Transmittals, 1971
10 Civil Engineering Addition: Utility Extensions, 1969
11 Civil Engineering Addition: Valves, Gates, Globe, Check, Plug (Nibco), 9171
12 Civil Engineering: Vibration Isolation Schedule, 1970
13 Civil Engineering Addition: Warranties & Guarantees, 1971
14 Civil/Mechanical Engineering: Glasswasher (Undercounter Lab) Forma, undated
15 Coleman Hall: Replace House Pumps Operating & Maintenance Info, 2010
16 Coleman Hall: Elevator Renovation Cab Submittal, 1999
17 Coleman Hall: Elevator Renovation Car Lantern Drawing Submittal, 1999
18 Coleman Hall: Elevator Renovation Car Station Drawing Submittal, 1999
19 Coleman Hall: Elevator Renovation Comments & Specs, 1998
20 Coleman Hall: Elevator Renovation Hatch Plan Drawing Submittal, 1999
21 Coleman Hall: Elevator Renovation Incline Hall Station Drawing Submittal, 1999
22 Coleman Hall: Elevator Renovation Machine Room Plan Drawing Submittal (1 blueprint), 1999
23 Coleman Hall: Elevator Renovation Position Indicator Drawing Submittal, 1999
24 Coleman Trash Chute: Electrical Submittal, 1998
25 Coleman Trash Chute: Electrical Submittal, 1998
26 Coleman Hall: Trash Chute Fire Protection Fire Operating & Maintenance, undated
27 Coleman Trash Chute: Fire Suppression System Submittal, 1998
28 Coleman Trash Chute: Mechanical Submittal, 1998
29 Coleman Hall: Trash Chute Protection Operating & Maintenance, 1998
30 Coleman hall: Trash Chute Fire Protection Project File, 1998
31 Coleman Hall: Fire Protection Hydraulic Calculations, 1999
32 Coleman Hall: Fire Protection Project File, 1999
33 Residence Halls Pump Replacement: Mechanical & Electrical Submittal, 1997
34 Coleman Hall Renovation: Electrical Submittal, 1986
35 Coleman Hall Office Renovation: Mechanical Submittal (Air Grilles/Pumps), 1986
36 Coleman Hall: Office Renovation TAB Report, 1984
37 Coleman Hall Office Renovation: Temperature Controls, 1986
38 Coleman/Weymouth Doors: Hardware Schedule, Comments, 1986
39 Coleman/Weymouth Door Replacement: Contract/Correspondence Minutes, 1985
40 Coleman Doors Inspection, 1984
41 Coleman Hall Door Replacement Hardware, 1984
42 Coleman Hot Water Generator Inspection, 1983
43 Coleman Hot Water Generator (O. W. Chisum), 1983
44 Coleman Booster Pumps (Aurora), 1981
45 Coleman Hall Flow Meter, 1984
46 Carpenter Wells: Acoustical Ceilings Submittal, 2008
47 Carpenter Wells: Caulking & Sealant Submittal, 2008
48 Carpenter Wells: Electrical Submittals, 2008
49 Carpenter Wells: Fire Alarm System, 2008
50 Carpenter/Wells Hall (New Residence Hall): Fire Protection System, 2008
51 Carpenter Wells: Glass & Glazing Submittal, 2008
52 Carpenter Wells: Gypsum Wallboard Systems Submittals, 2008
53 Carpenter Wells: Lighting Submittals, 2008
54 Carpenter Wells: Mechanical Submittals, 2008
55 Carpenter Wells: Painting Submittals, 2008
56 Carpenter Wells: TV Mounts Submittals, 2008
57 Carpenter Wells: Wood Door Submittals Hardware, 2008
58 Carpenter/Wells Hall (New Residence Hall): Addendums 1-3, 1997
59 Carpenter/Wells Hall (New Residence Hall): Architectural Submittals, 2000
60 Carpenter/Wells Hall (New Residence Hall): Bell Tower Clock & Roof Warranty, 2000
box folder
40 1 Carpenter/Wells Hall (New Residence Hall): Division 15 Mechanical Submittal, 1997
2 Carpenter/Wells Hall (New Residence Hall): Division 15 Mechanical Submittal, 1997
3 Carpenter/Wells Hall (New Residence Hall): Electrical Submittal, 1997
4 Carpenter/Wells Hall (New Residence Hall): Electrical Submittal Fields, 1997
5 Carpenter/Wells Hall: Elevator Submittal, 1997
6 Carpenter/Wells Hall (New Residence Hall): Fire Alarm Operating & Maintenance Manual, 1999
7 Carpenter/Wells Hall (New Residence Hall): Fire Alarm System, 1998
8 Carpenter/Wells Hall: Grinnel Fire Protection (4 blueprints), 1997
9 Carpenter/Wells Hall (New Residence Hall): Hydraulic Calculations, 1997
10 Carpenter/Wells Hall (New Residence Hall): Mechanical Submittal (Johnson Controls), 1998
11 Carpenter/Wells Hall (New Residence Hall): Johnson Controls Operating & Maintenance Manual, 1997
12 Carpenter/Wells Hall (New Residence Hall): Mechanical Submittal, 1997
13 Carpenter/Wells Hall (New Residence Hall): Mechanical Submittal, 1997
14 Carpenter/Wells Hall (New Residence Hall): Metal Doors & Frames, 1997
15 Carpenter/Wells Hall (New Residence Hall): Miscellaneous Documents, 1997
16 Carpenter/Wells Hall (New Residence Hall): Operating & Maintenance Manual, 1999
box folder
41 1 Carpenter/Wells Hall (New Residence Hall): Precast Vaults & Grease Traps, 1997
2 Carpenter/Wells Hall (New Residence Hall): Punchlists, 1999
3 Carpenter/Wells Hall (New Residence Hall): Structural Steel Submittal, 1997
4 Carpenter/Wells Hall (New Residence Hall): Submittal 042200-0001, 1997
5 Carpenter/Wells Hall (New Residence Hall): TAB Reports, 1999
6 Carpenter/Wells Hall Demolition: Tunnel Insulation and Waterproofing Submittal, 1997
7 Carpenter/Wells Hall (New Residence Hall): Warranty Manual, 1999
8 Carpenter/Wells Hall (New Residence Hall): Waterproofing, 1999
9 Carpenter Hot Water Generator: Preconstruction Minutes, 1987
10 Wells Bath Renovation: Hardware/Door Schedule, 1986
11 Charles Maedgen Theatre: Renovate Ease Entrance Seating & Area Addendums, 2001
12 Charles Maedgen Theatre: Renovate East Entrance & Seating Area AHU Resubmittal & Controls, 2001
13 Charles Maedgen Theatre: Renovate Ease Entrance Seating & Area Cast Stone Shop Drawings (11 blueprints), 2001
14 Charles Maedgen Theatre: Renovate East Entrance & Seating Area Electrical Submittal, 1984
15 Charles Maedgen Theatre: Renovate Ease Entrance Seating & Area Fire Alarm System, 2001
16 Charles Maedgen Theatre: Renovate East Entrance & Seating Area Hollow Metal/Finish Hardware, 2001
17 Charles Maedgen Theatre: Renovate Ease Entrance Seating & Area Johnson Controls, 2001
18 Charles Maedgen Theatre: Renovate East Entrance & Seating Area Light Fixtures & Switchgear, 2001
19 Charles Maedgen Theatre: Renovate Ease Entrance Seating & Area Mechanical Submittal, 2001
20 Charles Maedgen Theatre: Renovate East Entrance & Seating Area Millwork Shop Drawings, 2001
21 Charles Maedgen Theatre: Renovate Ease Entrance Seating & Area Miscellaneous Submittals, 2001
22 Charles Maedgen Theatre: Renovate East Entrance & Seating Area Painting & Caulking, 2001-2002
23 Charles Maedgen Theatre: Renovate Ease Entrance Seating & Area Plumbing Fixture Resubmittal, 2001
24 Charles Maedgen Theatre: Renovate East Entrance & Seating Area Record Submittal Volume 1 (7 blueprints), 2001
25 Charles Maedgen Theatre: Renovate Ease Entrance Seating & Area Record Submittal Volume 2, 2001
26 Charles Maedgen Theatre: Renovate East Entrance & Seating Area Structural Shop Drawings, 2001
27 Charles Maedgen Theatre: Renovate Ease Entrance Seating & Area Toilet Partitions & Accessories, 2001
28 Charles Maedgen Theatre: Renovate East Entrance & Seating Area Operating & Maintenance Warranties, 2001
29 Charles Maedgen Theatre: Renovate Ease Entrance Seating & Area Windows Shop Drawings, 2001
box folder
42 1 Charles Maedgen Theatre: Lighting Controls Electrical Submittal, 1997
2 Charles Maedgen Theatre: Lighting Controls Manual, 1999
3 Charles Maedgen Theatre: Reroof Closeout Documents & Submittals, 1998
4 Charles Maedgen Theatre: Reroof Mechanical Equipment Operating & Maintenance, 1997
5 Charles Maedgen Theatre: Reroof Roof Warranty, 1997
6 University Lab Theater Addition: Electrical Submittal, 1985
7 University Theater Lab Addition: Fire Damper Information, 1985
8 University Theater Lab Addition: Fire Sprinkler System (Falcon), 1985
9 Lab Theater Addition: Mechanical Submittal, 1985
10 Charles Maedgen Theatre: Renovate East Entrance & Seating Area: Mechanical Submittal 2, 1985
11 University Lab Theater Addition: Smoke Detectors, 1985
12 University Lab Theater Addition: Testing/Balancing Report, 1985-1986
13 University Lab Theater Addition: Temperature Controls (Johnson Service), 1985
14 Speech/Psychology: Auditorium Seating, 1964
15 Speech/Psychology Mobile Platform University Theatre Speech Clinic (Spaceman), 1963
16 Speech/Psychology Projector Doors/Vents University Theatre (Swarthwout), 1964
17 University Theater: Temperature Controls (Powers), 1963
18 University Theater: Emergency Lighting, 1975
19 University Theater: Emergency Generator (Onan), 1982
20 Ranching Heritage Center East Addition: Electrical Submittal, 2005
21 Ranching Heritage Center East Addition: Elevator Shop Drawings, 2005
22 Ranching Heritage Center East Addition: Fire System Submittal, 2005
23 Ranching Heritage Center East Addition: HVAC Controls, 2005
24 Ranching Heritage Center East Addition: Louver Submittal, 2005
25 Ranching Heritage Center East Addition: Mechanical & Plumbing Resbumittal, 2005
26 Ranching Heritage Center East Addition: Mechanical Submittal, 2005
27 Ranching Heritage Center East Addition: Minutes & Construction Schedule, 2005
28 Ranching Heritage Center East Addition: Thermacore Piping, 2005
29 Ranching Heritage Center Paint Exterior: Pain Submittal (Gruber), 2000
30 Ranching Heritage Center Paint Exterior: Project #108778CR, 2002
31 Ranching Heritage Center Reroof: Roofing Submittal, 1999
32 Ranching Heritage Center HVAC Controls, 1984
33 Ranching Heritage Center Project #83-08 Mechanical & Electrical Submittals (Devitt/Mallet), 1984
34 Ranching Heritage Center Addition 83-08: Specs & Insulated Pipe Submittal, 1983
35 Ranching Heritage Center TAB, 1985
36 Ranching Heritage Center Addition 83-08: Temperature Controls (Honeywell), 1984
37 Ranching Heritage Center Temperature Controls Submittal, 1984
38 Ranching Heritage Center Addition 83-08: Warranty & Maintenance Manuals, 1984
39 Ranching Heritage Center Original: Addendums, 1978
40 Ranching Heritage Center Air Handling Units (Trane), 1975
41 Ranching Heritage Center Ceiling Exhauster/Fans (Acme), 1975
42 Ranching Heritage Center Circulating Pump (Armstrong), 1975
43 Ranching Heritage Center Pump Condensate Return (Skidmore Corporation), 1975
44 Ranching Heritage Center Correspondence & Guarantees, 1975
box folder
43 1 Ranching Heritage Center Expansion Converter Tank (Adamson Co.), 1976
2 Ranching Heritage Center Fire Detection Submittal (Fenwall), 1975
3 Ranching Heritage Center Fire Hose Cabinet (Potter-Roemer, Inc.), 1976
4 Ranching Heritage Center Grilles, Registers, Diffusers (Tuttle Bailey), 1975
5 Ranching Heritage Center Lighting Fixtures/Panelboard Submittal, 1976
6 Ranching Heritage Center Original: Mechanical Operating & Maintenance Manual, 1972
7 Ranching Heritage Center Plumbing Submittal (Fields & Co.), 1975
8 Ranching Heritage Center Resubmittal Insulation, Duct Liner, Service Sink (Howell Insulation), 1976
9 Ranching Heritage Center Temperature Pneumatic Control System (Barber-Colman), 1975
10 Southwest Collections Clay Tile Roof Reroof Phase 2: Certificate of Guarantee, 2006
11 Southwest Collections Originals: 30 Day Inspection Report, 1996
12 Southwest Collections: Resubmittal AHU 1-14, 1995
13 Southwest Collections Anchor Bolt Setting Submittal, 1995
14 Southwest Collections: Cold Storage Room Submittal, 1996
15 Southwest Collections Concrete Mix Design, 1995
16 Southwest Collections Originals: Electrical Operating & Maintenance Manual, 1996
17 Southwest Collections Originals: Electrical Operating & Maintenance & As Built Drawings, 1994
18 Southwest Collections: Electrical Submittal, 1995
19 Southwest Collections Originals: Electrical Submittal, 1996
20 Southwest Collections: Elevator Submittal, 1995
21 Southwest Collections: Elevator Test Data Sheets, 1996
22 Southwest Collections: Finish Hardware Resubmittal, 1995
23 Southwest Collections: Finish Hardware Submittals, 1995
24 Southwest Collections: Fire Alarm System Submittal, 1995
25 Southwest Collections Originals: Fire Alarm System Manual, 1996
26 Southwest Collections: Fire Protection System Submittal (6 blueprints), 1995
27 Southwest Collections: Mechanical Submittal, 1995
28 Southwest Collections Originals: Mechanical Submittal, 1995
29 Southwest Collections Originals: Miscellaneous (5 photographs), 1996
30 Southwest Collections: Reinforcing Tunnel, Pier, Grade Beam Submittal (1 blueprint), 1995
31 Southwest Collections Roof, 1996-2001
32 Southwest Collections Roof: Warranty, 1999
33 Southwest Collections Roofing Submittal, 1995
34 Southwest Collections Originals: Temperature Controls, 1996
35 Southwest Collections Insulation & Waterproofing Submittal, 1995
36 Southwest Collections Originals: Video Surveillance System Operating & Maintenance, 1996
37 Southwest Collections Originals: Warranties, Guarantees & Bonds, 1996
box folder
44 1 Electrical Engineering Pulse Lab Addition: Electrical Submittal, 2000
2 Electrical Engineering Annex Charles A. Bassett Laboratories Pulse Lab Addition: Electrical Submittal, 1998
3 Electrical Engineering Pulse Lab Addition: Elevator Operation & Maintenance, 1998
4 Electrical Engineering Annex Charles A. Bassett Laboratories Pulse Lab Addition: Elevator Submittal, 1998
5 Electrical Engineering Charles A. Bassett Laboratories Pulse Lab Addition: Final Inspection Punchlist, 1998
6 Electrical Engineering Annex Charles A. Bassett Laboratories Pulse Lab Addition: Fire Extinguisher Submittal, 1998
7 Electrical Engineering Annex Charles A. Bassett Laboratories Pulse Lab Addition: Hardware Submittal, 1998
8 Electrical Engineering Pulse Lab Addition: Mechanical & Electrical Operating & Maintenance, 1999
9 Electrical Engineering Pulse Lab Addition: Mechanical Submittal, 1998
10 Electrical Engineering Pulse Lab Addition: Operation & Maintenance, 1997
11 Electrical Engineering Charles A. Bassett Laboratories Pulse Lab Addition: Temperature Controls Submittal, 1998
12 Electrical Engineering Annex Porch Roof: Acceptance Letter, 1994
13 Electrical Engineering Renovation: Addendums, 1987
14 Electrical Engineering Renovation: AHU Motor Info (Motor Size/HP), 1987
15 Electrical Engineering Renovation: AHUs, 1987
16 Electrical Engineering Renovation: Ceiling Suspension System, 1986
17 Electrical Engineering Renovation: Chalkboards, 1987
18 Electrical Engineering Renovation: Change Orders & Submittal Index, 1987
19 Electrical Engineering Renovation: Concrete Mix, 1987
20 Electrical Engineering Renovation: Dishwasher, 1988
21 Electrical Engineering Renovation: Electrical Motors & Tubular Silencers, 1987
22 Electrical Engineering Electrical Submittal (Bill Tavern Company), 1988
23 Electrical Engineering Renovation: Electrical Submittal, 1987
24 Electrical Engineering Renovation: Electrical Submittal, 1987
25 Electrical Engineering Renovation: Elevator, 1987
26 Electrical Engineering Dover Elevator: Operating & Maintenance Manual, 1985
27 Electrical Engineering Renovation: Emergency Generator (Onan), 1987
28 Electrical Engineering Renovation: Emergency Generator, 1987
29 Electrical Engineering Renovation: Expansion Joint Covers, 1987
30 Electrical Engineering Renovation: A/H Fan Coil Units Preheat Coils (Steam), 1987
31 Electrical Engineering Renovation: Fire Alarm Submittal, 1987
32 Electrical Engineering Renovation: Fire Alarm System (7 blueprints), 1987
33 Electrical Engineering Renovation: Fire Extinguisher, 1987
box folder
45 1 Electrical Engineering Renovation: Fire Protection, 1987
2 Electrical Engineering Renovation: Fire Protection Equipment, 1987
3 Electrical Engineering Renovation: Fire Sprinkler Drawings/Calculations, 1988
4 Electrical Engineering Renovation: Floor Access Doors, 1987
5 Electrical Engineering Renovation: Floor Tile & Wall Base, 1987
6 Electrical Engineering Renovation: Floor Underlayment, 1987
7 Electrical Engineering Renovation: Hardware Schedule, 1987
8 Electrical Engineering Renovation: Hollow Metal Doors & Frames, 1987
9 Electrical Engineering Renovation: INV Speed Controller, 1987
10 Electrical Engineering Renovation: Inverter Speed Controller, 1987
11 Electrical Engineering Renovation: Johnson Controls, 1989
12 Electrical Engineering Renovation: Johnson Controls, 1987
13 Electrical Engineering Renovation: Light Fixtures, Panels, Switchgear, 1987
14 Electrical Engineering Renovation: Lockers, 1987
15 Electrical Engineering Renovation: Louvers, 1987
16 Electrical Engineering Renovation: Mail Cabinets, 1987
17 Electrical Engineering Renovation: Mechanical Operating & Maintenance, 1987
18 Electrical Engineering Renovation: Mechanical Submittal, 1987
19 Electrical Engineering Renovation: Overhead Door, 1987
20 Electrical Engineering Renovation: Paint, 1987
21 Electrical Engineering Renovation: Panelboard, 1987
22 Electrical Engineering Renovation: Plumbing, undated
23 Electrical Engineering Renovation: Projection Screen, 1987
24 Electrical Engineering Renovation: Roof, 1987
25 Electrical Engineering Renovation: Seating, 1987
26 Electrical Engineering Renovation: Sheetrock & Insulation, 1987
27 Electrical Engineering Renovation: Skylight, 1987
28 Electrical Engineering Renovation: Sound Attenuators (Rink), 1987
29 Electrical Engineering Renovation: Steam Preheat Coils, 1987
30 Electrical Engineering Renovation: Stone & Brick Cleaner, 1987
31 Electrical Engineering Renovation: Structural Shop Drawings (4 blueprints), 1987
32 Electrical Engineering Renovation: Structural Shop Drawings (3 blueprints), 1987
33 Electrical Engineering Renovation: Structural Shop Drawings, 1987
34 Electrical Engineering TAB Deficiency List, 1988
35 Electrical Engineering Renovation: TAB Report, 1988
36 Electrical Engineering Renovation: Temperature Controls (Johnson), 1987
37 Electrical Engineering Renovation: Toilet Accessories & Partitions, 1987
38 Electrical Engineering Renovation: Valves, Strainers, Piping, 1987
39 Electrical Engineering Renovation: Valves, Strainers, & Thermometers, 1987
40 Electrical Engineering Renovation: Vav Boxes & Controllers Correspondence, undated
41 Electrical Engineering Renovation: Warranties & Guarantees, 1988
42 Electrical Engineering Renovation: Windows (13 blueprints), 1998
43 Electrical Engineering Renovation: Wiring Devices, 1988
44 Electrical Engineering Renovation: Wood Doors & Millwork, 1987
box folder
46 1 Electrical Engineering Addition: Air Compressor and Accessories, 1982
2 Electrical Engineering Addition: Electrical Submittal, 1979
3 Electrical Engineering Addition: Electrical Submittal, 1979
4 Electrical Engineering Addition: Fire Alarms (Simplex), 1979
5 Electrical Engineering Addition: Light Fixtures (Joiner Electric), 1979
6 Electrical Engineering Addition: Mechanical Submittal, 1979
7 Electrical Engineering Addition: Operation & Maintenance Instructions, 1980
8 Electrical Engineering Addition: Temperature Controls (Johnson Service), 1979
9 Electrical Engineering: Air Conditioning, 1960
10 Electrical Engineering: Air Conditioning Placement Office, 1960
11 Electrical Engineering: Air Units (Trane), 1973
12 Electrical Engineering Renovation: Fan Coil Unit #2 Replacement (Carrier), 1989
13 Electrical Engineering: Installation & Operating Manual, 1975
14 Electrical Engineering: Liebert A/C 1, 1989
15 Electrical Engineering Remodeling: Air Handling Units Building 206 Operation & Maintenance Data (Trane), 1973
16 Electrical Engineering: Pump Vacuum (Economy), undated
17 Electrical Engineering Addition: Air Compressor and Accessories, 1982
18 Electrical Engineering Addition: Service Manual (Dual-Lite), 1979
19 Electrical Engineering: Steam Relief Valve (Kunkle) Hoppes Relief Hood, 1989
20 Electrical Engineering: Temperature Controls (Dean Bradfords), undated
21 West Hall 3rd Floor Financial Services: Addendums, 2005
22 West Hall 3rd Floor Financial Services: AHU Manual, undated
23 West Hall 3rd Floor Financial Services: Controls, 2006
24 West Hall 3rd Floor Financial Services: Operating & Maintenance Manual 1, 2005
25 West Hall 3rd Floor Financial Services: TAB Report, 2005
26 West Hall Room 205 HVAC, 2001
27 West Hall Room 205 Paint, 2001
28 West Hall Visitor's Center Addition: Controls, 2000
29 West Hall New Visitors Center: Electrical Submittal, 2000
30 West Hall New Visitors Center: Elevator Repair Study, Site Survey Report Submittal, 1999
31 West Hall New Visitor's Center: Fan Coil Unit Valve Schedule, 2000
32 West Hall new Visitors Center: Fire Protection, 2000
33 West Hall Visitors Center Addition: Mechanical Submittal, 2000
34 West Hall Old Terrazzo Floor, 2005
35 West Hall Roofing Warranty, 2005
36 West Hall Visitors Center Addition: Step Lights, 2008
37 West Hall New Terrazzo Floor (1 blueprint), 2005
38 West Hall Copy Tech Electrical (Lee King), 1986
39 West Hall Copy Tech Submittal: Mechanical & Plumbing, 1986
40 West Hall Copy Tech: Air Conditioning Operation & Maintenance Manuals (Liebert), 1986
41 West Hall: Electrical Submittal, 1979
42 West Hall: Fire Alarm Submittal, 1979
43 West Hall: Mechanical Equipment, 1979
44 West Hall: Temperature Controls, 1979
45 West Hall: Air Conditioning & Heating (Lennox), 1965
46 West Hall Electrical, 1965
47 West Hall Plumbing (Crane), 1965
48 West Hall 3rd Floor Financial Services: AHU Manual, undated
47 West Hall Plumbing (Crane), 1965
48 West Hall 3rd Floor Financial Services: AHU Manual, undated
box folder
47 1 West Hall Kitchen: Refrigerated Walk-In, 1956
2 West Hall: Water Pressure Booster System (Syncroflo), 1966
3 Mechanical Engineering: Renovate Room 119 for Nanotech Lab Operation & Maintenance Manual, 2010
4 Mechanical Engineering: 10 Feet High Security Walls Closeout Documents, 2007
5 Mechanical Engineering: Alleviate HVAC Noise Diffusers & Vibration Isolation, 2007
6 Mechanical Engineering: Alleviate HVAC Noise TAB Report, 2007
7 Mechanical Engineering: Alleviate HVAC Noise Warranty, 2007
8 Mechanical Engineering: New Lab in 133B Competitive Sealed Proposal, 2009
9 Mechanical Engineering: New Lab in 133B Electrical Submittal, 2009
10 Mechanical Engineering: New Lab in 133B Operation & Maintenance Manual, 2009
11 Mechanical Engineering: New Lab in 133B Submittals, 2009
12 Mechanical Engineering: Wind Tunnel Electrical Submittal, 1998
13 Mechanical Engineering: Wind Tunnel Mechanical Submittal, 1998
14 Mechanical Engineering: Wind Tunnel Punchlist, 2007
15 Mechanical Engineering: Wind Tunnel Warranties & Closeout Documents, 1998
16 Mechanical Engineering Building: Stairway Replacement Aluminum Door Submittal, 1994
17 Mechanical Engineering Building: Replace Exterior Stairs Certification of Completion/Final, 1994
18 Mechanical Engineering Building: Stairway Replacement Concrete Coating Submittal, 1994
19 Mechanical Engineering Building: Stairway Replacement Concrete Patch and Sealant Submittal, 1994
20 Mechanical Engineering Building: Exterior Paint Replacement Pain Submittal, 1994
21 Mechanical Engineering Building: Exterior Stair Replacement Rebar Submittal, 1994
22 Mechanical Engineering Building: Stairway Replacement Safety Tread Submittal, 1994
23 Mechanical Engineering Building: Exterior Stair Replacement Skylight Submittal, 1994
24 Mechanical Engineering Building: Stairway Replacement Stair Tread Submittal, 1994
25 Mechanical Engineering Building: Stairway Replacement Steel Submittal, 1994
26 Mechanical Engineering: Hydro Test Facility Electrical Submittal, 1989
27 Mechanical Engineering: Hydrodynamics Test Facility Junction Boxes/Conduit/Wiring, 1990
28 Mechanical Engineering: Mechanical Submittal (Hydrology Test), 1989
29 Mechanical Engineering: Hydrodynamics Test Facility Mechanical Submittal, 1990
30 Mechanical Engineering: Experimental Hydrology Test Facility Operation & Maintenance Manual, 1990
31 Mechanical Engineering: Hydrodynamics Test Facility Specs, 1989
32 Mechanical Engineering: Hydrodynamics Test Facility Warranties/Guarantees, 1990
33 Mechanical Engineering Renovate: Air handler Units 1/4 Scale Mechanical Room Drawing, 1987
34 Mechanical Engineering: Cuno Filters Correspondence, 1988
35 Mechanical Engineering Renovation Design Development, 1986
36 Mechanical Engineering: Duct Layout Drawings/Letters, 1987
37 Mechanical Engineering Renovate: Electrical/Miscellaneous Submittal, 1987
38 Mechanical Engineering: Fans (Centrifugal) M-15, 1988
39 Mechanical Engineering: Fire Alarm, 1990
40 Mechanical Engineering: Fire Service, 1987
41 Mechanical Engineering Renovation: Fixture Submittal, 1987
42 Mechanical Engineering Renovation: Flex Duct Submittal, 1988
43 Mechanical Engineering Renovation: Generator (Kohler), 1990
44 Mechanical Engineering: Graham vs Tester, 1989
45 Mechanical Engineering Renovation: Insulation Metal Jackets, 1988
46 Mechanical Engineering: Engineering Research Center Mechanical Submittal, 1987
47 Mechanical Engineering: Mechanical Submittal ERC Renovations, 1987
box folder
48 1 Mechanical Engineering: Engineering Research Center Mechanical Submittal, 1991
2 Mechanical Engineering Renovation: Power/Fire Alarms/Generator, 1987
3 Mechanical Engineering: Sprinkler Shop Drawings (Falcon), 1988
4 Mechanical Engineering Renovation: Steam Coil Submittal, 1988
5 Mechanical Engineering: TAB Report, 1989
6 Mechanical Engineering: Engineering Research Center TAB Report (Preliminary), 1989
7 Mechanical Engineering: Temperature Controls EQ/Drawings (10 blueprints), 1988
8 Mechanical Engineering: Temperature Controls as Built (30 blueprints), 1988
9 Mechanical Engineering Renovation: Wiring Devices Submittal, 1988
10 Mechanical Submittal Literature for Textile Chemical Research Laboratories, 1965
11 Mechanical Engineering: Textile Chemical Research Lab Addition Soils Report, 1967
12 Mechanical/Civil Engineering: Condensing Unit Rooms 101, 103, 103A, 103B, 103C, 103D, 105, 107, & Lab (Fandaire), 1987
13 Mechanical Engineering: Air Compressor (Devilbliss), 1960
14 Mechanical/Civil Engineering: Air Conditioning Condensing Units (Mathes), 1958
15 Mechanical Engineering: Electrical, 1960
16 Mechanical Engineering: Mechanical Submittal, 1960
17 Mechanical Engineering: Air Conditioning Room 1 Operating & Maintenance Manual (Carrier), 1957
18 Mechanical Engineering: Temperature Controls, 1960
19 Mechanical Engineering: Temperature Controls (Honeywell), 1960
20 Mechanical Engineering: Test & Balance, 1998
21 Mechanical Engineering: Temperature Control, 1991
22 Mechanical Engineering Renovation: Windows, 1981
23 International Cultural Center: Room 110A/B HVAC Modification Mechanical Submittal, 1997
24 International Cultural Center: Room 110A/B HVAC Modifications Punchlist, 1997
25 International Cultural Center Originals: Cast Stone Shop Drawings, 1995
26 International Cultural Center Originals: Concrete Design Mix, 1995
27 International Cultural Center Originals: Door & Window Shop Drawings, 1995
28 International Cultural Center: Electrical Submittal, 1995
29 International Cultural Center: Finish Hardware Submittal, 1994
30 International Cultural Center Originals: Fire Alarm System, 1995
box folder
49 1 International Cultural Center Originals: Hollow Metal Submittal, 1995
2 International Cultural Center Electrical Lighting, 1995
3 International Cultural Center Originals: Masonry Submittal, 1995
4 International Cultural Center Originals: Mechanical Submittal, 1995
5 International Cultural Center Originals: Miscellaneous Submittals, 1994
6 International Cultural Center Originals: Operation & Maintenance Manual, 1997
7 International Cultural Center Originals: Overhead Door, 1995
8 International Cultural Center Originals: Plastic Laminate Doors, 1995
9 International Cultural Center: Plumbing Mechanical, 1995
10 International Cultural Center Originals: Programmable Thermostat, undated
11 International Cultural Center Originals: Project File, 1996
12 International Cultural Center Originals: Roofing Submittal, 1995
13 International Cultural Center Originals: Structural Shop Drawings (8 blueprints), 1995
14 International Cultural Center Originals: TAB Report (Preliminary), 1996
15 International Cultural Center Originals: Toilet Partitions, 1995
16 International Cultural Center Originals: Wall & Ceiling System, 1995
17 International Cultural Center Originals: Warranty Manual, 1994
18 Stangel/Murdough Hall: Fire Alarm Improvements Operation & Maintenance Systems Drawings (15 blueprints), undated
19 Stangel/Murdough Hall: AHU Coil Replacement (Notice & Warranties), 2001
20 Stangel/Murdough Hall: Replace Dining & Kitchen Roof (Bad Bid), 2001
21 Stangel/Murdough Hall: Fire Protection Upgrade Electrical Submittal, 2001
22 Stangel/Murdough Hall: Fire Protection Upgrade Fire Sprinkler Submittal (3 blueprints), 2001
23 Stangel/Murdough Hall: Fire Protection Upgrade Life Safety Survey, 1998
24 Stangel/Murdough Hall: Fire Protection Upgrade Transmittals, 2001
25 Stangel/Murdough Hall: Office Renovation Fire Alarm Submittal, 1998
26 Stangel/Murdough Hall: Office Renovation Johnson Controls Operation & Maintenance Manual, 1998
27 Stangel/Murdough Hall: Dining Hall Renovation Addendums, 1998
28 Stangel/Murdough Hall: Dining Hall Renovation Addendums (Electrical), 1999
29 Stangel/Murdough Hall: Dining Hall Renovation Alarm & Detection As-Builts, 1999
30 Stangel/Murdough Hall: Dining Hall Renovation Asbestos Disclaimers & MSDS, 1999
31 Stangel/Murdough Hall: Office Renovation Closeout/Warranty Documents, 1999
32 Stangel/Murdough Hall: Dining Hall Renovation Door Frame Submittal, 1998
33 Stangel/Murdough Hall: Dining Office Renovation Electrical Submittal, 1998
34 Stangel/Murdough Hall: Dining Hall Renovation Electrical Submittal, 1998
35 Stangel/Murdough Hall: Dining Hall Renovation: Electrical Submittal, 1998
36 Stangel/Murdough Hall: Dining Hall Renovation Elevator Submittal, 1998
37 Stangel/Murdough Hall: Dining Hall Renovation Equipment Operation & Maintenance Manual 1 of 2, 2000
box folder
50 1 Stangel/Murdough Hall: Dining Hall Renovation Equipment Operation & Maintenance Manual 2 of 2, 2000
2 Stangel/Murdough Hall: Dining Hall Renovation Fire Alarm & Sprinkler Submittal, 1998
3 Stangel/Murdough Hall: Dining Hall Renovation Fire Alarm Submittal, 1998
4 Stangel/Murdough Hall: Dining Hall Renovation Hollow Metal Doors & Frames Submittal, 1998
5 Stangel/Murdough Hall: Dining Hall Renovation Johnson Controls Operation & Maintenance, 1998
6 Stangel/Murdough Hall: Dining Hall Renovation Mechanical Submittal, 1998
7 Stangel/Murdough Hall: Dining Hall Renovation Operation & Maintenance Manual, 1999
8 Stangel/Murdough Hall: Dining Hall Renovation Project Record Documents, 1999
9 Stangel/Murdough Hall: Dining Hall Renovation Roof/Stainless Steel Trim Submittal, 1998
10 Stangel/Murdough Hall: Dining Hall Renovation Steel Details Submittal, 1998
11 Stangel/Murdough Hall: Dining Hall Renovation TAB Report, 1999
12 Stangel/Murdough Hall: Dining Hall Renovation Temperature Control Valve (Submittal Comments), 1998
13 Stangel/Murdough Hall: Dining Hall Renovation Test Report, 1999
14 Stangel/Murdough Hall: Parking Renovation & Expansion Asphalt Paving Submittal, 1999
15 Murdough Parking Renovation & Expansion: Electrical Submittal, 1997
16 Murdough Hall Parking Renovation & Expansion: Final Inspection, 1997
17 Murdough Parking Renovation & Expansion: Warranty & Guarantee, 1997
18 Stangel/Murdough Hall: Elevator Renovation Car Submittals & Colors, 1996
19 Stangel/Murdough Hall: Hot Water Generator Replacement Mechanical & Electrical Submittal, 1986
20 Stangel/Murdough Hall: Hot Water Generator (Kitchen Basement) Operation & Maintenance Manual, 1987
21 Stangel/Murdough Hall: Lobby Renovation Air Handler Controller (Johnson Control), 1986
22 Stangel/Murdough Lobby Renovation: Electrical Fixtures, 1986
23 Stangel/Murdough Hall: Exhaust Fan Submittal, 1987
24 Stangel/Murdough Hall Lobby Renovation: Final Inspection, 1987
25 Stangel/Murdough Hall Lobby Renovation: Fire Alarm System (Sound), 1986
26 Stangel/Murdough Hall Lobby Renovation: hardware Inspection Reports, 1987
27 Stangel/Murdough Hall Lobby Renovation: Hardware Submittal, 1986
28 Stangel/Murdough Hall Lobby Renovation: Mechanical Submittal, 1986
29 Stangel/Murdough Hall: Structural Drawings (41 blueprints), 1986
30 Stangel/Murdough Hall Lobby Renovation: Temperature Controls, 1986
31 Stangel/Murdough Hall Lobby Renovation: Wheel Chair Lifts, 1986
32 Stangel/Murdough Hall: Bid Tabulation (Scramble System), 1985
33 Stangel/Murdough Hall: Electrical Submittal (Scramble System), 1985
34 Stangel/Murdough Hall: Fire Hose Cabinet Serving Line Replacement (Scramble System), 1985
35 Stangel/Murdough Hall: Fire Protection (Scramble System), 1985
36 Stangel/Murdough Hall: Inspection Reports (Scramble System), 1985
37 Stangel/Murdough Hall: Mechanical Submittal (Scramble System), 1986
38 Stangel/Murdough Hall: Interior A/C & Heating Pumps, 1985
39 Stangel/Murdough Hall: Interior Renovations Construction Documents, 1985
40 Stangel/Murdough Hall: Interior Exhaust Hoods/Grill Submittal, 1985
41 Stangel/Murdough Hall: Interior Finish Hardware, 1985
42 Stangel/Murdough Hall: Interior Fire Alarm Detectors, 1985
43 Stangel/Murdough Hall: Interior Fixtures, 1985
44 Stangel/Murdough Hall: Interior Handicapped Lift, 1985
45 Stangel/Murdough Hall: Interior Inspection Reports, 1985
46 Stangel/Murdough Hall: Interior Renovation Operation & Maintenance Manual, 1986
47 Stangel/Murdough Hall: Interior Plumbing, 1985
48 Stangel/Murdough Hall: Interior Range Hoods, 1985
49 Stangel/Murdough Hall: Serving Counters Electrical Submittal, 1984
50 Stangel/Murdough Hall: Fan Coil Units (Miscellaneous Renovations), 1984
51 Murdough Apartment Miscellaneous Renovations: Warranty Manuals, 1984
52 Stangel/Murdough Hall Lobby: Air System Study, 1986
53 Stangel/Murdough Hall Repairs & Renovations: Fan Coil Units, 1984
54 Stangel/Murdough Hall Repairs & Renovations: Inspection Report, 1984
55 Murdough Hall Bathrooms: Electrical Submittal, 1984
56 Murdough Bathroom Remodel: Grilles & Registers, 1983
57 Murdough Bathroom Remodel: Hardware Schedule, 1984
58 Murdough Bathroom Remodel: Inspection Reports, 1984
59 Murdough Hall Bathrooms: Mechanical Submittal, 1984
60 Stangel/Murdough Hall: Fire Alarm System Phase 1 (Inspection Reports), 1984
61 Stangel/Murdough Hall: Fire Alarm Submittals, 1984
box folder
51 1 Murdough Bathroom Renovation: Addendum/Correspondence, 1983
2 Murdough Bathroom Remodeling: Electrical Submittal, 1983
3 Stangel/Murdough Remodeling: Electrical Submittal, 1973
4 Stangel/Murdough Remodeling: Operating & Spare Parts Manuals, 1974
5 Stangel/Murdough Mechanical Submittal, 1974
6 Stangel/Murdough Remodeling: Temperature Controls, 1974
7 Stangel/Murdough Absorption Machine (Carrier), 1963
8 Stangel/Murdough Air Conditioning for Kitchen Office (Payne), 1963
9 Stangel/Murdough Air Conditioning/Heating for Dieticians & Supervisors Apartments (Modine), 1963
10 Stangel/Murdough Air Handlers, Louvers, Dampers (Buffalo), 1963
11 Stangel Murdough Bath & Shower: Supervisors Apartments (Eljer), 1963
12 Stangel/Murdough Bathroom: Toilet Partitions, 1963
13 Stangel/Murdough Belts & Bearings Used for Buffalo Forge Units for A/C & Heating, 1963
14 Stangel/Murdough Chillers for Drinking Water (Heat-X, Inc.), 1963
15 Stangel/Murdough Cold Storage Doors (Jamison), 1963
16 Stangel/Murdough Convertors/Expansion Tanks, 1963
17 Stangel/Murdough Ceramic Cooling Towers, 1963
18 Stangel/Murdough Electrical Shop Drawings, 1963
19 Stangel/Murdough Transformers, Oil Fuse Cutouts, Clocks, Conductors, Panelboards, Telephone (Electrical Submittal), 1963
20 Stangel/Murdough Elevators: Westinghouse, 1963
21 Stangel/Murdough Exhaust Fans for Toilets (Tradewind), 1963
22 Stangel/Murdough Exhaust Fans for Bathrooms (Ammerman), 1963
23 Stangel/Murdough Filters (American Air), 1963
24 Stangel/Murdough Fire Damper, Manual Dampers, Access Louvers (Krueger), 1963
25 Stangel/Murdough Fire Protection Equipment (Allenco), 1963
26 Stangel/Murdough Fire Pump Control (Allis Chalmers), 1963
27 Stangel/Murdough Grilles, Registers, Diffusers, Air Valves, 1963
28 Stangel/Murdough Heat Exchanger (Bell Gossett), 1963
29 Stangel/Murdough Hot Water Generator (Tube Bundle), 1963
30 Stangel/Murdough Incinerators (Alamo), 1963
31 Men's 9 & 10 Index of Shop Drawings and Submittal Data, 1965
32 Stangel/Murdough Insulation: Standard Asbestos, 1963
33 Stangel/Murdough Light Fixtures, 1964
34 Stangel/Murdough Meters (P H Recording), 1963
35 Stangel/Murdough Miscellaneous Accessories (Also Drapery Tracks), 1963
36 Stangel/Murdough Plumbing Submittal, 1963
37 Stangel/Murdough Pump: Air Washer Spray for Kitchen (Buffalo), 1963
38 Stangel/Murdough Pump: Chilled Water # 2 (Weiman), 1963
39 Stangel/Murdough Pump: Condensate (Skidmore), 1963
40 Stangel/Murdough Pump: Condenser Water # 1 (Weiman Type L), 1963
41 Stangel/Murdough Pump: Heating Water # 3 (Weiman Type L), 1963
42 Stangel/Murdough Pump: Hot Water Circulating (Weiman), 1963
43 Stangel/Murdough Pump: Hot Water Circulating #2 (Thrush), 1963
44 Stangel/Murdough Pump: Sewage Ejector (Weiman), 1963
45 Stangel/Murdough Pumps: Sump 2 (Weiman), 1963
46 Stangel/Murdough Recessed Terrace: Recessed Patio Aluminum Railings, 1963
47 Stangel/Murdough Refrigeration Equipment: Walk In Units Compressors (Dunham Bush), 1963
48 Stangel/Murdough Hall Originals: Shop Drawings (15 blueprints), 1963
49 Stangel/Murdough Shower Columns, Valves, Heads (Bradley), 1963
50 Stangel/Murdough Snack Bar Submittal, 1963
51 Stangel/Murdough Steam Specialties (Traps, Valves, Etc.), 1963
52 Stangel/Murdough Submittal Books on Equipment #1, #2, #4, #5, 1963
box folder
52 1 Stangel/Murdough Temperature Controls (Minneapolis Honeywell), 1963
2 Stangel/Murdough Thermometers (Weskler), 1963
3 Stangel/Murdough Valves: Shower Mixing (Powers), 1963
4 Stangel/Murdough Wall Covering, 1963
5 Stangel/Murdough Water Softeners, Hulen/Clement Chemical Feed System (Pumps, Meters, Chemicals, Valves), 1963
6 Stangel/Murdough Water Softeners (Allis Chalmers), 1963
7 Stangel/Murdough Preheat Coils (Control Air), 1980
8 Stangel/Murdough, Horn/Knapp Remodel: Temperature Controls (Johnson Service), 1973
9 Engineering & Computer Center: Powerware 9390 UPS, 2006
10 Engineering & Computer Center: Install Fire Suppression System Equipment Submittal, 2006
11 Engineering & Computer Center: Install Fire Suppression System Operation & Maintenance Manual, 2006
12 Engineering & Computer Center: Install Backup Generator Concrete, Fence & Miscellaneous Elect, 2006
13 Engineering & Computer Center: Install Backup Generator Electrical Gear, 2006
14 Engineering & Computer Center: Install Backup Generator (Generator), 2006
15 Engineering & Computer Center: Install Backup Generator Operation & Maintenance Manual, 2007
16 Engineering & Computer Center: Install Backup Generator Surge Protection Device, 2006
17 Engineering & Computer Center: Renovation Doors, Frames & Hardware, 2002
18 Engineering & Computer Center: Renovation Electrical Submittal, 2002
19 Engineering & Computer Center: Renovation Fire Alarm Submittal, 2002
20 Engineering & Computer Center: Renovation Operation & Maintenance Data, 2003
21 Engineering Center Basment/3rd Floor: Operation & Maintenance & Warranty Information, 2003
22 Engineering & Computer Center: Renovation Plumbing Submittal, 2002
23 Engineering & Computer Center: Renovation Project Manual, 2002
24 Engineering & Computer Center: Renovation Sprinkler System, 2002
25 Engineering & Computer Center: Renovation Warranties, Guarantees, & Bonds, 2003
26 Engineering & Computer Center: Replace Leibert AHUs AC Unit, 2000
27 Engineering & Computer Center: Replace Leibert AHUs Operation & Maintenance Manual, 2001
28 Engineering & Computer Center: Reroof Closeout Items, 1995
29 Engineering & Computer Center: Reroof Inspection Reports, 1995
30 Engineering 2nd & 3rd Floor Phase II: Plumbing Submittal, 1990
31 Computer Center Renovation Phase II: Air Distribution, Exhaust Fans, Fan Coil Insulation, 1984
32 Computer Center Renovation Phase II: Fixture Submittal, 1984
33 Engineering & Computer Center: Phase 2 Johnson Controls, 1985
34 Engineering Center Phase II: Operation & Maintenance, 1985
35 Computer Center Renovation Phase II: Panelboard, 1984
36 Engineering & Computer Center: Phase 2 TAB Deficiency List, 1985
37 Engineering & Computer Center: Phase 2 TAB File, 1987
38 Engineering & Computer Center: Phase 2 TAB Report, 1986
39 Computer Center Renovation Phase II: Testing/Balancing (TAB) Report, 1986
40 Engineering Center Remodeling: Air Handling Units (Temptrol), 1972
41 Computer Center Duct Heater, 1972
42 Engineering Center: Compressor (Carrier), 1956
43 Engineering Center: Submittal Data (H. E. Taylor Co.), 1954-1959
44 Engineering Center: Temperature Controls (Powers), 1959
45 Engineering Center: Air Compressor (Quincy), undated
46 Engineering & Computer Center: Electrical Installation Instructions, 1968
47 Computer Center Seasonmaker Fan Coils, undated
48 Computer Center Maintenance & Parts Manual, 1997
49 Engineering & Computer Center: Condair Steam Humidifiers, 1987
50 Engineering Center: Test & Balance, 1998
51 Building 206: Power Flowrite Valves (Water Mix), 1978
box folder
53 1 Engineering & Tech Lab MOCVD Lab: Centrifugal Fans, undated
2 Texas Tech University Engineering MOCVD Lab: Phase 5 Finish Out Close Out Documents, 2009
3 Engineering & Tech Lab MOCVD Lab: Electrical Submittal & Warranty, 2009
4 Engineering & Tech Lab MOCVD Lab: Rooftop Unit Operation & Maintenance, 2009
5 Engineering Tech Semiconductor: Electrical & Fire Alarm Submittal, 1998
6 Engineering Tech Semiconductor Lab: Fire Sprinkler Submittal, 2009
7 Engineering Tech Semiconductor: Hardware Submittal, 1998
8 Engineering Tech Semiconductor Lab: Insulation Submittal, 1998
9 Engineering Tech Semiconductor Lab: Controls Resubmittal, 1998
10 Engineering Tech Semiconductor Lab: Controls Submittal, 1998
11 Engineering Tech Semiconductor: Fume Hood Submittal & Lab Furniture, 1998
12 Engineering Tech Semiconductor: Mechanical Submittal, 1998
13 Engineering Tech Semiconductor: Owners Equipment Monitoring System, 1998
14 Engineering & Tech Lab Semiconductor Lab: Operation & Maintenance Manuals, 1998
15 Engineering Tech Semiconductor Lab: PPES File, 1998
16 Engineering & Technology Lab: Semiconductor Lab, 1999
17 Engineering & Tech Lab Semiconductor Lab: Warranties & Operations & Maintenance, 1998
18 Engineering Tech Lab Renovation: Clean Room Submittal, 1996
19 Engineering Tech Lab Renovation: Control Valves Submittal, 1996
20 Engineering Tech Lab: Controls Submittal, 1997
21 Engineering Tech Lab Renovation: Electrical Submittals, 1996
22 Engineering Tech Lab renovation: Exhaust Fan #15 Submittal Mechanical, 1996
23 Engineering & Tech Lab Renovation: Fire Alarm Submittal, 1996
24 Engineering & Tech Lab Renovation: Fire Alarm Submittal, 1996
25 Engineering Tech Lab Renovation: Fire Alarm Operation & Maintenance, 1997
26 Engineering Tech Lab Renovation: Fire Extinguisher Submittal, 1996
27 Engineering Tech Lab Renovation: Fire Sprinkler Resubmittal Calculations, 1996
28 Engineering Tech Lab Renovation: Hardware Locks, 1996
29 Engineering Tech Lab: Hardware Submittal, 1996
30 Engineering Tech Renovation: Hardware/Wood Door Submittal, 1996
31 Engineering Tech Lab Renovation: Heat Plate Exchanger Submittal for Information only Mechanical, 1996
32 Engineering Tech Lab Renovation: Doors & Frames Hollow Metal, 1996
33 Engineering & Tech Lab Renovation: Mechanical Operating & Maintenance, 1996
34 Engineering & Tech Lab Renovation: Mechanical Submittals & Shop Drawings, 1996
35 Engineering Tech Lab Renovation: Air Handler Unit Mechanical Submittal, 1996
box folder
54 1 Engineering & Tech Lab Renovation: Mechanical Submittal & JC As-Builts, 1996
2 Engineering Tech Lab Renovation: Paint Submittal, 1996
3 Engineering Tech Lab Renovation: Pipe Hangers & Supports, 1996
4 Engineering Tech Lab Renovation: Spence Prv Steam Valve Submittal, 1996
5 Engineering Tech Lab Renovation: Roofing Submittal, 1996
6 Engineering Tech Lab Renovation: Steel Submittal, 1996
7 Engineering Tech Lab Renovation: TAB Specs, 1996
8 Engineering Tech Lab Renovation: Toilet Accessories Submittal, 1996
9 Engineering Tech Lab Renovation: Toilet Accessory & Grab Bars Submittal Hardware, 1996
10 Engineering & Tech Lab Renovation: Warranties & Johnson Controls, 1998
11 Engineering Tech Lab Renovation: Welding Hood & Accessories Submittals, 1996
12 Engineering & Tech Lab Replace Roof: Closeout Items, 1995
13 Engineering Technology Lab Replace Roof: Final Inspection Report, 1994
14 Horn Hall: Elevator Renovation Support Work (Sandia Construction Inc.), 1999
15 Horn Hall: Elevator Renovation, 1999
16 Horn/Knapp Hall: Air Conditioning Project Close Out Documents, 1996
17 Horn/Knapp Hall: Air Conditioning Project Electrical Submittal, 1996
18 Horn/Knapp Hall: Air Conditioning Project Mechanical Operation & Maintenance Manual, 1996
19 Horn/Knapp Hall: Air Conditioning Project Mechanical Submittal, 1996
20 Horn/Knapp Hall: Air Conditioning Project TAB Report, 1996
21 Horn Hall: Mechanical Submittal Hot Water Generator, 1989
22 Horn/Knapp Hall: Operations & Maintenance Manuals Hot Water Generator Replacement, 1989
23 Horn/Knapp Hall: Kitchen Hoods Mechanical/Electrical Submittal, 1986
24 Horn/Knapp Hall: Serving Counters Electrical Submittal, 1985
25 Horn Hall Mail Room: Comments on Plans & Specs, 1984
26 Horn Hall Mail Room: Electrical Submittal, 1984
27 Horn Hall Mail Room: Hardware Submittals, 1984
28 Horn Hall Mail Room: Notice to Proceed, 1984
29 Horn/Knapp Hall: Knapp Remodeling Electrical Submittal, 1976
30 Knapp Hall Remodeling (Kitchen) Elevators, 1976
31 Knapp Hall Remodeling Hardware Schedule, 1976
32 Horn/Knapp Hall: Knapp Remodeling Johnson Controls, 1977
33 Horn/Knapp Hall: Knapp Remodeling Mechanical Submittal, 1976
34 Horn/Knapp Hall: Knapp Remodeling Plumbing Submittal, 1977
35 Horn/Knapp Hall: Horn Remodeling Electrical Submittal, 1975
36 Horn/Knapp Hall: Horn Remodeling Fire Alarm System, 1975
37 Horn Hall Remodel: Hardware, 1975
box folder
55 1 Horn/Knapp Hall: Horn Remodeling Johnson Controls, 1975
2 Horn/Knapp Hall: Horn Remodeling Mechanical Submittal, 1976
3 Horn/Knapp Hall: Horn Remodeling Plumbing Submittal, 1975
4 Horn/Knapp Hall Remodeling: Electrical Submittal (Fixtures/Power), 1974
5 Horn/Knapp & Stangel Murdough Hall Remodeling: Mechanical Submittal, 1975
6 Horn/Knapp & Stangel Hall Renovation (Dining & Kitchen Remodeling): Temperature Controls (Johnson Service), 1973
7 Horn/Knapp Hall Remodeling: Temperature Controls, 1974
8 Horn/Knapp Hall: Hot Water Heater (Adsco Tube Bundle), 1963
9 Horn/Knapp & Drane Hall: Condensers, Chillers, Wiring Diagram, 1967
10 Horn/Knapp Hall: Elevator Guarantee (Dover Elevators), 1977
11 Horn/Knapp Hall: Exhaust Hoods, undated
12 Horn/Knapp Hall: Roof Repair, 1986
13 Horn/Knapp Hall: Parking Lot, 1985
14 Horn/Knapp, Weeks, Thompson, Gaston, Carpenter, and Wells Hall: Refrigeration Door Closers, 1964
15 Horn/Knapp, Bledsoe/Gordon Hall: Temperature Controls (Honeywell), 1975
16 Horn/Knapp Hall: Vacuum Pump Submittal (Nash Vacuum Heating Pump), undated
17 Food Technology Renovate Energy Management System (Johnson Controls), 1998
18 Food Technology: Clock & Fire Alarm (Simplex Time Recorder), 1975
19 Food Technology: Submittal Cold Room (Tersco Inc.), 1975
20 Food Technology: Fixtures (J & J Electric), 1975
21 Food Technology Mechanical Submittal Literature: Operation & Maintenance, 1976
22 Food Technology Mechanical Submittal Literature, 1975
23 Food Technology: Pneumatic Computer (Taylor), 1975
24 Food Technology: Pneumatic Square Root Extractor (Taylor Instruments), 1975
25 Food Technology: Resistance to Pressure Transmitter (Taylor), 1975
26 Food Technology: Alterations & Additions Specs Volume 1, 1975
27 Food Technology: Switchboard Panels (J & J Electric), 1975
28 Food Technology: Temperature Controls (Johnson Service), 1975
29 Food Technology: Transmittal Fire Line Connection, 1975
30 Food Technology: Wiring Devices (J & J Electric), 1975
31 Food Technology: Water Softener (J. P. Philibert Asso.) Kisco Boiler & Engineering Co.), undated
32 Food Technology: Lighting Survey, 1989
33 Food Technology: Room 204 A, G, F TAB Report, 1986

Return to the Table of Contents