Woodson Research Center, Rice University

Guide to the Rice University Architectural drawings, oversize manuscript material, maps and photographs, Part 1 of 3 UA 226-pt1



creatorctb Rice University
Title: Rice University architectural drawings, oversize manuscript material, maps and photographs, Part 1 of 3
Dates: 1840-2010
Abstract:These records include architectural drawings, maps, posters, oversize manuscript materials, and photographs ranging in dates from 1840s-2010. The majority of architectural drawings relate to Rice University. The collection also contains oversize material from other manuscript collections. Links to these finding aids are included.
Identification: UA 226-pt1
Quantity: 500 Linear Feet
Quantity: Drawers 1-50 of 164 drawers
Language: English
Repository: Woodson Research Center, Rice University, Houston, Texas

Biographical / Historical

William Marsh Rice was born in Springfield, Massachusetts on March 14, 1816. He was the third of ten children born to David and Patty Hall Rice. Little is known about Rice's childhood but records indicate that he worked for a while as a shopkeeper in Springfield before deciding to move to Texas in 1838.

Rice started out in business as a merchant in Houston, Texas. His first business partnership with a Barnabas Haskill was formed in 1840 but dissolved by 1842. In 1844 Rice became a commission and forwarding merchant in partnership with Ebenezer B. Nichols, a successful Houston businessman. By 1850 Rice's siblings began to follow him to Houston and assisted in his ventures. On June 29, 1850 Rice married Margaret Bremond whose father Paul was one of Rice's many business partners. In the census of 1860, Rice is listed as having $750,000 in real and personal property, making him one of the wealthiest men in Texas at the time.

On August 13, 1863 Margaret Rice died, possibly from cholera or yellow fever. Shortly after his wife's death, Rice went to Monterrey, Mexico and stayed there until August of 1865 when he returned to Houston. Later in that summer, he went to Massachusetts for business and did not return to Houston until 1866. On June 26, 1867 Rice married for a second time. His second wife was Julia Elizabeth Baldwin Brown, a widow and a daughter of Horace Baldwin, one of the early mayors of Houston. Elizabeth's sister Charlotte was the wife of William's younger brother Frederic.

Rice and his second wife moved to New Jersey to live with Rice's sister Charlotte and her family. Rice and his wife divided their time between New York City and New Jersey with occasional trips to Houston to oversee business.

During one of the Rices' visits to Houston, he was approached by Cesar Maurice Lombardi, who was interested in building a high school in Houston. Rice had been interested in endowing an educational institute of some kind, having revised his will twice previously to include a school for needy boys, first in New Jersey, then in New York City. After the meeting with Lombardi, Rice decided to fund an institute of higher learning in Houston. On May 19, 1891 the charter for the William M. Rice Institute for the Advancement of Literature, Science and Art was incorporated in Austin, Texas. Captain James Addison Baker, William's brother Frederic, Houston businessmen Emanuel Raphael, Cesar Lombardi, James E. McAshan and Alfred S. Richardson were named as the first board of trustees.

In article two of the charter: "(t)he objects, intents, and purposes of this Institution are declared to be the establishment and maintenance, in the City of Houston, Texas, of a Public Library, and the maintenance of an Institution for the Advancement of Literature, Science, Art, Philosophy and Letters; the establishment and maintenance of a Polytechnic school; for procuring and maintaining scientific collections; collections of chemical and philosophical apparatus, mechanical and artistic models, drawings, pictures and statues; and for cultivating other means of instruction ..." The institute was initially endowed with a promissory note for $200,000 to be paid upon Rice's death. Rice revised his will on September 26, 1896 and left the bulk of his estate to his namesake institute.

Elizabeth Rice's health began to fail in the early months of 1896. The Rices moved to Houston in April 1896, hoping the warm weather would improve Elizabeth's condition. On June 1, 1896 Mrs. Rice drew up a new will without her husband's knowledge naming Orren Holt, a Houston lawyer, as her executor. The will claimed that the Rices were residents of Texas (a community property state) and Elizabeth could bequeath half of the Rice estate as she saw fit. Rice moved Elizabeth to a hotel in Waukesha, Wisconsin shortly after the new will was signed. Elizabeth died on July 24, 1896 in Waukesha. Rice returned to New York City. In September 1896 Orren Holt, Elizabeth's executor, filed to probate Elizabeth's last will. Captain Baker, Rice's lawyer, informed Rice of the situation and a court battle began over the will. Rice disputed his wife's claim that she had been a Texas resident since this division of their estate would decrease what was available for the institute.

During the battle over the estate two lawyers became involved with the proceedings and would end up greatly influencing the final results. Captain Baker, a trustee of the Rice Institute, served as William Rice's lawyer. Albert Patrick, the other lawyer, was hired by Orren Holt in 1898 to investigate the residency question in New York City. There Patrick met Charlie Jones, Rice's valet. The two spent a great deal of time together and slowly a plan was formed. At first it seemed that Patrick was only interested in the settlement of the contested will and was looking for any way to win. He convinced Jones, in the spring of 1900, to start poisoning Rice with mecury pills as a way to avoid a court battle. By the summer of 1900 Patrick came up with the idea to forge a will that left the majority of Rice's estate to himself and small sums to relatives and friends. The forged will was dated June 30, 1900.

On September 8, 1900 a hurricane struck the Gulf Coast and one of Rice's businesses, the Merchants and Planters Oil Company, suffered severe damage. The business manager telegraphed that they needed money for repairs and the sum was most of what Rice had available in his bank account. Patrick was worried at the loss of such a large sum of ready cash and he convinced Jones to use chloroform to kill Rice. On September 23, 1900 Rice was murdered by Jones. Patrick, in his haste to get hold of Rice's cash, tried to withdraw money from Rice's bank using a check forged by Jones right after Rice's death. The bank refused to honor the check since Patrick's name was spelled incorrectly. When calling to verify the check with Rice, the bank learned that he was dead. Since the circumstances were suspicious, the bank contacted Rice's Houston lawyer, Captain Baker.

When Baker arrived in New York City, he learned there had been a new will written up by Patrick. Baker was suspicious of the will since Rice had never notified him of any changes to the one Baker had drawn up on September 26, 1896. This suspicion led to a long and sensational trial where Patrick's version of the will was exposed as a forgery and the scheme to kill Rice was discovered. Patrick was found guilty of murder and forgery on March 26, 1902 and was sentenced to die in the electric chair. Jones, who confessed to his part of the events, ended up being released despite being the one who had actually committed the murder. Patrick's sentence was commuted to life imprisonment by the governor of New York, but eventually won a full pardon in 1912.

On February 6, 1902 Orren Holt settled the suit over Elizabeth's will for $200,000. After the trials and settlement, Captain Baker and the original Board of Trustees set about fulfilling Rice's dream to have an institute for higher learning in Houston, Texas. To guide them, the trustees chose an imaginative first president, a young mathematician and astronomer at Princeton University named Edgar Odell Lovett, who signed on as president in 1908. Lovett had earned doctorates both from the Universities of Virginia and Leipzig and had taught at Johns Hopkins, the University of Chicago, and Princeton, the most innovative American universities of the time. The trustees sent him on a worldwide tour of the "competition," where he interviewed faculty, inspected facilities, and developed an inspired vision of what might be accomplished on the plains of Texas with a blank-check charter, a generous endowment, and high ambitions. The goal was a university "of the highest grade" that kept "the standards up and the numbers down." Lovett shaped the university that Rice would become.

The Rice Institute opened on September 23, 1912, the anniversary of Mr. Rice's murder, with 77 students and a dozen faculty. An international academic festival celebrated the opening three weeks later, a spectacular event that brought Rice to the attention of the entire scholarly world. Four years later, at the initial commencement, 35 bachelor degrees and one master's degree were awarded, with the first doctorate conferred in 1918.


Scope and Contents

These records include architectural drawings, maps, posters, oversize manuscript materials, and photographs ranging in dates from 1840s-2010. The majority of architectural drawings relate to Rice University. The collection also contains oversize material from other manuscript collections. Links to these finding aids are included.


Restrictions

Conditions Governing Access

This material is open for research.

Conditions Governing Use

Permission to publish material from this collection must be obtained from the Woodson Research Center, Fondren Library.


Index Terms

Subjects (Organizations)
ctb Rice University
Genres
maps (documents)
architectural drawings (visual works)
blueprints (reprographic copies)
photographs

Related Material

Rice University Architectural drawings, oversize manuscript material, maps and photographs, 1840-2010, UA 226-2, Woodson Research Center, Fondren Library, Rice University. See finding aid online: http://www.lib.utexas.edu/taro/ricewrc/00761/rice-00761p2.html

Rice University Architectural drawings, oversize manuscript material, maps and photographs, 1840-2010, UA 226-3, Woodson Research Center, Fondren Library, Rice University. See finding aid online: http://www.lib.utexas.edu/taro/ricewrc/00761/rice-00761p3.html


Administrative Information

Preferred Citation

Rice University Architectural drawings, oversize manuscript material, maps and photographs, 1840-2010, UA 226, Woodson Research Center, Fondren Library, Rice University.

Immediate Source of Acquisition

The majority of this material forms part of the Rice University Archives, and was transferred to the archives, Woodson Research Center, Fondren Library. Any non-university archives materials form part of a manuscript collection with its own finding aid which will include information on provenance.


Detailed Description of the Collection

 

Drawer 1: Ruth McGonigle Architectural Drawings

General
See Ruth McGonigle Architectural Records (MS 22) http://www.lib.utexas.edu/taro/ricewrc/00191/rice-00191.html



 

Drawer 2: Ralph Anderson, Jr.

General
See Ralph Anderson, Jr. Papers, 1860-1989 (MS 413) http://www.lib.utexas.edu/taro/ricewrc/00047/rice-00047.html



 

Drawer 3: Maps of Rice Institute Land Holdings

draweritem
31W.M. Rice ranch, encapsulated 1908
2J.M. West Clear Lake mansion; 9/4/1928; 4 blueprints; 2 revisions 12-16-68; architectural preliminary print, 12/17/68
3Newton County #30A, print. 1937
4Oil and gas fields of Texas #53B, n.d.; prints.
5Orange County #46, n.d.; blueprint.
6Orange County #46A, blueprint 1908
7Tyler County #39, n.d.; blueprint
8Rice Institute holdings in the Wm. B. Bridges & Bennet Blake Surveys, Harris County; blueprint. 1932
9Robertson County geological report #54, n.d.; paper.
10San Patrico County #26, blueprint 1934
11Tyler County, free hand on paper 1910
12Timber types for quadrangle area #39B, prints. 1938
13Tyler county #39A, n.d.; print.
14Waller County, Stephen’s surve, blueprints, 2 copies. 1947
15Waller County, areas adjacent to, n.d.; print
16Waller County #40, n.d.; blueprint.
17Waller County oil and gas, n.d.; negative.
18Weatherford #45, n.d.; blueprint.
19Wharton County #41A, blueprint. 1895
20Wharton County #41B, n.d.; blueprint.
21Wortham #42, n.d.; linen.
22Navarro County, White and Choate leagues #35A; blueprint, 2 copies. 1901
23Navarro County, White and Choate leagues #35B; 3 copies, 1 linen 2 print. 1904
24Newton County #30, n.d.; print.
25City of Lampassas, a portion of, #48, n.d.; linen.
26Lee County #23; paper. 1879
27Lee County lands belonging to Rice Institute; blueprints, 2 copies 1908
28Leon County #50, n.d.; blueprint
29Limestone County #24; linen. 1888
30Limestone County #26A; print and blueprint, 6 copies 1913
31Madison County #25; blueprint. 1907
32Limestone County, town of Mexia, Division Q #26C; blueprint. 1921
33Mexia #26B; n.d.; blueprint
34Montgomery County #27, n.d.; print.
35Montgomery County #27A, n.d.; blueprint.
36Montgomery County, map of Conroe area #27B; linen 1931
37Montgomery County #27C, n.d.; print.
38Southeast Montgomery County, n.d.; print.
39Navarro County #29; linen. 1888
40Village Mills Area, Hardin and Tyler Counties; blueprint. 10-10-1840
41Erath County#10, n.d.; print.
42Westmoreland Farm Survey, n.d.
43Hardin County #14, n.d.; linen.
44Map of Giddings, Washington County #13, n.d.; linen (very fragile).
45Irion County ownership map #18A, 1919; print.
46Hunt County #11; linen. 1879
47Harris County #15E, Tomball-Huffsmith area ownership map, n.d.; blueprint.
48Revised map of Limestone County, n.d.; blueprint.
49Harris County #15C, Reinerman Land Company; blueprint. 8/30/1910
50Map of Bexar County #3, n.d.; linen.
51Brazoria County #53, East half, n.d.; print.
52Brazoria County #53A, West half, n.d.; print.
53Kaufman County #20; pen on paper. 4/12/1907
54Map of Trustees Land at Bremond, Robertson County, n.d.; pen on paper.
55Revised map of Bremond, Robertson County, n.d.; pen on paper.
56Blanco County #4; linen. 1890
57Brazos County #5; linen. 1879
58Bastrop County, part of A. Martinez survey #2A; pen and pencil on paper. 1908
59Bastrop County, part of A. Martinez survey #2B; pen and pencil on paper. 1908
60Falls County #11, n.d.; linen.
61Callahan County #43; linen. 1879
62Callahan County ownership map #43A, n.d.; print.
63Camp Logan First Addition #51A; print. 1923
64Harris County, Sutton Estates survey; blueprints, 2 copies. 1933
65City of Houston map #52; blueprint. 1910
66Jones County #47; linen. 1898
67Lampassas County #22; linen. 1888
68Rice Institute, n.d.; 2 photocopies.
69Rice Institute playground; original site for University on Louisiana Street at Leeland, pencil drawing on paper 1913
70Calcasieu and Rapides Parishes Pine Lands-Pawnee Tract Range 3 West
71Calcasieu Parish Pine Lands-Oberlin Tract Range 5 West.
72Old Map of Louisiana Street Property “Institute Grounds.”
73Old Map of Louisiana Street Property “Institute Grounds.”
74Old Map of Louisiana Street Property “Institute Grounds.”
75Old Map of Louisiana Street Property “Institute Grounds.”
76Plans for an Addition to a Store Building for Mr. David Tartakov; floor plan, blueprint. 1/18/1926
77Plans for an Addition to a Store Building for Mr. David Tartakov; foundation plan, blueprint. 1/18/1926
78Plans for an Addition to a Store Building for Mr. David Tartakov; roof plan, blueprint. 1/18/1926
79Store building for the Empire Electric Supply Co.; plumbing, heating and electrical plans, blueprint. 1924
80Store building for the Empire Electric Supply Co.; first and second floors plan, blueprint. 1924
81Store building for the Empire Electric Supply Co.; third floor and roof plan, blueprint. 1924
82Store building for the Empire Electric Supply Co.; front and west elevation, blueprint. 1924
83Store building for the Empire Electric Supply Co.; front elevation detail, blueprint. 1924
84Store building for the Empire Electric Supply Co.; column and footing schedule, blueprint. 1924
85Store building for the Empire Electric Supply Co.; second and third floors plan, blueprint. 1924
86Store building for the Empire Electric Supply Co.; roof and stair details, blueprint. 1924
87Calcasieu Parish Tax Roll; 10 pages, blueprint, encapsulated. 1909
88Foster-Smith Survey, n.d.; blueprint, encapsulated.



 

Drawer 4: Americas (MS 518)

Related Materials
These items have been digitized in the Americas Archive http://scholarship.rice.edu/handle/1911/9219 also see Americas Collection (MS 518): http://www.lib.utexas.edu/taro/ricewrc/00227/rice-00227.html
draweritem
41Map of Battle of El Molino del Rey (issued 1850); lithographed battle plan engraved by A. Kollner and lithographed by P.S. Duval.
2Map of the American Hemisphere; engraving, with full period colouring, plate mark. 1823
3Invitation to the Americas Collection, 1776-1920 exhibition; October 11, no year.
4“City Treasurer!” ; broadside requesting assistance from Mr. Jefferson Davis on opportunities in Nicaragua. March 7, 1860
5“Alocucion”Portino Melendez; broadside. November 5, 1903
6Treaty Between the United States and Peru;” James Buchanan. Handwritten copy, English with Spanish on verso, countersigned by Lewis Cass as Secretary of State. 1857
7Florida Whig --- extra. Eucheeanna Convention. April 27, 1848
8Bando del Don Eustoquio Diaz Velez Coronel Mayor De Los Exercitos De La Patria…;” decree. June 16, 1819
9Albany Journal; December 18, 1835, January 1, 5, 15, 19, 22, 1836, February 4, 19, 1836.
10Decree from Ramon Rayon, Brigadier General and Governor of the Federal District of Mexico. March 12, 1835
11Mexico-U.S. Treaty beginning, “El G. Ignacio Romero Vargas, Gobernador Constitucional Interino Del Estado L.Y.S. [Libre y Soberano] De Puebla, á sus habitantes…”. 1869
12Valley towards Saltillo, from near the base of "Palace Hill" at Monterey. Color print. ca. 1845.
13Birds-eye view of Camp of the Army of Occupation, commanded by Gen[eral] Taylor. Near Corpus Christi, Texas (from the North). Color map. October 1845.
14Heights of Monterey, from the Saltillo Road looking towards the city (from the West). Color map. 1846.
15Monterey, from Independence Hill, in the rear of the Bishop's Palace. As it appeared on 23rd September 1846. Color map.
16Monterey, as seen from a house-top in the main Plaza (to the West). Color map. October 1846.



 

Drawer 5: Miscellaneous Archive Materials

draweritem
51Aerial view of Rice Institute campus; photostatic copy. c. 1946-47
2Base map of Rice campus property(revised). 1956
3W.M. Rice Institute Grounds Topographical Survey; ink on tracing paper. Dec. 14, 1909
4Houston Lighting & Power Co., Engineering Department, Harris County; blueprint. March 9, 1937
5Rice Institute Spur Track; fragile. 1925
6Pedestal of W.M. Rice statue, n.d.; blueprints, 3 copies.
7General Plan of Rice Institute; Cram Goodhue and Ferguson Architects; colored pencil. April 1910
8Fondren Library Renovation, Design Review; blueprints. January 4, 2005



 

Drawer 6: Panoramas

Separated Materials
Contents of Drawer 6 have been rehoused in Oversized box located in Annex.
draweritem
61Wiess Team UA 079; color photograph.
2Football Team, n.d.; (poor condition, stuck to piece of glass)
3Football Team (S.W. Conf. 1934-on back) 1934
4Rice Institute. Jan 31, 1912
5Rice Institute. June 5, 1911
6Football Team. 1928
7Football Team in frame. 1928
8[Owl] band. 1926
9Will Rice College. Color photograph. 1989
10Football Team, n.d.
11Football Team. 1931
12Class of 1920 (2 copies)
13Garden Party honoring the British Ambassador, Sir Auckland Geddes, K.C.B. May 13, 1921
14Jubilee of Sir George Gabriel Stokes (Dr. Lovett a delegate) 1899
15[Owl] band, (2 copies) c. 1927
16ROTC Regiment 16th Co., Ft. Sheriden, Ill. June 1918
17Delegates to Formal Opening (damaged stuck to glass) 1912
18Men of Rice Institute #1. Feb. 27, 1922
19Women’s Army Corps, Rice Institute, View I, (3 copies) 1918
20Women’s Army Corps, Rice Institute, n.d.
21Women’s Army Corps, Rice Institute, View II, (3 copies) 1918
22Attending Delegates Formal Opening Rice Institute. October 12, 1912
23Men of Rice Institute #2. Feb. 27, 1922
24Rice Institute campus, (2 copies) c. 1920s
25Rice Institute Campus. May 14, 1915
26Student Body of Rice Institute. 1924-25
27Attending Delegates Formal Opening Rice Institute, View II. October 12, 1912
28[American] Math Society Meeting. June 6, 1921
29G-designated area: campus. 1920
30Attendants at the Luncheon given by Mayor Rice [of Houston] for the Trustees, Faculty and guests of the Rice Institute. Huxley in front row. (2 copies). Oct. 10, 1912
31Campus, (digital print) 1920
32Lovett Administration Building and Mechanical Engineering Lab. 1912
33Formal Opening Ceremonies at Rice Institute. October 12, 1912
34SATC, n.d.
35Rice Institute campus. c. 1920
Rice Owls NCAA Baseball championship game at Rosenblatt Stadium, Omaha, Nebraksa



 

Drawer 7: Maps (cataloged separately)

General
Maps are catalogued in the Fondren Library catalog.



 

Drawer 8: Maps (cataloged separately)

General
Maps are catalogued in the Fondren Library catalog.



 

Drawer 9: Campus Maps

draweritem
91Map showing land for site of the Rice Institute. A.E. Stimson and P.F. Eller. Ink on linen and two prints on paper. No date.
1BMap showing lands for the Rice Institute. Ink on linen. Jos. Gamble. No date.
2Survey of the Rice Institute with letter from surveyor attached. Lockwood and Andrews. Print on paper. December 12, 1949.
3U.S. Geological Survey, Bellaire, 1921 edition. Photocopy. 1915 survey.
4Five Campus maps. Prints on paper. No dates.
5Map of Rice Campus. Print on paper. January 1943.
6Map of the Institute campus. Print on paper. c. 1920
7Map of the campus by Elwyn Simons. Print on paper. 3 copies. 1957
8Plat of the campus of the Rice Institute. Print on paper. No date.
9Isometric of the campus. Blueprint on paper. No date.
10Topical survey of Rice Institute grounds. Ink on linen. Rolled in the back of drawer 5. December 14, 1909
11Surveyors sketch of south Rice campus. Ink on linen. c. 1920
12Survey made by class of 1916-17. Ink on paper. May 26, 1917.
13Topographical map: Proposed site for sewage treatment plant. One blueprint on paper, one ink on linen, one ink on paper. No date.
14Aerial photo of the Rice campus. Print on paper. No date. Rolled in the back of drawer 5.
15Sketch showing the location of Rice Institute's lands in the Bringhurst Subdivision of the Jno. Rienermann league. Ink on linen. October 1911.
16Analysis of campus. Four sheets. Ink on vellum. No date.
17Preliminary general plan. Colored pencil on trace, framed in museum board. No date.
18Two proposals for general plan. Watercolor rendering. Cram, Goodhue & Ferguson. 1909.
19General plan. Ink on linen. April, 1910.
20General plan of campus. William Ward Watkin. Ink on linen. Rolled in the back of drawer 5. April 1910.
21General plan of campus. Cram, Goodhue and Ferguson, Boston. Original in colored pencil on trace. March 16, 1910.
22General plan. Print on linen. April 24, 1912.
23General plan of campus. Cram, Goodhue and Ferguson. July 1910.
24General plan showing underground piping. Ink on linen. No date.
25Revised general plan of laboratories. Cram, Goodhue and Ferguson. No date.
26Revised general plan of science and graduate groups. Cram, Goodhue and Ferguson. Colored pencil on trace, print on paper, and one negative on blueprint. No date.
27Proposals for general plan. (3). Colored pencil on trace. No date.
28Proposal for Residential groups for faculty. Blueprint on paper. No date.
29Tunnel plan. Blueprint on paper. August 27, 1912.
30Texas flag. Colored pencil on trace. August 27, 1912.
31Rice automobile flag. Colored pencil on trace. August 27, 1912.
32Plot plan. Staub and Rather with William Ward Watkin. Blueprint on paper. No date.
33General plan of the Institute. Ink on linen. 1959
34General plan. Print on paper. No date.
35Several studies of campus. Ink on trace. No date.
36Map showing location of Rice Institute. Rolled in back of drawer 5.
37Campus map. Blueprint on paper. February 14, 1991.
38Three campus maps for parking study. Black ink on paper, mylar copy, reduced version on coated paper. c. 1991
39Base map of campus property. Lockwood and Andrews, Consulting Engineers; Drawing B2735. Blueprint on paper. Rolled in back of drawer 5. June 1956.
40General plan of the Rice Institute campus. Blueprint on paper. 1949
41Pipes and tunnels. Physical plant map. Ink on paper. 1986
42Campus base map. Blueprint on paper. July 16, 1988.
43Rice University accessibility map. No date.
44Rice Institute campus from stadia survey. (2 copies) May 1922
45New projects construction. Encapsulated computer printout. Sheet #1. February 25, 1999.
46Additions to the Heating and Cooling Plant. Blueprint on paper. May 22, 1970.
47Site plan. Sheet A-1. Blueprint on paper. May 22, 1970.
48Basement floor plan. Sheet A-2. Blueprint on paper. May 22, 1970.
49First floor plan. Sheet A-3. Blueprint on paper. May 22, 1970.
50Roof plan & elevations. Sheet A-4. Blueprint on paper. May 22, 1970.
51Sections & details. Sheet A-5. Blueprint on paper. May 22, 1970.
52Wall sections & details. Sheet A-6. Blueprint on paper. May 22, 1970.
53Basement floor and foundation plan. Sheet S-1. Blueprint on paper. May 22, 1970.
54First floor plan & details. Sheet S-2. Blueprint on paper. May 22, 1970.
55Roof framing plan & details. Sheet S-3. Blueprint on paper. May 22, 1970.
56Canopy framing & misc. details. Sheet S-4. Blueprint on paper. May 22, 1970.
57Mechanical plans & details. Sheet M-1. Blueprint on paper. May 22, 1970.
58Electrical plan-basement & roof. Sheet E-1. Blueprint on paper. May 22, 1970.
59Electrical plan-first floor. Sheet E-2. Blueprint on paper. May 22, 1970.
60Master plan for utilities: chilled water & steam. Print on paper. Revised. 1970
61Pipe and tunnel plan. Print on paper. No date.
62Pipe and tunnel plan-Large scale. Print on paper. No date.
63Drawings for Central Plant Expansion: '69-'70. Blueprint on paper. May 1970.
64Key plan. Sheet M-1. Blueprint on paper. April 1970.
65First floor plan. Sheet M-2. Blueprint on paper. April 1970.
66Basement plan. Sheet M-3. Blueprint on paper. April 1970.
67Piping details. Sheet M-4. Blueprint on paper. April 1970.
68Cooling tower plan & detail. Sheet M-5. Blueprint on paper. April 1970.
69CHS & CHR piping details. Sheet M-6. Blueprint on paper. April 1970.
70Boiler & feedwater modifications. Sheet M-7. Blueprint on paper. April 1970.
71Feedwater modifications. Sheet M-7A. Blueprint on paper. April 1970.
72Underground CHS & CHR plan & profile. Sheet M-8. Blueprint on paper. April 1970.
73Underground CHS & CHR plan & profile. Sheet M-9. Blueprint on paper. April 1970 April 1970.
74Underground CHS & CHR plan & profile. Sheet M-10. Blueprint on paper. April 1970.
75Underground CHS & CHR plan & profile. Sheet M-11. Blueprint on paper. April 1970.
76Tunnel piping plan & details. Sheet M-12. Blueprint on paper. April 1970.
77Girls dorm tunnel plan & details. Sheet M-13. Blueprint on paper. April 1970.
78Tunnel area plan. Sheet M-14. Blueprint on paper. April 1970.
79Tunnel piping plan & details. Sheet M-15. Blueprint on paper. April 1970.
80Tunnel piping sections. Sheet M-16. Blueprint on paper. April 1970.
81Mechanical details. Sheet M-17. Blueprint on paper. April 1970.
82Mechanical details. Sheet M-18. Blueprint on paper. April 1970.
83Building chilled water control schematics. Sheet M-19. Blueprint on paper. April 1970.
84Partial site Plan-1 of 2. Sheet E-1. Blueprint on paper. April 1970.
85Partial site Plan-2 of 2. Sheet E-1. Blueprint on paper. April 1970.
8612.47KV one line diagram. Sheet E-3. Blueprint on paper. April 1970.
874.16KV one line diagram. Sheet E-4. Blueprint on paper. April 1970.
8812.47KV one line diagram. Sheet E-5. Blueprint on paper. April 1970.
89Control plan 480V diagram. Sheet E-6. Blueprint on paper. April 1970.
90Basement plan- electrical. Sheet E-7. Blueprint on paper. April 1970.
91First floor plan- electrical. Sheet E-8. Blueprint on paper. April 1970.
92Roof plan- electrical. Sheet E-9. Blueprint on paper. April 1970.
93Cooling towers plan. Sheet E-10. Blueprint on paper. April 1970.
94Cooling tower one line & maintenance building. Sheet E-11. Blueprint on paper. April 1970.
95Details 2, 3, & 4. Sheet E-12. Blueprint on paper. April 1970.
96Details 5, 6, & 7. Sheet E-13. Blueprint on paper. April 1970.
97Details 8, 9, 10, & 11. Sheet E-14. Blueprint on paper. April 1970.
98Details 12, 13, & 14. Sheet E-15. Blueprint on paper. April 1970.
99Details 15 & 16. Sheet E-16. Blueprint on paper. April 1970.
100Detail 17. Sheet E-17. Blueprint on paper. April 1970.
101Cooling tower area paving & grading plan & details. Sheet C-1. Blueprint on paper. April 1970.
102Cooling tower foundation plan & details. Sheet S-1. Blueprint on paper. April 1970.
103Tunnel structural plans & details. Sheet S-2. Blueprint on paper. April 1970.
104Tunnel structural plan & details. Sheet S-3. Blueprint on paper. April 1970.
105Treated water equipment supports & foundation. Sheet S-4. Blueprint on paper. April 1970.
106Switchgear building plans & details. Sheet A-1. Blueprint on paper. April 1970.
107Change house & garage building plans & details. Sheet A-2. Blueprint on paper. April 1970.
108Garage building. Foundation plan, elevations, & storage bin details. Sheet A-3. Blueprint on paper. April 1970.
109Carport- plans & details. Sheet A-4. Blueprint on paper. April 1970.
110A portion of the Rice University campus. Blueprint on paper. June 22, 1967.
111Rice University campus [H37 business office bldg. under construction]. Blueprint on paper. [1967]
112Sketch in the P.W. Rose League, Harris Co. TX, mylar. March 1909.
113W.M. Rice Institute Grounds topographical survey. Mylar. Dec. 14, 1909.
114Map of Rice Institute by Sergio Garcia ca late 1940's
115Maps (2) of original land holdings of the Rice Institute in downtown Houston. Ink on paper. June 1914



 

Drawer 10: Administration Building

General note
Architects: Cram, Goodhue and Ferguson, 15 Beacon St., Boston. (c. 1911)
draweritem
101Basement plan: North wing. Working drawing #1. One blueprint on linen, one on paper, one mylar copy and one photocopy on paper. February 27, 1911.
Scope and Contents note
Items 1-9: Floorplans.
2Basement plan: South wing (with foundation details). Working drawing #2. One blueprint on linen, one on paper, one photocopy on paper, and one ink drawing on mylar. No date.
3First floor plan: North wing. Working drawing #3. One blueprint on linen, one on paper, one mylar copy. 1911
4First floor plan: South wing. Working drawing #4. One blueprint on linen, two on paper, one mylar copy. No date.
5Second floor plan: North wing. Working drawing #5. One blueprint on linen, two on paper, one print on paper, one copy on mylar. No date.
6Second floor plan: South wing. Drawing #6. One blueprint on linen, one copy on mylar, and one blueprint on paper. No date.
7Third floor plan: North wing. Working drawing #7. One blueprint on linen, one on paper, one copy on mylar, one photocopy. No date.
8Third floor plan: South wing. Working drawing #8. One blueprint on linen, one on paper, one copy on mylar, one photocopy. No date.
9Roof plan: North wing. Working drawing #9. One blueprint on linen, one on paper, one copy on mylar, one photocopy. No date.
10West elevation: North wing. Working drawing #1 0. One blueprint on paper. No date.
Scope and Contents note
Items 10-76: Sections and elevations.
11South and west elevations. Working drawing #11. Blueprint on paper. No date.
12East elevation. Working drawing #12. Blueprint on paper. no date.
13North and East elevations. Working drawing #13. Blueprint on paper, two copies. No date.
14Section on line A-B. Working drawing #14. One blueprint on linen, one on paper. No date.
15Section on line C-D. Working drawing #15. Blueprint on paper. No date.
16Sections on lines 1-J, E-F, and G-H. Working drawing #'16. One blueprint on linen, one on paper. No date.
17Sections on lines M-N and K-L with an elevation of the north side of the tower. Working drawing #17. One blueprint on linen, one on paper. No date.
18Truss sections, base elevation. Drawing D1158. Ink on linen. No date.
19Staircases, smoke stack, ladders, catch basin covers. Sections. Drawing D2382. No date.
20Stair, second to third floor, curved rail. Plan, sections. Drawing D2383. Ink on linen. August 19, 1912.
21South wing beams 101-111, 117, 120-21. Sections. Drawing D2995. Ink on linen. December 29, 1911.
22South wing first floor beams. Sections. Drawing D2996. Ink on linen. December 30, 1911.
23North wing beams. Sections. Drawing D3010. Ink on linen. January 12, 1912.
24Anchor bolt plan, north wing. Plan, elevation, drawing. D3012. Ink on linen. January 12, 1912.
25North wing trusses. Sections. Drawing 3016. Ink on linen. January 13, 1912.
26Second floor south wing beams. Sections. Drawing 3017. Ink on linen. January 13, 1912.
27Second floor south wing beams. Sections. Drawing 3018. Ink on linen. January 15, 1912.
28First floor beams. Sections. Drawing 3019. Ink on linen. January 13, 1912.
29First floor beams. Sections. Drawing 3020. Ink on linen. January 13, 1912.
30First floor beams. Sections. Drawing 3021. Ink on linen. January 13, 1912.
31North wing beams. Sections. Drawing 3022. Ink on linen. January 13, 1912.
32Fourth floor beams. Sections. Drawing D3026. Ink on linen. January 13, 1912.
33Loggia floor beams. Sections. Drawing D3027. Ink on linen. February 13, 1912.
34North wing-setting plan of common room roof. Drawing D3029. Ink on linen. March 30, 1912.
35North wing beams. Sections. Drawing D3031. Ink on linen. February 13, 1912.
36North wing beams. Sections. Drawing 3033. Ink on linen. February 13, 1912.
37Beams. Sections. Drawing D3035. Ink on linen. January 24, 1912.
38South wing beams. Sections. Drawing D3055. Ink on linen. February 5, 1912.
39South wing, fourth floor beams. Sections. Drawing 3061. Ink on linen. February 9, 1912.
40North wing beams. Sections. Drawing 3062. Ink on linen. February 6, 1912.
41South wing beams. Sections. Drawing 3063. Ink on linen. February 10, 1912.
42North wing truss. Sections. Drawing D3068. Ink on linen. February 26, 1912.
43North wing trusses. Sections. Drawing D3091. Ink on linen. March 20, 1912.
44North wing trusses. Sections. Drawing D3117. Ink on linen. March 20, 1912.
45South wing columns. Sections. Drawing E606. Ink on linen. December 15, 1911.
46Setting plan for columns, south wing. Sections. Drawing E607. Ink on linen. January 6, 1912.
47South wing columns. Sections. Drawing E608. Ink on linen. December 29, 1911.
48South wing columns. Sections. Drawing E609. Ink on linen. February 7, 1912.
49South wing columns. Sections. Drawing E61 0. Ink on linen. February 12, 1912.
50Roof framing plan, south wing. Drawing E611. Ink on linen. February 13, 1912.
51South wing beams. Sections. Drawing E612. Ink on linen. February 17, 1912.
52South wing beams/trusses. Sections. Drawing E613. Ink on linen. February 21, 1912.
53South wing beams/trusses. Sections. Drawing E614. Ink on linen. February 24, 1912.
54South wing beams/trusses. Sections. Drawing E615. Ink on linen. February 26, 1912.
55North wing columns. Sections. Drawing E624. Ink on linen. January 8, 1912.
56North wing columns. Sections. Drawing E626. Ink on linen. January 9, 1912.
57First floor framing plan, north wing. Drawing E627. Ink on linen. January 12, 1912.
58Second floor framing plan, north wing. Drawing E628. Ink on linen. January 12, 1912.
59Second floor framing plan, south wing. Drawing E629. Ink on linen. January 13, 1912.
60North wing columns. Sections. Drawing E630. Ink on linen. February 16, 1912.
61Third floor framing plan. Drawing E638. Ink on linen. February 1, 1912.
62Fourth floor framing plan. Drawing E639. Ink on linen. January 20, 1912.
63North wing roof trusses. Sections. Drawing E640. Ink on linen. January 20, 1912.
64North wing roof trusses. Sections. Drawing E642. Ink on linen. March 21, 1912.
65North wing fourth floor, third floor, loggia plans. Drawing E643. Ink on linen. February 9, 1912.
66North wing kitchen and tower roofs plans. Drawing E644. Ink on linen. February 26, 1912.
67North wing beams/trusses. Sections. Drawing E645. Ink on linen. February 26, 1912.
68North wing trusses. Sections. Drawing E646. Ink on linen. February 26, 1912.
69North wing beams/trusses. Sections. Drawing E647. Ink on linen. March 30, 1912.
70South wing beams/trusses. Sections. Drawing E649. Ink on linen. March 2, 1912.
71South wing beams. Sections. Drawing E650. Ink on linen. March 7, 1912.
72South wing beams/trusses. Sections. Drawing E652. Ink on linen. March 9, 1912.
73Admissions office revisions - Lovett Hall, first floor plans. Blueprint on paper. September 25, 1989.
74Admissions office revisions- Lovett Hall, first floor plans. Blueprint on paper. September 12, 1989
75Space utilization study 1960 - Lovett Hall. Blueprint on paper. Revised. September 26, 1989.
76Furniture layout- founder's room. Blueprint on paper. November 3, 1970.



 

Drawer 11: Administration Building

draweritem
111Rendering and negative showing administration and part of physics. Pen on paper. No date.
2Structural details. The Phoenix Iron Co. Sheet #2P. Blueprint on paper.
Scope and Contents note
Items 2-9: Details and mechanical systems.
3External details. Working drawing #19. Blueprint on paper. No date.
4External details. Working drawing #20. Blueprint on paper. No date.
5Central motive of end elevations: elevation of typical bay of east facade. Working drawing #21.
6Full size detail of stone inscriptions. Blueprint on paper. No date.
7Designs for concave tiles in Sally Port. Drawing #119. Pencil on trace. May 29, 1911.
8Revision of doors in stair halls no. 2 and 3. Ink on linen with one blueprint on paper. No date.
9Full size detail of bronze plate and handle for outside doors. Drawing #118. May 23, 1911.
10Detail of door knobs. Drawing #115. Pencil on trace. 1911
Scope and Contents note
Items 10-22: Additions and Changes.
11Elevation of passenger elevator. Sheet #1. Pencil on trace. No date.
12Elevation of passenger elevator. Sheet #2. Pencil on trace. No date.
13Basement plan showing elevator. Sheet #3. Pencil on trace. No date.
14First floor plan showing elevator. Sheet #4. Pencil on trace. No date.
15Second floor plan showing elevator. Sheet #5. Pencil on trace. No date.
16Third floor plan showing elevator. Sheet #6. Pencil on trace. No date.
17Fourth floor plan showing elevator. Sheet #7. Pencil on trace. No date.
18Roof plan showing elevator. Sheet #8. Pencil on trace. No date.
19Alterations to library dead storage. Print on paper. August 29, 1962.
20Addition of vault, south wing. Pencil on trace. No date.
21Addition of women's toilet on second floor. James C. Morehead. Sheet #2. Print on paper. No date.
22Full size and 3/4 scale details. Blueprints on paper. No date. [missing]
23Drawing #129. Water closet doors. April 16, 1912.
Scope and Contents note
Items 23-50: Details and sections. Blueprints by Cram, Goodhue, and Ferguson, architects.
24Elevation of carved panels on sides of abacus. Drawing #75. January 25, 1911.
25Tower windows. Drawing #81. January 25, 1911.
26Triple windows, third floor. Drawing #55. November 25, 1910.
27Carved panel in north side of sally port. Drawing #103. March 8, 1911.
28Staircase window, east side. Drawing #35. August 24, 1910.
29Third floor window in upper part of loggia #1. Drawing #47. October 11, 1910.
30Panels of windows in classroom #2, second floor. Drawing #48. October 3, 1910.
31Finish for opening in dumb waiter shaft. Drawing #126. April 5, 1912.
32Window in coatroom #3, second floor tower. Window in stairhall #3a. Drawing #80. January 12, 1911.
33Carved panel at ends of parapet of loggia #3, tower, fourth floor, west. Drawing #89. February 2, 1911.
34Panel over large columns, west elevation. Drawing #108. March 17, 1911.
35Conductor head, west pavilion, and adjacent bay of chemistry lab. Drawing #65. September 11, 1913.
36Triple windows, third floor, north and south elevations. Drawing #46. October 10, 1910.
37Patterns under cornice, east elevation, first three bay, and west elevation, Drawing #42. October 6, 1910.
38Coupled windows in classroom 7, east elevation, tower. Drawing #70. December 29, 1910
39Marble facing above arcade of loggia #3 tower, fourth floor, west elevation. Drawing #83. n.d.
40Pierced stone grille for stair window, third floor, east elevation. Drawing #77. January 11, 1911.
41Tile between arches, second and third story windows. October 6, 1910.
42Windows, third floor, west elevation, south wing. December 2, 1910.
43Center panel, top of parapet, west side. Drawing #110. March 17, 1911.
44Windows in pavilions, third floor and balconies. Drawing #53. November 23, 1910.
45Stone canopy at top of tower, east elevation. Drawing #92. February 17, 1911.
46Large columns, west elevation, second floor. Drawing #56. November 30, 1910.
47Ceiling in great hall. Drawing #101. March 8, 1911.
48Entrances 2 & 3, vestibules 2 & 3. Drawing #30. August 23, 1910.
49Windows, third floor, north ring, west elevation. Drawing #57. December 1, 1910.
50Base of piers at end of cloisters, west elevation. Drawing #40. October 1, 1910.
51Watercolor rendering of the Administration Building (Lovett Hall) with reflection pool, Cram Goodhue & Ferguson. n.d.



 

Drawer 12: Administration Building, Allen Center, & Anderson Hall

draweritem
121Pattern between arches, third story, north and south elevation. Drawing #44. October 7, 1910.
2East elevation, north wing. Drawing #1128. March 17, 1911.
3Arcade in loggia 3, fourth floor tower, west elevation. Drawing #82. January 26, 1911.
4Exterior stonework of loggias 1 & 2, east elevation. Drawing #54. November 15, 1910.
5Full size details panel top of buttresses, east elevation. Drawing #107. March 17, 1911.
6Full size details, impost and spring, tower arch, west side. Drawing #27. August 10, 1910.
7Full size details, cloister arch on abacus, fsd elevation, cloister cap and base. Drawing #34. August 17, 1910.
8Full size details windows in trustees' room, third floor, west elevation of tower. Drawing #65. December 17, 1910.
9Cornice and parapet to tower, west elevation. Drawing #84. January 30, 1911.
10Toilet room window and sallyport fountain. Drawing #93. February 17, 1911.
11Full size details marble facing over windows in trustees' room, third floor tower, west elevation. Drawing #94. February 17, 1911.
12Full size details caps of large columns and archivalt above fourth floor tower, east elevation. Drawing #74. January 5, 1911.
13Sallyport, 1/2 inch scale. Drawing #29. n.d.
14Three odd third floor windows and diamonds on pavilions. Drawing #61. December 5, 1910.
15Vertical panel of parapet, west side of tower. Drawing #111. March 17, 1911.
16Marble shield in spandrel of tower. Drawing #24. [missing] August 22, 1910
17Windows in stairhall #2, in toilet, stairhall #3, and coatroom 3. Drawing #97. No date.
18Full size details 6 windows in north and south elevation on tower. Drawing #95. February 20, 1911.
19Three windows in stenographer's office and east wall of stairhall 3B, tower, fourth floor, east elevation. Drawing #71. December 31, 1910.
20Marble facings upper part of tower. Drawing #109. March 17, 1911.
21Keystones over arches, loggias 1 & 2. Drawing #64. December 15, 1910.
22First floor plan. Sheet #A3. Blueprint on paper. March 30, 1966.
23South and west elevations. Sheet #A7. Blueprint on paper. March 30, 1966.
24North and east elevations. Blueprint on paper. No date.
25Office Building for Rice University. Print on paper. May 5, 1966.
26Index. Print on paper. May 5, 1966.
27Site plan. Sheet A-1. Print on paper. March 30, 1966.
28Basement floor plan. Sheet A-2. Print on paper. March 30, 1966.
29First floor plan & schedules. Sheet A-3. Print on paper. March 30, 1966.
30Second floor plan. Sheet A-4. Print on paper. March 30, 1966.
31Third floor plan. Sheet A-5. Print on paper. March 30, 1966.
32North & east elevations. Sheet A-6. Print on paper. March 30, 1966.
33South & west elevations. Sheet A-7. Print on paper. March 30, 1966.
34Wall sections. Sheet A-8. Print on paper. March 30, 1966.
35Core plans- stair & elevator sections. Sheet A-9. Print on paper. March 30, 1966.
36Detailed wall & door sections. Sheet A-10. Print on paper. March 30, 1966.
37First floor lobby & core details. Sheet A-11. Print on paper. March 30, 1966.
38Elevator & window details. Sheet A-12. Print on paper. March 30, 1966.
39Reflected ceiling plans & details. Sheet A-13. Print on paper. March 30, 1966.
40Schedules. Sheet S-1. Print on paper. March 30, 1966.
41Basement & foundation plan. Sheet S-2. Print on paper. March 30, 1966.
42First floor framing plan & details. Sheet S-3. Print on paper. March 30, 1966.
43Second floor framing plan & details. Sheet S-4. Print on paper. March 30, 1966.
44Third & roof framing plan & details. Sheet S-5. Print on paper. March 30, 1966.
45Stair step & tunnel details. Sheet S-6. Print on paper. March 30, 1966.
46Plot plan. Sheet MEP-1. Print on paper. March 30, 1966.
47Basement plan. Sheet M-2. Print on paper. March 30, 1966.
48First floor plan. Sheet M-3. Print on paper. March 30, 1966.
49Second floor plan. Sheet M-4. Print on paper. March 30, 1966.
50Third floor plan. Sheet M-5. Print on paper. March 30, 1966.
51Basement mechanical room plans. Sheet M-6. Print on paper. March 30, 1966.
52Basement electrical room plan. Sheet M-7. Print on paper. March 30, 1966.
53Piping risers and details. Sheet M-8. Print on paper. March 30, 1966.
54Schedules. Sheet M-9. Print on paper. March 30, 1966.
55Basement plan lighting. Sheet E-2. Print on paper. March 30, 1966.
56Basement plan power. Sheet E-3. Print on paper. March 30, 1966.
57First floor plan lighting. Sheet E-4. Print on paper. March 30, 1966.
58First floor plan power. Sheet E-5. Print on paper. March 30, 1966.
59Second floor plan lighting. Sheet E-6. Print on paper. March 30, 1966.
60Second floor plan power. Sheet E-7. Print on paper. March 30, 1966.
61Third floor plan lighting. Sheet E-8. Print on paper. March 30, 1966.
62Third floor plan power. Sheet E-9. Print on paper. March 30, 1966. March 30, 1966.
63Distribution & riser diagrams. Sheet E-10. Print on paper. March 30, 1966.
64Basement floor plan. Sheet P-2. Print on paper. March 30, 1966.
65First floor plan. Sheet P-3. Print on paper. March 30, 1966.
66Second floor plan. Sheet P-4. Print on paper. March 30, 1966.
67Third floor plan. Sheet P-5. Print on paper. March 30, 1966.
68Plumbing risers & details. Sheet P-6. March 30, 1966.
69Millwork. Allen Center Renovations, 7 sketches. July 2, 2004.
70Base, Horizontal ceiling trim and vertical trim in elevator lobby. Allen Center Renovations: President's suite, blueprint. July 20, 2004.
71First floor plan. Working drawing #2. One pencil on trace. Two blueprints on paper. One blueprint sketch on paper. August 1, 1946.
Anderson Hall
Architects: Staub and Rather, Houston, TX. (1946). William Ward Watkin, consulting architect.
72First floor plan. Sheet #1. Print on paper. [missing] 1946
73Second floor plan. Working drawing #3. One blueprint on paper. August 1, 1946.
74Second floor plan revision. Working drawing #3R. Pencil on paper with one blueprint on paper. [missing] February 24, 1947.
75Second floor plan revision. Sheet #3R. One blueprint on trace. October 23, 1946.
76Second floor plan. Sheet #2. Print on paper [missing] 1946
77Third floor plan. Working drawing #4. Two blueprints on paper. August 1, 1946.
78Third floor plan. Sheet #3. Print on paper.[missing] 1946
79Rendering. E.H. Shiwetzdel. Pencil on trace, mounted. c.1946.
80Detail of marble frieze on cloister. Pencil on trace. No date.
81Detail of brick panels above windows 301, 302, 303. Pencil on trace. No date.
82Plan of type 2 teacher's cabinet. Sheet #D-1. Pencil on trace. October 31, 1946.
83Elevation of interior wood doors. Sheet #D-2. Pencil on trace. October 31, 1946.
84Revised cloister floorplan. Sheet #D-3. Pencil on trace. November 1, 1946
85Detail of cast iron boots for downspouts. Sheet #D-4. Pencil on trace.
86Revised detail of door trim type 8. Sheet #D-5. Pencil on trace. November 15, 1946.
87Buttress details, northwest entrance. Sheet #D-6. Pencil on trace. No date.
88Detail of door jams. Sheet #D-8. Pencil on trace. No date.
89Full size marble profiles over main entrance. Sheet #D-9. Pencil on trace. No date.
90Full size detail with exterior steps and cloister arch. Sheet #D-10. Pencil on trace. No date.
91Full size profiles. Sheet #D-11. Pencil on trace. No date.
92Details of coping flashing. Sheet #D-12. Pencil on trace. February 5, 1947.
93Revised door types "E" and "H". Sheet #D-13. Pencil on trace. December 16, 1946.
94Revised dimensions for pipe chaces and windows 221 and 222. Sheet #D-14. Pencil on trace. December 16, 1946.
95Dimension revision. Sheet #D-15. Pencil on trace. December 17, 1946.
96Detail of sump pump. Sheet #D-16. Pencil on trace. December 16, 1946.
97Relocation of fire hose cabinets. Sheet #D-17. Pencil on trace. December 23, 1946.
98Detail of chamfer. Sheet #D-18. Pencil on trace. January 21, 1947.
99Revision of column 55. Sheet #D-19. Pencil on trace. January 23, 1947.
100Door #130. Sheet #D-20. Pencil on trace. January 24, 1947.
101Detail of grilles. Sheet #D-21. Pencil on trace. February 7, 1947.
102Details of special stone anchors. Sheet #D-22. Pencil on trace. February 7, 1947.
103Detail of suspended ceilings. Sheet #D-23. Pencil on trace. February 12, 1947.
104Plan of cloister showing revision in location of ceiling outlets. Sheet #D-24. Pencil on trace. February 20, 1947.
105Location diagram for program chimes, program gongs, clocks, and exit lights. Sheet #D-25. Pencil on trace. February 20, 1947.
106Replacement of Breche Violet marble by Broshell Pink in one piece. Sheet #D-27. Pencil on trace. March 12, 1947.
107Detail of stair railings. Sheet #D-28. Pencil on trace. July 16, 1947.
108Revised cloister marble. Sheet #D-29. Pencil on trace. August 14, 1947.
109Detail of inscription. Sheets #D-31, D31a, D-31b, D-31c, D-31d. Pencil on trace. October 1947.



 

Drawer 13: Anderson Hall

General note
Additions and changes: Architect: James Stirling with Michael Willford and Associates. (1980)
draweritem
131Table of contents for working drawings. May 16, 1980.
2Site plan. Working drawing #1. One blueprint on paper. May 16, 1980.
3Context plan (site plan). Print on laminated linen.
4Basement plan. Working drawing #2. One blueprint on paper. May 16, 1980.
5First floor plan. Print on laminated linen. Two copies - one in color one b/w. September, 1979.
6First floor plan with revisions. Blueprint on paper, three copies. July 28, 1980.
7First floor plan. Working drawing #3. One blueprint on paper. July 28, 1980.
8First floor plan. Working drawing #3. One blueprint on paper. May 16, 1980.
9Second floor plan. Print on laminated linen. Two copies - one in color, one b/w. September, 1979.
10Second floor plan with revisions. Blueprint on paper. Three copies. July 28, 1980.
11Second floor plan. Working drawing #4. One blueprint on paper. May 16, 1980.
12Third floor plan. Print on laminated linen. Two copies - one in color, one b/w. September, 1979.
13Third floor plan with revisions. Blueprint on paper. Three copies. July 28, 1980.
14Third floor plan. Working drawing #5. One blueprint on paper. May 16, 1980.
15Exhibition and jury space: 4 typical setups. Print on laminated linen. September, 1979.
16Typical studio layouts. Print on laminated linen. September, 1979.
17South, west, and north elevations. Working drawing #6. One blueprint on paper. May 16, 1980.
18East elevation and sections. Working drawing #7. One blueprint on paper. May 16, 1980.
19Sections. Working drawing #8. One blueprint on paper. May 16, 1980.
20South, west, east, and north elevations. Print on laminated linen. Two copies- one in color, one b/w. September, 1979.
21Sections: Gallery looking west, existing wing looking east Exhibion/jury space looking north, and new wing looking east. Print on laminated linen. September, 1979.
22Schedules. Working drawing #8. One blueprint on paper. May 16, 1980.
23Plan of photo lab and toilets. Working drawing #10. One blueprint on paper. May 16, 1980.
24Entrances, classroom A. Working drawing #12. One blueprint on paper. May 16, 1980.
draweritem
1225Elevator and mechanical details. Working drawing #12. One blueprint on paper. May 16, 1980
draweritem
1326Stairs 3 and 4. Working drawing #13. One blueprint on paper. May 16, 1980.
27Stair #5. Working drawing #14. One blueprint on paper. May 16, 1980.
28Wall sections. Working drawing #15. One blueprint on paper. May 16, 1980.
29Wall sections and details. Working drawing# 16. One blueprint on paper. May 16, 1980.
30Wall sections. Working drawing #17. One blueprint on paper. May 16, 1980.
31Wall sections. Working drawing #18. One blueprint on paper. May 16, 1980.
32Details. Working drawing #19. One blueprint on paper. May 16, 1980.
33Details. Working drawing #20. One blueprint on paper. May 16, 1980.
34Details. Working drawing #21. One blueprint on paper. May 16, 1980.
35Reflected ceiling plan. Working drawing #22. One blueprint on paper. May 16, 1980.
36Reflected ceiling plans. Working drawing #23. One blueprint on paper. May 16, 1980.
37Existing building demolition, first floor. Working drawing #24. One blueprint on paper. May 16, 1980.
38Existing building demolition, second and third floor plans. Working drawing #25. One blueprint on paper. May 16, 1980.
39Isometric of the exhibition/jury space. Print on laminated linen. September, 1979.
40Southwest view of exterior. Print on laminated linen. September, 1979.
41Northwest view of exterior. Print on laminated linen. September, 1979.
42Rendering of the court facing Fondren. Print on laminated linen. September, 1979.



 

Drawer 14: Anderson Hall, Biology Lab, and Chemistry Lab

draweritem
141Proposed classroom building. Colored pencil on trace/board. April 4, 1929.
General note
Rejected proposals.
2Proposed floorplans. Staub and Rather. Pencil on trace. No date.
3Rice computer. 78 drawings on trace. 1958-60.
4First floor plan. Staub and Rather. Blueprint on paper. Sheet 1. March 20, 1946.
5Second floor plan. Staub and Rather. Blueprint on paper. Sheet 2. March 20, 1946.
6Third floor plan. Staub and Rather. Blueprint on paper. Sheet 3. March 20, 1946.
7First floor plan. Staub and Rather. One pencil on trace, one print on paper. April 1, 1946.
8Two proposals for second floor plan. Staub and Rather. Pencil on trace and print on paper. March 15, 1946.
9Second floor plan. Staub and Rather. Pencil on trace. Sheet 2. March 15, 1946.
10Third floor plan. Staub and Rather. Pencil on trace, one print on paper. April 1, 1946.
11Plan study: second floor. Rice architecture department. Print on paper. April 29, 1959.
12Feasibility study no. 1: Second floor. Rice Architecture department. Print on paper. April 29, 1959.
13Feasibility study no. 4: Second floor. Rice Architecture department. Two copies. Print on paper. April 29, 1959.
14Interim proposal for archtecture department. Print on paper. June 3, 1959.
15Architecture department layout- second floor classroom. Print on paper. No Date.
16Third floor and roof plan. Print on paper. 1960
General note
Items 16-24: Anderson Biology Laboratory
17Third floor and fourth floor plan. Print on paper. 1968
18Third floor plan: scheme I & II. Print on paper. June 9, 1971.
19Basement plan. Sheet A-2. Print on paper. July 6, 1966
20First floor plan. Sheet A-3. Print on paper. July 6, 1966.
21Seminar and reading room plan. Sheet A-4. Print on paper. July 6, 1966.
22Second floor plan. Sheet A-5. Print on paper. July 6, 1966.
23Third floor plan. Sheet A-6. Print on paper. July 6, 1966.
24Roof and penthouse plans. Sheet A-7. Print on paper. July 6, 1966.
25Foundation, basement, and first floor framing plan. Working drawing #1. Ink on linen. No date.
General note
Items 25-111: Chemistry Laboratory. Architects: Cram and Ferguson, Boston and Wm. Ward Watkin, Houston.
26First floor plan. Working drawing #2. Ink on linen. No date.
27Second floor plan. Working drawing #3. Ink on linen. No date.
28Third floor plan. Working drawing #4. Ink on linen. No date.
29Roof plan. Working drawing #5. Ink on linen. No date.
30Roof plan. Blueprint on paper. Two sheets. No date.
31Front (south) and west elvations. Working drawing #6. Ink on linen. No date.
32Rear (north) elevation and side elevations. Working drawing #7. Ink on linen with one blueprint on paper. No date.
33Elevation of south wall of west court. Sheet #45. Pencil on linen. No date.
34Elevation on east court. Ink on linen. No date.
35Section on line C-C. Working drawing #8. Ink on linen. No date.
36Section on line D-D. Working drawing #9. Ink on linen. No date.
37Sections. Working drawing #10. Ink on linen. No date.
38Section of tower. Blueprint on paper. No date.
39First floor furniture layout. Ink on linen. No date.
40Second floor furniture layout. Ink on linen. No date.
41Third floor furniture layout. Ink on linen. No date.
42Detail of hot plate for all hoods. Ink on linen. No date.
43Detail of stairs. Working drawing #11. Ink on linen. No date.
44Detail of west court elevation. Working drawing #12. Ink on linen. No date.
45Second floor framing plan. Working drawing #13. Ink on linen. No date.
46Third floor framing plan. Working drawing #14. Ink on linen. No date.
47Attic framing plan. Working drawing #15. Ink on linen. No date.
48Roof framing plan. Working drawing #16. Ink on linen. No date.
49Basement plumbing and electrical plan. Working drawing #17. Ink on linen. No date.
50First floor plumbing and electrical. Working drawing #18. Ink on linen. No date.
51Second floor plumbing and electrical. Working drawing #19. Ink on linen. No date.
52Third floor plumbing and electrical. Working drawing #20. Ink on linen. No date.
53Attic plumbing and electrical. Working drawing #21. Ink on linen. No date.
54Basement heating and ventilation. Working drawing #22. Ink on linen. No date.
55First floor heating and ventilation. Working drawing #23. Ink on linen. No date.
56Second floor heating and ventiliation. Working drawing #24. Ink on linen. No date.
57Third floor heating and ventilation. Working drawing #25. Ink on linen. No date.
58Attic heating and ventilation. Working drawing #26. Ink on linen. No date.
59Furniture. Sheet #2. Pencil on trace. No date.
60Furniture. Sheet #3. Pencil on trace. No date.
61Details of stone relief. Print on paper (the original cannot be found). James Chillman. October 15, 1962.
62Full size detail of disc in main Entrance, cloister. Pencil on trace. No date.
63Detail of main entrance, cloisters, and tower. Sheet #40. Pencil on trace. No date.
64Full size details of stone moldings (see Sheet #40). Sheet #41. Pencil on trace. No date.
65Full size detail of stone disc over cloister arches. Sheet #43. Pencil on trace. No date.
66Full size detail of stone disc over cloister arches. Sheet #46. Pencil on trace. No date.
67Full size detail of stone discs on interior walls of amphitheater. Sheet #48. Pencil on trace. No date.
68Stone details: west court cloister. Sheet #49. Pencil on trace. No date.
69Floor design for side cloister. Sheet #56. Pencil on trace. No date.
70Details of two corner entrance arches on west court. Sheet #57. Pencil on trace. No date.
71Detail of amphitheater entrance. Sheet # 58. Pencil on trace. No date.
72Detail of ornament over door to theater. Sheet #60. Pencil on trace. No date.
73Full size details of stone on tower. Sheet #61. Pencil on trace. No date.
74Detail of stone panels on tower. Sheet #62. Pencil on trace. No date.
75Detail of 4 stone circular ornaments on tower. Sheet #63. Pencil on trace. No date.
76Detail of ornament on front of tower at second floor. Sheet #64. Pencil on trace. No date.
77Panels for pier caps facing east. Sheet 65. Pencil on trace/board. No date.
78First floor plan, basement and deck framing plan and roof and structural plan. Sheet #1. Ink on linen and one blueprint on paper. No date.
79North and east elevations with section 1-1. Sheet #2. Ink on linen and one blueprint on paper. No date.
80Plan showing space for department of architecture on second floor of chemistry. Ink on linen. No date.
81East elevation. Blueprint on paper. No date.
82First floor plan. Blueprint on paper. No date.
83Alterations to chemistry building. Blueprint on paper. Two copies; 1 with alterations in pencil. June 14, 1965.
84Air conditioning alterations to chemistry lab building. Sheet M-1. Blueprint on paper. June 28, 1965.
85Air conditioning alterations to chemistry building. Sheet M-2. Blueprint on paper. June 28, 1965.
86Alterations to second floor chemistry building. Sheet P-1. Blueprint on paper. August 7, 1964.
87Alterations to second floor chemistry building. Sheet P-2. Blueprint on paper. August 7, 1964.
88Alterations to chemistry building. Sheet AC-1. Blueprint on paper. No date.
89Alterations to chemistry building. Sheet #1. Blueprint on paper. January 27, 1964.
90Alterations to chemistry building. Sheet #2. Blueprint on paper. January 27, 1964.
91Alterations to chemistry building. Sheet #3. Blueprint on paper. January 27, 1964.
92Basement heating-plumbing and drainage plan. Sheet 1A. Blueprint on paper. No date.
93First floor plan. Sheet A-1. Blueprint on paper. May 24, 1962.
94Third floor plan. Sheet A-2. Blueprint on paper. May 24, 1962.
95Interior elevations. Sheet A-3. Blueprint on paper. May 24, 1962.
96Large scale electrical plans. Sheet E-1. Blueprint on paper. May 24, 1962.
97Large scale electrical plans. Sheet E-2. Blueprint on paper. May 24, 1962.
98Lab 119 plumbing plan. Sheet M-1. Blueprint on paper. May 24, 1962.
99Large scale mechanical plan. Sheet M-2. Blueprint on paper. May 24, 1962.
100Large scale plumbing plan. Sheet M-3. Blueprint on paper. May 24, 1962.
101Large scale mechanical plans. Sheet M-4. Blueprint on paper. May 24, 1962.
102Basement floor plan. Sheet A-1. Blueprint on paper. No date.
103First floor plan. Sheet A-2. Blueprint on paper. No date.
104Second floor plan. Sheet A-3. Blueprint on paper. No date.
105Third floor plan. Sheet A-4. Blueprint on paper. No date.
106Rooms 301, 304, 310, 320, & north corridor. Sheet A-5. Blueprint on paper. No date.
107Rooms 107, 109, 112, 114, & 219. Sheet A-6. Blueprint on paper. No date.
108Rooms 302, 304, & 305. Sheet A-7. Blueprint on paper. No date.
109Rooms 306, 316, & 318. Sheet A-9. Blueprint on paper. No date.
110Rooms 317 & 319. Sheet A-10. Blueprint on paper. No date.
111Rooms 102, 114, & 319, Sheet A-11. Blueprint on paper. No date.
112Building site plan. FKP Architects, Inc. Blueprint on paper. Sheet A1.1 February 24, 1999
General note
Items 112-119: Old Chemistry Building Renovation
113First floor life safety plan. FKP Architects, Inc. Blueprint on paper. Sheet A2.1. February 24, 1999
114Second floor life safety plan. FKP Architects, Inc. Blueprint on paper. Sheet A2.2. February 19, 1999
115Third floor life safety plan. FKP Architects, Inc. Blueprint on paper. Sheet A2.3. February 24, 1999
116Interior elevations. FKP Architects, Inc. Blueprint on paper. Sheet A9.1. February 24, 1999
117Interior elevations. FKP Architects, Inc. Blueprint on paper. Sheet A9.2. February 24, 1999
118Interior elevations. FKP Architects, Inc. Blueprint on paper. Sheet A9.3. February 24, 1999
119Interior elevations. FKP Architects, Inc. Blueprint on paper. Sheet A9.4. February 24, 1999
120Floor 1 floor plan. John Outram Associates. Print on paper. Sheet A3.01. September 28, 1995
General note
Items 120-123: Computational Engineering Building
121Floor 2 floor plan. John Outram Associates. Print on paper. Sheet A3.02. September 28, 1995
122Floor 3 floor plan. John Outram Associates. Print on paper. Sheet 3.03. September 28, 1995
123Floor 3 floor plan. John Outram Associates. Print on paper. Sheet A3.04. October 31, 1995



 

Drawer 15: Cohen House, Engineering Laboratory Building, Entrance Gates, Field House, Autry Gym, Geology Laboratory Building, Cohen House Fountain

draweritem
151Cohen house crest. Ink on linen. No date.
General note
Items 1-66: Architects: William Ward Watkin with Cram and Ferguson, consulting architects.
2Site plan: Sheet #1. Ink on linen with one print on paper. No date.
3Foundation plan. Sheet #S1. H.M. Sanford, consulting engineer. Ink on linen. No date.
4Basement. Sheet #2. Ink on linen, one blueprint on paper. No date.
5First floor plan. Sheet #3. Ink on linen with one print on paper. No date.
6First floor plan. Sheet #S2. H.M. Sanford, consulting engineer. Ink on linen. No date.
7Second floor plan. Sheet #4. Ink on linen with one print on paper. No date.
8Third floor plan. Sheet #5. Ink on linen with one print on paper. No date.
9East and north elevations. Sheet #6. Ink on linen with one print on paper. No date.
10South and west elevations. Sheet #7. Ink on linen with one print on paper. No date.
11Section through roof of south wing. Sheet #S7. H.M. Sanford, consulting engineer. Ink on linen. No date.
12Section through stair hall. Sheet #9. Also contains detail of kitchen. Ink on linen with one print on paper. No date.
13Section thru Lounge and Cloister. Sheet #10. Ink on linen with one print on paper.
14Basement heating layout. Sheet #2H. Ink on linen. No date.
15Second floor framing plan. Sheet #S3. H.M. Sanford, consulting engineer. Ink on linen. No date.
16Framing plan for roof over stair well, third floor of tower, and south wing. H.M. Sanford, consulting engineer. Sheet #S4. Ink on linen. No date. Revised May 17, 1927.
17Structure of main stair. Sheet #S5. H.M. Sanford, consulting engineer. Ink on linen. No date.
18Detail of truss over lounge. Sheet #S6. H.M. Sanford, consulting engineer. Ink on linen. No date.
19Detail of front entrance. Sheet #8. lnk on linen with one print on paper. No date.
20Detail of doors and ornaments. Sheet #11. Ink on linen with one print on paper. No date.
21Window details. Sheet #12. Ink on linen with one print on paper. No date.
22Details of windows. Sheet #13. Ink on linen with one print on paper. No date.
23Details of fireplace. Pencil on linen. No date.
24Revised foundation details. Sheet #S1A. Pencil on trace. June 3, 1927.
25Full size detail of head over stair winclow on north elevation. Sheet #56. Pencil on trace. No date. [missing]
26Full size detail of cornice around third story roof. Full size detail of stone caps for windows. Full size detail of stone jamb for game room window, west elevation. Full size detail of cornice for game room roof. Sheet #59. Pencil on trace. No date. [missing]
27Full size detail of cloister columns and arches. Sheet #69. Pencil on trace. No date.
28Full site planting plan. Print on paper. July 3, 1959 and January 12, 1960.
General note
Items 28-31: Landscape plans: Robert F. White and associates.
29Planting plan. Print on paper. October 17, 1960.
30Garden plan. One copy pencil on trace, one print on paper. No date.
31Study for a garden wall. Print on paper. July 24, 1959.
32Key plan. Print on paper. March 5, 1960.
General note
Fountain: Engineers: Etablissements Houdry.
33Ground view; cross section on A-B; pond cross section; key plan; view C. Print on paper. March 5, 1960.
34Design of the pumping station with a detail of the filter. Print on paper. March 16, 1960
35Plan of hydraulic equipment. Print on paper. . March 5, 1960
36Design for electric equipment. Print on paper. March 5, 1960.
37Cross-section of fountain. Pencil on trace. September 26, 1956.
38aSide view, top view. Print on paper. March 9, 1960.
38bBasement. Sheet #1. Ink on linen with two prints on paper. No date.
General note
Items 38b-39: Additions and changes, William Ward Watkin, Architect.
39First floor plan. Sheet #2. Ink on linen with two prints on paper. No date.
40South and west elevations. Sheet #3. Ink on linen with two prints on paper. No date.
41Detail of kitchen windows. Sheet #4. Ink on linen with one print on paper. No date.
42Site plan. Working drawing #1. Blueprint on paper. September 17, 1947.
General note
Items 42-54: Second addition, Staub and Rather, Architects.
43First floor plan with schedule of door types. Working drawing #2. Blueprint on paper. September 17, 1947.
44Second floor plan. Working drawing #3. Blueprint on paper. September 17, 1947.
45North and south elevations. Working drawing #5. Blueprint on paper. September 17, 1947.
46East and west elevations with transerse section at line A-A and longitudinal section at line B-B. Working drawing #6. Blueprint on paper. September 17, 1947.
47Entrance hall, passage #1, and stair hall. Working drawing #9. Blueprint on paper. September 17, 1947.
48Dining room, living room, and study. Working drawing #11. Blueprint on paper. September 17, 1947.
49Reception room and family stair hall. Working drawing #11. Blueprint on paper. September 17, 1947.
50Bed rooms and sitting room. Working clrawing #12. Blueprint on paper. September 17, 1947.
51Bathrooms. Working drawing #13. Blueprint on paper. September 17, 1947.
52Detail of cabinets in kitchen. Blueprint on paper. No date.
53Layout for equipment in new kitchen. Blueprint on paper. No date.
54Detail of recess for kitchen range. Blueprint on paper. No date.
55Plot plan. Sheet #1. Print on paper. February 27, 1958.
General note
Items 55-66: Third addition, Lloyd and Morgan, Architects.
56First floor. Sheet #2. Print on paper. February 27, 1958.
57Second and third floor plans. Sheet #3. Print on paper. February 27, 1958.
58Elevations: No. 1,2,3,4. Sheet #4. Print on paper. February 27, 1958.
59Sections: A-A, B-B, C-C, D-D. Sheet #5. Print on paper. February 27, 1958.
60Miscellaneous details. Sheet #6. Print on paper. February 27, 1958.
61Eave details. Sheet #7. Print on paper. February 27, 1958.
62Section detail and detail of memorial stone. Sheet #8. Print on paper. February 27, 1958.
63Doors and door details. Sheet #9. Print on paper. February 27, 1958.
64Equipment layout and mechanical connections plans. Sheet #10. Print on paper. February 27, 1958.
65Inside elevations showing stone plaques and memorial stone. No date.
66First floor plan; north, east, west elevations; canopy section. Two prints. No date
General note
Renovations: Anderson Todd, William T. Cannady, Architects.
67First floor plan. Working drawing #1R. Blueprint on paper. February 12, 1947.
General note
Items 67-90: Engineering Laboratory Building; Staub and Rather, Houston, with William Ward Watkin, Architects.
68Second floor plan. Working drawing #2R. Blueprint on paper. February 4, 1947 and February 12, 1947.
69Diagrammatic plan of engineering shop building. Print on paper. No date.
70Southwest and southeast elevations. Working drawing #3R. Blueprint on paper. February 12, 1947.
71Northeast and northwest elevations. Working drawing #4R. Blueprint on paper. February 12, 1947.
72Section along A-A. Working drawing #SR.
73Typical transverse section through 60' shops. Print on paper. No date.
74Watercolor rendering. Artist unknown. No date.
75Sketch of engineering shops. Print on paper. No date.
76Sketch of engineering school. Print on paper. No date.
77Mechanical systems and details: Detail of overhang, wall framing, and continuous windows. Working drawing #7R. Blueprint on paper. Fetruary 12, 1947 and January 3, 1947.
78Plan. Sheet #1. Pencil on trace. No date.
79West elevation with sections B-B, C-C, and D-D. Sheet #2. Pencil on trace. No date.
80Section A-A. Sheet #3. Pencil on trace. No date.
81Roof framing plan. Sheet #4. Pencil on trace. No date.
82Roof plan. Sheet #5. Pencil on trace. No date.
83West elevation. Sheet #6. Pencil on trace. No date.
84Ceiling and floor plan. Sheet #1. Print on paper. No date.
85Roofing plan. Sheet #2. Print on papar. No date.
86Electrical plan. Sheet #3. Print on paper. No date.
87Proposal for first and second floor plans. Print on paper. December 16, 1946.
88Proposal for first and second floor plans. Print on paper. January 29, 1947.
89Plot plan for addition. Print on paper. December 5, 1946
90Southwest elevation. Print on paper. No date.
91Entrance Gates: Plans and elevations. Blueprint on linen. No date.
92Foundation plan. Sheet #1. Blueprint on paper.
General note
Items 92-125: Field House.
93First floor plan. Sheet #2. Blueprint on paper. May 1920.
94Second floor plan. Sheet #3. Ink on linen and blueprint on paper. May 1920.
95Roof plan. Sheet #4. Ink on linen and blueprint on paper. May 1920.
96Front elevation. Sheet #5. Ink on linen and blueprint on paper.
97Rear elevation. Sheet #6. Ink on linen and blueprint on paper.
98North and south elevations. Sheet #7. Ink on linen and blueprint on paper. May 1920.
99Exterior details. Sheet #8. Ink on linen and blueprint on paper. May 1920.
100Speaker arrangement. Pen and pencil on trace. No date.
101Foundation plan. Sheet #1. Pencil on trace and blueprint on paper. No date.
General note
Items: 101-125: First Addition changes, William Ward Watkin, Architect.
102First floor plan. Sheet #2. Pencil on trace and blueprint on paper. No date.
103Second floor plan. Sheet #3. Pencil on trace and blueprint on paper. No date.
104Roof plan. Sheet #5. Pencil on trace and blueprint on paper. No date.
105Elevations. Sheet #4. Pencil on trace and blueprint on paper. No date.
106Section through new gymnasium with truss diagram. Sheet #6. Pencil on trace and blueprint on paper. No date.
107Electrical plans and dryer ducts. Sheet #M-1. Pencil on trace and blueprint on paper. No date.
108Electrical plans. Sheet #M-2. Pencil on trace and blueprint on paper. No date.
109Foundation, first, and second floor plans; foundation details; door and window schedules. Ink and pencil on trace and one blueprint on paper. February 7, 1938.
110Elevations and details. Ink on trace. 1938
111Second floor plan. Blueprint on paper. No date.
112First floor plan. Blueprint on paper. No date.
113Floor plan. Sheet #1. Blueprint on paper. No date.
114South and west elevations. Sheet #2. Blueprint on paper. No date.
115Sections A-A and B-B. Sheet #3. Blueprint on paper. No date.
116Roof plan and detail of doorway. Sheet #4. Blueprint on paper. No date.
117Roof plan and section. Blueprint on paper. No date.
118Plot plan and sections. Two blueprints on paper. No date.
119Elevations. Two blueprints on paper. No date.
120Roof plan. Blueprint on paper. No date.
121Floor plans, plot plan, and sketch diagram of vent system. Sheet #M-1. Blueprint on paper.
122First and second floor plans. Sheet #M-2. Blueprint on paper. No date.
123First and second floor plans. Blueprint on paper. January 15, 1949.
124Floor plan. The Houston Ready-Cut House Company. Blueprint on paper. March 27, 1931.
125Rear elevation. Blueprint on paper. March 27, 1931.
126[Proposed] Flagpole and Base: Elevation, plan, and section. Drawing #1. Three blueprints on paper. November 1, 1929
127Preliminary basement floor plan. Sheet #1. Print on paper. No date.
General note
Items 127-134: Autry Gym
128Preliminary first floor plan. Sheet #2. Print on paper. No date.
129Preliminary mezzanine floor plan. Sheet #3. Print on paper. No date.
130Preliminary balcony floor plan. Sheet #4. Print on paper. No date.
131Preliminary elevations and sections. Sheet #5. Print on paper. No date.
132Proposed addition to gymnasium. Print on paper. No date.
133Revised additions and alterations to gymnasium. Eight blueprints on paper. July 28, 1967.
134Renovation of the Pool Exterior Wall in the Gymnasium. 2 blueprints on paper. March 7, 1989.
135-136Study of space utilization. Two floorplans. Prints on paper. 1960
General note
Items 135-148: Geology Laboratory Building, Keith Wiess, Architect.
137-142Renovation of Geology Department; elevations, floor plans, schedules sections, electrical, plumbing. Set of six blueprints. August 25, 1981
143-148Biology Laboratory and Geology Laboratory buildilng; floor plans and alterations to second floor. Set of six blueprints. July 25, 1956 and May 11 , 1963.
149Lighting and electrical layout. Drawing #E-1. Blueprint on paper. No date.
General note
Items 149-151: Cohen House Fountain. Brown and Root Inc., Engineers and Constructors
150Foundation plan for garden wall. Blueprint on paper. No date.
151Pumps and piping. Drawing #P-1. Two Blueprints on paper. No date.
152First Floor West, Blueprint on paper. Schedules and details #A1.1. 1989
General note
Items 152-156: Bioscience/Bioengineering Laboratory
153First Floor East, print on paper, schedules and details, #A1.2. 1989
154Second Floor East, print on paper, schedule and details, #A1.4. 1989
155Third Floor West, print on paper, schedules and details; #A1.5. 1989
156Third Floor East, print on paper, schedules and details, #A1.6. 1989
157Cohen House Renovation; complete set of 29 drawings: architectural, mechanical, electrical, plumbing, audiovisual. Print on paper. Gensler Architect, William T. Cannady, Design Consultant. June 3, 2005



 

Drawer 16: Graduate Research Library, Herman Brown

General note
Architects: Staub and Rather
draweritem
161First floor carrel and bookstack plan. Working drawing #27. Blueprint on paper and one print on paper. August 15, 1966.
2Site plan and index to working drawings. Working drawing #1. August 15, 1966
3Basement floor plan. Working drawing #2. Blueprint on paper. August 15, 1966.
4First floor plan. Working drawing #3. Blueprint on paper. August 15, 1966.
5Mezzanine floor plan. Working drawing #4. Blueprint on paper. August 15, 1966.
6Second floor plan. Working drawing #5. Blueprint on paper. August 15, 1966
7Third floor plan. Working drawing #6. Blueprint on paper. August 15, 1966
8Third floor plan of existing building. Working drawing #35. Blueprint on paper. August 15, 1966
9-10Fourth floor plan of existing building. Working drawing #36. Blueprint on paper. August 15, 1966
11Roof plan. Working drawing #7. Blueprint on paper. August 15, 1966
12West and south elevations. Working drawing #9. Blueprint on paper. August 15, 1966
13North and east elevations. Working drawing #10. Blueprint on paper. August 15, 1966
14Sill and door frame details. Working drawing #8. Blueprint on paper. August 15, 1966
15First floor toilets. Working drawing #11. Blueprint on paper. August 15, 1966
16Wall sections A-A and B-B. Working drawing #12. Blueprint on paper. August 15, 1966
17Typical panel of windows in north and south wall. Working drawing #13.Biueprint on paper. August 15, 1966
18Wall section 14. Working drawing #14. Blueprint on paper. August 15, 1966
19Elevator #1 at basement floor. Working drawing #15. Blueprint on paper. August 15, 1966
20Elevator #2 at basement and first floors. Working drawing #16. Blueprint on paper. August 15, 1966
21Stairs #1 and #2 in loading dock and areaway. Working drawing #17. Blueprint on paper. August 15, 1966
22Stair #2. Working drawing #18. Blueprint on paper. August 15, 1966
23Stair #3. Working drawing #19. Blueprint on paper. August 15, 1966
24Typical smoking rooms and studies and mezzanine, second and third floors. Working drawing #20. Blueprint on paper. August 15, 1966
25East wall of Graduate and Faculty Research Center. Working drawing #21. Blueprint on paper. August 15, 1966
26West wall of Reserve Reading Room, charging desk shelving at south end of Humanities reference. Working drawing #22. Blueprint on paper. August 15, 1966
27Basement floor reflected ceiling plan. Working drawing #23. Blueprint on paper. August 15, 1966
28First floor reflected ceiling plan. Working drawing #24. Blueprint on paper. August 15, 1966
29Third floor reflected ceiling plan. Working drawing #25. Blueprint on paper. August 15, 1966
30Basement floor carrel and bookstack plan. Working drawing #26. One print on paper, one blueprint on paper. August 15, 1966
31-32Mezzanine floor carrel and bookstack plan. Working drawing #28. One blueprint on paper. August 15, 1966
33Second floor carrel and bookstack plan. Working drawing #29. One print on paper, one blueprint on paper. August 15, 1966
34Third floor carrel and bookstack plan. Working drawing #30. One print on paper, one blueprint on paper. August 15, 1966
35Basement floor existing building, carrel and bookstack plan. Working drawing #31. One print on paper, one blueprint on paper. August 15, 1966
36First floor plan of existing building. Working drawing #32. One print on paper, one blueprint on paper. August 15, 1966
37Mezzanine floor plan of existing building. Working drawing #33. One blueprint on paper. August 15, 1966
38-39Second floor plan of existing building. Working drawing #34. One print on paper. August 15, 1966
40Science center, gallery, humanities center. Working drawing #37. One blueprint on paper. August 15, 1966
41Basement floor carrel and bookstack plan. Working drawing #CNP-1. One print on paper. August 15, 1966
42Mezzanine floor carrel and bookstack plan. Working drawing #CNP-2. One print on paper. August 15, 1966
43Second floor carrel and bookstack plan. Working drawing #CNP-3. One print on paper. August 15, 1966
44Third floor carrel and bookstack plan. Working drawing #CNP-4. One print on paper. August 15, 1966
45Basement floor existing building carrel and bookstack plan. Working drawing #CNP-5. One print on paper. August 15, 1966
46Basement and foundation plan. Working drawing #S1. One blueprint on paper. August 15, 1966
47Stairs and cross sections. Working drawing #S2. One blueprint on paper. August 15, 1966
48First floor framing plan. Working drawing #S3. One blueprint on paper. August 15, 1966
49Mezzanine floor framing plan. Working drawing #S4. One blueprint on paper. August 15, 1966
50Second floor framing plan Working drawing #S5. One blueprint on paper. August 15, 1966
51Third floor framing plan. Working drawing #S6. One blueprint on paper. August 15, 1966
52Roof framing plan. Working drawing #S7. One blueprint on paper. August 15, 1966
53Stairs. Working drawing #S8. One blueprint on paper. August 15, 1966
54Column and footing schedule. Working drawing #S9. One blueprint on paper. August 15, 1966
55Beam schedule. Working drawing #S10. One blueprint on paper. August 15, 1966
56Working drawings MEP1, E2-E17, Job #1292. [1966]
57Site plan and symbols. Working drawing #MEP1. One blueprint on paper. August 15, 1966.
58Basement floor plan. Working drawing #M2. One blueprint on paper. August 15, 1966.
59First floor plan. Working drawing #M3. One blueprint on paper. August 15, 1966.
60Mezzanine floor plan. Working drawing #M4. One blueprint on paper. August 15, 1966.
61Second floor plan. Working drawing #MS. One blueprint on paper. August 15, 1966.
62Third floor plan. Working drawing #M6. One blueprint on paper. August 15, 1966.
63Roof plan. Working drawing #M7. One blueprint on paper. August 15, 1966.
64Basement floor plan of existing building. Working drawing #MS. One blueprint on paper. August 15, 1966.
65Part existing basement plan. Working drawing #M9. One blueprint on paper. August 15, 1966.
66First floor plan of existing building. Working drawing #M10. One blueprint on paper. August 15, 1966.
67Second floor plan of existing building. Working drawing #M11. One blueprint on paper. August 15, 1966.
68Third floor plan of existing building. Working drawing #M12. One blueprint on paper. August 15, 1966.
69Fourth floor plan of existing building. Working drawing #M13. One blueprint on paper. August 15, 1966.
70Air duct details. Working drawing #M14, One blueprint on paper. August 15, 1966.
71Heating detail. Working drawing #M15. One blueprint on paper. August 15, 1966.
72Schedules. Working drawing #M16. One blueprint on paper. August 15, 1966.
73Basement electrical plan -new building. Working drawing #E2. One blueprint on paper. August 15, 1966.
74First floor electrical plan. Working drawing #E3. One blueprint on paper. August 15, 1966.
75First floor - under floor duct, communication, and supplemental power. Working drawing #E4. One blueprint on paper. August 15, 1966.
76Mezzanine floor electrical plan. Working drawing #E5. One blueprint on paper. August 15, 1966.
77Second floor electrical plan. Working drawing #E5. One blueprint on paper. August 15, 1966.
78Third floor electrical plan. Working drawing #E7. One blueprint on paper. August 15, 1966.
79Existing building carrel and bookstack plan. Working drawing #EB. One blueprint on paper. August 15, 1966.
80First floor electrical plan for existing building. Working drawing #E9. One blueprint on paper. August 15, 1966.
81Mezzanine floor electrical plan for existing building. Working drawing #E10. One blueprint on paper. August 15, 1966.
82Second floor electrical plan for existing building. Working drawing #E11. One blueprint on paper. August 15, 1966.
83Third floor electrical plan for exiseting building. Working drawing #E12. One blueprint on paper. August 15, 1966.
84Fourth floor electrical plan for existing building. Working drawing #E13. One blueprint on paper. August 15, 1966.
85Fifth floor and roof electrical plan for existing building. Working drawing #E14. One blueprint on paper. August 15, 1966.
86Electrical riser diagram. Working drawing #E15. One blueprint on paper. August 15, 1966.
87Basement electrical plan- new building. Working drawing #HE2. One print on paper. August 15, 1966.
88Basement floor plan. Working drawing #HE2A. One print on paper. August 15, 1966.
89Mezzanine electrical floor plan. Working drawing #HE5. One print on paper. August 15, 1966.
90Second floor electrical plan. Working drawing #HE6. One print on paper. August 15, 1966.
91Third floor electrical plan. Working drawing #HE7. One print on paper. August 15, 1966.
92Basement of existing building carrel and bookstack electrical plan. Working drawing #HEB. One print on paper. August 15, 1966.
93Basement floor plan. Working drawing #P2. One blueprint on paper. August 15, 1966.
94First floor plan. Working drawing #P3. One blueprint on paper. August 15, 1966.
95Mezzanine floor plan. Working drawing #P4. One blueprint on paper. August 15, 1966.
96Second floor plan. Working drawing #P5. One blueprint on paper. August 15, 1966.
97Third floor plan. Working drawing #P6. One blueprint on paper. August 15, 1966.
98Fourth floor plan. Working drawing #P7. One blueprint on paper. August 15, 1966.
99Roof plan. Working drawing #P8. One blueprint on paper. August 15, 1966.
100Plumbing and fire line riser diagrams. Working drawing #P9. One blueprint on paper. August 15, 1966.
101Study of space utilization. Floor plans. Print on paper. 1967
General note
Items 101-112: Herman Brown
102Space sciences laboratory facilities. Site plan. Print on paper. March 25, 1963.
103Basement furnishing plan. Print on paper. No date.
104Fourth floor furnishing plan. Print on paper. No date.
105First floor furnishing plan. Print on paper. No date.
106Second floor furnishing plan. Print on paper. No date.
107Third floor furnishing plan. Print on paper. No date.
108Mathematical sciences building. Basement plan. Sheet A-3. Print on paper. No date.
109Mathematical sciences building. First floor plan. Sheet A-4. Print on paper. No date.
110Mathematical sciences building. Second floor plan. Sheet A-5. Print on paper. No date.
111Mathematical sciences building. Third floor plan. Sheet A-6. Print on paper. No date.
112Mathematical sciences building. Fourth floor plan. Sheet A-7. Print on paper. No date.
113Proposed Research Library. Floor plans on paper bound with renderings and notes. June 1964



 

Drawer 17: Fondren Library

General note
Architects: Staub and Rather
draweritem
171Basement plan. Sheet #2. Three blueprints on paper. January 15, 1947.
2First floor plan. Sheet #1. Print on paper. January 15, 1947.
3First floor plan. Sheet #3. Blueprint on paper. January 15, 1947.
4Mezzanine floor plan. Sheet #2. Print on paper. January 15, 1947.
5Second floor plan. Sheet #3. Print on paper. January 15, 1947.
6Third floor plan. Sheet #4. Print on paper. January 15, 1947.
7Fifth floor plan and roof plan. Sheet #8. Print on paper. January 15, 1947.
8Northeast elevation. Print on paper. July 1, 1947.
9Full size profiles of exterior marble moldings. Sheet #D-7. Pencil on trace. June 27, 1947.
10Insert spacing for balustrades. Sheet #D-13. Pencil on trace. August 12, 1947.
11Panel board locations. Sheet #D-21. Pencil on trace. October 2, 1947.
12Rendering of front of library by Schiewtz. Two b&w prints on paper. No date; 1 color print on paper. 1952
13Part of basement plan. Sheet #1. Print on paper. November 27, 1962.
14Fourth floor plan. Sheet #2. Print on paper. November 27, 1962.
15Fifth floor plan. Sheet #3. Print on paper. November 27, 1962.
16Isometrics of carrel "A" and "B". Sheet #4. Print on paper. November 27, 1962.
17Proposed library studies series. Pencil on trace. No date. Elevation renderings; 8 tracings Basement plan; 2 Tracings First floor plan First floor plan "B" with section rendering Second floor plan Second stack level floor plan Second stack level "B" floor plan Fourth stack level floor plan; 2 tracings
18Basement feasibility study. Print on paper. Feasibility study by Morehead & Ransom, Architects. May 1959.
19Basement feasibility study II. Print on paper. Feasibility study by Morehead & Ransom, Architects. May 1959.
20Basement feasibility study II; scheme "A". Print on paper. May 1959, June 1959. Feasibility study by Morehead & Ransom, Architects.
21Basement feasibility study III; scheme "B", Print on paper. Feasibility study by Morehead & Ransom, Architects. June 1959
22Basement feasibility study 5. Print on paper. December 1959, January 1960. Feasibility study by Morehead & Ransom, Architects.
23Main floor plan. Sheet #2. Three prints on paper. May 27, 1946.
General note
Items 23-73: Architects: Staub & Rather; Consulting Architect: William Ward Watkin.
24First mezzanine floor. Three prints on paper. Sheet #3. May 27, 1946.
25Second floor plan. Three prints on paper. Sheet #4. May 27, 1946.
26Second floor plan. Three prints on paper. Sheet #5. May 27, 1946.
27Third floor plan. Three prints on paper. Sheet #6. May 27, 1946.
28Third floor mezzanine. Three prints on paper. Sheet #7. May 27, 1946.
29Fourth floor plan. Three prints on paper. Sheet #8. May 27, 1946.
30First mezzanine floor plan with revisions. Print on paper. Sheet #3. July 1, 1946.
31Second floor plan with revisions. Print on paper. Sheet #4. July 1, 1946.
32Second mezzanine floor with revisions. Print on paper. Sheet #5. July 1, 1946.
33Third floor plan with revisions. Print on paper. Sheet #6. July 1, 1946.
34Third mezzanine floor with revisions. Print on paper. Sheet #7. July 1, 1946.
35Basement floor plan. Blueprint on paper. Sheet #1. July 9, 1946.
36Main floor plan. Blueprint on paper. Sheet #2R. July 9, 1946.
37First mezzanine floor with revisions. Blueprint on paper. Sheet #3. July 9, 1946.
38Second floor plan with revisions. Blueprint on paper. Sheet #4. July 9, 1946.
39Second mezzanine. Blueprint on paper. Sheet #5. July 9, 1946.
40Second mezzanine. Two blueprints on paper. Sheet #5. July 16, 1946.
41Third floor plan. Blueprint on paper. Sheet #6. July 16, 1946.
42Third floor plan. Blueprint on paper. July 16, 1946.
43Third mezzanine floor plan. Blueprint on paper. Sheet #7. July 1, 1946.
44Third mezzanine floor plan. Blueprint on paper. July 16, 1946.
45Basement floor plan. Print on paper. Sheet #1R. August 12, 1946.
46Main floor plan. Print on paper. Sheet #2R. August 12, 1946.
47Third and fourth floorplans of stack room. Blueprint on paper. January 15, 1947.
48Fifth floorplan of stack room. Blueprint on paper. January 15, 1947.
49Stack room section. Blueprint on paper. January 15, 1947.
50Main floorplan. Print on paper. Sheet #1. February 22, 1946.
51First mezzanine floorplan. Print on paper. Sheet #2. February 22, 1946.
52Second floorplan. Print on paper. Sheet #3. February 22, 1946.
53Second mezzanine floorplan. Print on paper. Sheet #4. February 22, 1946.
54Third floorplan. Print on paper. Sheet #5. February 22, 1946.
55Third mezzanine floorplan. Print on paper. Sheet #6. February 22, 1946.
56Fourth floorplan. Print on paper. Sheet #7. February 22, 1946.
57Main floor, scheme C. Print on paper. Sheet #1. March 11, 1946
58First mezzanine, scheme C. Print on paper. Sheet #2. March 11 , 1946.
59Second floor, scheme C. Print on paper. Sheet #3. March 11 , 1946.
60Second mezzanine, scheme C. Print on paper. Sheet #4. March 11, 1946.
61Third floor, scheme C. Print on paper. Sheet #5. March 11, 1946.
62Third mezzanine, scheme C. Print on paper. Sheet #6. March 11, 1946.
63Fourth floor. Print on paper. Sheet #7. March 11, 1946.
64Main floorplan. Print on paper. March 11, 1946.
65Basement plan with revisions. Three prints on paper. Sheet #1. April 9, 1946.
66Main floor with revisions. Print on paper. Sheet #2. April 9, 1946.
67First mezzanine with revisions. Print on paper. Sheet #3. April 9, 1946.
68Second floor with revisions. Print on paper. Sheet #4. April 9, 1946.
69Second mezzanine with revisions. Print on paper. Sheet #5. April 9, 1946.
70Third floor with revisions. Print on paper. Sheet #6. April 9, 1946.
71Third mezzanine with revisions. Print on paper. Sheet #7. April 9, 1946.
72Fourth floor with revisions. Print on paper. Sheet #8. April 9, 1946.
73Fourth mezzanine with revisions. Print on paper. Sheet #9. April 9, 1946. Renovations, 1987-88.
74Site, floor plans, key. Sheet A0.01. Print on paper.
General note
Items 74-117: Ray Bailey Architects, Inc., June 30, 1987.
75Basement plan, finish and door schedules, frame-door opening types, door rail and stile detail. Sheet A2.10. Print on paper.
76Reflected ceiling plan-basement; fabric panels, sections, lockers, cabinet details, coffee bar elevation.
77Basement sections and details. Sheet A4.01. Print on paper.
78First floor demolition. Sheet A0.02. Print on paper.
79First floor plan. Sheet A2.01. Print on paper.
80Mezzanine floor plan. Sheet A2.02. Print on paper.
81Lounge floor plan, furniture plan, reflected ceiling plan; stair #B01, basement plan; stair #B01 basement reflected ceiling plan; partial plan at room #104, 105, 116; vestibule floor plan. Sheet A2.03. Print on paper.
82First floor reflected ceiling plan. Sheet A2.10. Print on paper.
83Mezzanine reflected ceiling plan. Sheet A2.11. Print on paper.
84First floor furniture plan. Sheet F2.10. Print on paper.
85Mezzanine furniture plan. Sheet F2.11. Print on paper.
86Room finish and door schedules; base conditions, wall sections; door details; door frame-interior. Sheet A5.01. Print on paper.
87Sections and elevations. Sheet A7.20. Print on paper.
88Elevations. Sheet A7.21. Print on paper.
89Sections. Sheet A7.40. Print on paper.
90Sections and details. Sheet A7.41. Print on paper.
91Floor plans; fire protection, plumbing and mechanical notes. Sheet MP-1. Print on paper.
92First floor reflected ceiling plan. Sheet MP-2. Print on paper.
93Mezzanine reflected ceiling plan. Sheet MP-3. Print on paper.
94Partial basement mechanical room demolition and renovation plans; notes; risers; partial basement plan; section; partial second floor demolition and renovation plans. Sheet MP-4. Print on paper.
95General remodeling notes; electrical symbol legend; partial riser; electrical notes-power. Sheet E-1. Print on paper.
96Lighting fixture schedule; lighting class panelboard 1LB and 1LA; electrical notes-lighting. Sheet E-2. Print on paper.
97First floor plan. Sheet E-3. Print on paper.
98First floor reflected ceiling plan. Sheet E- 4. Print on paper.
99Mezzanine floor plan. Sheet E-5. Print on paper.
100Mezzanine reflected ceiling plan. Sheet E-6. Print on paper.
101Lounge floor plan; lounge reflected ceiling plan; partial risers. Sheet E-7. Print on paper.
102First floor plan demolition. Sheet A2.00. Print on paper. June 30, 1987.
103Details, elevations, sections. Sheet A7.22. Print on paper. April 11, 1988.
104Details, elevations, sections. Sheet A7.23. Print on paper. April 11, 1988.
105Basement floor plan power revisions. Sheet E-1. Print on paper. 1988
106First floor lighting plan revisions. Sheet E-4. Print on paper. 1988
107Lounge floor plan; lounge furniture plan; lounge reflected ceiling plan; stair no.; basement plan. Print on paper. June 11, 1987.
108Basement plan; door rail and style detail; opening type; door types; frame types; partition types; finish and door schedules. Sheet: A1.01. Print on paper. June 30, 1987.
109First floor plan revisions. Sheet A2.01. Print on paper. July, 1987.
110Lounge floor plans; lounge reflected ceiling plans; lounge furniture plan; partial plan at room 104, 105, 116; vestibule floor plan; stair #B01 basement and reflected ceiling plan. Sheet A2.03. Print on paper. July, 1987.
111Room finish and door schedules; base conditions; wall sections at foyer 112; door details; frame-door-interior opening types. Sheet A5.01. Print on paper. July, 1987.
112Sheet A7.21. Print on paper. July, 1987.
113Sheet A7.41. Print on paper. July, 1987.
114Sheet E-1. Print on paper. July, 1987.
115Sheet E-2. Print on paper. July, 1987.
116Sheet E-3. Print on paper. July, 1987.
117Sheet E-4. Print on paper. July, 1987.
118Sheet E-5. Print on paper. July, 1987.
119Sheet E-6. Print on paper. July, 1987.
120Sheet E-7. Print on paper. July, 1987.
121Temporary library proposal: site plan & first floor plan. December 14, 1999.
General note
Items 121-163: Fondren Library & Renovation: Shepley, Bullfinch, Richardson & Abbott, Architects.
122Temporary library proposal: first floor plan. February 29, 2000.
123Temporary library proposal: second floor plan. February 29, 2000.
124Basement floor plan. Drawing A101. February 16, 2000.
125First floor plan. Drawing A102. February 16, 2000.
126Second floor plan. Drawing A103. February 16, 2000.
127Third floor plan. Drawing A104. February 16, 2000.
128Fourth floor plan. Drawing A105. February 16, 2000.
129Fifth floor plan. Drawing A106. February 16, 2000.
130Sixth floor and roof plans. Drawing A107. February 16, 2000.
131Lower level floor plan. Drawing A101. February 29, 2000.
132First floor plan. Drawing A102. February 29, 2000
133Level 2 floor plan. Drawing A103. February 29, 2000.
134Lower level floor plan. Drawing A101. April 4, 2000.
135First floor plan. Drawing A102. April 4, 2000.
136Level 2 floor plan. Drawing A103. April 4, 2000.
137Third floor plan. Drawing A104. April 4, 2000.
138Fourth floor plan. Drawing A105. April 4, 2000.
139Fifth floor plan. Drawing A106. April 4, 2000.
140Sixth floor plan. Drawing A107. April 4, 2000.
141Roof plan. Drawing A108. April 4, 2000.
142Building sections. Drawing 301. April 4, 2000.
143Lower level floor plan. Drawing A101. June 21, 2000.
144Level 1 floor plan. Drawing A102. June 21, 2000.
145Level 2 floor plan. Drawing A103. June 21, 2000.
146Level 3 floor plan. Drawing A104. June 21, 2000.
147Level 4 floor plan. Drawing A105-A. June 21, 2000.
148Level 4 floor plan. Drawing A105-B. June 21, 2000.
149Level 5 floor plan. Drawing A106-A. June 21, 2000.
150Level 5 floor plan. Drawing A106-B. June 21, 2000.
151Level 6 floor plan. Drawing A107. June 21, 2000.
152Building sections. Drawing A301. June 21, 2000.
153Lower level floor plan. Drawing A101. July 19, 2000.
154Level 1 floor plan. Drawing A102. July 19, 2000.
155Level 2 floor plan. Drawing A103. July 19, 2000.
156Level 3 floor plan. Drawing A104. July 19, 2000.
157Level 4 floor plan. Drawing A105-A. July 19, 2000.
158Level 4 floor plan. Drawing A105-B. July 19, 2000.
159Level 5 floor plan. Drawing A106-A. July 19, 2000.
160Level 5 floor plan. Drawing A106-B. July 19, 2000.
161Level 6 floor plan. Drawing A107. July 19, 2000.
162Roof plan. Drawing A108. July 19, 2000.
163Building sections. Drawing A301. July 19, 2000.
164Basement plan. Drawing 2.
General note
Items 164-170: Staub & Rather, Architects. Consulting Architect: W.W. Watkin. (paper copy drawings used for renovation; project dimensions added to these updated originals of Fondren Library, probably 1947)
165First floor plan. Drawing 3.
166Mezzanine plan. Drawing 4.
167Second floor plan. Drawing 5.
168Fourth floor plan. Drawing 7.
169Fifth floor plan. Drawing 8.
170Lecture Lounge. Floor plan w/furniture. Color and fabric samples on board. No date.
171Set 1: A-0 Project Information Sheet; A-1 Demolition Floor Plan; A-2 Floor Plan; A-3 Enlarged Plan with Sections; A-4 Interior Elevations; A-5 Interior Elevations; A-6 Reflected Ceiling Plan; TAS-1 Texas Accessibility Standards; TAS-2 Texas Accessibility Standards; M1 Mechanical Plan; E1 Electrical Plan
General note
Items 171-173: Patent and Trademark Office (SCIPPR); Architects: Chelsea, 1997.
172Set 2: A-2 Floor Plan; A-5 Interior Elevations; A-6 Reflected Ceiling Plan
173Set 3: M1 Mechanical Plan; E1 Electrical Plan
174Floor plan. January 9, 1987.
175Fire supression Sprinkler Main. CHP & Associates, Consulting Engineers. January 20, 1989.
176Fondren Library Space Utilization. 7 prints on paper. August 26, 2008.
177New Fondren Library Perspective Looking West from Main Quadrangle. Shepley Bulfinch Richardson and Abbott, Architects. Color rendering on foam board. No date.
178Master Planning Study for the Fondren Library. Spiral bound 61-page report. Shepley Bullfinch Richardson and Abbott. May 1999.



 

Drawer 18: Rice Institute Memorial Library

General note
Architect: William Ward Watkin.
draweritem
181One bound collection of preliminary plans. Photo reductions on paper. No date.
2Basement plan. One drawing in pencil on paper, two photo reductions on paper. No date.
3First floor plan. One drawing in pencil on paper. No date.
4Second floor plan. One drawing in pencil on paper, one photo reduction on paper. No date.
5Second stack level. One drawing in pencil on paper, two photo reductions on paper. No date.
6Third floor plan. One drawing in pencil on paper, two photo reductions on paper. No date.
7Fourth stack level. One drawing in pencil on paper, two photo reductions on paper. No date.
8Front elevation. One photo reduction, one negative on paper. No date.
9Cross section and section on main axis. One drawing in pencil on paper, two positive photo reductions on paper. No date.
10Basement plan. Pencil and marker on paper with a photographic reduction on paper. No date.
General note
Items 10-16: Bender Hall and Rice Library.
11First floor plan. Pencil and marker on paper with a photographic reduction on paper. No date.
12Second floor plan. Pencil and marker on paper with photographic reductions on paper. No date.
13Front and rear elevations. Ink on paper and photographic reduction on paper. No date.
14Elevation from south and court elevation with section of library. Ink on pape and photographic reduction on paper. No date.
15One point perspective rendering of the front of the building. Pencil on paper with watercolors and colored print on board. No date.
16Sketch for library. Cram and Ferguson with William Ward Watkin. Colored pencil on paper and colored print on board. December 14, 1927.
17Proposals for Art and Architecture Library by lnterstudio Urban Planning and Design Architecture. Seven prints on paper, with attached cover letter and cost estimate. February 29, 1976.
General note
Items 17-21: Other Proposals.
18Tentative location of proposed library group. Cram and Ferguson, Boston. Print with colored pencil on paper. January 23, 1941.
19Undated and unlabeled sketches and studies. Pencil on trace.
20Fondren Library third floor furniture plan. Blueprint on paper. 1983
21Fondren Library third floor renovation. Sheets A1 through AS, E-1. Six blueprints on paper. September 21 and 29, 1983.



 

Drawer 19: Mechanical Building

draweritem
191Basement plan. Ink on linen. No date.
General note
Items 1-4: William Ward Watkin, Architect.
2First floor plan. Ink on linen. No date.
3Second floor plan. Ink on linen.
4Detail of pump and water connections in engine room. Wolworth, English-Flett Co., contractors. One blueprint on paper. No date.
5Floor plan of Mechanical lab annex. Ink on linen and blueprint on paper. No date.
General note
Items 5-7: Cram and Ferguson, Boston, Architects.
6Roof plan of Mechanical lab annex. Three blueprints on paper. No date.
7Details and mechanical systems: Annex; foundation, roof plans, elevations. Full size and 3/4 size details. Blueprints on paper. No date.
8Plot plan. Sheet #P1. Blueprint on paper. September 24, 1957.
General note
Items 8-50: Rice Memorial Center, Harvin C. Moore, Architect (1957).
9First floor plan. Sheet #A-15. Print on paper. September 24, 1957. Revised November 27, 1957, March 11, 1958, and May 22, 1958.
10First floor plan. Sheet #A15. Blueprint on paper. September 24, 1957.
11First floor plan. Sheet #A1. Blueprint on paper. September 24, 1957.
12First floor plan. Sheet #A-1. Blueprint on paper. September 24, 1957. Revised November 27, 1957 and May 23, 1958.
13Four elevations. Sheet #A19. Blueprint on paper. September 24, 1957.
14North elevation and details. Sheet #A4. Blueprint on paper. September, 1957.
15North elevation and details. Sheet #A4. Blueprint on paper. September 24, 1957. Revised November 6, 1957, November 27, 1957, and May 23, 1958.
16Bronze push plate details. Print on paper. February 7, 1958.
17Plan. Blueprint on paper. June 14, 1957.
18Room schedule. Sheet A-1. Blueprint on paper. September 24, 1957.
19Door schedule. Sheet A-2. Blueprint on paper. September 24, 1957.
20Religious wing exterior elevations. Sheet A-3. Blueprint on paper. September 24, 1957.
21South/North elevations. Sheet A-4. Blueprint on paper. September 24, 1957.
22Tower details. Sheet A-5. Blueprint on paper. September 24, 1957.
23Longitudinal section thru chapel. Sheet A-6. Blueprint on paper. September 24, 1957.
24Section at channel section thru nave. Sheet A-7. Blueprint on paper. September 24, 1957.
25Room 120, 121, 122, 123, 124, 125, & 126 elevations. Sheet A-8. Blueprint on paper. September 24, 1957.
26Room elevations. Sheet A-9. Blueprint on paper. September 24, 1957.
27Room 110, 111, and apse elevations. Sheet A-10. Blueprint on paper. September 24, 1957.
28Cloister ceiling plan. Sheet A-11. Blueprint on paper. September 24, 1957.
29Chapel pew details. Sheet A-12. Blueprint on paper. September 24, 1957.
30Basement floor plan. Sheet A-13. Blueprint on paper. September 24, 1957.
31Alternate basement floor plan. Sheet A-14. Blueprint on paper. September 24, 1957.
32First floor plan. Sheet A-15. Blueprint on paper. September 24, 1957.
33Second floor plan. Sheet A-16. Blueprint on paper. September 24, 1957.
34Door schedule. Sheet A-18. Blueprint on paper. September 24, 1957.
35Finish schedule. Sheet A-17. Blueprint on paper. September 24, 1957.
36East, South, West, & North elevations. Sheet A-19. Blueprint on paper. September 24, 1957.
371/2 full size mullion. Sheet A-21. Blueprint on paper. September 24, 1957.
38Sections 1, 2, & 3. Sheet A-20. Blueprint on paper. September 24, 1957.
39Unspecified plans. Sheet A-22. Blueprint on paper. September 24, 1957.
40Unspecified plans. Sheet A-23. Blueprint on paper. September 24, 1957.
41Unspecified plans. Sheet A-24. Blueprint on paper. September 24, 1957.
42Unspecified plans. Sheet A-25. Blueprint on paper. September 24, 1957.
43Unspecified plans. Sheet A-27. Blueprint on paper. September 24, 1957.
44Staircase plans. Sheet A-28. Blueprint on paper. September 24, 1957.
45Toilet plan & elevations. Sheet A-29. Blueprint on paper. September 24, 1957.
46Floor plan & elevation. Sheet A-30. Blueprint on paper. September 24, 1957.
47Room 137 & 140 plans. Sheet A-31. Blueprint on paper. September 24, 1957.
48Room 141 wall elevations and details. Sheet A-32. Blueprint on paper. September 24, 1957.
49Room 142 & 143 elevations. Sheet A-33. Blueprint on paper. September 24, 1957.
50Roof plans & marble plaque details. Sheet A-34. Blueprint on paper. September 24, 1957.
51Foundation plan. Sheet #1. Blueprint on paper. June 1, 1941.
General note
Items 51-58: Naval R.O.T.C. Unit; William Ward Watkin, Architect.
52Foundation and floorplan studies. Blueprint on paper. No date.
53Floor plan. Sheet #2. Blueprint on paper. May 30, 1941.
54Roof and roof drainage plan. Sheet #4. Blueprint on paper. June 1, 1941.
55Front and rear elevations. Sheet #3. Blueprint on paper. May 31, 1941.
56Elevations and floor plan for Gun Shed. Blueprint on paper. No date.
57Elevations and longitudinal section. Blueprint on paper. No date.
58Drawing for the NROTC Building. Ink on paper. No date.
60Pedestal for Willy's Statue. Elevations of pedestal. One blueprint on paper. November 18, 1929.
61Annex to Mechanical Lab, elevations, north and east. Blueprint on paper. No date.
General note
Items: 61-75: Mechanical Lab and Power House.
62Annex to Mechanical Lab, elevations, south and west. Blueprint on paper. No date.
63Balcony and triple windows over main entrance #25. Blueprint on paper. February 11, 1911.
64Head and jamb doors to pump and engine rooms, doors to machine shop, head jamb and sill windows in cloister; brick patterns over door. Drawing #19. Blueprint on paper. February 4, 1918.
65Triple windows in machine shop, east and west elevation. Drawing #18. Blueprint on paper. February 4, 1911.
66Details of upper portion of chimney. Drawing #23. Blueprint on paper. February 10, 1911.
67Basement openings showing wrought iron grilles. Blueprint on paper. No date.
68Exterior entrance to hydraulics and engineering lab on north. Drawing #17. Blueprint on paper. No date.
69Miscellaneous details sheet #16. Blueprint on paper. No date.
70Head jamb and sills of first story windows. Drawing #22. Blueprint on paper. February 8, 1911.
71Details of drinking fountain in stair hall and entrance 2. Drawing #21. February 9, 1911
72Iron walks and ladders in boiler room. Blueprint on paper. No date.
73Stonework of cloister arcade and entrance 1. Drawing #24. February 13, 1911.
74Details of main cornice. Drawing #27. February 15 1911.
75Details of base, course and exterior stone steps. Drawing #10. November 25, 1940.



 

Drawer 20: Physics Laboratory

General note
Architects: Cram, Goodhue, and Ferguson with William Ward Watkin. These plans are rolled.
draweritem
201Basement floor plan. Working drawing #1. Two blueprints on linen. No date.
2First floor plan. Working drawing #2. One blueprint on linen, one blueprint on paper and four prints on paper. No date.
3Second floor plan. Working drawing #3. Two blueprints on linen, one blueprint on paper and two prints on paper. No date.
4Attic plan. Sheet #1-B. Two blueprints on linen. No date.
5Roof plan. Working drawing #4. Two blueprints on linen. No date.
6South elevation. Working drawing #5. One blueprint on paper and two prints on paper. No date.
7North elevation. Working drawing #6. One blueprint on linen and two prints on paper.
8East elevation. Working drawing #6. Two bluerpints on linen and one print on paper. No date.
9West elevation. Working drawing #8. Two blueprints on linen and one print on paper. No date.
10Longitudinal and transverse section through lecture hall. Working drawing #9. Two blueprints on linen and one print on paper. No date.
11Longitudinal section through main building. Working drawing #10. Two blueprints on linen and one print on paper. No date.



 

Drawer 21: Physics Laboratory

draweritem
211Ink sketch on paper. W. Mood. 1967
2Light fixture in foyer. Bob King. Photocopy on paper. April 25, 1983.
3Cloister and exterior details. Working drawing #11. One blueprint on paper. No date.
4Exterior details. Working drawing #12. One blueprint on linen and two prints on paper. No date.
5Elevation details. Two prints on paper. No date.
6Basement floor framing plan. Working drawing #13. One blueprint on paper. No date.
7First floor framing plan. Working drawing #14. Two blueprints on paper. No date.
8First floor framing plan with bill of materials. Blueprint on paper. No date.
9Second floor framing plan. Working drawing #15. Two blueprints on linen. No date.
10Second floor framing plan with bill of materials. Blueprint on paper. No date.
11Roof framing plan. Working drawing #16. Two blueprints on linen. No date.
12Roof framing plan with bill of materials. Blueprint on paper. No date.
13Roof truss details. Working drawing #17. Blueprint on linen. No date.
14Basement heating, plumbing, and drainage. Working drawing #1A. One blueprint on linen. No date.



 

Drawer 22: President's House

General note
Architects: Staub and Rather, Houston.
draweritem
221Plot plan and roof plan. Sheet #1. Pencil on paper. May 27, 1948.
2Foundation plan. Sheet #S-1. Pencil on paper. May 27, 1948
3First floor plan. Sheet #2. Pencil on paper. May 27, 1948.
4Second floor plan. Sheet #3. Pencil on paper. May 27, 1948.
5East and west elevations. Sheet #4. Pencil on paper. May 27, 1948.
6North and south elevations with framing plans. Sheet #5. Pencil on paper. May 27, 1948.
7Sections A-A and B-B. Sheet #6. Pencil on paper. May 27, 1948.
8First floor plumbing. Sheet #P-1. Pencil on paper. May 27, 1948.
9Second floor plumbing. Sheet #P-2. Pencil on paper. May 27, 1948.
10First floor electrical. Sheet #E-1. Pencil on paper. May 27, 1948.
11Second floor electrical. Sheet #E-2. Pencil on paper. May 27, 1948.
12Electrical details. Sheet #E-3. Pencil on paper. May 27, 1948.
13Air conditioning plan. Sheet #AC-1. Pencil on paper. May 27, 1948.
14Air conditioning plan. Sheet #AC-2. Pencil on paper. May 27, 1948.
15Air conditioning plan. Sheet #AC-3. Pencil on paper. May 27, 1948.
16Air conditioning plan. Sheet #AC-4. Pencil on paper. May 27, 1948.
17Wall sections. Sheet #7. Pencil on paper. May 27, 1948.
18Wall sections. Sheet #8. Pencil on paper. May 27, 1948.
19Wall and door details. Sheet #9. Pencil on paper. May 27, 1948.
20Wall and door details. Sheet #10. Pencil on paper. May 27, 1948.
21Wall and door details. Sheet #11. Pencil on paper. May 27, 1948.
22Wall and door details. Sheet #12. Pencil on paper. May 27, 1948.
23Wall and door details. Sheet #13. Pencil on paper. May 27, 1948.
24Stair and trim details. Sheet #14. Pencil on paper. May 27, 1948.
25Partial plot plan. Blueprint on paper. February 2, 1946.
26First floor plan. Print on paper. February 2, 1946
27Second floor plan. Print on paper. February 2, 1946.
28Second floor plan. Sheet #S-4. Pencil on trace and print on board. July 27, 1923.
29First floor plan. Sheet #S-12. Pencil on trace with one blueprint on paper and print on board. No date.
30Second floor plan. Sheet #S-13. Pencil on trace with one blueprint on paper. No date.
31Front elevation. Sheet #S-14. Pencil on trace and print on board. No date.
32Garden elevation. Sheet #S-15. Pencil on trace and print on board. No date.
33Foundation plan. Sheet #1. Ink on linen and one print on paper. No date.
General note
Items 33-42: Original proposal for President's House. Architects: Cram and Ferguson, Boston.
34First floor plan. Sheet #2. Ink on linen, one blueprint on paper and print on board. No date.
35Second floor plan. Sheet #3. Ink on linen and print on board. No date.
36Roof plan. Sheet #4. Ink on linen. No date.
37Front elevation. Sheet #5. Ink on linen. No date.
38Rear elevation. Sheet #6. Ink on linen and print on board. No date.
39East and west elevations. Sheet #7. Ink on linen. No date.
40Sections. Sheet #8. Ink on linen. No date.
41Sections. Sheet #9. Ink on linen. No date.
42Exterior details. Sheet #10. Ink on linen. No date.
43Basement floor plan. Working drawing #1. One blueprint on paper. No date.
General note
Items 43-59: Second proposal for President's House. Architects: Cram and Ferguson, Boston.
44First floor plan. Working drawing #2. One blueprint on paper. No date.
45Second floor plan. Working drawing #3. One blueprint on paper. No date.
46Third floor plan. Working drawing #4. One blueprint on paper. No date.
47South elevation. Working drawing #9. One blueprint on paper. No date.
48North elevation. Working drawing #10. One blueprint on paper. No date.
49East elevation. Working drawing #11. One blueprint on paper. No date.
50North and West elevation. Working drawing #12. One blueprint on paper. No date.
51Section on line A-A. Working drawing #5. One blueprint on paper. No date.
52Section on line D-D. Working drawing #6. One blueprint on paper. No date.
53Section on line C-C. Working drawing #7. One blueprint on paper. No date.
54Section on line B-B and F-F. Working drawing #8. One blueprint on paper. No date.
55Detail of south elevation. Working drawing #13. One blueprint on paper. No date.
56Interior details. Working drawing #14. One blueprint on paper. No date.
57Heating/plumbing and drainage plans. Working drawing #15. One blueprint on paper. No date.
58First floor plan. No date.
59Second floor plan. No date.
60Landscape development plans. Site plan and construction details. 4 plans on paper. Robert F. White & Associates, Landscape Architects. May 17, 1965.
61Rendering.
General note
Items: 61-71: Shepherd School of Music-circa 1951
62Side elevation. Blueprint on paper.
63Facade facing campus elevation. Blueprint on paper.
64Longitudinal section. Blueprint on paper.
65Facade facing street elevation. Blueprint on paper.
66Basement floor plan. Blueprint on paper.
67Ground floor plan. Blueprint on paper.
68Second floor plan. Blueprint on paper.
69Plot plan. Blueprint on paper.
70Rendering of house. Model for Shepherd School plans?
71Concert hall renderings (3). November 1989.
72Part lower basement plan. Sheet A-1C. Blueprint on paper. September 30, 1969
General note
Items 72-115: Sewall Hall.
73Part lower basement LTG plan. Sheet E-1C. Blueprint on paper. December 2, 1969.
74Plot plan. Blueprint on paper. October 29, 1948.
75Plot plan. Blueprint on paper. November 3, 1948.
76A/C duct layout for West wing of lower basement. Sheet LB-W. Blueprint on paper. No date.
77A/C duct layout for East end of lower basement. Sheet LB-E. Blueprint on paper. No date.
78A/C duct layout of East section of first floor. Sheet 1-E. Blueprint on paper. No date.
79A/C duct layout for first floor of office building. Sheet 1-S. Blueprint on paper. No date.
80A/C duct layout for West wing of classroom building. Sheet 1-W. Blueprint on paper. No date.
81A/C duct layout for East section of upper basement. Sheet UB-E. Blueprint on paper. No date.
82A/C duct layout for West wing of upper basement. Sheet UB-W. Blueprint on paper. No date.
83A/C duct layout for upper basement of office building. Sheet UB-S. Blueprint on paper. No date.
84A/C duct layout for third floor of office building. Sheet 3-S. Blueprint on paper. No date.
85A/C duct layout for third floor of classroom building. Sheet 3-N. Blueprint on paper. No date.
86A/C duct supply risers in office building & classroom building. Sheet SR-1. Blueprint on paper. No date.
87Air handling unit #2 in lower basement of office building. Sheet AH-2. Blueprint on paper. No date.
88Air handling unit #1 & 3 in lower basement of office building. Sheet AH-1. Blueprint on paper. No date.
89A/C duct layout for West end of office building. Sheet LBX. Blueprint on paper. No date.
90A/C duct layout for second floor of office building. Sheet 2-S. Blueprint on paper. No date.
91A/C duct layout for second floor of classroom building. Sheet 2-N. Blueprint on paper. No date.
92First floor plan. Blueprint on paper. No date.
93Upper basement plan. Blueprint on paper. No date.
94Lower basement plan. Blueprint on paper. No date.
95A/H unit #2 plan. Blueprint on paper. No date.
96Lower basement plan. Sheet A-1. Blueprint on paper. March 31, 1969.
97Upper basement plan. Sheet A-2. Blueprint on paper. March 31, 1969.
98First floor plan. Sheet A-3. Blueprint on paper. March 31, 1969.
99Second floor plan. Sheet A-4. Blueprint on paper. March 31, 1969.
100Third floor plan. Sheet A-5. Blueprint on paper. March 31, 1969.
101Site plan. Blueprint on paper. October 21, 1971.
102Riser diagrams & schedule. Blueprint on paper. October 26, 1971.
103Reflected plan of foundation details for air handling unit. Blueprint on paper. October 26, 1971.
1041/4" scale plan equipment room and A/C unit. Sheet AH-1 . Blueprint on paper. No date.
105Piping layout for mechanical rooms 139 & 140. Sheet CW: M-2. Blueprint on paper. No date .
106Underfloor plumbing plan. Blueprint on paper. October 21, 1971.
107Lower basement plan. Blueprint on paper. October 21, 1971.
108Upper basement plumbing plan. Blueprint on paper. October 21, 1971.
109First floor plan. Blueprint on paper. October 21, 1971.
110Second floor plan. Blueprint on paper. October 21, 1971.
111Third floor plan. Blueprint on paper. October 21, 1971.
112Roof & drainage plan. Blueprint on paper. October 26, 1971
113Roof drain & downspout riser. Blueprint on paper. October 26, 1971.
114Plumbing riser for office wing. Blueprint on paper. October 26, 1971.
115Details. Sheet 1 of 2. Blueprint on paper. October 26, 1971.
116Study of space utilization. Ground floor plan. Sheet 1 of 2. Blueprint on paper. 1960.
General note
Items 116-124: Hamman Hall.
117Study of space utilization. Main seating level and upper floor plan. Sheet 2 of 2. Blueprint on paper. 1960
118Proposed renovations & additions. Ground floor plan. Blueprint on paper. November 12, 1990.
119Proposed renovations & additions. Second floor plan. Blueprint on paper. November 12, 1990
120Additions & renovations. Ground floor plan. Tracing paper. October 1, 1991.
121Additions & renovations. South elevation. Tracing paper. October 1, 1991.
122Ground floor plan. Sheet 1 of 3. Blueprint on paper. September 25, 1972.
123Second floor plan. Sheet 2 of 3. Blueprint on paper. September 25, 1972.
124South elevation. Sheet 3 of 3. Blueprint on paper. September 25, 1972.



 

Drawer 23: Physics Lab-Miscellaneous Details

draweritem
231Details of marble windows 3, 4-8, 9, and basement windows- Physics Lab building. Drawing 22. Section, elevations, plan. July 25, 1913.
2FSD all exterior and all ordinary interior door frames- Physics Lab building. Drawing 24. Elevation. July 25, 1913
3FSD lower part of pavilions- south elevation- Physics Lab building. Drawing 25. Sections. July 28, 1913.
4FS and 3/4" scale details of double hung and French windows in museum cloister- Physics Lab building. Drawing 26. Sections, elevation. July 28, 1913.
5Balcony details, windows 5 & 6, stone details for museum doors- Physics Lab building. Drawing 30. Elevations, sections. July 30, 1913.
6FS & 3/4" scale detail of second story double hung and French windows- Physics Lab building. Drawing 29. Sections. July 29, 1913.
7Revised second story double hung windows (French windows as shown on #29) - Physics Lab building. Drawing 29a. Sections, elevations. August 20, 1913.
8Detail of stone for museum doors and windows #5-6. Drawing 30. No date. Plan, section, elevation.
9FSD pewabic tile- Physics Lab building. Drawing 31. July 31, 1913.
10FSD of exterior door architraves and plinth stones - Physics Lab building. Drawing 32. Elevation, section. August 1, 1913.
11Details of stone balustrade - museum cloister and arches over window 3 (N & E elevation) - Physics Lab building. Drawing 34. No date. Elevation, section.
12FS & 3/4" scale detail of windows marked 12 with balcony - Physics Lab building. Drawing 35. Section, elevation. August 6, 1913
13Detail of top of pilasters, cornice, and balustrade - west end of main building- Physics Lab building. Drawing 42. Sections. August 11, 1913.
14FSD of stone on French windows marked 11 and balconies. Also, stonework around disks under turrets in Physics Lab building. Drawing 41. Elevation, sections. One blueprint and one mylar. August 11, 1913.
15Cohesive tile dome over main stair hall. Ground floor - Physics Lab building. Drawing 40. Section, plan. Two blueprints. August 7, 1913.
16Stonework above door from museum cloister to: lecture hall, museum, Physics corridor, & apparatus museum - Physics Lab building. Drawing 39. Elevations, sections. August 7, 1913.
17Details of windows 12, 13, 14 - Physics Lab building. Drawing 38. Plan, elevation. August 6, 1913.
18Detail of inner cloister arch - main entrance, south elevation - Physics Lab building. Drawing 36. No date. Elevations, plans, sections.
19FSD of stonework and brickwork on #11 windows (north elevation) and stone shields over 1st story windows - Physics Lab building. Drawing 44. Sections, plan, elevation. August 12, 1913.
20FSD of cornice and balustrade connecting cloister between administration building and laboratory. Drawing 45. Sections, plan. One blueprint and one mylar. August 14, 1913.
21FSD of dining hall truss and of exterior cornice- residential hall for men, north wing. Drawing 46. December 9, 1911.
22Details of workshop door - Physics Lab building. Drawing 50. Elevation, sections. August 19, 1913.
23FSD of drinking fountain #1 at end of main cloister - Physics Lab building. Drawing 51. Elevation. August 22, 1913.
24FSD of enlarged columns on lecture hall wing - Physics Lab building. Drawing 52. Elevation. August 25, 1913.
25Pediment of doorway - lecture hall wing, north elevation - Physics Lab building. Drawing 54. Elevation. August 27, 1913.
26FSD of stone and brickwork on window in staircase bay (north elevation) Physics Lab building. Drawing 55. Elevation, sections, plan. August 27, 1913.
27Lecture hall wind details of windows, tiles, parapets, collonettes, vents - Physics Lab building. Drawing 56. August 28, 1913.
28Detail of stone cornice- south elevation - Physics Lab building. Drawing 57. August 29, 1913.
29Details of window in staircase, east elevation of brickwork on lecture hall. Marble discs - staircase bay - north elevation - Physics Lab building. Drawing 58. Sections. September 2, 1913.
30Detail of brick pattern between vents on pavilions, north, elevation -Physics Lab building. Drawing 59. Elevation. August 4, 1913.
31FSD of stonework on turrets, main building - Physics Lab building. Drawing 60. Elevation. One blueprint and one mylar. September 5, 1913
32FS & 3" scale detail of stone and brickwork on windows marked #15 - Physics Lab building. Drawing 46. Elevation, section, plan. August 15, 1913
33FSD of lead turrets on main building.
34FSD of DH frames for windows in 2nd floor - dorm #2. Drawing 25. Elevation, plan. December 30, 1913
35Stone balcony on seley and frames for windows in masonry walls without columns- dorm #2. Drawing 23. Elevation. December 26, 1913
36FSD of stone in connecting cloister and abacus of cloister piers - dorm #2. Drawing 20. December 19, 1913.
37Ironwork door for Physical Lab building. Rogers-Schmitt Wire & Iron Co. Plan. October 11, 1913
38FS & 3/4" scale details of first story window boxes in main building and lecture hall wing - Physics Labo building. Drawing 21. Sections. July 24, 1913.
39FSD of stairs in lecture hall wing - Physics Lab building. Drawing 89. March 3, 1914.
40FSD of stairs in lecture hall wing - Physics Lab building. Drawing 88. Elevation, sections. January 6, 1914.
41Lecture table 1:10. Drawing 190. No date. Plan.
423/4" & FSD of automatic curtain boxes- Physics Lab building. Drawing 91. Elevations, sections. March 6, 1914.
433/4" scale of details on cloister pavings - Physics Lab building. Drawing 85. January 1, 1914.
443/4" scale details of tile vaults in connecting cloister - Physics Lab building. Drawing 86. Plans, sections. January 3, 1914.
453/4" scale detail of tile vaults in museum cloister - Physics Lab building. Drawing 87. Sections, plan. January 1, 1914.
46Interior details for Rice Laboratory- Physics Lab building. Drawing 77. Sections. November 24, 1913
47FSD of carved caps in middle bay, west elevation, main building- Physics Lab building. Drawing 75. Plan, elevation. October 21, 1913.
48FSD of wrought iron work for stone steps on west elevation of lecture hall wing- Physics Lab building. Drawing 74. Plans, sections, elevations. October 20, 1913.
49FSD of scuttle on roof of main building - Physics Lab building. Drawing 73. Sections. September 2, 1913.
50FSD of lead turrets on main building - Physics Lab building. Drawing 72. Plans, sections. One blueprint & one mylar. October 16, 1913.
511/2"scale and FSD of all toilet rooms- Physics Lab building. Drawing 69. Plans, sections. September 25, 1913.
52FS & 3/4" scale detail of drinking fountain in library corridor - Physics Lab building. Drawing 68. No date. Section, plan.
53Main cloister details - Physics Lab building. Drawing 64. Elevations, sections. September 10, 1913
54Detail of parapet NW & SW corners of main building - Physics Lab building. Drawing 63. No date. Sections, elevation.
55FSD of marble panels - west elevation of museum - Physics Lab building. Drawing 62. Elevations, sections. September 5, 1913.
56FSD of windows marked 17 & 18, lecture hall wing (stonework) - Physics Lab building. Drawing 61. No date. Sections, elevations.
57Cut stone for steps and thresholds - Physics Lab building. Drawing 20. Elevations, plan, details. July 22, 1913
58Stone grade courses, belt courses and window sills in 1st floor- Physics Lab building. Drawing 16. No date. Elevations, plans.
59FSD of bays on 3rd floor- Dorm #2. Drawing 30. Plans, elevations, sections. January 9, 1913.
603/4" and FSD of stone trim for east entrance door on north elevations and windows over - south wing - residential group #2. Drawing 22. Elevations, plan, sections. January 31 , 1916.
61FSD of all granite, north and south wings. Drawing 15. Sections. October 28, 1911.



 

Drawer 24: Early Residential College Details

draweritem
241Floor plan; unidentified. No date.
2Section showing basin and waste pipe. No date.
3FSD marble work, base and plinths in dining hall; paving pattern; all marble thresholds, wood plinths and thresholds, marble stool caps in toilers, etc. Drawing 62. No Date.
4FSD drinking fountain. Drawing 21. Elevation. December 19, 1913.
53/4" scale details of bays on 3rd floor. Drawing 29. Elevation, plan. January 6, 1913.
6FSD of finish in dining room and common room. Drawing 73. Section. April 25, 1912.
7FSD of stonework for cloister piers, doors to pavilions, south elevation, entrance doors in cloister and first story window heads, south wing. Drawing 18. January 1, 1915.
8FSD of exterior door frames, south wing. Drawing 20. January 20, 1916
9FSD of eaves, north wing. Drawing 42. December 4, 1911.
10FSD of eaves, south wing. Drawing 35. November 22, 1911.
11FSD of eaves of connecting cloister and serving pantry. Drawing 44. December 8, 1911.
12FSD of cornices and gutters. Drawing 46. Sections. April 27, 1914.
13FSD of wrought iron balconies. Drawing 61. Elevation, sections, plan. March 7, 1912
14Second floor framing plan, south wing. No date. Mosher Mfg. Co.
15South wing first floor beams. Mosher Mfg. Co. January 22, 1912
16Detail of footings for south wing. No date. Sections, elevations.
173/4" and FSD of stairs in hall number three, six and eight. No date. Sections, plans.
18Details showing beam at entrance to passageway from 4th floor stair hall. Drawing 39. Elevation, section. February 10, 1914.
19FSD of conductor boxes on tower; dormitory #2. Drawing 35. Elevation. January 21, 1914.
20Detail of all doors for residential hall for men; north and south wings. Drawing 64. Sections. January 4, 1912
213" scale detail of panel over entrance to slype, south, elevation, south wing. Drawing 63. Plan, section. March 26, 1912.
22Plans of pipe tunnel. No date. Plan, detail, section.
231/2" scale detail of stairs in tower, south wing. Drawing 55. No date. Plan, section.
241/2" scale detail of stairs in tower, north wing. Drawing 54. No date. Plan, section.
25FS 1 1/2" and 1/2" scale detail of bridge leading over kitchen. Drawing 75. Section, elevation. April 26, 1912.
261/2" and 1/4" scale detail of serving room and scullery cabinets, cases, etc. Drawing 70. Plan, elevation. April 24, 1912
273/4" and FSD of all doors. Drawing 42. Sections, elevations. March 20, 1914.
28Miscellaneous stone details. Drawing 28. Section, elevation. November 15, 1911.
29FSD of moulded brick arches. Drawing 19. Elevation. November 7, 1911
30FSD of interior finish, south wing, residential group #2. Drawing 38. March 31, 1916.
313/4"and FSD of stairs in hall #1. Drawing 33. Sections, plan, elevations. January 14, 1914.
32FSD drinking fountain at west end of cloister, south wing, residential group #2. Drawing 26. Section, elevation. February 4, 1916.
33FSD casement window for residential hall. Drawing # (?). Sections. 1912.
341/2" scale of chimneys and fireplaces, north and south wings. Drawing 38. No date. Sections.
35FSD of chimney caps. Drawing 39. November 29, 1911.
363" scale detail of tile frieze on tower, south wing. Drawing 41. No date. Section, details.
373" scale detail of tile field and stone shield over fourth story windows above entrance to cloister, north elevation, south wing. Drawing 36. No date. Sections, details.
38FSD of conductor boxes. Drawing 40. Elevation. November 29, 1911.
39FSD of all exterior door frames. Drawing 52. December 27, 1911.
401/2" scale details of entrance hall and vestibule, north wing. Drawing 68. Sections, elevations, plan. April 15, 1912.
41FSD of thresholds, south wing of residential group #2. Drawing 21. Elevation, plan. June 22, 1916.
42FSD of mantels in studies #1 and #2. Drawing 72. April 25, 1912.
43FSD of dining hall buttress weatherings. Drawing 48. Plan, elevations. December 18, 1911.
44FSD of arched openings in slype and of drinking fountain. Drawing 30. Elevation, section, plan. November 16, 1911.
45FSD of stone mullion, imposts and archivalt, window in bedroom #59, 4th floor, south elevation. Drawing 43. Section. November 18, 1911.
46Column base [to to be used with #56]. No date. Detail, section.
47Job #2311, sheet 11a. Revised. Elevation, section. December 17, 1923
48FSD of brickwork over triple window 2nd story tower, south elevation, north wing. Drawing 33. Section, elevation. November 21, 1911
49FSD of piers and arches in cloisters. Drawing 20. Plan, elevation. November 8, 1911.
50FSD of stonework on tower. Drawing 34. Sections. November 22, 1911.
51FSD of stonework for windows in common room and dining hall, north wing. Drawing 31. Elevation. November 16, 1911.
523/4" and FSD of gable on north elevation. Drawing 45. Section, elevation, details. April 25, 1914.
53Details of stonework in cloister, south wing and in cloister connecting north and south wings. Drawing 23. Plan, section, elevation. November 13, 1911.
54FSD of stone details of tower. Drawing 32. Details, sections, elevations. November 20, 1911.
55Beams and brackets, loggia of tower, north wing. Drawing 45. Elevations. July 12, 1911.
56FSD limestone door architraves. Drawing(?). No date. Section, plan.
57FSD of stonework for door at east end of cloister and windows in fifth story of tower south wing, residential group #2. Drawing 25. Details, elevations. February 2, 1916.
58FSD of stone of windows and frames for windows with finials and windows 346 & 347. Drawing 27. Sections. November 14, 1911.
59Casements and French windows FSD. Drawing 27. Elevations, sections. January 5, 1913.
60FSD grouped windows in tower, north elevation; south wing. Group #2. Drawing 23. Sections, elevations. January 28, 1916.
61Double hung windows. Drawing 18. Elevations, sections. November 7, 1911.
62FSD of glazed cases, cabinets, shelves, etc. in sewing room, pastry room, kitchen, and scullery and linen closet. Drawing 71. Sections. April 24, 1912.
633/4"scale and FSD of revised stone tympanum for entrances on north elevation. Drawing 24. Sections, elevations. February 2, 1916.
64Illustration for the publication "Rice University: A Community Asset." Acrylic on board. [missing] 1953
General note
Items 64-65: Stadium.
65Preliminary Proposal, plan. Print on paper. January 23, 1947.
66Seating plan. Print on paper. No date.
General note
Items 66-95: Original Stadium. William Ward Watkin, Architect.
67Seating plan of south stands. Ink on linen. No date.
68Plan of foundation piers. Sheet #1. Ink on linen. March 1938.
69Diagram of steel channels and beams and plan of footings and grade beams, south stand. Sheet #2. Ink on linen. March 1938.
70Plan at ground level. Sheet #3. Ink on linen. March 1938.
71Plan of steel for second floor slabs and toilet room roof. Sheet #4. March 1938
72Plan of second floor of south stand. Sheet #5. Ink on linen. March 1938.
73Foundation plan for circle end of stands. Sheet #10. Ink on linen. March 1938.
74Steel plan for circle end of stands. Sheet #11. Ink on linen. March 1938.
75Seating plan of circle end of stands. Sheet #12. Ink on linen. March 1938.
76Foundation, steel and seating plans of north stand extension. Sheet #13. Ink on linen. March 1938.
77Elevation facing University Boulevard. Sheet #6. Ink on linen. March 1938.
78Sections. Sheet #8. Ink on linen. March 1938.
79Elevations and sections. Sheet #9. Ink on linen. March 1938.
80Sections A-A, B-B, and C-C. Sheet #3. Ink on linen. February 1939.
81Section through north stand extension. Sheet #14. Ink on linen. March 1938.
82Sections. Sheet #15. Ink on linen. March 1938.
83Proposed Main Street entrance to south stands. Pencil on paper. April 24, 1939.
84Proposed ticket booths for south stands. Pencil on trace. July 8, 1938.
85Alternate "A" addition to south ramps and alternate "B" addition south ramps. Pencil on paper. March 28, 1939.
86Proposed "scout box" tor north stands. Pencil on paper. March 25, 1939.
87Plan of press box. Pen on trace. No date.
88Diagrams of steel columns, beams, and rods in wall of south stand. Sheet #7. Ink on linen. March 1938.
89North grand stand. Detail. Ink on linen. No date.
90General lighting plan. Sheet #1. Ink on linen. February 1939.
91Wiring diagram. Sheet #2. Ink on linen. February 1939.
92Wiring diagram. Blueprint on paper. February 9, 1939.
93Light poles. Sheet #4. Ink on linen. February 1939.
94Plumbing. Sheet #16. Ink on linen. March 1938.
95Plumbing. Sheet #17. Ink on linen. March 1938.
96Foundation plan. Sheet #3. Ink on linen and one print on paper. No date.
General note
Items 96-99: Steel Grand Stand. William Ward Watkin, Architect.
97Plan and typical aisle and boxes. Sheet #1. Ink on linen and one blueprint on paper. No date.
98Section through grand stand. Sheet #2. Ink on linen and one blueprint on paper. No date.
99Section and bracing. H.M. Sanford, consulting engineer. Sheet #4. Ink on linen and one blueprint on paper. No date.
100West hall. South wing. Encapsulated. Second residential hall for men. First, second, third, fourth, and fifth floor plans. Includes room rates. Ink on paper. No date.
101Copy of #100, without room rates. Ink on paper. No date.
102East wing. Residential hall for rnen. First, second, third, and fourth floor plans. Ink on paper. No date.
103South hall. South wing. Residential hall for men. First, second, third, and fourth floor plans. Ink on paper. No date.
104North wing. Residential hall for men. Second, third, and fourth floor plans. Ink on paper. No date.
105Booklet: Residential hall for men floor plans. No date.
106North wing. Residential hall for men. Second, third, and fourth floor plans. Page 1 of booklet. No date.
107East wing. Residential hall for men. First, second, third, fourth, and fifth floor plans. Page 2 of booklet. No date.
108South hall. South wing. Residential hall for men. First, second, third, and fourth floor plans. Page 3 of booklet. No date.
109West hall. South wing. Residential hall for men. First, second, third, fourth, and fifth floor plans. Page 4 of booklet. No date.
110Faculty tower. Residential hall for men. Second, third, and fourth floor plans. Page 5 of booklet. 1941
111East hall. Residential hall for men. First, second, third, fourth, and fifth floor plans. Page 6 of booklet. 1942
112South hall. Residential hall for men. First, second, third, and fourth floor plans. Page 7 of booklet. 1942
113West hall. Residential hall for men. First, second, third, fourth, and fifth floor plans. Page 8 of booklet. 1942
114Rendering of Baker College. Watercolor. Framed on wall. December 1911
115Site plan & legends. Sheet C. Blueprint on paper. February 15, 1975.
General note
Items 115-152: Renovations of Baker, Hanszen, and Will Rice Colleges.
116WRC floor plan: floors 1, 2, & 3. Sheet #1. Blueprint on paper. February 15, 1975.
117WRC floor plan: floors 4 & 5. Sheet #2. Blueprint on paper. February 15, 1975.
118WRC floor plan: detail of floor 1. Sheet #3. Blueprint on paper. February 15, 1975.
119WRC floor plan: detail of floor 2. Sheet #4. Blueprint on paper. February 15, 1975.
120WRC floor plan: detail of floor 3. Sheet #5. Blueprint on paper. February 15, 1975.
121WRC electrical plan: floors 1, 2, & 3. Sheet #6. Blueprint on paper. February 15, 1975
122WRC electrical plan: floors 4 & 5. Sheet #7. Blueprint on paper. February 15, 1975.
123Hanszen College floor plan: floors 1, 2, & 3. Sheet #8. Blueprint on paper. February 15, 1975.
124Hanszen College floor plan: floors 4 & 5. Sheet #9. Blueprint on paper. February 15, 1975.
125Hanszen College floor plan: detail of floors 1 & 2. Sheet #10. Blueprint on paper. February 15, 1975.
126Hanszen College floor plan: detail of floors 3 & 4. Sheet #11. Blueprint on paper. February 15, 1975.
127Hanszen College electrical plan: floors 1, 2, & 3. Sheet #12. Blueprint on paper. February 15, 1975.
128Hanszen College electrical plan: floors 4 & 5. Sheet #13. Blueprint on paper. February 15, 1975.
129Baker College floor plan: floors 1, 2, & 3. Sheet #14. Blueprint on paper. February 15, 1975.
130Baker College floor plan: floors 4 & 5. Sheet #15. Blueprint on paper. February 15, 1975.
131Baker College floor plan: faculty tower. Sheet #16. Blueprint on paper. February 15, 1975.
132Baker College floor plan: detail of floor 2. Sheet #17. Blueprint on paper. February 15, 1975.
133Baker College floor plan: detail of floor 3. Sheet #18. Blueprint on paper. February 15, 1975.
134Baker College electrical plan: floors 1, 2, & 3. Sheet #19. Blueprint on paper. February 15, 1975.
135Baker College electrical plan: floors 4 & 5. Sheet #20. Blueprint on paper. February 15, 1975.
136Baker College electrical plan: faculty tower. Sheet #21. Blueprint on paper. February 15, 1975.
137Interior wall sections & elevations. Sheet #22. Blueprint on paper. February 15, 1975.
138Details. Sheet #23. Blueprint on paper. February 15, 1975.
139Stair elevations. Sheet #24. Blueprint on paper. February 15, 1975.
140Stair sections. Sheet S-1. Blueprint on paper. February 15, 1975.
141WRC plumbing floor plan: floors 1, 2, & 3. Sheet P-1. Blueprint on paper. February 15, 1975.
142WRC plumbing floor plan: floors 4 & 5. Sheet P-2. Blueprint on paper. February 15, 1975.
143WRC plumbing riser diagram. Sheet P-3. Blueprint on paper. February 15, 1975.
144WRC plumbing riser diagram. Sheet P-4. Blueprint on paper. February 15, 1975.
145Hanszen College plumbing floor plan: floors 1, 2, & 3. Sheet P-5. Blueprint on paper. February 15, 1975.
146Hanszen College plumbing floor plan: floors 4 & 5. Sheet P-6. Blueprint on paper. February 15, 1975.
147Hanszen College plumbing riser diagram. Sheet P-7. Blueprint on paper. February 15, 1975.
148Baker College plumbing floor plan: floors 1, 2, & 3. Sheet P-8. Blueprint on paper. February 15, 1975.
149Baker College plumbing floor plan: floors 4 & 5. Sheet P-9. Blueprint on paper. February 15, 1975.
150Baker College plumbing riser diagram. Sheet P-10. Blueprint on paper. February 15, 1975.
151Baker College plumbing floor plan: faculty tower. Sheet P-11. Blueprint on paper. February 15, 1975.
152Baker College faculty tower plumbing riser diagram. Sheet P-12. Blueprint on paper. February 15, 1975.



 

Drawer 25: Rayzor Hall & Residential Colleges

draweritem
251Four elevations and one section- as built. Blueprint on paper. No date. Architects: Staub, Rather, and Howze (1961)
2First floor plan (dormitory L). Sheet #2. Blueprint on paper. December 12, 1955.
General note
Items 2-3: Baker College [New Wing]. Architects: Wilson, Morris, and Crain (1955)
3Second floor plan. Sheet #3. Blueprint on paper. December 12, 1955.
4Addition to kitchen. Elevation. Sheet #4. Wilson, Morris, and Crain. December 12, 1955.
General note
Items 4-13: Baker College [Old Wing].
5Foundation plan. Sheet #1. Ink on linen. No date.
General note
Items 5-13: Dining hall extension and alterations. Architect: William Ward Watkin.
6Plan at lower level. Sheet #2. Ink on linen. No date.
7Plan at upper level. Sheet #3. Ink on linen. No date.
8South, east, and north elevations. Sheet #4. Ink on linen. No date.
9Details and section. Sheet #5. Ink on linen. No date.
10Plan: upper level. Pencil on trace. No date.
11Floorplan: lower level. Pencil on trace. No date.
12First floor plan and south and east elevations. Pencil on trace. No date.
13Building identification: sign background & base. Print on paper. October 2, 1972.
14Two schematic studies. Blueprints on paper. December 11, 1963.
General note
Items 14-15: Lovett College.
15First floor plan. Blueprint on paper. March 13, 1967.
16Basement and foundation plan. Sheet #1. Ink on linen. No date.
General note
Items 16-34: Hanszen College [Old Wing]. Architects: Cram, Goodhue, and Ferguson, Boston.
17First floor plan. Sheet #2. Ink on linen. No date. [missing]
18Second floor plan. Sheet #3. Ink on linen. No date.
19Third floor plan. Sheet #4. Ink on linen. No date.
20Fourth and fifth floor plans. Sheet #5. Ink on linen. No date.
21South elevation. Sheet #6. Ink on linen. No date.
22North elevation. Sheet #7. Ink on linen. No date.
23East and west elevations with sections A-A and B-B. Sheet #8. Ink on linen. No date. [missing]
24Details. Sheet #9. Ink on linen. No date.
25Details of interior of cloister. Sections C-C and D-D. Sheet #10. Ink on linen. No date.
26Trim details. Sheet #11. Ink on linen. No date.
27Trim details. Sheet #12. Ink on linen. No date.
28First floor framing. Sheet #13. Ink on linen. No date.
29Second floor framing. Sheet #14. Ink on linen. No date.
30Third floor framing. Sheet #15. Ink on linen. No date.
31Fourth floor framing. Sheet #16. Ink on linen. No date.
32Floor plan of new kitchen. Sheet #1. Blueprint on paper. March 19, 1956.
33Mechanical connection plan of new kitchen. Sheet #2. Blueprint on paper. March 19, 1956.
34Electrical connection plan of new kitchen. Blueprint on paper. March 19, 1956.
35Basement floor plan. Sheet #1. Blueprint on paper. No date.
General note
Items 35-52: Will Rice College [Old Wing]. Architects: Cram, Goodhue, and Ferguson, Boston.
36First floor plan. Sheet #2. Blueprint on paper. No date.
37Second floor plan. Sheet #3. Blueprint on paper. No date.
38Third floor plan. Sheet #4. Blueprint on paper. No date.
39Fourth floor and roof plan. Sheet #5. Blueprint on paper. No date.
40Plan of hall for Physical Education with elevation. Ink on linen. No date.
41South elevation. Sheet #6. Blueprint on paper. No date.
42North elevation. Sheet #7. Blueprint on paper. No date.
43East and west elevations with sections. Sheet #8. Blueprint on paper. No date.
44Elevation and section of cloister. Sheet #9. Blueprint on paper. No date.
45Typical window details. Sheet #10. Blueprint on paper. No date.
46Window sections. Sheet #11. Blueprint on paper. No date.
47First floor framing plan. Sheet #12. Blueprint on paper. No date.
48Second floor framing plan. Sheet #13. Blueprint on paper. No date.
49Third floor framing plan. Sheet #14. Blueprint on paper. No date.
50Fourth floor framing plan. Sheet #15. Blueprint on paper. No date.
51Details of study hall for Physical Education. Ink on linen. No date.
52Frame of roof and fifth floor of tower. Blueprint on paper. No date.
53Master's House. First floor plan. Sheet #1. Blueprint on paper. December 12, 1955.
General note
Items 53-57: Will Rice College [New Wing]. Architects: Wilson, Morris, and Crain (1955)
54First floor plan (dormitory G). Sheet #2. Blueprint on paper. December 12, 1955.
55Second and third floor plans. Sheet #3. Blueprint on paper. December 12, 1955.
56Elevations 01, 01, and 03. Sheet #4. Blueprint on paper. December 12, 1955.
57Window details. Sheet #6. Blueprint on paper. December 12, 1955.
58First floor plan. Sheet #2. Blueprint on paper. December 12, 1955.
General note
Items 58-60: Hanszen College [New Wing]. Architects: Wilson, Morris, and Crain (1955)
59Second, third, fourth, and fifth floor plans. Sheet #3. Blueprint on paper. December 12, 1955.
60Door details. Sheet #ADD1. Blueprint on paper. December 30, 1955.
61Lettering worded "Wiess Hall 1949." One blueprint on paper and one pencil drawing on trace. 1949
General note
Items 61-64: Wiess College.
62Plan of proposed sidewalks and parking lot. Pencil on paper. August 16, 1949.
63Rendering of Wiess dormitory. Rice Institute. Pencil on paper. 1949.
64Rendering of Wiess with Hanszen's old wing. Staub and Rather. Watercolor on paper. 1949.
65First floor plan. Print on paper. No date.
General note
Items 65-67: Wiess House.
66South and east elevations. Print on paper. No date.
67North and west elevations. Print on paper. No date.
68Typical floor plan. Blueprint on paper. No date.
General note
Items 68-81: Sid Richardson College. Architects: Neuhaus and Taylor.
69Roof plan. Blueprint on paper. No date.
70East elevation. Blueprint on paper. No date.
71North elevation. Blueprint on paper. No date.
72South elevation. Blueprint on paper. No date.
73Proposal for addition to resident associate room. Print on paper. June 13, 1975.
74Section of tower. Trace paper on board. June 17, 1968.
75Floor plan-typical. Trace paper on board. June 17, 1968.
76Plot map (ground level). Trace paper on board. July 9, 1968.
77Site plan A. Trace paper on board. June 17, 1968.
78Ground floor plan. Trace paper on board. June 17, 1968.
79Second floor plan. Trace paper on board. June 17, 1968.
80Future development. Trace paper on board. September 13, 1968.
81Perspectives. Trace paper on board. September 13, 1968.
82Site plan. Sheet #1. Blueprint on paper. May 1964.
General note
Items 82-155: Brown College.
83Roof penthouse plan. Sheet #2. Blueprint on paper. May 1964.
84Ground floor plan. Sheet #3. Blueprint on paper. May 1964.
85Typical floor plan- 2nd floor thru 8th floor. Sheet #4. Blueprint on paper. May 1964.
86Elevations- dormitory. Sheet #5. Blueprint on paper. May 1964.
87Elevations- dormitory. Sheet #6. Blueprint on paper. May 1964.
88Lounge, lobby, corridor, and vestibule elevations. Sheet #8. Blueprint on paper. May 1964.
89Lobby counter, desk unit, and bookcase details. Sheet #9. Blueprint on paper. May 1964.
90Floor plan toilet rooms. Sheet #10. Blueprint on paper. May 1964.
91Building section. Sheet #7. Blueprint on paper. May 1964.
92Wall sections. Sheet #11. Blueprint on paper. May 1964.
93Curtain wall details. Sheet #12. Blueprint on paper. May 1964.
94Wall details. Sheet #13. Blueprint on paper. May 1964.
95Stairway plans. Sheet #14. Blueprint on paper. May 1964.
96Sliding door, louver, letter box, and fin anchor details. Sheet #15. Blueprint on paper. May 1964.
97Section thru dorm commons enclosed covers. Sheet #16. Blueprint on paper. May 1964.
98Kitchen cabinet room and lounge details. Sheet #17. Blueprint on paper. May 1964.
99Composite site plan: commons & dormitory. Sheet #18. Blueprint on paper. May 1964.
100Commons basement plan. Sheet #19. Blueprint on paper. May 1964.
101Main floor plan- commons. Sheet #20. Blueprint on paper. May 1964.
102Elevations, major cross-sections, & loading dock details. Sheet #21. Blueprint on paper. May 1964.
103Interior elevations & miscellaneous details- commons. Sheet #22. Blueprint on paper. May 1964.
104Stair & restroom details- commons. Sheet #23. Blueprint on paper. May 1964.
105Wall sections & related details- commons. Sheet #24. Blueprint on paper. May 1964.
106Doors, jambs, windows, & room finish schedule- commons. Sheet #25. Blueprint on paper. May 1964.
107Reflective ceiling plans & related details- commons. Sheet #26. Blueprint on paper. May 1964.
108Roof plan & miscellaneous details- commons. Sheet #27. Blueprint on paper. May 1964.
109Typical gate elevation. Sheet #28. Blueprint on paper. May 1964.
110Equipment and hood plan. Sheet #29. Blueprint on paper. May 1964.
111Electrical & plumbing plan. Sheet #30. Blueprint on paper. May 1964.
112Food service equipment schedule. Sheet #31. Blueprint on paper. May 1964.
113Landscape site plan. Sheet L. Blueprint on paper. May 1964.
114Basement & foundation plan sections. Sheet S-1. Blueprint on paper. May 1964.
115Basement & foundation plan sections. Sheet S-2. Blueprint on paper. May 1964.
116Plan at basement and areaway sections. Sheet S-3. Blueprint on paper. May 1964.
117Plan at existing tunnel. Sheet S-4. Blueprint on paper. May 1964.
118Mechanical plan of details at drive, return idler, and take-up. Sheet M-1. Blueprint on paper. May 1964.
119Ground floor plan. Sheet S-5. Blueprint on paper. May 1964.
120Sections 1-6 thru 7-6. Sheet S-6. Blueprint on paper. May 1964.
121Second floor plan. Sections 1-7 thru 5-7. Sheet S-7. Blueprint on paper. May 1964.
122Typical floor plan- 3rd thru 8th. Sections 1-8 thru 7-8. Sheet S-8. Blueprint on paper. May 1964.
123Typical floor reinforcing- 2nd thru 8th. Sheet S-9. Blueprint on paper. May 1964.
124Roof plan, penthouse roof plan, and section 1-10. Sheet S-10. Blueprint on paper. May 1964.
125Mechanical roof plan. Sections 1-11 thru 4-11. Sheet S-11. Blueprint on paper. May 1964.
126Sections 1-12 and 2-12. Sheet S-12. Blueprint on paper. May 1964.
127Commons basement plan and sections 1-13 and 2-13. Sheet S-14. Blueprint on paper. May 1964.
128Commons floor plan and sections 1-15 thru 8-15. Sheet S-15. Blueprint on paper. May 1964.
129Commons roof plan and sections 9-15 thru 12-15. Sheet S-16. Blueprint on paper. May 1964.
130Schedules, details, and plot plans. Sheet AC-1. Blueprint on paper. May 1964.
131Schedules & sections of basement. Sheet AC-2. Blueprint on paper. May 1964.
132Basement floor plan and sections. Sheet AC-3. Blueprint on paper. May 1964.
133Ground floor plan. Sheet AC-4. Blueprint on paper. May 1964.
134Typical floor plan- 2nd thru 8th. Sheet AC-5. Blueprint on paper. May 1964.
135Penthouse floor plan & sections. Sheet AC-6. Blueprint on paper. May 1964.
136Zone air & water isometrics and schedules. Sheet AC-7. Blueprint on paper. May 1964.
137Commons basement plan. Sheet AC-8. Blueprint on paper. May 1964.
138Commons ground floor plan. Sheet AC-9. Blueprint on paper. May 1964.
139Control diagrams. Sheet AC-10. Blueprint on paper. May 1964.
140Mechanical plot plan. Sheet P-1. Blueprint on paper. May 1964.
141Plumbing dorm riser diagram. Sheet P-2. Blueprint on paper. May 1964.
142Plumbing basement plan. Sheet P-3. Blueprint on paper. May 1964.
143Plumbing ground floor plan. Sheet P-4. Blueprint on paper. May 1964.
144Plumbing second floor plan. Sheet P-5. Blueprint on paper. May 1964.
145Plumbing typical floor plan. Sheet P-6. Blueprint on paper. May 1964.
146Plumbing roof penthouse plan. Sheet P-7. Blueprint on paper. May 1964.
147Plumbing commons floor plan. Sheet P-8. Blueprint on paper. May 1964.
148Plumbing commons basement floor plan. Sheet P-9. Blueprint on paper. May 1964.
149Electrical plot plan. Sheet E-1. Blueprint on paper. May 1964.
150Lighting panel schedule. Sheet E-2. Blueprint on paper. May 1964.
151Fixture schedule. Sheet E-3. Blueprint on paper. May 1964.
152Electrical ground floor plan. Sheet E-4. Blueprint on paper. May 1964.
153Electrical floor plan: Sheet E-5. Blueprint on paper. May 1964.
154Electrical basement floor plan. Sheet E-6. Blueprint on paper. May 1964.
155Electrical commons floor & basement plan. Sheet E-7. Blueprint on paper. May 1964.
156Grading & drainage plan. Sheet 1A. Blueprint on paper. April 30, 1956.
General note
Items 156-199: Jones College.
157Grading & drainage plan. Sheet 2B. Blueprint on paper. July 25, 1956.
158Plot plan. Sheet 1C. Blueprint on paper. July 25, 1956.
159Penthouse & roof plan and basement plan. Sheet #2. Blueprint on paper. April 30, 1956.
160Typical floor plan and first floor plan. Sheet #3. Blueprint on paper. April 30, 1956.
161First floor plan and basement plan. Sheet #4. Blueprint on paper. April 30, 1956.
162Elevations for dormitory #1. Sheet #5. Blueprint on paper. April 30, 1956.
163Elevations for dormitory #2. Sheet #6. Blueprint on paper. April 30, 1956.
164Staircase sections. Sheet #7. Blueprint on paper. April 30, 1956.
165Elevation sections. Sheet #8. Blueprint on paper. April 30, 1956.
166Window & louver schedule. Sheet #9. Blueprint on paper. April 30, 1956.
167Wall details. Sheet #9A. Blueprint on paper. April 30, 1956.
168Door schedule & details. Sheet #10. Blueprint on paper. April 30, 1956.
169Elevations typical toilet rooms. Sheet #11. Blueprint on paper. April 30, 1956.
170Sections 1-1 thru 9-9. Sheet #12. Blueprint on paper. April 30, 1956.
171Wall details. Sheet #13. Blueprint on paper. April 30, 1956.
172Patio wall elevations and details. Sheet #14. Blueprint on paper. April 30, 1956.
173Cafeteria plan. Sheet #15. Blueprint on paper. April 30, 1956.
174Elevations and cross & longitudinal section. Sheet #16. Blueprint on paper. April 30, 1956.
175Sections 1-1 thru IX-IX. Sheet #17. Blueprint on paper. April 30, 1956.
176Food service equipment schedule. Sheet #18. Blueprint on paper. April 30, 1956.
177Basement & foundation plan-dorm #1. Sheet #19. Blueprint on paper. April 30, 1956.
178Basement & foundation plan-dorm #2. Sheet #20. Blueprint on paper. April 30, 1956.
179Sections B1-B1 thru B11-B11. Sheet #21. Blueprint on paper. April 30, 1956.
180Second, third, and fourth floor framing plans. Sheet #22. Blueprint onpaper. April 30, 1956.
181Roof framing plan. Sheet #23. Blueprint on paper. April 30, 1956.
182Sections S1-S1 thru S4-S4. Sheet #24. Blueprint on paper. April 30, 1956.
183Foundation plan- cafeteria. Sheet #25. Blueprint on paper. April 30, 1956.
184Sections CB1-CB1 thru CB15-CB15. Sheet #26. Blueprint on paper. April 30, 1956.
185Roof framing plan-cafeteria. Sheet #27. Blueprint on paper. April 30, 1956.
186Covered passageway roof framing and foundation plan. Sheet #28. Blueprint on paper. April 30, 1956.
187Plot plan. Sheet #29. Blueprint on paper. April 30, 1956.
188Mechanical first floor and basement plan. Sheet #30. Blueprint on paper. April 30, 1956.
189Mechanical typical and fourth floor plan. Sheet #31. Blueprint on paper. April 30, 1956.
190Riser diagram & schematic piping. Sheet #32. Blueprint on paper. April 30, 1956.
191Schedule of air conditioning piping. Sheet #33. Blueprint on paper. April 30, 1956.
192Diagrammatic of electrical distribution. Sheet #34. Blueprint on paper. April 30, 1956.
193Typical lighting riser diagram. Sheet #35. Blueprint on paper. April 30, 1956.
194Lighting panel schedule. Sheet #36. Blueprint on paper. April 30, 1956.
195Piping first floor, basement, and underfloor plan for dorm #1. Sheet #37. Blueprint on paper. April 30, 1956.
196Basement and underfloor piping plan for dorm #2. Sheet #38. Blueprint on paper. April 30, 1956.
197Main roof & penthouse, fourth, third, and second floor piping. Sheet #39. Blueprint on paper. April 30, 1956.
198Riser diagram, basement, and underfloor of dorms #1 & 2. Sheet #40. Blueprint on paper. April 30, 1956.
199Dining hall and kitchen plan. Sheet #41. Blueprint on paper. April 30, 1956.
200Plans for 45. CAD drawing on mylar. 1984.
General note
Items 200-202: Sculpture Foundations for 45, 90, 180. Architects: Walter P. Moore and Associates, Houston.
201Plans for 90. CAD drawing on mylar. 1984.
202Plans for 180. CAD drawing on mylar. 1984.
203Rayzor Hall Expansion Study. Morris Architects. Schematic Plan: Ground floor, floors 2 & 3. July 27, 1994.



 

Drawer 26: Music Manuscripts

Scope and Contents
See Sacred music collection, circa 1400-1600 (MS 510), http://www.lib.utexas.edu/taro/ricewrc/00181/rice-00181.html



 

Drawer 27: O. Jack Mitchell Papers

Scope and Contents
See O. Jack Mitchell Papers 1960-1991 (MS 439), http://www.lib.utexas.edu/taro/ricewrc/00398/rice-00398.html
draweritem
271Rice 2000. Drawing of campus on mylar. November 20, 1990.
2Elevations and site plans for Anderson Hall renovations. February 1980.
3Development -Hermann Park.
4Hermann Park- walk system scheme 'A.' August 24, 1989.
5General plan- William M. Rice Institute.
6Rice University Physical Plant. Campus base map.
7Map- traffic analysis.
8The Houston Triangle. Analysis: freeways/streets.
9Cartoon- faculty meeting.
10Cartoon- grand opening.
11Drawing. August 1964.
12Certificate recognizing O. Jack Mitchell. 1971.
13Base drawing on tracing paper. January 2, 1990.
14Concept 'A' on tracing paper. January 2, 1990.
15Concept 'B' on tracing paper. January 2, 1990.
16Concept 'C' on tracing paper. January 2, 1990.
17Concept 'D' on tracing paper. January 2, 1990.
18Misc. drawing- tracing paper.
19Misc. drawing- xerox.
20Misc. drawing- xerox.
21Misc. drawing- xerox.
22Misc. drawing- blueprint.
23Misc. drawing- blueprint.
24Misc. drawing- tracing paper.
25Misc. drawing- tracing paper.
26Misc. drawing- tracing paper.
27Misc. drawing- tracing paper.
28Misc. drawing- tracing paper.
29Misc. drawing- tracing paper.
30Misc. drawing- tracing paper.
31Campus base map. March 26, 1987.
32Campus base map. February 12, 1991.
33Campus base map. February 14, 1991.
34Course material.
35Plans for George Bush Library.



 

Drawer 28: William Ward Watkin Papers

Scope and Contents
See William Ward Watkin Papers, 1903-1956 (MS 352), http://www.lib.utexas.edu/taro/ricewrc/00013/rice-00013.html
drawerfolder
281William Marsh Rice statue: Cram & Ferguson. No date. Revised detail of Texas state shield (drawing 5). Blueprints.
2Lt. Richard Dowling Memorial, Sabine Pass. Herring Coe, sculptor. William Ward Watkin, consulting architect. 1936.
2Ground plan. Pencil and color pencil on tracing paper.
2Granite base and foundation. Detail of stones 6 & 8. Detail of top of stone 10. FSD bronze star and wreath. Ink and pencil on tracing paper.
2Ground plan. Blueprint.
2Plan and sections of foundation. Plan of reinforcing. Section A-A, B-B, C-C. Sheet 1. Ink on linen.
2Plan, section, front, rear and side elevation. Sheet 2. Ink on linen.
3Cram, Goodhue, & Ferguson worksheets for Rice lnsitute and other Houston buildings (photocopies). Originals at Boston Public Library. 1910-1950.
4The Kinkaid School. c. 1925.
4Plot plan. Ink on linen.
4Left, right, rear, and front elevations. Ink on linen.
4Roof plan and details. Ink on linen.
4Cross section and details. Ink on linen.
4High School building for Kinkaid School. Floor plan. Sheet 2. Ink on linen. 1945
4High School building for Kinkaid School. Elevations. Sheet 5. Ink on linen. 1945.
4High School building for Kinkaid School. Details. Sheet 6. Ink on linen. 1945.
5Chemistry building for Rice Institute. First floor plan. No date.
6Nicholas residence. No date.
6One sheet. Endress & Watkin, architects, Houston & Austin.
6Basement plan. Sheet 1.
6First floor plan. Sheet 2.
6Second floor plan. Sheet 3.
6Roof plan. Sheet 4.
6Front elevation. Sheet 5.
6Side elevation. Sheet 6.
6Side elevation. Sheet 7.
6Rear elevation. Sheet 8.
6Wall section. Sheet 9.
6Plans of a garage. Sheet 1G.
7E.L. Crain house on McGregor Drive. W.W. Watkin, architect. Photograph. No date.
8Central Church of Christ, 4100 Montrose Blvd., Houston, TX.
8First floor plan. Tissue drawing. Sheet 1.
8Second floor plan. Tissue drawing. Sheet 2.
8Plot plan and roof plan. Tissue drawing. Sheet 3.
8Montrose Blvd. elevation. Colquitt St. elevation. Rear elevation. Tissue drawing. Sheet 4.
8North elevation. Section through church auditorium. Section through church school. Tissue drawing. Sheet 5.
8Partial front elevation. Section through smaller doorway. Partial plan. Tissue drawing. Sheet 6.
8Transverse section through church. Tissue drawing. Sheet 7.
8Details of kitchen, library, and minister's study. Elevation toward dressing rooms in baptistery. Elevation toward auditorium. Plan of narthex. Elevation B-B, A-A. Tissue drawing. Sheet 8.
8Foundation plan-church, auditorium. Section A thru P and basement. Linen drawing. Sheet 9.
8Roof framing plan. Lintel schedule. Truss A-E. Tissue drawing. Francis Niven, engineer. Sheet 10.
8Mechanical plans. Duct plan for auditorium. Plan of 2nd floor ducts. Equipment room plan for Sunday school. Elevation A-A, B-B. Tissue drawing. Sheet 11.
8Mechanical plans. Plan of first floor ducts. Floor plan of basement. Elevation A-A. Tissue drawing. Sheet 12.
8First floor plan. Windows and door schedule - 1st and 2nd floor. Tissue drawing. Sheet 1.
8Montrose Blvd. elevation. W. Main St. elevation of S.S. wing and section thru S.S. wing looking north. West (rear) elevation. Tissue drawing. Sheet 3.
8Transverse section. South elevation. Section thru S.S. wing looking south. Tissue drawing. Sheet 4.
8Partial front elevation. Partial plan. Tissue drawing. Sheet 5.
8Sections thru basement & baptistery- sections A-A thru E-E beam sections, truss & Purlen details, basement ladder, structural steel plan. Tissue drawing. Sheet 7.
8Partial plan of rostrum. Tissue drawing. Sheet 8.
8Plot plan and roof plan. Tissue drawing. Sheet 9.
8Plot plan and roof plan. Truss framing at beam. Lintel schedule. Framing diagram. Truss diagram. Tissue drawing. Sheet 11.
8Front & side elevation. Plan first floor narthex. Portion of section A-A, section F-F, G-G, H-H, full-size oak paneling. Large tissue drawing.
8Plan, sections A-A thru E-E. Large tissue drawing.
8Plan, toilet over narthex. Small tissue drawing.
8Plan of narthex. Section at head of stair, section A-A, B-B. Small tissue drawing.
8Scale sheathing, capstone. Small tissue drawing.
8Rafters, face of wall. Small tissue drawing.
8Unmarked, 5009 Caroline St., Houston, TX. Small tissue drawing.
8Unmarked plan at A-A, section. Tissue drawing.
8First floor plan, second floor plan of narthex, section A-A, B-B. Tissue drawing.
8Plan, section A-A, B-B, C-C. Tissue drawing.
8Unmarked. Tissue drawing.
9Cohen Memorial, Galveston, TX. W.W. Watkin, architect.
9Detail of lettering, full-size, plinth under right stele facing memorial: LET MINE END BE LIKE HIS. Tissue drawing.
9Detail of lettering, full-size, plinth under right stele facing memorial: LET ME DIE THE DEATH OF THE RIGHTEOUS. Tissue drawing.
9Plan of plot. Plan of monument. Elevation of monument. Detail of gravestone, coping alternate, end view. Section. Linen drawing 1.
9Details of monument showing stele at 1/2" full size. Full-size drawing of ornament at center of base. Section thru stele. Linen drawing 2.
9Full-size details of carving on principle stone of the Cohen Memorial. Tissue drawing.
10Christ Church Chapel (Episcopal). W.W. Watkin, architect.
10Choirstall. Plan of choirstalls. Front elevation. Section. Bench elevation. Reverse image (black).
10A chapel tryptich, right door panel, left door panel. Front elevation. Plan A-A, side view. Section B-B. Plan C-C. Reverse image (black).
10Altar rail, credence, gate post & rail, XL elevation. Section X-X, FS section D-D. Detail of shield. Plan A-B elevation. Reverse image (black).
10Bishop's chair: section, elevation, 4FS detail chair end. Sedilia: front and end elevation, plan B-B. Prayer desk: front, end elevation, section, 4FS section D-D, 4FS plan A-A. Reverse image (black).
10Areredos, side view, section A-A, plan B-B, symbols. Reverse image (image).
10Chapel altar rail, end and front elevation, chapel credence, side, elevation A, Rector's chair, section A-A, section D-D, plan.
11Map of Shadyside. H.A. Kipp, Engineer. [missing as of February 11 , 2000] October 1916.
12Shadowlawn. An addition to the City of Houston.[missing as of February 11, 2000] January 31, 1922.
13Texas Tech campus plot plan. Photocopy.
14F. A. Heitman residence, Shadyside. 11 Mylar copies. Foundation plan, First floor plan, Second floor plan, Attic plan, Roof plan, East and west elevations, North and south elevations, Elevations, Sections, Details, Window schedule. Early 1920s.
15William Ward Watkin certificates and awards.
16Museum of Fine Arts, Houston. Plot Plan. No date.
17James Bowie Memorial, Texarkana. William McVey, sculptor. W. W. Watkin, consulting architect. 1936.
17Granite base. Elevations. Plan. Ink on tracing paper. Sheet 1.
17FS lettering detail. Ink on tracing paper.
17Site plan. Pencil on tracing paper.
17FS of carving on corners, top of stone. Foundation plan and section through foundation. Ink and pencil on tracing paper.
17Granite base and foundation, half-size detail of shield, plan of base, front and side elevations, detail section 1-1, section A-A. Ink on tracing paper.
18Cleveland Sewall house. Cram worksheets.
19Houston Public Library. Cram worksheets.
20Trinity Church. Cram worksheets.
21Residence for Mr. W. A. James, Austin, TX. Endress & Watkin, Architects, Austin-Houston. 9 Ink and pencil drawings on linen. Detail showing method running basement walls & floors, 3/4" scale. Sheet 1, First floor plan. Sheet 2, Second floor plan. Sheet 3, North elevation. Sheet 5, Rear elevation. Sheet 6, West elevation. Sheet 7, East elevation. Sheet 8, Section on line A-B. Sheet 9, Roof plan. August 1916.
22Club House for College of Industrial Arts, Denton, TX. Endress & Watkin, Architects, Austin-Houston. Sections, details, plans. Ink on linen. No date.
23Highland University Presbyterian Church, Austin, TX. George Albert Endress, Architect. Ink, pencil, and color drawings on linen. September 27, 1912.
23Foundation section.
diskfolder
2823North elevation.
drawerfolder
2823West elevation.
23Second floor plan. Sheet 3.
23Third floor plan. Sheet 4.
23Roof plan. Sheet 5.
23East elevation. Sheet 6.
23West elevation. Sheet 7.
23North elevation. Sheet 8.
23South elevation. Sheet 9.
23Sections A-A, B-B. Sheet 10.
23Section through tower. Sheet 11.
23Section through tower. Sheet 12.
24Library of Department of Architecture. Rice Institute Fellows Hall, 1st and 2nd Floor plans. Pencil on board. No date.



 

Drawer 29: Rice Lumber Co. & Rice Institute Oil Lands.

drawerfolder
291William Marsh Rice- South Texas National Bank. Ledger sheets. 1897- 1900.
2Continental Oil Co. 1/2 Rice Institute, 29/64 W. R. Davis, 3/64 Houston Region Texas Gulf Coast Rincon District Starr, Co., TX.
2T.B. Slick Estate "F" lease location: west 1/2 section 539 no.T-9, Engineer- V.G. McAlister. April 2, 1948.
2F.D. Davenport "D" lease location: east 1/2 section 282 no. T-10, Engineer- V.G. McAlister. April 2, 1948.
2M.M. Garcia "B" lease location: section 538 no. T-11, Engineer- V.G. McAlister. April 5, 1948.
2M.M. Garcia "N" lease location: section 972 no. T-12, Engineer- V.G. McAlister. April 7, 1947.
2M.M. Garcia "M" lease location: section 91 no. T-21 , Engineer- V.G. McAlister. April 6, 1948.
2Helen W. Lyons lease location: section 282 no. T-22, Engineer- V.G. McAlister. March 31, 1948.
2M.M. Garcia "D" lease location: section 908 Boyle Field no. T-24, Engineer- V.G. McAlister. April 6, 1948.
2M.M. Garcia "K" lease location: section 91 no. T-25, Engineer- V.G. McAlister. April 7, 1948.
2M.M. Garcia "G" lease location: section 91 Boyle Field no. T-26, Engineer- V.G. McAlister. April 7, 1948.
2T.B. Slick Estate "G" lease location: section 541 no. T-31, Engineer- V.G. McAlister. April 1, 1948.
2T.B. Slick Estate "H" lease location: section 536 no. T-34, Engineer- V.G. McAlister. April 1, 1948.
2T.B. Slick Estate "B" lease location: section 266 no. T-399 (2nd copy loose). April 22, 1940.
2T.B. Slick Estate "B" and "H" lease location: section 486 no. T-400 (2nd copy loose). November 24, 1940.
2T.B. Slick Estate "A" lease location: section 485 no. T-403 (2nd sheets) (2nd copy loose). November 21, 1940.
2T.B. Slick Estate "B" lease location: section 232 no. T-404 (2nd copy loose). November 23, 1940.
2F. D. Davenport State "A" lease location: section 6 no. T-406 (2nd copy loose). November 24, 1940.
2T.B. Slick Estate "B" lease location: section 528 no. T-407 (2nd copy loose). November 24, 1940.
2T.B. Slick Estate "B" lease "HB" location: section 222 no. T-418, Engineer- F.T. Elliot (2nd copy loose). March 8, 1942.
2T.B. Slick Estate "B" lease "HB" location: "B" SE 1/4 section 509 "G.B" W-1/2 and NE 1/4 section 506 no. T-419, Engineer-F.T. Elliot (2nd copy loose). March 11, 1942.
2T.B. Slick Estate "A" lease location: section 265 no. T-422, Engineer- F.T. Elliot (2nd copy loose). March 9, 1942.
2T.B. Slick Estate "A" lease location: section 527 no. T-423, Engineer- F.T. Elliot (2nd copy loose). March 16, 1942.
2T.B. Slick Estate "D" lease location: section 219 no. T-424, Engineer- F.T. Elliot (2nd copy loose). March 18, 1942.
2Rincon Water System Gas System no. T-428, Engineer-V. G. McAlister (2 sheets). April 13, 1948.
2F.D. Davenport "D" lease location: section 530 no. T-442 (2nd copy loose). July 14, 1943.
2M.M. Garcia "I" lease location: section 92 no. T-443 (2nd copy loose). July 31, 1943.
2T.B. Slick Estate "A" lease location: section 529 no. T-444 (2nd copy loose). July 15, 1943.
2Dallas Joint Stock Land Bank lease location: section 226 no. T -448 (loose items). March 4, 1948.
2T.B. Slick Estate "A" lease location: east 1/2 section 221 "C" lease west 1/2 section 221 no. T-421, Engineer- F.T. Elliot (2 copies). March 17, 1942.
2T.B. Slick Estate "E" lease location: section 537 no. T-425, Engineer- F.T. Elliot (2 copies). March 19, 1942.
2Erna F. Wehrle lease location: section 220 no. T-426, Engineer- F.T. Elliot. March 17, 1942.
2M.M. Garcia "D" lease location: section 907 no. T-427, Engineer- F.T. Elliot (2 copies). March 19, 1942.
2Rincon Water System Gas System Co. Station Gas Gathering Input Systems no. T-428, Engineer- F.T. Elliot. March 31, 1942.
2Yard location: section 485 no. T-441, Engineer- Shriner (2 copies, B variant, C-Yard, and camp). August 14, 1943.
2Camp location: section 485 no. T-441, Engineer- J.G. Kilgore. April 11, 1945.
2Rincon Compressor Plant location: section 485 no. T-445, Engineer- Shriner. August 7, 1943.
2W.l. Cameron lease 585 .SAC location: section 138 G.F. Smith Sur. ABS 957 no. T-446, Engineer J.G. Kilgore. September 2, 1943.
2Continental Oil Co. Houston Region Texas Gulf Coast Division Rincon District Residential section Rincon District Camp Service Lines Starr Co., TX. no. 441. March 27, 1945.
3Continental Pipe Line Co. and Rice Institute
3Oil pipe lines key map McAllen District Plat no. A4-0. January 1, 1949.
3Oil pipe lines key map McAllen District Plat no. A4-0. Copy 2. November 8, 1949.
3Oil pipe lines Port Isabel Quadrangle Cameron Co., TX. plat no. A4-1. January 1, 1949.
3Oil pipe lines Laguna Vista Quadrangle Cameron Co., TX. plat no. A4-2. January 1, 1949.
3Oil pipe lines Los Frenos Quadrangle Cameron Co., TX. plat no. A4-3. January 1, 1949.
3Terminal layout Brownsville Terminal, Cameron Co., TX. plat no. A4-4A. C1. January 1, 1949.
3Terminal layout Brownsville Terminal, Cameron Co., TX. plat no. A4-4A. Copy 2. No date.
3Terminal layout Brownsville Terminal, Cameron Co., TX. plat no. A4-4A. Copy 3. November 3, 1949.
3Loading docks Brownsville Terminal, Cameron Co., TX. plat no. A4-4B. January 1, 1949.
3Oil pipe lines Barmda Quadrangle, Cameron Co., TX. plat no. A4-5. January 1, 1949.
3General layout Barreda pump station, Cameron Co., TX. plat no. A4-5A. Parcel no. T-F-9. 3.5 acres, Copy 1. January 1, 1949.
3General layout Barreda pump station, Cameron Co., TX. plat no. A4-5A. Parcel no. T-F-9. 3.5 acres, Copy 2. November 3, 1949.
3Oil pipe lines La Paloma Quadrangle Cameron Co., TX. plat no. A4-6. January 1, 1949.
3Oil pipe lines Lines Rangerville Quadrangle, Cameron Co., TX. plat no. A4-7. January 1, 1949.
3Oil pipe lines Kern Quadrangle, Hidalgo and Cameron Co., TX. plat no. A4-8. Copy 1. January 1, 1949.
3Oil pipe lines Kern Quandrangle, Hidalgo and Cameron Co., TX. plat no. A4-8. Copy 2. November 3, 1949.
3Oil pipe lines Mercedes Quadrangle Hidalno Co., TX. plat no. A4-9. Copy 1. January 1, 1949.
3Oil pipe lines Mercedes Quadrangle Hidalno Co., TX. plat no. A4-9. Copy 2. November 3, 1949.
3General layout Mercedes pump station Hidalgo Co., TX. plat no. A4-9A. Parcel no. T-F-10. 3 acres, Copy 1. January 1, 1949.
3General layout Mercedes pump station Hidalgo Co., TX. plat no. A4-9A. Parcel no. T-F-10. 3 acres, Copy 2. November 3, 1949.
3Oil pipe lines South Donna Quadrangle Hidalgo Co., TX. plat no. A4-10. Copy 1. January 1, 1949.
3Oil pipe lines South Donna Quandrangle Hidalgo Co., TX. plat no. A4-10. Copy 2. November 3, 1949.
3General layout Ray Boosteer Station Hidalgo Co., TX. plat no. A4-1OA. Copy 1. January 1, 1949.
3General layout Ray Boosteer Station Hidalgo Co., TX. plat no. A4-1OA. Copy 2. November 4, 1949.
3Oil pipe lines South Alamo Quadrangle Hidalgo Co., TX. plat no. A4-11. Copy 1. January 1, 1949.
3Oil pipe lines South Alamo Quadrangle Hidalgo Co., TX. plat no. A4-11. Copy 2. November 4, 1949.
3Oil pipe lines Hidalgo Quadrangle Hidalgo Co., TX. plat no. A4-12. Copy 1. January 1, 1949.
3Oil pipe lines Hidalgo Quadrangle Hidalgo Co., TX. plat no. A4-12. Copy 2. November 4, 1949.
3General layout McAllen pump station Hidalgo Co., TX. plat no. A4-12A. Parcel no. T-F-11. 3.5 acres, Copy 1. January 1, 1949.
3General layout McAllen pump station Hidalgo Co., TX. plat no. A4-12A. Parcel no. T-F-11. 3.5 acres, Copy 2. November 4, 1949.
3Oil pipe lines McAllen Quadrangle Hidalgo Co., TX. plat no. A4-13. Parcel no. T-F-14. Copy 1. January 1, 1949.
3Oil pipe lines McAllen Quadrangle Hidalgo Co., TX. plat no. A4-13. Parcel no. T-F-14. Copy 2. November 4, 1949.
3Oil pipe lines Mission Quadrangle Hidalgo Co., TX. plat no. A4-14. Copy 1. January 1, 1949.
3Oil pipe lines Mission Quadrangle Hidalgo Co., TX. plat no. A4-14. Copy 2. November 4, 1949.
3Oil pipe lines South Chihuahua Quadrangle Hidalgo Co., TX. plat no. A4-15. Copy 1. January 1, 1949.
3Oil pipe lines South Chihuahua Quadrangle Hidalgo Co., TX. plat no. A4-15. Copy 2. November 4, 1949.
3Oil pipe lines Chihuahua Quadrangle Hidalgo Co., TX. plat no. A4-16. Copy 1. January 1, 1949.
3Oil pipe lines Chihuahua Quadrangle Hidalgo Co., TX. plat no. A4-16. Copy 2. November 4, 1949.
3Oil pipe lines Sam Fordyce Quadrangle Starr and Hidalgo Co., TX. plat no. A4-17. Copy 1. January 4, 1949.
3Oil pipe lines Sam Fordyce Quadrangle Starr and Hidalgo Co., TX. plat no. A4-17. Copy 2. November 7, 1949.
3General layout Jackson pump station Hidalgo Co., TX. plat no. A4-17A. Paroel no. T-F-12. 10 acres, Copy 1. January 4, 1949.
3General layout Jackson pump station Hidalgo Co., TX. plat no. A4-17A. Paroel no. T-F-12. 10 acres, Copy 2. November 7, 1949.
3Oil pipe lines La Grulla Quadrangle Starr and Hidalgo Co., TX. plat no. A4-18. Copy 1. January 1, 1949.
3Oil pipe lines La Grulla Quadrangle Starr and Hidalgo Co., TX. plat no. A4-18. Copy 2. November 7, 1949.
3Oil pipe lines South Boyle Quadrangle Starr Co., TX. plat no. A4-19. Copy 1. January 1, 1949.
3Oil pipe lines South Boyle Quadrangle Starr Co., TX. plat no. A4-19. Copy 2. November 7, 1949.
3Oil pipe lines South Boyle Quadrangle Starr Co., TX. plat no. A4-20. Copy 1. January 1, 1949.
3Oil pipe lines South Boyle Quadrangle Starr Co., TX. plat no. A4-20. Copy 2. November 7, 1949.
3Oil pipe lines and telephone lines Boyle Quadrangle Starr Co., TX. plat no. A4-21. Copy 2. January 1, 1949.
3Oil pipe lines and telephone lines Boyle Quadrangle Starr Co., TX. plat no. A4-21. Copy 2. November 7, 1949.
3Station layout Boyle pump station Starr Co., TX. plat no. A4-21A. No date.
3Oil pipe lines and telephone lines El Tanque Quadrangle Starr Co., TX. plat no. A4-22. January 1, 1949.
3General layout El Tanque pump station Starr Co., TX. plat no. A4-23. Parcel no. T-F-13. 1.17 acres. January 1, 1949.
3Oil pipe lines Yzaquirre Quadrangle Starr Co., TX. plat no. A4-23. Copy 1. January 1, 1949.
3Oil pipe lines Yzaquirre Quadrangle Starr Co., TX. plat no. A4-23. Copy 2. November 7, 1949.
3Oil pipe lines and telephone lines Rincon Quadrangle Starr Co., TX. plat no. A4-24. January 1, 1949.
3General layout Rincon Tank Farm Starr Co., TX. plat no. A4-24A. Copy 1. January 1, 1949.
3General layout Rincon Tank Farm Starr Co., TX. plat no. A4-24A. Copy 2. November 7, 1949.
3Oil pipe lines Charco Blanco Quadrangle Starr Co., TX. plat no. A4-25. Copy 1. January 1, 1949.
3Oil pipe lines Charco Blanco Quadrangle Starr Co., TX. plat no. A4-25. Copy 2. November 7, 1949.
3Oil pipe lines Sun Quadrangle Starr and Hidalgo Co., TX. plat no. A4-27. Copy 1. January 1, 1949.
3Oil pipe lines Sun Quadrangle Starr and Hidalgo Co., TX. plat no. A4-27. Copy 2. November 7, 1949.
3Oil pipe lines North Rincon Quadrangle Starr Co., TX. plat no. A4-28. Copy 1. January 1, 1949.
3Oil pipe lines North Rincon Quadrangle Starr Co., TX. plat no. A4-28. Copy 2. November 7, 1949.
3Oil pipe lines and telephone lines Rio Grande City Quadrangle Starr Co., TX. plat no. A4-32. January 1, 1949.
3Oil pipe lines North Sam Fordyce Quadrangle Starr and Hidalgo Co., TX. plat no. A4-33. Copy 1. January 1, 1949.
3Oil pipe lines North Sam Fordyce Quadrangle Starr and Hidalgo Co., TX. plat no. A4-33. Copy 2. No date.
4Rincon pipe line Company Starr Co., TX.
4Oil pipe lines Rincon Quadrangle plat no. RPL-1. December 31, 1942.
4Tank farm layout Rincon tank farm plat no. RPL-1A. March 23, 1942.
4Oil pipe lines Boyle Quadrangle plat no. RPL-2. December 31, 1942.
4Oil pipe lines El Tanque Quadrangle plat no. RPL-3. December 31, 1942.
4Oil pipe lines Garcias Quadrangle plat no. RPL-4. December 31, 1942.
4Telephone lines Rio Grande City Quadrangle plat no. RPL-5. December 31, 1942.
4Key map McAllen District plat no. VPL-0. December 31, 1942.
General note
Items 7-39: Valley Pipe Line Company Oil Pipe Lines.
4Port Isabel Quadrangle Cameron Co., TX. plat no. VPL-1. November 1, 1942.
4Laguna Vista Quadrangle Cameron Co., TX. plat no. VPL-2. November 1, 1942.
4Los Frenos Quadrangle Cameron Co., TX. plat no. VPL-3. November 1, 1942.
4Terminal Quadrangle Cameron Co., TX. plat no. VPL-4. November 1, 1942.
4Barreda Quadrangle Cameron Co., TX. plat no. VPL-5. April 29, 1943.
4La Paloma Quadrangle Cameron Co., TX. plat no. VPL-6. November 1, 1942.
4Rangerville Quadrangle Cameron Co., TX. plat no. VPL-7. November 1, 1942.
4Kern Quadrangle Cameron Co., TX. plat no. VPL-8. November 1, 1942.
4Mercedes Quadrangle Hidalgo Co., TX. plat no. VPL-9.
4South Donna Quadrangle Hidalgo Co., TX. plat no. VPL-10. November 1, 1942.
4South Alamo Quadrangle Hidalgo Co., TX. plat no. VPL-11. November 1, 1942.
4Hidalgo Quadrangle Hidalgo Co., TX. plat no. VPL-12. November 1, 1942.
4McAllen Quadrangle Hidalgo Co., TX. plat no. VPL-13. November 1, 1942.
4Mission Quadrangle Hidalgo Co., TX. plat no. VPL-14. November 1, 1942.
4South Chihuahua Quadrangle Hidalgo Co., TX. plat no. VPL-15. November 1, 1942.
4Chihuahua Quadrangle Hidalgo Co., TX. plat no. VPL-16. November 1, 1942.
4Sam Fordyce Quadrangle Hidalgo Co., TX. plat no. VPL-17. November 1, 1942.
4La Grulla Quadrangle Starr and Hidalgo Co., TX. plat no. VPL-18. November 1, 1942.
4South Boyle Quadrangle Starr Co., TX. plat no. VPL-19. November 1, 1942.
4Garcias Quadrangle Starr Co., TX. plat no. VPL-20. November 1, 1942.
4Boyle Quadrangle Starr Co., TX. plat no. VPL-21. November 1, 1942.
4El Tanque Quadrangle Starr Co., TX. plat no. VPL-22. November 1, 1942.
4Yzaquirre Quadrangle Starr Co., TX. plat no. VPL-23. November 1, 1942.
4Rincon Quadrangle Starr Co., TX. plat no. VPL-24. November 1, 1942.
4Charco Blanco Quadrangle Starr Co., TX. plat no. VPL-25. November 1, 1942.
4Los Olmas Quadrangle Starr Co., TX. plat no. VPL-26. November 1, 1942.
4Sun Quadrangle and Hidalgo Co., TX. plat no. VPL-27. November 1, 1942.
4North Rincon Quadrangle Starr Co., TX. plat no. VPL-28. November 1, 1942.
4Mirasoles Quadrangle Starr Co., TX. plat no. VPL-29. November 1, 1942.
4Viboras Quadrangle Starr Co., TX. plat no. VPL-30. November 1, 1942.
4Guerra Quadrangle Starr Co., TX. plat no. VPL-31. November 1, 1942.
4Rio Grande City Quadrangle Starr Co., TX. plat no. VPL-32. November 1, 1942.
5(a) Sectional map of Rincon Field Starr Co., TX.
5(b) Map of Rincon Field (see A) with Rice Institute holdings designated in color.
5W.R. Davis Inc. and Continental Oil Co., proposed well spacing Rincon Field Starr Co., TX. map no. T-135.
5Continental Oil Co. production Department 4" water Iince Rincon-Juarez. May 6, 1948.
5Sectional map of Neale Area Beauregard Parish, Louisiana. April 1, 1940.
6List of oil companies and wells in Neale Field Beauregard Parish, Louisiana.
6Reflection seismograph survey Northeast Waller Area Waller Co., contours on 7700 ft. horizon, H.R. Cullen Texas-Louisiana Co. (original and 3 copies). January 10, 1938.
6Map showing Jos. Christy, G.P. Foster, and part of the O. Smith Surveys International Eng. Co. (very fragile, badly torn, rolled up). Houston Ship Channel District Map extending from the city to the bay bounded on the north by Market St. bounded on the south by Ho-LaPorte (fragile). No date.
6Advertisement for Opening Day of North Baytown W. F. Carothers Attorney. May 31, 1930.
6Profile main sewer pipe line for H.F. MacGregors New South End Subdivision (fragile). March 18, 1906.
6Map of Rice land bordered by Commerce and Main St. Houston, TX.; H.J. MacNair, Surveyor and Civil Engineer. May 10, 1983.
6Plan of Westmoreland Farms survey F.L. Dormant, consulting engineer.
6Plat of right of way of the Jasper and Eastern Railroad through the land of William Marsh Rice Institute in the township 3 South 11 West Calcasieu Parish, Louisiana.
6Map of the William Marsh Rice Ranch Harris Co., TX (boundaries included on supplementary sheet). December 1908.
7W.M. Rice lnstitute Houston, TX. Calcasieu Parish, Louisiana Oberlin Tract Surveyor- F. Shutts, Lake Charles, Louisiana. November 1907.
7Rice Land Lumber Company of Louisiana Oberlin Tract bearing trees F. Shutts and Sons, Lake Ch1arles (6 copies). October 1, 1925.
7W.M. Rice lnstitute Houston, TX. Calcasieu and Rapides Parish Pine Lands Pawnee Tract. Surveyor- F.Shutts, Lake Charles, Louisiana. November 1907.
7Rice Land Lumber Company of Louisiana Pawnee Tract Lake Charles (3 copies). September 23, 1925.
7W.M. Rice Institute, Houston, TX. Calcasieu Parish Pine Land Merryville Tract. Surveyor- F. Shutts, Lake Charles, Louisiana. November 1907.
7Map of Beauregard Parish, Louisiana showing Merryville Tract. March 20, 1916.
7Map of Allen Parish T.H. Mandell Civil Engineer, Lake Charles, Louisiana. 1914.
7Map of Allen Parish with Rice Land and Lumber Co. holdings in Allen and Rapicles Parishes, Louisiana designated in color. F. Shutts and Sons. May 1, 1916.
8Rice Institute Land Investments
8Anderson County no. 1. September 30, 1895.
8Anderson County no. 1a (fragile). No date.
8Ellis County no. 8. No date.
8Sabine County no. 11a. Lands sold to T.L.L. Temple. 1907.
8Harris County no. 15. No date.
8Harris County no. 15b. October 1911.
8Hill County no. 16. c. 1900.
8Irion County no. 18 revised 1919 (2 copies). 1893.
8Jasper County no. 19a (2 copies). c. 1900.
8Lee County no. 23a. Map of Institute lands. January 7, 1908.
8Dallas County no. 28. Plat showing the present holdings of Rice, House and Oliver on the West side of the H. and T.C.R.R., in the McFarland and Smith Surveys. John R. West, Surveyor (3 maps together). No date.
8Navarro County no. 35a. Choate and White Surveyors adjoining Richland (2 maps together). November 11, 1901.
8Village Mills Area, Hardin & Tyler Counties (3 copies). October 10, 1940.
8White Oak Bayou in the vicinity of MK & T Railroad Crossing. Rice Institute Dept. of Engineering. Drawn by H.F. Yerges (fragile). December 10, 1921.



 

Drawer 31: Royal Abbey of Saint-Denis

Scope and Contents note
22 laminated leaves of plates.
General note
call number in catalog: NA 5551 .S214 C76 1987b



 

Drawer 30: Wiess House.

draweritem
301Alteration of residence. Full size detail of fireplace. Staub. Blueprint.
1aAlteration of residence. Electrical notes plus north, south, east, and west walls. Staub. Blueprint.
2Proposed arrangment of 2nd floor air conditioning system. #H-13676-B. Staub. Blueprint.
3Proposed arrangement of 1st floor air conditioning system. #H-13676-A. Staub. Blueprint.
4Proposed arrangement of basement air conditioning system. #H-13676-C. Staub. Blueprint.
5Exterior door details. Door #108. Martin-Wilder Co. Millwork. Staub. Blueprint.
6Stone steps. Sheet 1. South Texas Stone Co .. Staub. Blueprint.
7Additions to residence. Part of 1st floor including garage, kitchen, pantry, breakfast room. Staub. Blueprint.
8Alteration of residence. 2nd floor. Sheet 25. Staub. Drawing (on cream, opaque paper).
9Alteration of service wing. Scheme "A." Sheet #1S-A. Staub. Drawing.
10Copy of above on cream, opaque paper.
11Alteration of service wing. Scheme "B." Sheet #1S-B. Staub. Drawing.
12Copy of above on cream, opaque paper.
13First floor heating plan. 1/4"=1'0" Unknown architect. Drawing.
14Basement heating plan. 1/4''=1'0" Unknown architect. Drawing.
15Alteration of residence. South wall and east wall. Staub. Drawing.
16Elevations of breakfast room. Note for identification: has a person drawn in. Unknown architect. Drawing.
17Addition to residence. Foundation plan and structural sections. Sheet 1. Staub. Drawing.
18Addition to residence. Partial foundation plan, new footing for chimney. Staub. Drawing.
19Addition to residence. First floor plan with electrical plans and symbols. Staub. Drawing.
20Addition to residence. Full size detail of base for servant's dining room, storage closets 1 & 2. Staub. Drawinu.
21Addition to residence. Pantry cabinet details. Sheet 2a. Staub. Drawing.
22Addition to residence. Second floor plan, very detailed. Staub. Drawing.
23Addition to residence. Full size section of metal doors in north wall of breakfast room. Staub. Drawing.
24Addition to residence. Full size of wood panel under window stool. Staub. Drawing.
25Addition to residence. North side elevation. Staub. Drawing.
26Addition to residence. Longitudinal section. Staub. Drawing.
27Addition to residence. Full size section of metal windows in east and west walls of breakfast room. Staub. Drawing.
28Addition to residence. South side elevations and rear (west) side elevations. Staub. Drawing.
29Alteration of residence. 1st and 2nd floor plans with key notations. Staub. Drawing.
30Addition to residence. Wall elevations and details of bedroom "E." Staub. Drawing.
31Addition to residence. 2nd floor plan with section details. Staub. Drawing.
32Addition to residence. Horizontal section thru cabinets along west hall. Staub. Drawing.
33Addition to residence. Details of cabinet in servant's dining room. Staub. Drawing.
34Addition to residence. Elevations and details of bedroom "G." Staub. Drawing.
35Addition to residence. Detail of cabinet in dressing room #1. Staub. Drawing.
36Addition to residence. Full size of steeI sash for dressing room. Staub. Drawing.
37Addition to residence. Details of stone steps at north walls of breakfast room. Staub. Drawing.
38Full size detail of #S-68399. Four lights in breakfast room and sun room. William Ward Watkin. Blueprint.
39Full size detail of #S-68492. Six lights on large porch. W.W.W. Blueprint.
40Full size detail of #S-68495. Light under stairs. W.W.W. Blueprint.
41FSD of #S-68496. Three lights in bed-ooms. W.W.W. Blueprint.
42FSD of #S-68496 1/2. Light in corner bedroom alcove. W.W.W. Blueprint.
43FSD of #S-68517. Light in vestibule. W.W.W. Blueprint.
44Detail of residence. Elevation of end of linen room. W.W.W. Blueprint.
45Detail of residence. Storage cellar in southeast corner of basement. W.W.W. Blueprint.
46Detail of residence. Wrot iron entrance gate to residence. W.W.W. Blueprint.
47Detail of residence. Revised elevation of drive gates, showing additions drawn in solid lines. W.W.W. Blueprint.
48Alteration to residence. West elevation, north elevation, floor plan, and foundation plan. W.W.W. Blueprint.
49Letter from William Ward Watkin to H.C. Wiess about plans for living room.
50FSD #S-59153. Four lights in rec. hall (front)/ living room. W.W.W. Blueprint.
51FSD #S-59154. Two lights in library and dining room. W.W.W. Blueprint.
52FSD #S-59155. Light in "motor entrance." W.W.W. Blueprint.
53FSD #S-59157. Light in bedrooms. W.W.W. Blueprint.
54FSD #S-59157 1/2. Light in bedrooms. W.W.W. Blueprint.
55FSD #S-68312 1/2. Fixture made of brass. W.W.W. Blueprint.
56Tentative plan for living room/ library/ porch layout. Scheme 1. Assumed W.W.W. Drawing.
57Tentative plan for living room/ library/ porch layout. Scheme 2. Assumed W.W.W. Drawing.
58Swimming pool for H.C. Wiess. 18'0" x 50'0" W.W.W. Drawing.
591/4" & 1/2" scale detail of living room. Sheet 6. Lindeberg. Blueprint.
601/4" & 1/2" scale detail of living room. Sheet 7. Lindeberg. Blueprint.
61Plot plan. 1/16" = 1'0" Overview. Lindeberg. Blueprint.
62Missing.
63Foundation plan of new wing and porch, with note: All work shown stippled or cross hatched to be new. Sheet 1. Lindeberg. Blueprint.
64First floor plan. Includes index of materials, electric symbols, and abbreviations. Sheet 2. Lindeberg. Blueprint.
65Second floor plan. Sheet 3. Lindeberg. Blueprint.
66Alteration to house. Includes new living room side, north elevation/new living room, rear elevation, front elevation. Sheet #4. Lindeberg. Blueprint.
67Alteration to house. Front and side porches plus wardrobe and divers details. Sheet 5. Lindeberg. Blueprint.
68Alteration to residence. Second floor plan. Scheme A. Lindeberg. Blueprint.
69Alteration to residence. Second floor plan. Scheme A. This one has been pieced. Lindeberg. Blueprint.
70Alteration to residence. First floor plan. Scheme B. Also pieced. Lindeberg. Blueprint.
71Alteration to house. Foundation plan of new wing and porch. Sheet 1. Lindeberg. Blueprint.
72Alteration to house. Duplicate sheet 4 in stack of 5 stapled (63-67).
73First floor plan. Duplicate sheet 2 in same stack.
74Second floor plan. Duplicate sheet 3 in same stack.
75Plot plan. Duplicate. Lindeberg. Blueorint. [missing]
761/4" & 1/2"scale detail dining room. Sheet 7. Lindeberg. Blueprint. [missing]
771/4" & 1/2" scale detail living room. Sheet 6. Lindeberg. Blueprint. [missing]
78Unknown torn scrap, apparently part of the bathroom plans. [missing]
79Plan of dressing room. Very small, approximately 10" x 12" Revised July 6, 1926. Architect unknown. Blueprint.
80Planting plan for formal garden of Mr. and Mrs. Harry Wiess. Includes attached list of "plants for spring, plants for summer, and bulbs." Drawing 6. Lindeberg. Blueprint.
81Planting plan for front wall border. Drawing 7. Lindeberg. Blueprint.
82Planting plan for side wall border. Drawing 8. Lindeberg. Blueprint.
83Dayton Underground "Pop-up" Sprinkling System. Landscaping created by Fleming & Sheppard. Blueprint.
84Full size details of Mrs. W's dressing room. Job #302. Sheet 217-R. July 6, 1926.
85Utility building plan. August 2, 1930. Sheet 6. Staub. Drawing.
86Details of north elevation of dressing room. Job #120. Sheet #119. Staub. Drawing.
87Stable. Includes details of stalls, cornices, windows, 1st & 2nd floors. Job #120. Sheet 1. Staub. Drawing.
88Specifications, general work, alteration to residence. 54 pp. Lindeberg. Blueprints.
89Specifications, general work, alteration to residence. 54 pp. Duplicate of #88. Lindeberg. Blueprints.
90Specifications, steam heating system, alteration to residence. 17 pp. Lindeberg. Blueprints.
91Plot plan. Opaque. Colored. Architect unknown. Drawing. February 24, 1936.
92Plot plan. Plain. Similar to above. Architect unknown. Drawing. February 24, 1936.
93Plot plan. More elaborated. 8-31-35, 2-4-36, 2-5-36, 2-12-36. Architect unknown. Drawing.
94Plot plan. No date. Newer-looking paper. Says "1462 Humble Building" at bottom in pencil. Architect unknown. Drawing.
951/2" scale and full size details of library. Job #302. Sheet 231. Lindeberg. Blueprint. August 17, 1928.
96Detail sketch- library mouldings. Alterations/additions. Folded. Staub. Blueprint. October 5, 1928.
97Detail of round corners on mantel breast in library. Architect unknown. Blueprint. September 24, 1928.
98Shop drawing. Library paneling. Alterations/additions. Folded. Drawing 3. Architect unknown. Blueprint. August 27, 1928
99Plan of library. Noted to be English oak at bottom of one print. Drawing 1. Architect unknown. Blueprint. August 28, 1928.
100Detail of screen door for 2 openings in library. Oak. Drawing A. Hole in the middle. Architect unknown. Blueprint. October 24, 1928.
1011" scale detail library fireplace. Very small print. Lindeberg. Blueprint.
1023/4" scale outline of marble mantle for living room. Sheet 210. Very small. Lindeberg. Blueprint.
103"Wiess Job." New dining room. Very small. Architect unknown. Blueprint. May 14, 1926.
104Detail of round corners on mantel breast of library. Drawing 4. Architect unknown. Blueprint. Duplicate of #97. September 24, 1928.
105Detail of windows on south wall in library. Folded. Drawing 3. Architect unknown. Blueprint. August 27, 1928.
106(2) Detail of bookcases & paneling in library. Folded. Drawing 2. Architect unknown. Blueprint. August 24, 1928.
1073/4" & full size detail of library door. Sheet 232. Lindeberg. Blueprint. October 3, 1928.
108Detail of fireplace. Order- Jesse H. Jones. Design # FSD-99. William H. Jackson Co .. Blueprint. May 10, 1927.
109Study for a proposed drive. #7-8. Notes Vol E-1. Page 214. Office of J. S. Boyles, C. E. Blueprint. February 6, 1926.
110Specification, plumbing & drainage alteration to residence. 22 pp. Lindeberg. Blueprint.
111Specification, electric light alteration to residence. 20pp. Lindeberg. Blueprint.
1121/2"scale & full size detail of dressing rooms. Sheet 217. June 21, 1926. Revised July 21, 1926. Lindeberg. Blueprint.
1131/2" scale details of dining room. Alteration to house. Sheet 213. Lindeberg. Blueprint.
1141/2" scale & full size details of stair hall. Sheet 215. Lindeberg. Blueprint. June 9, 1926.
115Elevation of south wall. Living room. Sheet 212-A. Lindeberg. Blueprint. May 28, 1926.
116Elevation of north wall. Living room. Sheet 212-B. Lindeberg. Blueprint. May 28, 1926.
117Elevation of east and west walls. Living room. Sheet 212-C. Lindeberg. Blueprint. May 28, 1926.
1181/2" scale details of west entrance. Sheet 201. Lindeberg. Blueprint. March 8, 1926.
119Full size detail termination steps for south porch-from iron SD. Architect unknown. Drawing.
120Radiator enclosures under 2 north windows in northeast bedroom- 2nd floor. Sheet 1078. Staub. Drawing. September 13, 1926.
121Door details. Full size details bail & elevation, doors #116, 117, 118. Staub. Drawing.
122Sketch of Wiess library. Appears to be mouldings. Paper quite long, but only 18"-24" wide. Folded. Architect unknown.
123Sketch of Wiess library. Appears to be an arched moulding. Architect unknown. Drawing.
124First floor plan. Includes revised plan second floor. Sheet 1s. Architect unknown. Drawing. March 12, 1926.
125Full size details dressing rooms. Sheet 217-A. Lindeberg. Drawing. June 21, 1926.
126Full size details of Mrs. W's dressing room. Sheet 217-R. Lindeberg. Drawing. July 6, 1926.
127Boiler flue. Plan & cross-section. Revised. Lindeberg. Drawing. July 11, 1926.
128Boiler & piping plan. Layout showing changes in residence for H. C. Wiess. Revised. Lindeberg. Drawing. July 11, 1926.
129Full size details doors #210-215. Lindeberg. Drawing. July 19, 1926.
130Plans of east and south porches. Lindeberg. Drawing. July 23, 1926.
1311/2" scale and full size details door- vestibule to reception hall. Sheet 225. Lindeberg. Drawing. July 27, 1926.
132Frame for outswinging doors in dining room. Lindeberg. Drawing. July 28, 1926.
133Full size details for outswinging doors in dining room. Lindeberg. Drawing. July 29, 1926.
134Grilles for radiator enclosure second floor windows. Lindeberg. Drawing. August 3, 1926.
135Full size bedroom cornice. Sheet 228. Lindeberg. Drawing. August 4, 1926.
136Wiess job. Sheet 14S. Includes "plan at head of stair." Architect unknown. Drawing. August 10, 1926.
137Details of door jambs for hardware. Lindeberg. Drawing. September 9, 1926.
138Addition to residence. Typical detail of garden wall. July 1, 1935. Revised July 18, 1935. Staub. Drawing.
139Alteration to residence. Section thru new windows and section thru blanked up windows. Staub. Drawing. May 27, 1936.
140Alteration of residence. Including full size section of mantel at A-A, full size detail of trim, full size of chair rail, etc. Staub. Drawing.
141Addition to residence. Details of gard:m wall. Staub. Drawing. March 11, 1936.
142Alteration to residence. Details of garden wall. Staub. Drawing. March 4, 1926.
143Elevation from Main Street. Scale 1/8"=1'0" Very long drawing. Staub. Drawing. April 13, 1936.
144Addition to residence. Full size detail pier cap. Staub. Drawing. April 18, 1936.
145Details of slat roof over greenhouse work room. Staub. Drawing. January 20, 1936.
146Proposed greenhouses and service buildings. The Foley Greenhouse Mfg. Co.. Blueprint. January 12, 1928.
147Proposed curved eave greenhouse for J. F. Staub. King Construction Co .. Blueprint. February 19, 1925.
148Heating layout for greenhouse. On linen. Staub. Drawing March 26, 1929.
149Greenhouse, including floor plan, roof plan, incinerator and chimney, south elevation, etc. Sheet 1. Staub. Drawing. March 13, 1929.
150New greenhouse and revised service layout. Staub. Drawing. January 15, 1929.
151Remodeling of garage. August 29, 1928. Revised September 7, 1928. Staub. Drawing.
152Remodeling of garage. Duplicate. Staub. Drawing.
153Similar drawing to above: "remodeling of garage."
154Unidentified small drawing on plain yellowed paper. Marks out two roughly rectangular areas. One 44'11'' long, the other 20'8 1/2" long. Drawing.
155Blueprint marked window 108-B living room Lambert Residence. Drawing 14. Blueprint. August 31, 1928.
156Addition to residence. South, west, north, and east walls. Full size cornice detail. Chair rail. Sketchings of other sections. Sheet 8. Staub. Blueprint.
157"Heating." Apparently first floor. Sheet M-1. Lindeberg. Blueprint. December 12, 1925.
158Alteration to house. Foundation plan and first floor plan of New Wing. Sheet M-2. Lindberg. Blueprint. December 14, 1925.
159Missing.
160(2) Second floor plan for electrical work. Scale 1/4" = 1'0" W. W. W .. Blueprint.
161"Note: for all electrical work see electrical plans." Sheet #2. W.W.W .. Blueprint.
162Pictorial drawing. Alteration to residence with side and rear elevation. Scheme "B." Lindeberg. Drawing.
163Plot plan scale 1/16" = 1'0". Lindberg. Blueprint.
1641/4" & 1/2" scale detail living room. Lindberg. Blueprint. October 1925.
1651/4" & 1/2" scale detail dining room. Lindberg. Blueprint. October 1925.



 

Drawer 33: Oversize Manuscript Material

drawerfolder
334Andrew Forest Muir Papers (MS 017)
General note
See Andrew Forest Muir Papers (MS 017) http://www.lib.utexas.edu/taro/ricewrc/00195/rice-00195.html
4Alamo watercolor C.A. Walker June 6, 1888.
4University of Texas diploma. Andrew Forest Muir Doctor of Philosophy May 30, 1949
5McCollum Newspapers
The London Chronicle. Vol. LIV, no. 4178. August 9-12, 1783.
The London Magazine. November 1766.
The Farmer's Calendar. Philadelphia. 1838.
The National Register. London, no. 372. February 12, 1815.
The Sun, New York. No. 245. June 16, 1834.
Relfs Philadelphia Gazette and Daily Advertiser. Vol. XXVI, no. 6305. March 10, 1809.
Relfs Philadelphia Gazette and Daily Advertiser. Vol. XXVI, no. 6307. March 13, 1809.
Relfs Philadelphia Gazette and Daily Advertiser. Vol. XXVI, no. 6308. March 14, 1809.
The Evening Star (London), no. 8487. May 17, 1814.
The Sun. New York, no. 7055. April 17, 1815.
Journal of Commerce, Jr. New York. August 13, 1861.
National Gazette and Literary Register. Philadelphia. Vol. XII, no. 2077. August 2, 1834.
National Gazette and Literary Register. Philadelphia. Vol. XII, no. 2078. August 5, 1861.
The World. New York. Vol. V, no. 1286. August 5, 1864.
The World. New York. Vol V, no. 1287. August 6, 1864.
drawerfolder
336Hamman Collections (MS 006)
Scope and Contents
See William Harrison Hamman Papers (MS 006) http://www.lib.utexas.edu/taro/ricewrc/00003/rice-00003.html
7John William Hutcheson Papers (MS 037)
General note
See John William Hutcheson Papers finding aid, Series II (MS 037) http://www.lib.utexas.edu/taro/ricewrc/00003/rice-00003.html
8Family chart; Broun Family US Civil War Papers (MS 177)
Scope and Contents
See Broun Family US Civil War Papers (MS 177) http://www.lib.utexas.edu/taro/ricewrc/00072/rice-00072.html
9William L. Clayton Papers (MS 007)
Scope and Contents
See Thomas L. Clayton Papers (MS 007) http://www.lib.utexas.edu/taro/ricewrc/00004/rice-00004.html
10William M. McVey Papers (MS 026) oversized watercolor. No date.
Scope and Contents
See William M. McVey Papers (MS 026) http://www.lib.utexas.edu/taro/ricewrc/00041/rice-00041.html
11Charles C. Winnia Papers (MS 132)
Scope and Contents
See Charles C. Winnia Papers (MS 132) Series VI: http://www.lib.utexas.edu/taro/ricewrc/00275/rice-00275.html
12Indentured servant contract between the Duke of Chandos and one George Harvey (MS 171)
General
See also guide to the Indentured servant contract between the Duke of Chandos and one George Harvey (MS 171) http://www.lib.utexas.edu/taro/ricewrc/00841/rice-00841.html



 

Drawer 34: Oversize Manuscript Material

drawerfolder
341Thomas A. Rabson Academic Papers (MS 558)
General note
See Thomas A. Rabson Academic Papers (MS 558) http://www.lib.utexas.edu/taro/ricewrc/00645/rice-00645.html
2Dillon Anderson Papers (MS 540)
General note
See Dillon Anderson (MS 540) http://www.lib.utexas.edu/taro/ricewrc/00450/rice-00450.html
3Engraved prints of Caprarola and Odense (MS 555)
General note
See Engraved prints of Caprarola and Odense (MS 555) http://www.lib.utexas.edu/taro/ricewrc/00515/rice-00515.html
4Takao Doi's Rice Flight Kit for Space Shuttle Endeavour materials (MS 552)
General note
See Takao Doi's Rice flight kit for Endeavour (MS 552) http://www.lib.utexas.edu/taro/ricewrc/00527/rice-00527.html
5Discover Houston Tours Records (MS 522)
General note
See Discover Houston Tours Records (MS 522) http://www.lib.utexas.edu/taro/ricewrc/00519/rice-00519.html
6Rhode Island Artillery, 5th Regiment, Company G Records (MS 253)
General note
See Rhode Island Artillery, 5th Regiment, Company G Records (MS 253) http://www.lib.utexas.edu/taro/ricewrc/00201/rice-00201.html
7Merchants and Planters Oil Company Records (MS 260)
General note
See Merchants and Planters Oil Company Records (MS 260) http://www.lib.utexas.edu/taro/ricewrc/00032/rice-00032.html
8Sir William Sidney Smith Papers (MS 267)
General note
See Sir William Sidney Smith Papers (MS 267) http://www.lib.utexas.edu/taro/ricewrc/00245/rice-00245.html
9Asa Crawford Chandler Papers (MS 337)
General note
See Asa Crawford Chandler Papers (MS 337) http://www.lib.utexas.edu/taro/ricewrc/00483/rice-00483.html
10John W. Freeman Papers (MS 344)
General note
See John W. Freeman Papers (MS 344) http://www.lib.utexas.edu/taro/ricewrc/00432/rice-00432.html
11Jack McCaine Nasa Collection (MS 045)
General note
See Jack McCaine Nasa Papers (MS 045) http://www.lib.utexas.edu/taro/ricewrc/00052/rice-00052.html
12Grace Spaulding John Papers (MS 383)
General note
See Grace Spaulding John Papers (MS 383) http://www.lib.utexas.edu/taro/ricewrc/00138/rice-00138.html



 

Drawer 35: Oversize Manuscript Collections

drawerfolder
351Lt. Jerry C. Debes Military Service. Photographs, American flag, Purple Heart, Purple Heart citation, Air Medal, Memorial from President Harry S. Truman and biographical essay all mounted on foamboard. (MS 579)
General
See Jerry C. Debes World War II papers (MS 579)for more information http://www.lib.utexas.edu/taro/ricewrc/00500/rice-00500.html
2Sugarland and Fort Bend Historical Papers of Jane McMeans (MS 032)
General note
See Sugarland and Fort Bend Historical papers of Jane McMeans (MS 032) http://www.lib.utexas.edu/taro/ricewrc/00284/rice-00284.html
3Hutcheson and allied families Papers (MS 496)
General note
See Hutcheson and allied families Papers (MS 496) http://www.lib.utexas.edu/taro/ricewrc/00161/rice-00161.html
4Marriage certificate of Gus S. Wortham and Elizabeth Lyndall Finley. Digital copy. November 23, 1926.
General note
See Wortham family and business records (MS 514) http://www.lib.utexas.edu/taro/ricewrc/00256/rice-00256.html
5Black & white panoramic photograph. Professor Welch's academy on Polk and Jackson. Barnes Research Papers (MS 455) ca. 1896.
General
See Barnes Research Papers (MS 455) http://www.lib.utexas.edu/taro/ricewrc/00017/rice-00017.html



 

Drawer 36: Harrie Thomas Lindeberg Architectural Drawings (MS 312)

General note
See Harrie Thomas Lindeberg (MS 312) http://www.lib.utexas.edu/taro/ricewrc/00419/rice-00419.html



 

Drawer 37: William Harrison Hamman Newspaper Collection (MS 006), Stuart and Allied families (MS 553)

General note
See William Harrison Hamman Papers (MS 006) http://www.lib.utexas.edu/taro/ricewrc/00003/rice-00003.html
See Stuart and Allied families of Texas papers (MS 553) http://www.lib.utexas.edu/taro/ricewrc/00605/rice-00605.html



 

Drawer 38: Rice Computer

General note
Items 159-465 located in Drawer 39.
draweritem
381Schematic- variable voltage filament power supply. Drawing A0009. May 9, 1957.
2Interference generator. Drawing A-15-5. April 18, 1958.
3Diode chassis terminal strip. Drawing A-4035-C. May 22, 1958.
4Scaler diode board. Drawing A-3102. August 26, 1958.
5Procedure for vertical wiring. Drawing A-1015-C. August 26, 1958.
6By-pass connections. Drawing A-1018-C. February 2, 1959.
7Pulse Transformer Checker. Drawing A-4086-S. March 11, 1959.
8Printed circuit switch. Drawing A-0544. No date.
9Floor joint tie plate support mernory- back left corner. Drawing A-3120-C. March 16, 1959.
10DC filament supply for memory. Drawing A-0030-S. May 26, 1959.
11Back plate driver diode board. Drawing A-3107-C. June 2, 1959.
12Socket wiring for memory tubes. Drawing A-3043-C. June 3, 1959.
1375 Volt power supply. Drawing A-0041. June 26, 1959.
14Noise & DC output meter. Drawing A-3021-S. June 26, 1959.
15Transistor power amp. Drawing A-3022-C. No date.
16Nylon pole for buffer chassis. Drawing A-654-C. July 25, 1959.
17Radechon HV circuitry. Drawing A-3113-S. August 5, 1959.
18Light control for console. Drawing A-675-S. September 22, 1959.
19Special amplifiers for parity. Drawing A-3203-S. October 5, 1959.
20Typical flip-flop (control). Drawing A-2215-S. March 16, 1960.
21Line printer paper not advancing. Drawing A-2214-S. October 28, 1960.
22Control console table top. Drawing A-2219-C. December 7, 1960.
23Computer delay circuit. Drawing A-2221-S. January 9, 1961.
24Nylon terminal strip. Drawing B-4037. June 3, 1958.
25Transformer mounting channels. Drawing B-0017. March 7, 1959.
26Output writer wiring. Drawing B-540-C. April 13, 1959.
27Relay mounting angle. Drawing 8-547-C. May 14, 1959.
28Buffer chassis insulator. Drawing B-653-C. July 24, 1959.
29Magnetic tape recording writing circuitry. Drawing B-563-S. June 20, 1960.
30Multiplexer. No date
31Multiplexer. No date
32Multiplexer. No date
33Multiplexer. March 11, 1969.
34Multiplexer. No date.
35Shift (channel end). March 26, 1969.
36Shift (channel end). March 26, 1969.
37Channel scratch pad memory. No date.
38Multiplexer output gating. No date.
39CPU communicator. No date.
40CPU interrupt producer. No date.
41Multiplexer. No date.
42Multiplexer. No date.
43Multiplexer. No date.
44Channel memory buffer- control. No date.
45Channel memory buffer- counts and decoding. No date.
46Channel memory buffer- character 1. No date.
47Channel memory buffer- character 2. No date.
48Channel memory buffer- character 3. No date.
49Channel memory buffer- character 4. No date.
50Channel memory buffer- character 5. No date.
51Channel memory buffer- character 6. No date.
52Channel memory buffer- extra bits. No date.
53Deflection amplifier layout. Drawing D-3109-C. July 30, 1959.
54Field 2 class 1 mult. & division. Drawing D-2126. October 2, 1959.
55Field 2 class 4 logic. Drawing D-2140. July 3, 1959.
56End floor support side 1- front of control. Drawing D-2151-C. December 3, 1958.
57End floor support side 2- front of control. Drawing D-2152-C. December 3, 1958.
58End floor support- front of control. Drawing D-2153-C. December 3, 1958.
59Cross piece- center floor support part B. Drawing D-2154-C. November 17, 1958.
60Cross piece- center floor support part C. Drawing D-2155-C. November 17, 1958.
61Edge floor support- center front control. Drawing D-2156-C. December 3, 1958.
62Edge floor support- right end front control. Drawing D-2157-C. December 3, 1958.
63Edge floor support- left end front control. Drawing D-2158-C. December 3, 1958.
64Parity tree wiring. Drawing D-3202-S. April 27, 1963.
65Arithmetic- fixed & floating. Drawing S-2222-4. May 4, 1961.
66Blank grid. No date.
67B.O. location & FN- A. Drawing D-5014-C. No date.
68B.O. location & FN-B. Drawing D-5015-C. No date.
69Relay wiring table. Drawing D-546. No date.
70Typewriter connections. Drawing D-551-S. January 2, 1962.
71Memory assembly. Drawing D-3003-C. September 26, 1958.
72Assembly sketch: deflection bus structure & socket mtg. Drawing D-3015. No date.
73Memory tube mount. Drawing D-3054-C. June 4, 1958.
74Storage tube mounting plate (front). Drawing D-3059-C. August 12, 1958.
75Storage tube socket mounting plate (front). Drawing D-3060-C. August 7, 1958.
76Storage tube unit foot. Drawing D-3061-C. August 8, 1958.
77Storage tube transformer mounting plate. Drawing D-3062-C. August 8, 1958.
78Memory unit chassis mounting channel. Drawing D-3063-C. August 11, 1958.
79Storage tube mounting plate (rear). Drawing D-3066-C. August 12, 1958.
80Storage tube socket mounting plate (rear). Drawing D-3068-C. August 12, 1958.
81Storage tube mounting plate bracket. Drawing D-3069-C. August 21, 1958.
82Socket mounting plate spacer (side). Drawing D-3070-C. August 20, 1958.
83Socket mounting plate spacer (top). Drawing D-3071-C. August 20, 1958.
84Memory rack end panel. Drawing D-3072-C. August 22, 1958.
85Memory chassis mounting angle. Drawing D-3073-C. August 25, 1958.
86Spacer- memory tube socket mounting plate. Drawing D-3075-C. October 15, 1958.
87Memory rack grounding strip. Drawing D-3076-C. December 3, 1958.
88Memory intensity & focus control mounting plate. Drawing D-3077-C. February 3, 1959.
89Memory end cover- horizontal dividers. Drawing D-3081-C. February 16, 1959.
90Focus & intensity control cover plate. Drawing D-3082-C. February 6, 1959.
91Memory front base plate. Drawing D-3090-C. March 11, 1959.
92Edge floor support- right end memory. Drawing D-3091-C. December 3, 1958.
93Edge floor support- center memory A-B. Drawing D-3092-C. December 3, 1958.
94Edge floor support- left side memory. Drawing D-3097-C. December 3, 1958.
95Edge floor support- right side memory. Drawing D-3098-C. December 3, 1958.
96Edge floor support- spacer memory. Drawing D-3099-C. December 12, 1958.
97Memory control. Drawing D-3115-S. June 19, 1959.
98Memory mode register. Drawing D-3116-S. August 19, 1959.
99End floor support memory. Drawing D-3128-C. December 3, 1958.
100End center floor support memory. Drawing D-3133-C. December 3, 1958.
101Cross piece- center floor support memory. Drawing D-3134-C. November 17, 1958.
102Edge floor support angle- left side memory unit 2. Drawing D-3135-C. March 27, 1959.
103Cover plate- memory left side- center bottom. Drawing D-3139-C. March 28, 1959.
104Cover plate- memory right side- left middle- and right middle. Drawing D-3140-C. March 30, 1959.
10572 and 32 bar bus supports under floor. Drawing D-3143-C. April 1, 1959.
106Bottom plate- bus bar supports (under floor). Drawing D-3145-C. April 4, 1959.
107Bottom plate- bus bar supports narrow (under floor). Drawing D-3148-C. April 13, 1959.
108Edge floor support angle- center of left side memory units 2-3. Drawing D-3149-C. April 18, 1959.
109Edge floor support angle- left side memory unit 3. Drawing D-3151-C. April 18, 1959.
110Cover plate- memory left side- center bottom. Drawing D-3154-C. April 15, 1959.
111Edge floor support angle- left side memory unit 4. Drawing D-3157-C. April 18, 1959.
112Floor base plate between memory and arithmetic. Drawing D-3160-C. April 21, 1959.
113Floor base plate between memory sections. Drawing D-3161-C. April 21, 1959.
114Modifications- memory rack end panels. Drawing D-3172-C. June 23, 1959.
115Check bit system diagram. Drawing D-3201. July 3, 1959.
116Error correction decoding. Drawing D-3205. January 30, 1962.
117Computer layout (2). Drawing D-4000-C. September 19, 1959.
118Incomplete drawing for bringing up the power. Drawing C-0012. No date.
119Arithmetic unit assembly. Drawing D-4001-C. October 20, 1957.
120Elevation plan. Drawing D-4003-C. September 26, 1958.
121Arithmetic unit-foot. Drawing D-4021-C. Revision date: April 10, 1958.
122Arithmetic unit chassis mounting angle. Drawing D-4022-C. Revision date: November 13, 1957.
123Arithmetic unit chassis mounting angle. Drawing D-4023-C. May 12, 1957.
124Floor frame assembly. Drawing D-4043-C. August 1, 1958.
125Rack grounding strip. Drawing D-4047-C. December 3, 1958.
126Edge floor support spacer- end. Drawing D-4048-C. December 3, 1958.
127Edge floor support spacer- center. Drawing D-4051-C. December 3, 1958.
128Edge floor support- center. Drawing D-4052-C. December 3, 1958.
129Edge floor support- center. Drawing D-4052-C. Copy 2. December 3, 1958.
130Edge floor support- right end. Drawing D-4053-C. December 3, 1958.
131Edge floor support- left end. Drawing D-4054-C. December 3, 1958.
132End center floor support. Drawing D-4055-C. December 3, 1958.
133Center center floor support. Drawing D-4056-C. December 3, 1958.
134Door molding tee- center. Drawing D-4057-C. December 3, 1958.
135End & door tees. Drawing D-4058-C. December 3, 1958.
136End cover. Drawing D-4059-C. December 3, 1958.
137Cross piece- center floor support. Drawing D-4060-C. November 17, 1958.
138End floor support. Drawing D-4061-C. December 3, 1958.
139Vertical end cover spacer. Drawing D-4073-C. December 3, 1958.
140Edge ceiling support- right end. Drawing D-4079-C. January 9, 1959.
141Edge ceiling support- center. Drawing D-4080-C. January 9, 1959.
142Edge ceiling support- left end. Drawing D-4081-C. January 9, 1959.
143Arithmetic & control door paint detail. Drawing D-4082-C. February 3, 1959.
144Arithmetic & control door. Drawing D-4083-C. February 3, 1959.
145Control trim- right end. Drawing D-4125-C. No date.
146Typer chassis wiring. Drawing D-0552. No date.
147Typical rack assembly. Drawing D-1001-C. March 26, 1958.
148Shifts: end connections. Drawing D-1012. No date.
149Unspecified plan. Drawing D-1012-A. No date.
150"S" register assembly drawing. Drawing D-1035. July 25, 1958.
151Vertical wiring diagram "T" register. Drawing D-1068-C. May 28, 1958.
152Vertical wiring diagram adder. Drawing D-1084-C. May 28, 1958.
153Floor base plate between arithmetic & control. Drawing D-1096-C. April 21, 1959.
154Control adder vertical wiring. Drawing D-2024-C. June 9, 1959.
155Field 4- trapping & end connections. Drawing D-2114. June 24, 1959.
156Field 4-B modification. Drawing D-2115-A. October 1, 1959.
157Field 4-B modification. Drawing D-2115-B. October 1, 1959.
158Addition, subtraction, start class 1, normalization, rounding. Drawing D-2125. October 12, 1959.



 

Drawer 39: Rice Computer

General note
Items 1-158 located in Drawer 38.
draweritem
39159Memory access commutator. (3) Drawings. No date.
160Unibus receivers: address select byte network. No date.
161Core address counter #1. No date.
162Core address counter #2. No date.
163Core address counter #3. No date.
164Core address counter #4. No date.
165Core address counter #5. No date.
166Class 7 of 1 instructions: time delays and relay controls. Drawing C-2250-S. May 24, 1964.
167Analog-digital converter: control register. Drawing C-684-S. May 4, 1964.
168Synchronized oscillators: 1 KC, 100cps, 10cps. Drawing C-2251-S. No date.
169Analog-digital converter: switching register. Drawing C-683-S. April 27, 1964.
170Analog-digital converter: function generator. Drawing C-682-S. April 13, 1964.
171Analog-digital converter: oscillators. Drawing C-680-S. No date.
172Analog-digital converter: pulse distributor. Drawing C-681-S. April 3, 1964.
173Class 7 of 1 instructions: time delays and relay controls. Drawing C-2250-S. Copy 2. May 24, 1964.
174Analog-digital converter: control register. Drawing C-684-S. Copy 2. May 4, 1964.
175Synchronized oscillators: 1 KC, 100cps, 10cps. Drawing C-2251-S. No date. Copy 2.
176Analog-digital converter: switching register. Drawing C-683-S. Copy 2. April 27, 1964.
177Analog-digital converter: function generator. Drawing C-682-S. Copy 2. April 13, 1964.
178Analog-digital converter: oscillators. Drawing C-680-S. No date.
179Analog-digital converter: pulse distributor. Drawing C-681-S. Copy 2. April 3, 1964.
180BSR 1, 1A, 2, 2A. May 1972.
181BSR 3A. April 19, 1972.
182BSR 3F. May 1972.
183Register display panel to plug wiring. Drawing 5 of 5. No date.
184Data register block diagram. No date.
185Data register commutator. No date.
186Memory access commutator. No date.
187Unibus transceners: data control byte. No date.
188Unibus receivers: address select byte network. No date.
189"S" driver tree. Drawing R2ARL20- prefix DTS. No date.
190Specials driver tree. Drawing R2ARL21- prefix DTX. No date.
191"S" register. Drawing R2ARL24- prefix 15. No date.
192Numerical processor module. Drawing R2ARL24- prefix 14. No date.
193Numerical processor module. Drawing R2ARL24- prefix 13. No date.
194Numerical processor module. Drawing R2ARL24- prefix 12. No date.
195Numerical processor module. Drawing R2ARL24- prefix 11. No date.
196Numerical processor module. Drawing R2ARL24- prefix 10. No date.
197Numerical processor module. Drawing R2ARL24- prefix 9. No date.
198Numerical processor module. Drawing R2ARL24- prefix 8. No date.
199Numerical processor module. Drawing R2ARL24- prefix 7. No date.
200Numerical processor module. Drawing R2ARL24- prefix 6. No date.
201Numerical processor module. Drawing R2ARL24- prefix 5. No date.
202Numerical processor module. Drawing R2ARL24- prefix 4. No date.
203Numerical processor module. Drawing R2ARL24- prefix 3. No date.
204Numerical processor module. Drawing R2ARL24- prefix 2. No date.
205S Exp- 1-> adder. Drawing R2ARL26. No date.
206S Exp- 1-> adder. Drawing R2ARL26. No date. Copy 2.
207Arithmetic unit. Drawing R2ARL27. No date.
208Arithmetic unit. Drawing R2ARL28A. No date.
209Arithmetic unit. Drawing R2ARL28B. No date.
210Control logic. No date.
211Unibus transceners: data control byte permutation. No date.
212Disk data register- 1. No date.
213Disk data register- 2. No date.
214Disk data register- 3. No date.
215Disk data register- 4. No date.
216Logic oscillator and sequencer E. Drawing R2AML11. June 2, 1969.
217Arithmetic microcode. Drawing R2AML12- prefix SWP. February 1971.
218Arithmetic microcode. Drawing R2AML13- prefix EAD. February 1971.
219Arithmetic microcode. Drawing R2AML14- prefix RMC. February 1971.
220Arithmetic microcode. Drawing R2AML15- prefix NOR. February 1971.
221Arithmetic microcode. Drawing R2AML16- prefix FFL. February 1971.
222Arithmetic microcode. Drawing R2AML17A- prefix FLI. February 1971.
223Arithmetic microcode. Drawing R2AML 17B- prefix FFI. February 1971.
224Multiply microcode. Drawing R2AML18A- prefix MUL. June 16, 1972.
225Multiply microcode. Drawing R2AML 18B- prefix MUL. June 16, 1972.
226Arithmetic microcode. Drawing R2AML 19A- prefix DIV. February 1971.
227Arithmetic microcode. Drawing R2AML 19B- prefix DIV. February 1971.
228Arithmetic unit. Drawing R2ARL01. January 7, 1972.
229Arithmetic unit. Drawing R2ARL02. June 16, 1972.
230Arithmetic unit. Drawing R2ARL03. June 16, 1972.
231Arithmetic unit. Drawing R2ARL04. January 7, 1972.
232Arithmetic unit. Drawing R2ARL05A. January 6, 1972.
233Arithmetic unit. Drawing R2ARL05B. January 6, 1972.
234Arithmetic unit. Drawing R2ARL05C. January 7, 1972.
235Numerical processor module. No date.
236Numerical processor module. Drawing R2ARL08- prefix 15. No date.
237Numerical processor module. Drawing R2ARL08- prefix 14. No date.
238Numerical processor module. Drawing R2ARL08- prefix 13. No date.
239Numerical processor module. Drawing R2ARL08- prefix 12. No date.
240Numerical processor module. Drawing R2ARL08- prefix 11. No date.
241Numerical processor module. Drawing R2ARL08- prefix 10. No date.
242Numerical processor module. Drawing R2ARL08- prefix 09. No date.
243Numerical processor module. Drawing R2ARL08- prefix 08. No date.
244Numerical processor module. Drawing R2ARL08- prefix 07. No date.
245Numerical processor module. Drawing R2ARL08- prefix 06. No date.
246Numerical processor module. Drawing R2ARL08- prefix 05. No date .
247Numerical processor module. Drawing R2ARL08- prefix 04. No date.
248Adder sign bit. Drawing R2ARL09- prefix 03. July 13, 1971.
249Adder sign bit. Drawing R2ARL09- prefix 03. Copy 2. July 13, 1971.
250Arithmetic unit. Drawing R2ARL06- prefix ACL. August 5, 1971.
251Arithmetic unit. Drawing R2ARL1OA- prefix AE. August 25, 1971.
252Arithmetic unit. Drawing R2ARL10B- prefix AE. August 24, 1971.
253Central distributor section 1. Drawing R2CRL01. No date.
254Central distributor section 2. Drawing R2CRL02. No date.
255Central distributor section 3. Drawing R2CRL03. July 30, 1969.
256Central distributor section 4. Drawing R2CRL04. July 30, 1969.
257Central distributor section 5. Drawing R2CRL05. No date.
258Central distributor section 6. Drawing R2CRL06. July 30, 1969.
259Central distributor section 7. Drawing R2CRL07. July 30, 1969.
260Central distributor section 8. Drawing R2CRL08. No date.
261Central distributor section 9. Drawing R2CRL09. No date.
262Central distributor section 10. Drawing R2CRL10. No date.
263Central distributor section 11. Drawing R2CRL11. No date.
264"G" register section 1. (2) Drawing R2CRL12. No date.
265"G" register section 2. (2) Drawing R2CRL 13. June 13, 1969.
266"G" register section 3. (3) Drawing R2CRL14. August 14, 1969.
267"G" register section 4. (3) Drawing R2CRL15. No date.
268Decoders for hardware tags and CC register. (3) Drawing R2CRL16A. October 25, 1971.
269Software tags and CC register. Drawing R2CRL16B. No date.
270HTB and ITS registers. Drawing R2CRL16C. August 16, 1971.
271Left and right number generators. Drawing R2CRL17. No date.
272Adder input drivers. Drawing R2CRL18A. No date.
273I(N) drivers. Drawing R2CRL18B. No date.
274Adder to sum control and time delay circuits. Drawing R2CRL18C. No date.
275Gate drivers panel C1. Drawing R2CRL19A. No date.
276Gate drivers panel C1. Drawing R2CRL19B. No date.
277Gate drivers panel C1. Drawing R2CRL20. No date.
278G->CD drivers- part 1 of 8. Drawing R2CRL21A. No date.
279Leading zeroes drivers for G->CD sub fields- part 2 of 8. Drawing R2CRL21B. No date.
280Sign propagation for signed fields on CD- part 3 of 8. Drawing R2CRL21C. No date.
281G & CD drivers- part 4 of 8. Drawing R2CRL22. December 15, 1971.
282G & CD drivers- part 5 of 8. Drawing R2CRL23. December 11, 1971.
283G & CD drivers- part 6 of 8. Drawing R2CRL24. December 11, 1971.
284G & CD drivers- part 7 of 8. Drawing R2CRL25. No date.
285CD drivers- part 8 of 8. Drawing R2CRL26. No date.
286C frame drivers for arithmetic unit. Drawing R2CRL27. No date.
287Extract and replace field drivers. Drawing R2CRL28. January 4, 1972.
288Left adder input & complement gates. Drawing R2CRL29. June 17, 1969.
289Right adder input & complement gates. Drawing R2CRL30. March 19, 1969.
290Address adder section 1. Drawing R2CRL31. July 28, 1969.
291Address adder section 2. Drawing R2CRL32. July 28, 1969.
292Address adder section 3. Drawing R2CRL33. July 28, 1969.
293Address adder section 4. Drawing R2CRL34. July 28, 1969.
294Address adder section 5. Drawing R2CRL35. July 28, 1969.
295Sum register (left half). Drawing R2CRL36. No date.
296Sum register (right half). Drawing R2CRL37. No date.
297Mode register. Drawing R2CRL38. No date.
298"Mark" field. Drawing R2CRL39. January 4, 1972.
299Instruction register field and output. Drawing R2CRL40. No date.
300Decoders for instruction function code. Drawing R2CRL41A. No date.
301Function grouping logic. Drawing R2CRL41B. No date.
302Instruction register field X and register address matrix drivers. Drawing R2CRL42A. No date.
303Instruction register field Y. Drawing R2CRL42B. No date.
304Instruction register (N field). Drawing R2CRL43. October 27, 1971.
305Location buffer register. Drawing R2CRL44. August 31, 1969.
306Control number register. Drawing R2CRL45. June 3, 1969.
307Stack pointer and stack length registers. Drawing R2CRL46. June 4, 1969.
307ALoop counter. Drawing R2CRL47. July 2, 1969.
308Number encoder for LC register. Drawing R2CRL48. January 6, 1972.
309Instruction buffer- left half (bits 55-60 & 1-24). Drawing R2CRL49. No date.
310Instruction buffer- right half (bits 25-54). Drawing R2CRL50. No date.
311Instruction register load drivers. Drawing R2CRL51. No date.
312Register select decoder. Drawing R2CRL52. February 14, 1972.
313Adder test buffer. Drawing R2CRL53. January 31, 1972.
314Control flip-flops. Drawing R2CRL54. May 1972.
315Logic oscillator A and sequencer A. Drawing R2CRL55A. No date.
316Logic oscillator Band sequencer B. Drawing R2CRL55B. No date.
317Logic oscillator C and sequencer C. Drawing R2CRL55C. No date.
318B sequence grouping logic. Drawing R2CRL56. August 15, 1973.
319Osc B call and reply interlock. Drawing R2CRL57B. No date.
320Osc C call and reply interlock. Drawing R2CRL57C. No date.
321Normal sequence logic. Drawing R2CRL58. No date.
322Trad flip-flops & interrupt structure. Drawing R2CRL59. May 1972.
323Trad flip-flops & interrupt structure. Drawing R2CRL60. May 1972.
324Register display & sequencer control- 1 of 5. Drawing R2CRL61. August 24, 1973.
325Register display logic- 2 of 5. Drawing R2CRL62. June 1972.
326Register display: data (long) registers- 3 of 5. Drawing R2CRL63. June 1972.
327Register display: address (short) registers- 4 of 5. Drawing R2CRL64. June 1972.
328Register display: panel to plug wiring- 5 of 5. Drawing R2CRL65. No date.
329Store control. Drawing R2CRL66. March 24, 1972.
330Fetch control. Drawing R2CRL67. March 17, 1972.
331Scratchpad & drivers- C11. Drawing R2CRL68. May 5, 1972.
332Scratchpad- C12. Drawing R2CR69. No date.
333C frame scratchpad layout. Drawing R2CRL70. August 11, 1971.
334Sequencer A; control logic for A1. (2) Drawing R2CML01. No date.
335Sequencer A; control logic for A2. (2) Drawing R2CML02. No date.
336Sequencer A; control logic for A3. (2) Drawing R2CML03. No date.
337Sequencer A; control logic for A4 & AS. (2) Drawing R2CML04. No date.
338Sequencer A; control logic for A6 & A7. (2) Drawing R2CML05. No date.
339Functions 20-27, steps A1-AS. (2) Drawing R2CML06. April 10, 1972.
340Functions 30-36, steps A1 & A2. (2) Drawing R2CML07. January 20, 1972.
341Functions 30-36, steps A3, A4, & AS. (2) Drawing R2CML08. January 24, 1972.
342Universal last step A8. (2) Drawing R2CML09. May 1972.
343Functions 40-47, steps A1-A2. (2) drawings. August 7, 1973.
344Functions 40-47, steps A3-AS. (2) drawings. August 7, 1973.
345Functions 40-47, steps A6-A8. (2) drawings. August 7, 1973.
346Step A8 (all instructions). August 8, 1973.
347Jumps I(F)= 40-47. Drawing R2CML10. No date.
348Jumps I(F)= 40-47. Drawing R2CML11. No date.
349Prefix LAF. August 7, 1973.
350I(F)=MEM, I(F)=RET. No date.
351(56) CTR. No date.
352Prefix LAH. No date.
353Interrupt sequence. August 9, 1973.
354Interrupt sequence. August 13, 1973.
355Interrupt sequence. August 13, 1973.
356Interrupt sequence- prefix LAI. Drawing R2CML12. August 20, 1973.
357Interrupt sequence- prefix LAI. Drawing R2CML13. August 23, 1973.
358IOA instruction. No date.
359IOA instruction- prefix LAJ. August 15, 1973.
360All B subroutines- step 81. Drawing R2CML30. May 1972.
361BSR- step B2. Drawing R2CML31. May 1972.
362BSR- step B3. Drawing R2CML32. March 13, 1972.
363BSR- steps B4, B5, B6, & B7. Drawing R2CML33. March 14, 1972.
364BSR- steps B4 & B5. Drawing R2CML34. May 1972.
365BSR- step B6, B7, & B8. Drawing R2CML35. April 3, 1972.
366BSR #4. Drawing R2CML36. February 1972.
367BSR- steps B1-B3. Drawing R2CML37. May 10, 1972.
368BSR- steps B4-B7. Drawing R2CML38. May 17, 1972.
369Unstack sequence: stk #1. Drawing R2CML39. April 19, 1972.
370Index stack sequence: stk #7. Drawing R2CML40. May 1972.
371CSR 6A, 6B, 6C, & 6D. Drawing R2CML50. No date.
372CSR 7A, 7B, 7C, 7D, & 7E. Drawing R2CML51. No date.
373CSR 8, 9A, & 9B. Drawing R2CML52. February 4, 1972.
374CSR 1, 2, 3, & local "OR" gates. Drawing R2CML53. February 9, 1972.
375CSR 4A, 4B, 4C, & 5. Drawing R2CML54. February 10, 1972.
376CSR 10A, 10B, 10C, 10D, 10E, 10F, 11E, & 12. Drawing R2CML55. February 9, 1972.
377CSR 13, 14, & 15. Drawing R2CML56. No date.
378CSR 16A, 16B, 17A, 17B, & 18. Drawing R2CML57. May 1972.
379I(F): 0-13, 14, 16-17, steps 1-2. Drawing R2CMF01. January 6, 1972.
380I(F): 0-13, 14, 16-17, steps 3-5. Drawing R2CMF02. January 7, 1972.
381I(F): 0-13, 14, steps 6-7. Drawing R2CMF03. January 7, 1972.
382I(F): 15A, B, C, D, E, steps 1-2. Drawing R2CMF04. January 11, 1972.
383I(F): 15A, B, C, D, E, steps 3-7. Drawing R2CMF05. January 11, 1972.
384Functions 20-27, steps A1-AS. (2) Drawing R2CMF06. April 10, 1972.
385Functions 30-33, steps A1-AS. (2) Drawing R2CMF07. April 11, 1972.
386Functions 34-36, steps A1, A2, & A3. (2) Drawing R2CMF08. April 11, 1972.
387Step A8 (all instructions). Drawing R2CMF09. August 8, 1973.
388BSR #1 and BSR #1A- steps B1 & B2. Drawing R2CMF30A. July 24, 1973.
389BSR #2 and BSR #2A- steps B1 & B2. Drawing R2CMF30B. July 26, 1973.
390BSR #5, 5B, and 5C- steps B1 & B4. Drawing R2CMF30C. July 26, 1973.
391BSR #1, 1A, and STK #1- steps B3 & B4. Drawing R2CMF31A. August 14, 1973.
392BSR #2, 2A, 5A, 5B, and 5C- steps B3 & B4. Drawing R2CMF31B. August 15, 1973.
393BSR #1, 1A, and STK #1- steps B5, B6, & B7. Drawing R2CMF32A. August 16, 1973.
394BSR #2, 2A, 5A, 5B, and 5C- steps B5 & B6. Drawing R2CMF32B. July 27, 1972.
395BSR #2, 2A, 5A, 5B, and 5C- steps B7 & B8. Drawing R2CMF33B. July 27, 1972.
396STK #1 (unstack). April 24, 1972.
397CSR #6A, B, C, D, & E. Drawing R2CMF50. March 3, 1972.
398CSR #7 A, B, C, D, & E. Drawing R2CMF51. March 3, 1972.
399CSR #1-5- steps 1-3. Drawing R2CMF52. February 15, 1972.
400CSR #4, & 13-15- steps 4-6. Drawing R2CMF53. February 16, 1972.
401CSR #10, 11, & 12. Drawing R2CMF54. March 2, 1972.
402CSR #16A, 16B, 17A, & 17B. Drawing R2CMF55. April 25, 1972.
4034 Bits- "S" section used for mantissa bits. (2) Drawing Section 1. No date.
4044 Bits- "S" section used for mantissa bits. (2) Drawing Section 2. No date.
4054 Bits- "S" section used for mantissa bits. (2) Drawing Section 4. No date.
4064 Bits- "S" section used for mantissa bits. (2) Drawing Section 5. No date.
4074 Bits- "S" section used for mantissa bits. (2) Drawing Section 6. No date.
4084 Bits- "S" section used for mantissa bits. (2) Drawing Section 7. No date.
4094 Bits- "S" section used for mantissa bits. (2) Drawing Section 8. No date.
4104 Bits- "S" section used for mantissa bits. (2) Drawing Section 9. No date.
4114 Bits- "S" section used for mantissa bits. (2) Drawing Section 10. No date.
4124 Bits- "S" section used for mantissa bits. (2) Drawing Section 11. No date.
4134 Bits- "S" section used for mantissa bits. (2) Drawing Section 12. No date.
4144 Bits- "S" section used for mantissa bits. (2) Drawing Section 13. No date.
4154 Bits- "S" section used for mantissa bits. (2) Drawing Section 14. No date.
4164 Bits- "S" section used for mantissa bits. (2) Drawing Section 15. No date.
417A4 Bits- "R" section used for mantissa bits. (2) Drawing Section 2. No date.
417B4 Bits- "R" section used for mantissa bits. (2) Drawing Section 3. No date.
417C4 Bits- "R" section used for mantissa bits. (2) Drawing Section 4. No date.
4184 Bits- "R" section used for mantissa bits. (2) Drawing Section 5. No date.
4194 Bits- "R" section used for mantissa bits. (2) Drawing Section 6. No date.
4204 Bits- "R" section used for mantissa bits. (2) Drawing Section 7. No date.
4214 Bits- "R" section used for mantissa bits. (2) Drawing Section 8. No date.
4224 Bits- "R" section used for mantissa bits. (2) Drawing Section 9. No date.
4234 Bits- "R" section used for mantissa bits. (2) Drawing Section 10. No date.
4244 Bits- "R" section used for mantissa bits. (2) Drawing Section 11 . No date.
4254 Bits- "R" section used for mantissa bits. (2) Drawing Section 12. No date.
4264 Bits- "R" section used for mantissa bits. (2) Drawing Section 14. No date.
4274 Bits- "R" section used for mantissa bits. (2) Drawing Section 15. No date.
4284 Bits- "U" section used for mantissa bits. (2) Drawing Section 2. No date.
4294 Bits- "U" section used for mantissa bits. (2) Drawing Section 4. No date.
4304 Bits- "U" section used for mantissa bits. (2) Drawing Section 5. No date.
4314 Bits- "U" section used for mantissa bits. (2) Drawing Section 6. No date.
4324 Bits- "U" section used for mantissa bits. (2) Drawing Section 7. No date.
4334 Bits- "U" section used for mantissa bits . (2) Drawing Section 8. No date.
4344 Bits- "U" section used for mantissa bits. (2) Drawing Section 9. No date.
4354 Bits- "U" section used for mantissa bits. (2) Drawing Section 10. No date.
4364 Bits- "U" section used for mantissa bits. (2) Drawing Section 11. No date.
4374 Bits- "U" section used for mantissa bits. (2) Drawing Section 12. No date.
4384 Bits- "U" section used for mantissa bits. (2) Drawing Section 13. No date.
4394 Bits- "U" section used for mantissa bits. (2) Drawing Section 14. No date.
4404 Bits- "U" section used for mantissa bits. (2) Drawing Section 15. No date.
441Arithmetic unit- R reg. exponent, sheet 1 of 2. April 19, 1972.
442Arithmetic unit- R reg. exponent, sheet 2 of 2. April 19, 1972.
443Arithmetic unit- exponent adder, sheet 1 of 2. August 25, 1971.
444Arithmetic unit- exponent adder, sheet 2 of 2. August 24, 1971.
445Arithmetic unit- U driver tree, sheet 1 of 4. August 19, 1971.
446Arithmetic unit-S driver tree, sheet 2 of 4. August 11, 1971.
447Arithmetic unit- R driver tree, sheet 3 of 4. August 9, 1971.
448Arithmetic unit- specials control logic, sheet 4 of 4. August 16, 1971.
449Arithmetic unit- R control logic. August 3, 1971.
450Arithmetic unit- adder control logic. August 5, 1971.
451Arithmetic unit- U control logic. August 4, 1971.
452Arithmetic unit- logic oscillator and sequencer D. Drawing R2AML01. No date.
453Arithmetic unit- boolean ops. microcode, sheet 1 of 2. Drawing R2AML02A. July 20, 1972.
454Arithmetic unit- boolean ops. microcode, sheet 2 of 2. Drawing R2AML02B. July 20, 1972.
455Arithmetic unit- number conv. microcode. Drawing R2AML03. June 27, 1972.
456Arithmetic unit- upper level control, sheet 1 of 2. Drawing R2AML04A. February 1971.
457Arithmetic unit- upper level control, sheet 2 of 2. Drawing R2AML04B. February 1971.
458Arithmetic unit- microcode, prefix TST. Drawing R2AML05. February 1971.
459Arithmetic unit- microcode, prefix USA. Drawing R2AML06. February 1971.
460Arithmetic unit- microcode, prefix SHA. Drawing R2AML07. March 8, 1971.
461Arithmetic unit- shift B microcode, sheet 1 of 3. Drawing R2AML08A. July 17, 1972.
462Arithmetic unit- shift B microcode, sheet 2 of 3. Drawing R2AML08B. July 17, 1972.
463Arithmetic unit- shift B microcode, sheet 3 of 3. Drawing R2AML08C. July 17, 1972.
464Arithmetic unit- subroutine control flip-flops for oscillator E. Drawing R2AML09. No date.
465Circuit board drawing. No date.



 

Drawer 40: Rice Media Center, Utilities, Shuttle Routes, Stadium

draweritem
401Site plan. Drawing A. 1. September 29, 1969.
General note
Items 1-15: Barnstone & Aubry, Architects.
2Floor plan. Drawing A.2. September 29, 1969.
3Mezzanine floor plan. Drawing A.3. September 29, 1969.
4Elevations plan. Drawing A.4. September 29, 1969.
5Detail plan. Drawing A.5. September 29, 1969.
6Top and bottom chord framing plan. Drawing S-1. September 29, 1969.
7Floor framing and foundation plan. Drawing S-2. September 29, 1969.
8West elevation and North & South bay plan. Drawing S-3. September 29, 1969.
9Site plan. Drawing MEP.1. September 29, 1969.
10Floor plan-mechanical. Drawing M.2. September 29, 1969.
11Floor plan-electrical. Drawing E.2. September 29, 1969.
12Power distribution diagram. Drawing E.3. September 29, 1969.
13Floor plan-plumbing. Drawing P.2. September 29, 1969.
14Additions to exhibition farm. Two blueprints.
15Elevation, detail, and section plans for graphic studio.
16Rice Shuttle Routes. Enlarged laminated colored drawing. No date.
17Rice Shuttle Routes. Reduced laminated colored drawing. No date.
18Rice University Delivery Services: Interior renovations to Police Station and Delivery Services. Complete set of drawings: demolition plans, partition plan, reflected ceiling plan, mechanical and plumbing, electrical floor plan. June 21, 2001.
19Rice University Delivery Services: Interior renovations to Police Station and Delivery Services. Complete set of drawings: demolition plans, partition plan, reflected ceiling plan, mechanical and plumbing, electrical floor plan. 3 Revised copies. July 2, 2001.
20Rice Utilities West expansion project site plan, electrical plans. 10 sheets. February 1990.
21[Bush Library] preliminary colored sketch. Cannady, Jackson & Ryan, Architects. April 16, 1990.
22[Bush Library] preliminary colored sketch. Cannady, Jackson & Ryan, Architects. April 16, 1990.
23Forced Air Ventilation Flammable Storage site plan. December 10, 1982.
24Vehicle Maintenance Building for the Building and Grounds. Physical Plant Department. Site plans and elevations. April 20, 1988.
25Vehicle Maintenance Building for the Building and Grounds. Physical Plant Department. Foundation notes. April 20, 1988.
26Physical Plant Department: Demolition plan, construction plan, reflected ceiling plan. No date.
27Stadium parking lot repairs with notes. June 15, 1989.
28Stadium rendering blueprint. [1989].
29Stadium parking lot with tree planting locations. Colored drawing. No date.



 

Drawer 41: WWII Propaganda

draweritem
411Ten small posters from the US Gov't. Printing Office. 1945.
2"A Message About Food" poster from President Truman. 1946.
3"Societe D'Electricite Nilmelior'' poster. No date.
4Six US Bond posters from the US Treasury. 1944-46.
5"Grow your own" Garden in 1945 for Victory poster.
6"Going our Way?" US Crops Corps Poster. 1945.
7"En garde..." Canada Service of Information poster. No date.
8"Chacun a son poste" Canada Service of Information. No date.
9"The Atlantic Charter'' poster. August 1941.
10Two "Ceiling Prices" posters from the US Office of Price Administration. 1945.
11"France Forever'' poster. No date.
12"Experienced Seamen Needed!" poster from the US Employment Service. 1944.
13"Eat the basic 7" Nutrition poster from the US Dept. of Agriculture-War Food Administration. 1943.
14"Am I Proud!" poster from the US Dept. of Agriculture. 1946.
15"Christmas Overseas Gifts" poster from the US Army and Navy Postal Services. 1945.
16Two "7th War Loan: Now ... All Together!" poster from the US Treasury. 1945.
17"State of this Nation..." message from President Roosevelt. January 7, 1943.
18"We'll Take Care of the Rising Sun" poster from the US Office of Economic Stabilization. No date.
19"Women ... Our Wounded Need Your Care!" poster from the Women's Army Corps. 1945.
20"Could This Be You?" poster from the US Office of Defense Transportation. 1945.
21"O'er the Ramparts We Watch" poster from the US Army Air Forces. 1944.
22"Aux Eparges" poster. April 1915.
23"The Sky's the Limit!" poster from the US Treasury. 1944.
24Newsmap: January 31, 1944.
25"German Air Forces Uniforms" poster. No date.
26"German Army Uniforms" poster. No date.
27"Jap Army Uniforms" poster. No date.
28"Jap Infantry Weapons" poster. No date.
29The New York Times: July 4, 1957.
30"Aux Armes Citoyen's!" poster. No date.
31"Soyer Discrets!" poster. No date.



 

Drawer 42: J. Russell Wait Collection

General note
See the J. Russell Wait Port of Houston papers (MS 346) http://www.lib.utexas.edu/taro/ricewrc/00160/rice-00160.html
draweritem
421Blueprint of Houston Port. Sheet #11.
General note
Items 1-8: Houston Ship Channel- Alignment & Property Maps.
2Blueprint of Houston Port. Sheet #12.
3Blueprint of Houston Port. Sheet #11 (duplicate).
4Blueprint of Houston Port. Sheet #13.
5Blueprint of Houston Port. Sheet #13 (duplicate).
6Blueprint of Houston Port. Sheet #15.
7Blueprint of Houston Port. Sheet #15 (duplicate).
8Blueprint of Houston Port. Sheet #16.
9Colorado River Channel snagging plan 1/5. May 1963.
General note
Items 9-21: Gulf Intracoastal Waterway- Alignment & Property Maps
10Colorado River Channel snagging plan 2/5. May 1963.
11Colorado River Channel snagging plan 3/5. May 1963.
12Colorado River Channel snagging plan 4/5. May 1963.
13Colorado River Channel snagging plan 5/5. May 1963.
14San Bernard River Crossing dredging plan 1/2. May 1963.
15San Bernard River Crossing dredging plan 1/2. May 1963.
16Colorado River Channel dredging plan 2/6. April 1963.
17(6) Untitled drawings on grid paper.
18Colorado River Channel dredging plan. Sheet 6.
19Colorado River Channel dredging plan. Sheet 7.
20Colorado River Channel dredging plan. Sheet 8.
21Colorado River Channel dredging plan. Sheet 9.
22(3) Drawings on grid sheets.
General note
Items 22-46: Topographic Plat of the Turning Basin Area
23(8) Brazos River Harbor maps of industrial areas. August 10, 1954.
24Brazoria Co. Road Map- Precincts of Navigation District 8 County. 1955.
25Map of S.E. section of Texas. December 20, 1960.
26(2) Brazos River Harbor property map E. of Pine St. October 10, 1955.
27Brazos River Harbor property map W. of Pine St. June 29, 1959.
28(2) Plans for the Brazos River Harbor Navigation District Road Way.
29Map of Economic Areas Investigated. May 15, 1958.
30Brazos River Survey 1909-10, index sheet (2 parts).
31Map of Freeport Harbor.
32Map with plans for a highway & railway draw bridge at the top.
33(2) Map showing proposed sale to Humble Oil & Ref'g Co. July 30, 1948.
34Map of south one-third of Brazoria County. (partially rolled)
35Map of Barbour Terminal Morgan's Point Port of Houston.
36Map showing portion of La Porte, Morgan Point, and Barbour Terminal. (partially rolled) March 1956.
37(7) Maps of Brazos River Harbor. February 29, 1960.
38Graph of High Voltage Service Schedule. October 29, 1947.
39(2) Graphs of HVS-LGS (A) Differential Curve.
40Set of plans for Wharf Facility. 1964.
41Plans for Wharf Facility: plan, elevation, & section borings & piling layout.
42Plans for Wharf Facility: piling layouts.
43Plans for Wharf Facility: paving & drainage.
44Plans for Wharf Facility: liquid cargo facility platform.
45Plans for Wharf Facility: warehouse plan & elevation details.
46Plans for Wharf Facility: location map & general layout.



 

Drawer 43: J. Russell Wait Collection

draweritem
431Deep Sea Terminal #2- general arrangement plan.
General note
Items 1-21: Brazos River Harbor Navigation District Blueprints- April 1, 1957.
2Berth #2- typical cross sections.
3Berth #2- earthwork, road, & railroad plans.
4Berth #2- piling plan.
5Dock #2- platform layout & construction details.
6Berth #2- platform details.
7Berth #2- temporary cofferoam & procedure
8Berth #2- anticipated construction-progress schedule
9Transit Shed #2- elevations.
10Transit Shed #2- foundation plan & footing details.
11Transit Shed #2- south portion of transverse cross section.
12Transit Shed #2- north portion of transverse cross section, also longitudinal trusses.
13Transit Shed #2- sidewalls framing & bracing.
14Transit Shed #2- framing of end walls.
15Transit Shed #2- roof framing & bracing plan.
16Transit Shed #2- roof, drainage, gutters & downspouts.
17Transit Shed #2- plan of concrete girders & floor slabs.
18Transit Shed #2- Whart-apron paving.
19Berth #2- toilet rooms, door guards, future office.
20Berth #2- plan of piped utilities.
21Transit Shed & Berth #2- electrical plan.
22Wharf & Shed #9- general layout, showing roads, railroads, and water lines.
General note
Items 22-40: Wharf Facility Blueprints.
23Wharf & Shed #9- ground end floor plan.
24Wharf & Shed #9- piling plan.
25Wharf & Shed #9- piling anchors & details.
26Wharf & Shed #9- lower beam plan.
27Wharf & Shed #9- upper beam plan.
28Wharf & Shed #9- fender system.
29Wharf & Shed #9- beam schedules.
30Wharf & Shed #9- beam schedule & details.
31Wharf & Shed #9- section & details.
32Wharf & Shed #9- office, toilet & septic tank.
33Wharf & Shed #9- cross section.
34Wharf & Shed #9- cross section & sewer details.
35Wharf & Shed #9- fire hydrant boxes & skylight details.
36Wharf & Shed #9- steel framing elevations & details.
37Wharf & Shed #9- bottom chord framing plan & details.
38Wharf & Shed #9- roof framing plan & trusses.
39Wharf & Shed #9- light & power plan.
40Wharf & Shed #9- roof plan & details.



 

Drawer 44: J. Russell Wait Collection

draweritem
441Wadsworth Quadrangle. Texas-Matagorda Co. Topographic map (rolled)
2Madagorda Quadrangle. Texas- Matagorda Co. Topographc map (rolled)
3Blessing SE Quadrangle. Texas- Matagorda Co. Topographic map (rolled)
4Port of Houston map (rolled very fragile)



 

Drawer 45: Duncan Hall

General note
John Outram &; Associates, Chartered Architects. All renderings done on foamboard.
draweritem
451Front view of building (colored).
2First floor plan.
3Second floor plan.
4Third floor plan.
5Fourth floor plan.
6Roof plan.
7Top view of interior of building.
8Side (east) elevation study.
9View of the main hall.
10Duncan Hall (watercolor).
11East elevation.
12West elevation.
13The "Street" section. January 1994.
14The "Street" section. January 1994.
15Elevations. January 1994.
16First floor plan (colored). July 1993.
17Second floor plan (colored). July 1993.
18Third floor plan (colored). July 1993.
19Fourth floor plan (colored). July 1993.
20Main hall (watercolor).



 

Drawer 46: Duncan Hall

General note
John Outram & Associates, Chartered Architects. All renderings done on foamboard.
draweritem
461Sketch (brown marker).
2Sketch of roof (brown marker).
3Duncan Hall.
4Elevation of typical assemblies.
5Duncan Hall (brown marker).
6Duncan Hall (wires).
7Section (orange and black markers).
8Side view (watercolor).
9Top view (red marker).
10Calculations.
11Arch and balcony (brown marker).
12Top view with circles and corresponding numbers.
13Calculations.
14A typical office ceiling plan.
15Arch and balcony- angled view (brown marker).
16Figures in red, purple, green, and blue markers.
17Top view with calculations (yellow marker).
18Section looking south (pink and blue markers).
19South elevation.
20Section looking south (orange marker).
21First floor.
22Second floor.
23Third floor.
24Top view of interior (green and blue markers).



 

Drawer 47: Duncan Hall

draweritem
471View of Main Hall and Street. Color rendering mounted on foamboard. No date.
2Section looking south. Color rendering mounted on foamboard. No date.
3External view from South East. Color rendering mounted on foamboard. No date.
4Section of the Main Hall. Color rendering mounted on foamboard. No date.
5View of Main Hall. Color rendering mounted on foamboard. No date.
6Color ink rendering, laminated. No date.
7Computational Engineering Building, colored blueprints. Floors 1-3. October 13, 1995.
8Set of blueprints for "New Faculty Building, Computational Engineering." 6 drawings. July 1993.
9Set of "telephone plans" floors 1-3. 3 drawings. June 24, 1996.
10Set of "Computational Engineering Building Space Utilization Study." Floors 1-3. 3 drawings. November 8, 1995. Revised August 29, 1996.
11Unidentified set of blueprints [Computational Engineering Building]. 1-3 floors. 3 drawings. No date.
12Interim building estimate. First floor plan. August 15, 1994.
13Interim building estimate. Second floor plan. August 15, 1994.
14Interim building estimate. Third floor plan. August 15, 1994.
15Interim building estimate. Fourth floor plan. August 15, 1994.
16Interim building estimate. First floor plan. Copy 2. August 15, 1994.
17Interim building estimate. Second floor plan. Copy 2. August 15, 1994.
18Interim building estimate. Third floor plan. Copy 2. August 15, 1994.
19Set of reduced blueprints with notes. G.M.P. and addendums. Floors 1-3. 2 copies. Last revision date April 30, 1996.
20Floor 1 plan, reduced with notes. 2 copies. Last revision September 28, 1995.
21Floor 2 plan, reduced with notes. 3 copies. Last revision September 28, 1995.
22Floor 3 plan, reduced with notes. 2 copies. Last revision September 28, 1995.



 

Drawer 48: Baker Hall & Jamail Plaza

draweritem
481Color rendering of Jamail Plaza attached to cardboard and 4 copies on loose paper. No date.
2Color pencil rendering of Baker Hall. Hollingsworth. 1998.
3Pencil rendering of Baker Hall. Hollingsworth. 1998.
4Ink rendering of Baker Hall. No date.
5Color rendering of Baker Hall commons (outside view) on foamboard. Hammond, Beeby, & Babka, Architects. May 18, 1995.
6Color rendering of Baker Hall commons (inside view) on foamboard. Hammond, Beeby, & Babka, Architects. September 18, 1995.
7Color rendering of Baker Hall front view with east/west elevation on back. Attached to foamboard. Hammond, Beeby & Babka, Architects. No date.
8Color rendering of Baker Hall back view. Attached to foamboard. Hammond, Beeby & Babka, Architects. No date.



 

Drawer 49: Autry Weight Room, Campus Aerial Views, Herring Hall, Science & Technology Center, Ellington Field, Panhandle Eastern Pipe Lines

draweritem
491Autry Weight Room Schematic floor plan on foamboard. December 22, 1994.
2Campus aerial color photos on Kodak paper (9).
3Black and white campus aerial photo on board.
4Black and white campus aerial photo on board (oversize). [c. 1946-1947].
5Black and white campus aerial photo. Oversized attached to particle board. December 1968.
6Black and white campus aerial photo. No date.
7Color campus aerial photo on board. No date.
8Herring Hall study of space utilization. First floor plan. Sheet 1 of 2. 1985.
9Herring Hall study of space utilization. Second floor plan. Sheet 2 of 2. 1985.
10Science & Technology Center Phase 2 floor plan. Sheet A-2. May 16, 1989.
11(MS 547) Ellington Field Preliminary Master plan, 4 drawings. Thomas E. Greagen, II, Architect. June 1, 1950.
(MS 500) Panhandle Eastern Pipelines Big Inch and Little Big Inch. Station Maps 1-26
draweritem
4912Facility Map Longview Crude Station #1. April 14, 1945.
13Facility Map Kinsole Loading Rack, Gregg County. September 2, 1945.
14Contour and Property Map, Longview Crude Station #11. December 27, 1944.
15Facility Map, Crude Station #3, Hope, Arkansas. c. 1966.
16Facility Map Crude Station #5, Polaski, Co., Arkansas. 1945.
17Facility Map Crude Station #6, White County, Arkansas. 1945.
18Facility Map Crude Station #7, Egypt Station. 1945.
19Facility Map Crude Station #8, Clay County, Arkansas. 1945.
20Facility Map, Crude Station #9A, Scott County, Missouri. 1945.
21Facility Map Crude Station #10, Lick Creek Union County, Illinois. 1945.
22General layout and contour map #11. Norris City. 1944.
23Facility layout #12, Princeton. No date.
24Plot Plan, Crude station #13. No date.
25Plot Plan, crude station #14. 2 copies. 1945.
26Facility layout station #15. Oldenburg. 1944.
27Facility layout station #16. Lebanon. 1944.
28Facility layout station #17. Circleville. 1945.
29Facility layout station #18. No date.
30Facility layout station #19. Sarahsville. 1945.
31Facility layout station #23. Franklin Products & Chambersburg. 2 copies. 1946.
32Facility layout station #23. Franklin Products & Chambersburg. 1946.
33Facility layout station #22. Rockwood. 2 copies. No date.
34Facility layout station #24. Pump station. 2 copies. 1945.
35Facility layout station #25. May 12, 1945.
36Facility layout station #21. 1944.
37Facility layout station #25. May 19, 1945.
38Plot Plan. Linden Station, New Jersey. 1946.
39Facility layout at Cottages, Phonexville Station #25. December 12, 1945.
40Facility layout station #25. 2 copies. May 18, 1945.
41Facility layout station #25. May 19, 1945.
42Facility layout station #20. Wind Ridge. [1961].
43Tank Farm, Facility Layout, Linden, New Jersey. 1945.
44Facility Layout, Wind Ridge station #20. 1946.
45Facility Layout, Lambertville station #26. 1944.



 

Drawer 50: Champions Golf Club & Anderson Aeronautical Collection

(MS 525) Champions Golf Club
General note
See Jack Burke, Jr./Champions Golf Club Records (MS 525) http://www.lib.utexas.edu/taro/ricewrc/00521/rice-00521.html
draweritem
501Plat showing survey of 108.35 acres out of C.L. Rawson's 208 Acre Tract and 3.46 Acre Tract out of 500 Acre Tract, H.H. Norman, Trustee. November 24, 1964.
2Tract A of a 4.8727 Acre sq. ft. tract of land situation in the Benjamin Page survey, A-618, Harris County, TX. July 17, 1991.
3Champions Development Co. West + Northwest sections. 1960.
4Perimeter of Champions Fresh Water Supply District #52. August 16, 1960.
5Plat showing survey of 4.31 Acre Tract of Land in the Benjamin Page Survey, A-618. November 9, 1967.
6Proposed enlargement of Men's Locker Room. Champions-Golf Club. No date.
7Topography map of a 499.78 tract of land out of the Benjamin Page Survey. January 4, 1957.
8Champions South: 80.81 tract of land out of the Benjamin Page Survey A-618. November 24, 1964.
9Map showing 499.78 tract of land out of the Benjamin Page Survey A-618. November 9, 1962.
10Champions North: 63.137 Acres out of Benjamin Page Survey A-618. March 2, 1961.
(MS 69) Benjamin M. Anderson Aeronautical History Collection
General note
See Anderson Aeronautical History Collection (MS 069) http://www.lib.utexas.edu/taro/ricewrc/00826/rice-00826.html
draweritem
5011Boeing Four-engine Aircraft. c. 1949.
12L'Aero, first issue. September 3, 1908.
13North American XB-10-1 "Valkyrie," schematic. 1964-1969.
14Duesenberg Model "J" Chassis 1929 schematic. Redrawn 1965.
15Five French Aeronautical prints. Most of the posters are marked as being printed by Mabileau & Co. 1910.
16History of flight & commercial posters; No date.
17Assorted posters of planes. 19 medium and large format. (Includes Charles Lindberg's "Spirit of St. Louis," WW1-WW2 warplanes. 1971-2000.
18Alfred Owles posters, color large formats. 6 posters and duplicates. WW1 era planes. c. 1973.
19Aeronautical for cross country map-southeast and coastal Texas. Blueprint, no date.



Page | 1 | 2 | 3 |