University of Texas at Austin Libraries Home | Mobile | My Account | Renew Items | Sitemap | Help
support us
University of Texas Libraries
details contents options

Details

Title
Irrigation systems in Texas
Publisher
Geological Survey (U.S.)
Series
Water-supply and irrigation papers of the United States Geological Survey Volume no. 13
Date
1898
Author
Hutson, William Ferguson

12

IRRIGATION SYSTEMS IN TEXAS.

[NO. 13.

and next to this the capacity of the pump or ditches in cubic feet per second. This column also gives the total amount delivered in acre feet in 12.1 hours, since 1 cubic foot per second flowing for this length of time will cover 1 acre a foot in depth. To the acreage two columns are devoted —the first giving the total area irrigable, or the amount which it is estimated each system will cover; and the second, the area actually watered, this applying usually to the year 1896. Beyond this is given the total cost of the system, and, wherever practicable, the cost per acre. This latter column, in the case of the larger ditches, shows the amount asked or paid per acre for water rights. The last column gives the estimated annual cost per acre for water, figures for this being rarely obtainable.

Comparison of capacity and cost of various systems of water supply in Texas,

Acreage.

Cost.

Name.

System.

Pump.

Lift in feet.

Capac- ity second- feet.

Irri- gat- ed.

Per acre.

An- nual per acre.

6

Irriga- ble.

Total.

26

Catron

50 H. P. engine. 8-foot wind-

Menge

8

25

11.14

15

500

7

$1,500

300

$3 43

29

Stubenrauch ..

mill.

30

485

16

89

do

12-foot wind-

mill, a

300

25,000

3\

Lytle

Dam and ditch

S\

Lewis..'.

do

!

50

10

200

20

31

Metcalf

do

I

470

7

$0.75

82

Glenn

do

i

350

250

3,500

14

32

McGee

do

I

250

75

1,500

20

82

Swinden..

80 H. P.6-

Centrifugal

6.84

400

33

Baker

32 H. P. en-

Worthing -

2.72

80

75

2,000

27

c6.00

Willis

gine, d Turbine

ton.

.11

5

33

88

Alldridge

20 H. P. en-

1.00

75

gine, e

1.87

40

2,000

50

33

Lindsey

30 H. P. en-

34

Vanderstucken

gine./ 18 H. P. engine. Water wheel. -

Menge

2.60

100

1,500

15

38

Richards

.20

3

-,','.)

Garrett --

do

.32

12

-I IS

Upper Labor .. Trueheart

Ditch

600

100

2.00

46

Ditch g Artesian well.

30.00

1,500 1,000

400

250

18,000

3,000 2,500

15

2.50

46

47

Kampman —.

Pickett

40 H. P. boil-

Blakeslee ..

50

2.32

1.67

400

100

c4.00

er, h

Blake

48

.20

295

48

Crandall

10 H. P. boil-

er, i

.07

10

450

49

Simmons

2J H. P. gaso- line.

49

Experiment...

5} H. P. gaso-

48

.05

30

oline. *

Menge

48

14.00

500

70

5,000

1.00

r,r,

Grover

100 H. P. boiler j

a Combined watt b With reservoir. c Approximate. d Operating cost, e Can water 5 aci

» power and irri

igation. j

/'Open g Wat( h Costs i Pum] ; Open

ating cc er right 312J cer ps into: ating e:

>st, S3 poi ;s lield a< its per h reservoi: xpenses,

r day b$15. our t<

af elevei

a houi

•3.

> operati

a.

, $7 a day of twel ■es per day.

j ve hours. «

r$4.25

per day.